Loading...
HomeMy WebLinkAboutB17-0348 047-740-006 (2)9237 Ply: 2 SEON: 118492/T7/HIPS GARAGE GARAGE City: 2 FROM: FDRW:A HIP GIRDER Wgt: 201.6 lbs / ... 02/06/17 4'3"4 �+ 12' + 16' 20' 24' 27'8"12 32' r 4'3"4 3'8"1 2 + + + + 4' 4' 4' 4' 3'8"12 4'3"4 =5X6 D =-4X6 H =5X6 12 6 T T M ,4X6 C o 14X6 � e o Ln =4X8(ABR� T J =_4X8(ABRJ A 4_3.5 1112X4 -Q6 Il _P _ K _N I R O_ -M L 1'6" 4'3"4 3'8"12 4' 4' 4' 4' 3'8"12 4'3"4 1'6" 4'3"4 8' 12' 16' 20' 24' 27'8"12 32' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf m PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loo Udefl U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.185 F 999 360 B 4139 / - /220 / / - /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.533 F 706 360 J 4138 / - /220 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.044 D - - Wind reactions based on MWFRS Des Ld: 46.00 EXP: C HORZ(TL): 0.127 D B Min Big Width Req = 2.2 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 1.5 J Min Brg Width Req = 2.2 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.499 Load Duration: 1.25 BCDL: 6.0 psf TPI Sid: 1995 Max BC CSI: 0.747 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.207 Chords Tens.Comp. Chords Tens. Comp. C&C Dist a: 9.00 ft FT/RT: - Mfg Specified Camber: A - B 31 -4 F - G 0 -4489 GCpi: 0.18 Plate Type(s): B - C 0 -3879 G - H 0 -4212 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 C-0 0 -3831 H-1 0 -3830 Lumber Purlins D- E 0 -4215 1-1 0 -3877 Top chord 2x4 DF-L #2 In lieu of structural panels or rigid ceiling use purlins E -F 0 -4489 J -K 31 -4 Bot chord 2x6 DF-L #2 to laterally brace chords as follows: Webs 2x4 DF-L #2 Chord Spacing(in oc) Start(ft) End(ft) Maximum Bot Chord Forces Per Ply (Ibs) TC 24 7.74 23.74 Chords Tens.Comp. Chords Tens. Comp. Nailnote BC 120 0.03 31.45 Nail Strong Tie WSNTL212S screw Apply purlins to any chords above or below fillers B - R 3431 0 O - N 4240 0 Rowp@1son Top Chord: 1 Row @12.00" Chord: at 24" OC unless shown otherwise above. R - O 3430 0 N - M 3388 0 Bot Chord: 1 Row @ .c.o. o.c. O - P 3390 0 M - L 3429 0 " o.c00" Webs : 1 Row @ 4" o.c. P-0 4243 0 L - J 3429 0 Use equal spacing between rows and stagger nails in each row to avoid splitting. Maximum Web Forces Per Ply (Ibs) Special Loads Webs Tens.Comp. Webs Tens. Comp. ----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) R - C 40 -52 O - G 354 0 TC- From 72 pif at -1.50 to 72 pif at 8.00p ^SIC � C-0 12 -32 G - N 9 -378 f E� TC- From 36 plf at 8.00 to 36 plf at 24.00 QR N.Q 0 - D 394 0 N - H 1172 0 TC- From 72 pif at 24.00 to 72 pif at 33.50 CVD N M . D - P 1174 0 H - M 395 0 BC- From 20 plf at -1.50 to 20 pif at 0.00��� Q`O P - E 9 -375 M - 1 12 -32 BC- From 10 plf at 0.00 to 10 plf at 32.00 Z E-0 349 0 I - L 40 -52 BC- From 20 pif at 32.00 to 20 pif at 33.50 F-0 11 62 TC- 767 Ib Conc. Load at 8.00,24.00 C(1281 0 BC- 147 Ib Conc. Load at 2.06,29.94 BC- 139 Ib Conc. Load at 4.06,27.94 ^ BC- 86 lb Conc. Load at 6.06,25.94 * PERMIT# is - 408lbiConc. sa . sa 23 J'� ClV1�- >�Q BUTTE COUNTY D ELOPMENTSERVICES sa.06,10.06,12.06,14.0s gTForCA�,��� REVIEWED FOR Wind Wind loads and reactions based on MWFRS. �XA 09-3020CO E COMPLI CE1$ DATE 3 i'3 BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) fo'r sa ety practices prior to performing these functions. Installers shall provide temporary bractn per BCSI. Unless noted otherwtse,top chord shall have proper)Y attached structural sheathing and bottom chord shall have a proE�erly attach Locations for lateral rigpid ceiling shown permanent as app icable. Apply plates to each face of truss and restraint bf webs shall have bracing installed per BCSI sections B3, B7 or 810, as shown above and on the JoinfDetails, hefer position drawings 160A-Z for standard plate positions. unless noted otherwise. to ITW Buildiqng Compponents Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/TP1 1, Ar for handlin shipping, installation and bracing of trusses. A seal on this al wing or cover page listing this drawing, indicates acceptance of prol'essPN engineering responsibility sole) for the desigan shown. The suitability and use of this drawing for any structure Ps the responsibliity of the Building Designer per ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: rrW BCG: www.ftwbc .com• TPI: www. insi.or • SBCA: www.sbcindusl .com; ICC: www.iccsafe.org Iril,E COPY 9237 Ply: 1 SEAN: 118507 / T2 /HIPS GARAGE GARAGE Qty: 2 FROM: DRW: A2 HIP Wgt: 193.2 lbs .. / ... 02/06/17 5'3"4 i 10' 14' 18' t 22' 268"12 32' + 5'3"4 4'8"12 4' 4' 4 4'8"12 57"4 p DT -1"11 IIIJX4 =$X6 = G 6 T =5X6 12 6 M ,4X6 C /VL;j'�Z4X6 `r' o l4X6(A2� I=4X6(A2) a_s A 111274 =4 6 =6 10 =-4X6 =4 6 1112X4J 1I P O N M L K 1'6" 5'3"4 4'8"12 4' 4' 4' 48"12 5'3"4 1'6" 5'3"4 10' 14' 18' 22' 26'8"12 32' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Dell/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.105 E 999 360 B 1727 / 11 /1026/- / 120 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.309 E 999 360 1 1727 /11 11026/- / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.040 K - - Wind reactions based on C&C Des Ld: 46.00 EXP: C HORZ(TL): 0.118 K B Min Brg Width Req = 1.8 NCBCLL: 10.00 Mean Height: 15.00 It Code / Misc Criteria Creep Factor: 1.5 1 Min Brg Width Req = 1.8 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.505 Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.534 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " MWFRS Parallel Dist: h/2 to h Rep Factors Used: Yes Max Web CSI: 0.204 Chords Tens.Comp. Chords Tens. Comp. C&C Dist a: 9.00 It FT/RT: - Mfg Specified Camber: A - B 75 0 F - G 13 -2253 GCpi: 0.18 Plate Type(s): B - C 0 -2713 G - H 5 -2243 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 C - D 5 -2244 H - 1 0 -2713 Lumber D - E 14 -2268 1 - J 75 0 Top chord 2x4 DF-L #2 E - F 13 -2265 Bot chord 2x4 DF-L #2 Webs 2x4 DF-L #2 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Purlins In lieu structural panels or rigid ceiling use purlins B- P 2320 0 M- L 1923 0 P-0 2318 0 L - K 2318 0 to laterally ly brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) O - N 1923 0 K - 1 2321 0 TC 24 10.00 22.00n , N - M 2270 0 BC 120 0.29 31.71 Q�Qf EJ '10 Apply purlins to any chords above or below fillers �Q NM Maximum Web Forces Per Ply (Ibs) at 24" OC unless shown otherwise above. �Q Webs Tens.Comp. Webs Tens. Comp. h�� Loading P - C 153 0 F - M 55 -400 Truss designed for unbalanced load using 0.00/1.50 C-0 27 -484 M - G 608 -7 windward/leeward factors. 0-0 356 0 G- L 354 0 D-N 616 -9 L-H 26 -485 Wind * E -N 51 -417 H-K 154 0 Member design based on both MWFRS and C&C. if'J CIV`\� N - F 278 -293 �IFOF CAS\��� 4,.09-30-201\� F51`7- PERMIT# n?J4:P> BUTTE COUNTY DEVELOPMENT SERVICES EVIEWED FOR CO E COMPLI CE DAT I BY **WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. , Refer to and follow the latest edition of BCSI (Buildin Component Safety Information, by TPI and SBCA) for sa�ety practices prior to performing these functions. Installers shall provide temporar� bracing per BCSL Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly Locations for attacheed rigid ceiling shown permanent lateral restraint of webs shall have bracingg insTalled per BCSI sections 83, B7 or 810, as applicaI5 e. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Wefer to drawings 160A-Z for standard plate positions. ITW Buildin Components Group Inc. shall not be responsible for an deviation from this drawing any failure to build the truss in conformance with ANSI 1 1, pr for hand!g shipping, installation and bracing of trusses. A seal on this dfawmg or cover page listing this drawing, indicates acceptance of pro ess na engineering responstbtlity sole) for the design shown. The suitability and use of this drawing for any structure s the responsibi ity of the Building Designer ler ANSI/TPI QSec.2. For more information see this job's general notes page and these web sites: ff W BCG: w,wv.itwbc .com: TPI: www. inst.or ; SBCA: www.sbcindust .com; ICC: www.iccsafe.org 9237 Ply: 1 SEQN: 118517 / T3 /HIPS GARAGE GARAGE Qty: 2 FROM: DRW: A3 HIP Wgt: 182.0 lbs / ... 02/06/17 6'3"4 12' + 16' I 20' + 25'8"12 + 32' 6'3"4 5'8"12 4' 4' S'8"1 2 6'3"4 =5X6 D DT-1"11 IIIFX4 =5FX6 12 6 ,4X6 C r'�4X6 fO o i� = 4X6(A2VZ H= 4X6 A I 24 =46 =610 =46 24 N M L K J 1'6" 6'3"4 5'B"12 4' 4' 5'8"12 6'3"4 1'6" 6'3"4 12' 16' 20' 25'8"12 32' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udell U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.094 E 999 360 B 1727 /3 /1036/- /138 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.278 E 999 360 H 1727 / 3 /1036/- / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.039 J - Wind reactions based on C&C Des Ld: 46.00 EXP: C HORZ(TL): 0.115 J B Min Brg Width Req = 1.8 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 1.5 H Min Brg Width Req = 1.8 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.679 Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.521 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " MWFRS Parallel Dist: h/2 to h Rep Factors Used: Yes Max Web CSI: 0.421 Chords Tens.Comp. Chords Tens. Comp. C&C Dist a: 9.00 K FT/RT: - Mfg Specified Camber: A - B 75 0 E - F 27 -1921 GCpi: 0.18 Plate Type(s): B - C 0 -2690 F - G 9 -2083 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 C - D 9 -2083 G - H 0 -2690 Lumber D- E 27 -1921, H- 1 75 0 Top chord 2x4 DF-L #2 Bot chord 2x4 DF-L #2 Maximum Bot Chord Forces Per Ply (Ibs) Webs 2x4 DF-L #2 Chords Tens.Comp. Chords Tens. Comp. Purlins B- N 2290 0 L- K 1756 0 � In lieu of structural panels or rigid ceiling use purlins ESS N - M 2287 0 K - J 2287 0 4 Qy M- L 1756 0 J- H 2290 0 to laterally brace chords as follows: Q � Chord Spacing(inoc) Start(ft) End(ft) TC 24 12.00 20.00 �w Maximum Web Forces Per Ply (Ibs) BC 120 0.29 31.71 Webs Tens.Comp. Webs Tens. Comp. Apply purlins to any chords above or below fillers t n at 24" OC unless shown otherwise above. CO287 O N - C 214 0 L - F 466 -18 C- M 24 - 681 F- K 455 0 Loading * �t M - D 455 0 K - G 24 681 Truss designed for unbalanced load using 0.00/1.50 D - L 467 18 G - J 214 0 windward/leeward factors. fr L`(,f `�. `,Q E - L 58 -410 Wind 9TFOF Member design based on both MW FRS and C&C. .+' '\ .0 -30-23 00 PERMIT # r:?:)( -7 - 0'?5 4 BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR CO ECOMPL. CE DATE _ BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI an9 SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary brach per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attach rigid ceiling Locations shown for ermanent lateral restraint of webs shall have bracing installed per BCSI sections 83, B7 or B10, as applicable. Apply plates to each face o�truss and position as shown above and on the Join f Details, unless noted otherwise. befer to drawings 160A-Z for standard plate positions. ITW Building Components Group Inc. shall not be responsible for an deviation from this drawing any failure to build the truss in conformance with ANSI 41 1, pr for handlin shi ping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of pro�essPonaQ engineering responsibility solel for the design shown. The suitability and use of this drawing for any structure Is the responsiblity of the Building Designer �er ANSI/TPI QSec.2. For mare information see this'ob's general notes page and these web sites: rrW BCG: www.itwbc .com; TPI: www.t inst.or ; SBCA: www.sbcindust .coin; ICC: www.iccsate.or 9237 Ply: 1 SEAN: 118550 / T4 / HIPS GARAGE GARAGE Qty: 2 FROM: DRW: A4 HIP Wgt: 201.6 lbs / ... 02/06/17 5'0"5 9'6"3 + 14' 1 18' 1 22'5"13 26'11"11 32' + + 5'0"5 T 13 4'5" 13 4' 4'5"13 4'5'13 5'0"S E DT 1"11 FSX6 = 5X6 D C'�4X4 12 14X4 6 m 'v ^ o4X6 C H 4X6 0 bo 4X6(A2p I=4X6(A2) A J 24 -46 =410 =36 =46 =46 1112X4 Q P O N M L K 1'6" 5'0"5 4'S"13 4'5"13 4' 4'S"13 4'S" 13 5'0"5 1'6" 5'0"5 9'6" 3 14' 18' 22'5"13 26' 11 "11 32' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.090 M 999 360 B 1727 /- /1042/- /157 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.265 M 999 360 1 1727 / - /1042/- / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.038 K - - Wind reactions based on C&C Des Ld: 46.00 EXP: C HORZ(TL): 0.112 K B Min Brg Width Req = 1.8 NCBCLL: 10.00 Mean Height: 15.03 ft Code / Misc Criteria Creep Factor: 1.5 1 Min Brg Width Req = 1.8 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.510 Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.527 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " MWFRS Parallel Dist: h to 2h Rep Factors Used: Yes Max Web CSI: 0.433 Chords Tens.Comp. Chords Tens. Comp. C&C Dist a: 9.00 ft FT/RT: - Mfg Specified Camber: A-13 75 0 F - G 22 -1866 GCpi: 0.18 Plate Type(s): B - C 0 -2705 G - H 0 -2271 Wind Duration: 1.33 1WAVE VIEW Ver: 13.02.02.1219.20 C - D 0 -2271 H - 1 0 -2705 Lumber D- E 22 -1856 I- J 75 0 Top chord 2x4 DF-L #2 E - F 38 -1583 Bot chord 2x4 DF-L #2 Webs 2x4 DF-L #2 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Purlins B-Q 2311 0 N-M 1582 0 In lieu structural panels or rigid ceiling use purlins Q - P 2309 0 M - L 1960 - 0 al follows: to laterally brace chords Chord Spacing(in oc) P-0 1960 0 L - K 2309 0 c) t) End(ft).00 14.0 O - N 1582 0 K - 1 2312 0 TC 24 14.00 18.00 BC 120 0.29 31.71 Apply purlins to any chords above or below fillers Maximum Web Forces Per Ply (Ibs) at 24" OC unless shown otherwise above. QRQE ES /0 Webs Tens.Comp. Webs Tens. Comp. Loading ��t.0 ON M. Q - C 143 0 F - M 610 0 C - P 0 -415 M G 24 Truss designed for unbalanced load using 0.00/1.50 - -689 windward/leeward factors.�, P- D 312 0 G- L 311 0 D-O 23 -692 L-H 0 -416 Wind Ll)�$% O-E 511 0 H -K 143 0 Member design based on both MWFRS and C&C. * O - F 238 -231 CM gTfOF CA1 ✓r7 - r-):?A? 02 PERMIT# - FkP BUTTE COUNTY DEVELOPMENT SERVICES 09-30-Z01� REVIEWED FOR CODE COMPLI CE DATE- BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI SBCA) fo'r ansafety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise,top chord have bottom have shall properly attached structural sheathing and chord shall a pro eriy attacherigid ceiling Locations shown for permanent lateral restraint have bracin installed BCSI B3, B7 of webs shall p r sections or B10, as applicable. Apply plates to each face of truss and position as shown above and on the Joint" Details, unless noted otherwise. Deter to drawings 160A-Z for standard plate positions. ITW BuildiqngComponents Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/TP1 1, r for handlin shi�p1 1, installation and bracin of trusses. A seal on this " ng or cover page listing this drawing, indicates acceptance of ro ess csnar engineering res on ibility sole) for the design shown. The suitability and use of this gSec.2. drawing for any structure s the responsibQity of the Bui�ding Designer per ANSI/TPI For,more information see this 'Ws general notes paoe and these web sites: rrWBCG: wJtwbc .co,n; TPI: www. inst.or • SBCA: www.sbcindust .comE ICC: www.iccsafe.o 9237 Ply: 1 SEON: 118568 / T5 / COMN GARAGE GARAGE Qty: 1 FROM: DRW: A5 COMN Wgt: 179.2 lbs / ... 02/06/17 5'8"5 10'10"3 16' 21'1"13 26'3"11 32' 58"5 51"13 5'1"13 I 5'1"13 +' 51"13 '+ 5'8"5 '1 E =5X6 04X4 D F 4X4 - 12 6 c_o io ?� Go ,4X6 C C'�4X6 4X6(A2� H=-4X6(A2) > , 47 A 124 =46 =610 =46 1112X4 N M L K J 1'6" 5'8"5 5'1"13 10'3"11 1"13 5'8"5 1'6" 5'8"5 10'10"3 21' 1 "13 26'3"11 32' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Dell/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL / W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.093 L 999 360 B 1727 /- /1044/- /176 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.275 L 999 360 H 1727 / - /1044/- / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.039 J - - Wind reactions based on C&C Des Ld: 46.00 EXP: C HORZ(TL): 0.115 J B Min Brg Width Req = 1.8 NCBCLL: 10.00 Mean Height: 15.52 It Code / Misc Criteria Creep Factor: 1.5 H Min Brg Width Req = 1.8 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.533 Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.498 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " MWFRS Parallel Dist: h to 2h Rep Factors Used: Yes Max Web CSI: 0.711 Chords Tens.Comp. Chords Tens. Comp. C&C Dist a: 9.00 ft FT/RT: - Mfg Specified Camber: A - B 75 0 E - F 27 -1663 GCpi: 0.18 Plate Type(s): B - C 0 -2692 F - G 0 -2173 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 C - D 0 -2173 G - H 0 -2692 Lumber D- E 27 -1663 H-1 75 0 Top chord 2x4 DF-L #2 Bot chord 2x4 DF-L #2 Maximum Bot Chord Forces Per Ply (Ibs) Webs 2x4 DF-L #2 Chords Tens.Comp. Chords Tens. Comp. Purlins B- N 2293 0 L- K 1860 0 In lieu of structural panels or rigid ceilinguse purlins N -'M 2291 0 K- J 2291 0M - L 1860 0 J - H 2293 0 to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.29 31.71 Maximum Web Forces Per Ply (lbs) Apply purlins to any chords above or below fillers Webs Tens.Comp. Webs Tens. Comp. at 24" OC unless shown otherwise above. N-C 181 0 L-F 24 -838 Loading C- M 0 -534 F- K 379 0 Truss designed for unbalanced load using 0.00/1.50 M - D 379 0 K - G 0 -534 �EESSIU windward/leeward factors. Q(L N,� D - L 25 -838 G - J 181 0 M • E - L 1109 0 Wind ��� ON Member design based on both MW FRS and C&C. A-�IM Cnca7 0 * RMIT#(� Jl'4l CIVI Q��> BUTTE COUNTY DEVELOPMENT SERVICES EUFCAI\� REVIEWED FOR 09-30-21$ CODE COMPL CE DATE BY **WARNING** "WARNING'• READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI SBCA) for and safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a pro[�erly Locations for attached riclid ceiling shown permanent lateral restraint of webs shall have bracingg installed p r BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and as shown above and on the Join f Details, noted kefer to position unless otherwise. drawings 16OA-Z for standard ate positions. ITW Buildiqng Com onents Group Inc. shall not be responsible for an deviation from this drawing any failure to build the truss in conformance with ANSI/TP1 1, gr for handlin shi ping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, Indicates acceptance of ppI h`11sfonal en sneering responsibility sole) for the desigqn shown. The suitability and use of this drawing for any structure is the responsiblity of the Building Designer per ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: [TWBCG: w Jtwbc .coin; TPI: www.t inst.or : SBCA: www.sbcindustry.com ICC: www.iccsafe.or e 9237 Ply: 1SEQN: 118466 / T14 / EJAC GARAGE GARAGE Qty: 18 FROM: FRW:B MONO Wgt: 42.0 lbs / ... 02/06/17 4'3"4 3'8..12 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Q4pf Essfo A Truss designed for unbalanced load using 0.00/1.50 ��� �N M windward/leeward factors.Wind �� Q� ` • A Z 4 Vv1 t� Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. * ERMIT# ���/ `rl cmv >;a�Q . BUTTE COUNTY DEVELOPMENT SERVICES qT OFC�i I REi/IEWED FOR p0 -30-7-0 CO��(D�E/C�OMPLI CE D 0!**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! - **IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of SCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary brawn per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attach od rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Joinf Details, unless noted otherwise. peter to drawings 160A -Z for standard plate positions. ITW Buildin Components Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/T�1 1, r for handling, shipping, installation and bracing of trusses. A seal on this awing or cover page listing this drawing, indicates acceptance of pro) essldnal engineering responsibility sole) for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer ler ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: FW 8M www.itwbc .corn• TPI: www. inst.or • SBCA: www.sbcindust .corn ICC: w Jccsafe.or D 3'812 1112X4 43.4 8' M Wind Criteria Snow Criteria (Pg,PI in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) N Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R / U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA O B 656 / 39 /361 / - /170 /5.5 BCLL: 0.00 Enclosure: Closed IN VERT(TL): 0.013 F 999 360 1114X4 E Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Q4pf Essfo A Truss designed for unbalanced load using 0.00/1.50 ��� �N M windward/leeward factors.Wind �� Q� ` • A Z 4 Vv1 t� Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. * ERMIT# ���/ `rl cmv >;a�Q . BUTTE COUNTY DEVELOPMENT SERVICES qT OFC�i I REi/IEWED FOR p0 -30-7-0 CO��(D�E/C�OMPLI CE D 0!**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! - **IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of SCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary brawn per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attach od rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Joinf Details, unless noted otherwise. peter to drawings 160A -Z for standard plate positions. ITW Buildin Components Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/T�1 1, r for handling, shipping, installation and bracing of trusses. A seal on this awing or cover page listing this drawing, indicates acceptance of pro) essldnal engineering responsibility sole) for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer ler ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: FW 8M www.itwbc .corn• TPI: www. inst.or • SBCA: www.sbcindust .corn ICC: w Jccsafe.or 3'812 43.4 8' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,PI in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R / U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.006 F 999 360 B 656 / 39 /361 / - /170 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.013 F 999 360 E 408 / 59 /248- BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.002 E Wind reactions based on C&C Des Ld: 46.00 EXP: C HORZ(TL): 0.005 E B Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 it Code / Misc Criteria Creep Factor: 1.5 E Min Brg Width Req = - Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.341 Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.167 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " MWFRS Parallel Dist: h/2 to h Rep Factors Used: Yes Max Web CSI: 0.123 Chords Tens.Comp. Chords Tens. Comp. C&C Dist a: 9.00 ft FT/RT: - Mfg Specified Camber: A - B 75 0 C - D 60 -90 GCpi: 0.18 Plate Type(s): B - C 0 -540 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 Lumber Maximum Bot Chord Forces Per Ply (Ibs) Top chord 2x4 DF -L #2 Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF -L #2 B - F 401 -34 F - E 397 -36 Webs 2x4 DF -L #2 Purlins • Maximum Web Forces Per Ply (Ibs) In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. Webs Tens. Comp. to laterally brace chords as follows: F - C 172 0 D - E 54 -135 Chord Spacing(in oc) Start(ft) End(ft) BC 93 029 800 C - E 42 -465 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Q4pf Essfo A Truss designed for unbalanced load using 0.00/1.50 ��� �N M windward/leeward factors.Wind �� Q� ` • A Z 4 Vv1 t� Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. * ERMIT# ���/ `rl cmv >;a�Q . BUTTE COUNTY DEVELOPMENT SERVICES qT OFC�i I REi/IEWED FOR p0 -30-7-0 CO��(D�E/C�OMPLI CE D 0!**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! - **IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of SCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary brawn per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attach od rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Joinf Details, unless noted otherwise. peter to drawings 160A -Z for standard plate positions. ITW Buildin Components Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/T�1 1, r for handling, shipping, installation and bracing of trusses. A seal on this awing or cover page listing this drawing, indicates acceptance of pro) essldnal engineering responsibility sole) for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer ler ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: FW 8M www.itwbc .corn• TPI: www. inst.or • SBCA: www.sbcindust .corn ICC: w Jccsafe.or 9237 Ply: 1 SEON: 118434 / T13 / CAJA GARAGE GARAGE Qty: 4FROM: DRW: SJ2 JACK Wgt: 11.2 lbs / ... 02/06/17 12 C T6 r• - 4X4(A2) r B N " N A D 2r 1,18 1 t6.. 2' t tt8 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): NA B 402 / 228 / 218 / - /142 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): NA C -15 /21 /33 / - / - /1.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.000 C D 26 / - /21 / - / - /1.5 Des Ld: 46.00 EXP: C HORZ(TL):-0.001 C Wind reactions based on C&C NCBCLL: 10.00 Mean Height: 15.00 It Code / Misc Criteria Creep Factor: 1.5 B Min Brg Width Req = 1.5 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.312 C Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.052 D Min Brg Width Req = - Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: Yes Max Web CSI: 0.000 C&C Dist a: 3.00 It FT/RT: - - Mfg Specified Camber: Maximum Top Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 A - B 75 0 B - C 16 80 Lumber Top chord 2x4 DF-L #2 Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x4 DF-L #2 Chords Tens.Comp. Purlins B - D 2 -1 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) " BC 21 0.29 2.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. ^ Loading Truss designed for unbalanced load using 0.00/1.50 windward/leeward factors. Wind Qr,{df ESSIQNq Member design based on both MWFRS and C&C. r� d CO28710 PERMIT##„�(� Sf CIV1�- ��Q BUTTE COUNTY DiMLOPMENTSERVICES �T£OFCIN 1�ti�� REVIEWED FOR FkA 09-30-2�® COMPLI P LI GE DATE 3 _ BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Buildin Component Safety Information, by TPI ?in SBCA) for sa�ety practices prior to performing these functions. Installers shall provide temporan bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathinq and bottom chord shall have a prop6ly attach@c3 rigid ceiling Locations shown for ermanent lateral restraint of webs shall have bracing installed p r BCSI sections 83, 87 or a10, as applicabQe. Apply plates to ach face ofPtruss and position as shown above anc on the Join Details, un�ess noted otherwise. �{efer to drawings 160A-Z for s andard plate positions. ITW Building Compponents Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANS 4I 1, br for handlin4, shippin installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of pro 4'essponalq' engineering responbility solei for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI TSec.2. For more information see this mob's general notes page and these web sites: ITW BCG:. w Jtwbc .com• TPI: www.t inst.or ; SBCA: www.sbcindust .coin• ICC: w Jccsafe.o 9237 Ply: 1 SEQN: 118437 / T12 / CAJA GARAGE GARAGE Qty: 4 FROM: DRW: SJ4 JACK Wgt: 14.0 lbs / ... 02/06/17 C 1'6 2 1 — .1,,,3 2' "4'1 3 Loading Criteria (psf) Wind Criteria 12 6 Dell/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 T PP Deflection in loc Udefl U# cm B 439 / 90 /231 / - /117 /5.5 TCDL: 16.00 cm Pf: NA Ce: NA VERT(LL): 0.000 D 999 164 4X4(A2) Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.000 D 999 164 D 28 /- /18 / - / - /1.5 BCDL: 10.00- Risk Category: II Snow Duration: NA HORZ(LL): -0.000 C - C 123 /68 /63 / - / - /1.5 B EXP: C ih HORZ(TL):-0.001 C A D NCBCLL: 10.00 1'6 2 1 — .1,,,3 2' "4'1 3 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Dell/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R / U / Rw / Rh / RL /W B 439 / 90 /231 / - /117 /5.5 TCDL: 16.00 Speed: 110 mph - Pf: NA Ce: NA VERT(LL): 0.000 D 999 164 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.000 D 999 164 D 28 /- /18 / - / - /1.5 BCDL: 10.00- Risk Category: II Snow Duration: NA HORZ(LL): -0.000 C - C 123 /68 /63 / - / - /1.5 Des Ld: 46.00 EXP: C HORZ(TL):-0.001 C Wind reactions based on C&C Code / Misc Criteria NCBCLL: 10.00 Mean Height: 15.00 It Creep Factor: 1.5B Min Brg Width Req = 1.5 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.346 D Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.030 C Min Brg Width Req = - Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: 'Yes Max Web CSI: 0.000 C&C Dist a: 4.50 ft FT/RT: - Mfg Specified Camber: Maximum Top Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. VIEW Ver: 13.02.02.1219.20 A - B 75 0 B - C 56 -99 Wind Duration: 1.33 WAVE Lumber Top chord 2x4 DF -L #2 Bot chord 2x4 DF -L #2 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 21 0.29 2.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed for unbalanced load using 0.00/1.50 windward/leeward factors. Wind ` Member design based on both MWFRS and C&C. Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. B - D 2 -1 QgOF ES 'to M. (,0287 0 � J n ERMIT# civ\ ����� BUTTE COUNTY DEVELOPMENT SERVICES f OF CA��F� REVIEWED FOR 114p 09-30-10-\'6 COW O E MPLI CE DATE BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabricating handlin shi ping, installing and bracing. Refer to and follow the latest edition of BCSI (Buildin t Safety Information, by TPI ang'SBCA) fo'r sa�ety practices prior to performing these functions. Installers shall provide temporar� BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly �d ceiling Locations shown for ermanent lateral restraint of webs shall have bracingg installed per BCSI sections B3, B7 or 810, e. App i plates to each face ofPtruss and position as shown above and on the JoincDetails, unless noted otherwise. hefer to 60A -Z for standard plate positions. i Components Group Inc. shall not be responsible for an deviation from this drawing any failure to build the truss in conformance g l 1, pr for handling, shipping, installation and bracin of trusses. A seal on this thawing or cover page listing this drawing, acceptance of pro es's ona engineering respongibitity sole) for the design shown. The suitability and use of th rr any structure Is the responsib9ity of the Building Designer Ver ANSI/TPI QSec.2. 9237 Ply: GARAGE GARAGE I Oty:gt116.8 lbs FROM: 118440 / T11 / CAJA DRW: SJ6 JACK .. / ... 02/06/17 t 2 2' C -l';g u Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria 12 6 TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA v Loc R /U / Rw / Rh / RL /W , Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.000 D 999 164 M BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.000 D 999 164 N BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.001 C - - C 218 /90 /112 / - / - /1.5 Des Ld: 46.00 EXP: C HORZ(TL): 0.002 D Wind reactions based on C&C NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 1.5 B Min Brg Width Req = 1.5 Soffit: 10.00 4X4(A2) Bldg Code: Custom Max TC CSI: 0.520 D Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.140 B Spacing: 24.0 " MWFRS Parallel Dist: h/2 to h Rep Factors Used: Yes Max Web CSI: 0.000 T A D C&C Dist a: 4.50 ft 1 Mfg Specified Camber: t In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 21 0.29 2.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed for unbalanced load using 0.00/1.50 windward/leeward factors. Wind Member design based on both MWFRS and C&C. �OQRN E� /�1N9 0028710 � * MIT # ► J;U BUTTE COUNTY DEVELOPMENTSERVICES, �lgTfOF CN kiREVIEWED FOR �X .09-30-20N,?) 09-30-20N$ C E C MPLIANC E PAT R _ BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarryy bracing per SCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling4ocations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. A TTy p ales to each face of truss and position as shown above and on the Joinf"Details, unless noted otherwise. hefer to drawings 160A -Z for standard plate positions. ITW Buildiqng Compponents Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/TPI 1, br for handlin shipppingg, installation and bracing of trusses. A seal on this al wing or cover page listing this drawing, indicates acceptance of pro'essional engineering responsibility sole) for the design shown. The suitability and use of this drawing for any structure Is the responsibility of the Building Designer ler ANSI/TPI T Sec.2. For more information see this job's general notes page and these web sites: [TWBCG: www.itwbc .com; TPI: www.t inst.or • SBCA: www.sbcindustry.com; ICC: www.iccsafe.orq 2 2' 3 6'1w3 -l';g u Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.000 D 999 164 B 483 / 80 /249 / - /145 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.000 D 999 164 D 57 / 11 /37 / - / - /1.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.001 C - - C 218 /90 /112 / - / - /1.5 Des Ld: 46.00 EXP: C HORZ(TL): 0.002 D Wind reactions based on C&C NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 1.5 B Min Brg Width Req = 1.5 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.520 D Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0.140 C Min Brg Width Req = - Spacing: 24.0 " MWFRS Parallel Dist: h/2 to h Rep Factors Used: Yes Max Web CSI: 0.000 C&C Dist a: 4.50 ft FT/RT: - Mfg Specified Camber: Maximum Top Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 A - B 75 0 B - C 99 -139 Lumber Top chord 2x4 DF -L #2 Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x4 DF -L #2 Chords Tens.Comp. Purlins B - D 2 -3 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 21 0.29 2.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed for unbalanced load using 0.00/1.50 windward/leeward factors. Wind Member design based on both MWFRS and C&C. �OQRN E� /�1N9 0028710 � * MIT # ► J;U BUTTE COUNTY DEVELOPMENTSERVICES, �lgTfOF CN kiREVIEWED FOR �X .09-30-20N,?) 09-30-20N$ C E C MPLIANC E PAT R _ BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarryy bracing per SCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling4ocations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. A TTy p ales to each face of truss and position as shown above and on the Joinf"Details, unless noted otherwise. hefer to drawings 160A -Z for standard plate positions. ITW Buildiqng Compponents Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI/TPI 1, br for handlin shipppingg, installation and bracing of trusses. A seal on this al wing or cover page listing this drawing, indicates acceptance of pro'essional engineering responsibility sole) for the design shown. The suitability and use of this drawing for any structure Is the responsibility of the Building Designer ler ANSI/TPI T Sec.2. For more information see this job's general notes page and these web sites: [TWBCG: www.itwbc .com; TPI: www.t inst.or • SBCA: www.sbcindustry.com; ICC: www.iccsafe.orq 9237 GARAGE GARAGE EJ2 JACK Wind Criteria Ply: 1 Qty: 4 Wgt: 25.216S SEQN: 118444 / T16 / CAJA FROM: DRW: / ... 02/06/17 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA 12 C Loc R / U / Rw / Rh / RL 1W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA 6 B 374 / - /4 / - / - /5.5 BCLL: 0.00 T Lu: NA Cs: NA =4X4(A1) C 10 / - /5 / - / - /1.5 BCDL: ' 10.00 Risk Category: II Snow Duration: NA B D 147 / - /25 - Des Ld: 46.00 EXP: C HORZ(TL): 0.001 D Wind reactions based on MWFRS NCBCLL: 10.00 N T-3 T Creep Factor: 1.5 B Min Brg Width Req = 1.5 -T- TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.251 C Min Brg Width Req = - Load Duration: 1.25 CV TPI Std: 1995 A r _ p Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: Yes 1'6"81 I 8' C&C Dist a: 4.50 ft FT/RT: - Mfg Specified Camber: R, GCpi: 0.18 Loading Criteria (psi) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R / U / Rw / Rh / RL 1W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.000 D 999 360 B 374 / - /4 / - / - /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TQ: 0.000 D 999 360 C 10 / - /5 / - / - /1.5 BCDL: ' 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.000 D - - D 147 / - /25 - Des Ld: 46.00 EXP: C HORZ(TL): 0.001 D Wind reactions based on MWFRS NCBCLL: 10.00 Mean Height: 15.00 it Code / Misc Criteria Creep Factor: 1.5 B Min Brg Width Req = 1.5 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.251 C Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psi TPI Std: 1995 Max BC CSI: 0.287 D Min Brg Width Req = - Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: Yes Max Web CSI: 0.000 C&C Dist a: 4.50 ft FT/RT: - Mfg Specified Camber: Maximum Top Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 A - B 62 -4 B - C 7 -53 Lumber Top chord 2x4 DF -L #2 Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x6 DF -L #2 Chords Tens.Comp. Special Loads B - D 1 1 ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC- From 72 plf at -1.50 to 72 plf at 1.97 .BC- From 20 plf at -1.50 to 20 plf at 0.00 BC- From 10 plf at 0.00 to 10 plf at 8.00 BC- 26 Ib Conc. Load at 2.06 BC- 28 Ib Conc. Load at 4.06 BC- 57 Ib Conc. Load at 6.06 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) . End(ft) EJSto BC 75 0.29 8.00 Apply purlins to any chords above or below fillers OQ�O at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others CO281 0 Wind MIT #� ✓54 RS, Wind loads and reactions based on MWFRS. f �, �Q BUTTE COUNTY DEVELOPMENT SERVICES lqT� fCaO REVIEWED FOR 09-30-20 � E COMPLIeCE DATE BY "WARNING•' READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shi ping, installing and bracing. Refer to and fallow the latest edition of BCSI (Build' Component Safety Information, by TPI and SBCA) fo'r sa�ety practices prior to performing these functions. Installers shall provide temporar� bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attach d ri id ceiling Locations shown for permanent lateral re§traint of webs shall have bracin insTalled per BCSI sections B3, B7 or 810, as appe(icab�e. Apply places to each face of truss and position as shown above and on the JoinDetails, unless noted otherwise. Defer to drawings 160A -Z for standard plate positions. ITW Buildin Components Group Inc. shall not be responsible for any deviation from this drawing any failure to build the truss in conformance with ANSI 11, pr for handlin shippin , installation and bracing of trusses. A seal on this d-rawmg or cover page listing this drawing indicates acceptance of pro�essponalq enQsneering responsibility sole) for the design shown. The suitability and use of thQs drawing for any structure s the responsiblity of the Building Designer solely ANSI/TPI 9Sec.2. For more information see this mob's general notes page and these web sites: ITW BCG: www.itwbc .comE TPI: www. inst.or ; SBCA: www.sbcindust .com: ICC: www.iccsate.or ,r. 9237 Ply: 1 SEAN: 118447 / T9 / CAJA GARAGE GARAGE Qty:4 FROM: �,DRW: EJ4 JACK Wgt: 22.4 lbs / ... 02/06/17 C 12 6 fV CV 4X4(A2) B o M T 3 8 A p 8' 8 ... Loading Criteria (psf) Wind Criteria Snow Criteria ft,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udell U# Loc R /U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.000 D 999 360 B 487 / 51 /281 / - /113 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.000 D 999 360 C 137 /51 /77 / - / - /1.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.001 D - D 139 / - /70 - Des Ld: 46.00 EXP: C HORZ(TL): 0.003 D Wind reactions based on C&C NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 1.5 B Min Brg Width Req = 1.5 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.268 C Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: 0:520 D Min Brg Width Req = - Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: Yes Max Web CSI: 0.000 C&C Dist a: 4.50 It FT/RT: - Mfg Specified Camber: Maximum Top Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate`Type(s): Chords Tens.Comp. Chords Tens. Comp. Wind Duration: 1.33 WAVE VIEW Ver: 13.02.02.1219.20 A - B 75 0 B - C 63 -92 Lumber Top chord 2x4 DF -L #2 Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x4 DF -L #2 Chords Tens.Comp. Purlins • B - D 2 -2 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) ' BC 75 0.29 8.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Q�df EJS N Truss designed for unbalanced load using 0.00/1.50 ��9 Qi, M • windward/leeward factors. ��V 2 Wind t9 � I a Member design based on both MW FRS and C&C. tilt � Sf9l CM o�`�Q PERMIT#BUTT` COUNTYD� LIO � SERVICES O9 E 9 30--�F 'REVIEWED FOR �kp-Z�1$ � E COI1/IPLI f_j_E DATE � BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! .**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricatingg, handlin shipping, installing and bracing. , Refer to and follow the latest edition of BCSI (Build'n Component Safety Information, by TPI anc3 SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporar� braang per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a pro erly attached rigid ceilin Locations shown for ermanent lateral restraint of webs shall have bracing insTalled per BCSI sections B3, B7 or �10, as applicable. Appy plates to each face o�truss and position as shown above and on the JoingDetails, unless noted otherwise. Nefer to drawings 160A -Z for standard plate positions. ITW Building Components Group Inc. shall not be responsible for an deviation from this drawing any failure to build the truss in conformance with ANSI/TPI 1, pr for handlin, shipping, installation and bracing of trusses. A seal on this d-rawmg or cover page listing this drawing, indicates acceptance of pro ess Ina engineering res onsibility solel for the design shown. The suitability and use of this drawing for any structure is the responsibility of the BuTding Designer �er ANSIITPI gSec.2. 9237 Ply: 1 SEQN: 118450 / T8 / CAJA GARAGE GARAGE: Qty:,4 FROM: DRW: EJ6 JACK �Wgt:28.01ts .. / ... 02/06/17 4 W4 8' 1 D 1,6„ 4,3„4 3,8„12 ih 1 Loading Criteria (psf) ' f Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# T3 TCDL: 16.00 Speed: 110 mph 4 W4 8' 1 D 1,6„ 4,3„4 3,8„12 4'3"4 8' Loading Criteria (psf) ' Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R / U / Rw / Rh / RL /W TCDL: 16.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.088 F 999 360 B 569 /51 /315 / - /141 /5.5 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(TL): 0.214 F 433 360 D 237 /38 /148 / - / - /1.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.046 C E 86 /- /55 - Des Lci 46.00 EXP: C HORZ(TL): 0.113 C Wind reactions based on C&C NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 1.5 B Min Brg Width Req = 1.5 Soffit: 10.00 TCDL: 9.6 psf Bldg Code: Custom Max TC CSI: 0.592 D Min Brg Width Req = - Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 1995 Max BC CSI: .0.285 E Min Brg Width Req = - Spacing: 24.0 " MW FRS Parallel Dist: h/2 to h Rep Factors Used: Yes Max Web CSI: 0.022 C&C Dist a: 4.50 it FT/RT: - Mfg Specified Camber: Maximum Top Chord Forces Per Ply (Ibs) i GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. Wind Duration: 1.33 WAVE , VIEW Ver: 13.02.02.1219.20 A - B 75, 0 C - D 106 -32 Lumber B - C 37• -136 Top chord 2x4 DF -L #2 Bot chord 2x4 DF -L #2 Maximum Bot Chord Forces Per Ply (Ibs) Webs 2x4 DF -L#2 Chords Tens.Comp. Chords Tens. Comp. Purlins B- F 2 -1 F- E 0 0 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Maximum Web Forces Per PI y (Ibs) ) Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. BC 75 0.29 8.00 Apply purlins to any chords above or below fillers C - F 127 0 at 24” OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Truss designed for unbalanced load using 0.00/1.50 windward/leeward factors. Wind VA t� cam^ Member design based on both MWFRS and C&C. 00281 0 it PERMIT #% n ✓�� CIVIC- �a�Q BUTTE COUNTY DEVELOPMENT SERVICES l'�rForcA���°� REVIEWED FOR •c-�p09-30-201$ C ECJOMPLI CE DATE _1--- BY "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) fol safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathin and bottom chord shall have a proEerly attached rigid ceiling Locations shown for permanent lateral restraint of wefts shall have bracing ins�alled p@r BCSI sections B3, B7 or 810, as applicable. Apply plates to Bach face of truss and position as shown above and on the JoinrDetails, unless noted otherwise. kiefer to drawings 160A -Z for standard plate positions. ITW Building Components Group Inc. shall not be responsible for an deviation from this drawing any failure to build the truss in conformance with ANSI 0.1 1, pr for handling shi pin , installation and bracing of trusses, A seal on this any or cover page listing this drawing, indicates acceptance of progess�onal engineering resFgnslbflity sole) for the desiggn shown. The suitability and use of this drawing for any structure s the responsibi ity of the But ding Designer �er ANSI/TPI TSec.2. For more information see this •ob's general notes page and these web sites: nWBCG:. www.itwDc.com; TPI: www. inst.or • SBCA: www.sbcindust .cam• ICC: www.iccsafe.org i Butte County Department of Development Services TIM SNELLINGS, DIRECTOR I PETE CALARCO, ASSISTANT DIRECTOR -r 7 County Center Drive Oroville, CA 95965 (530) 538-7601 Telephone ® • (530).538=2140 Facsimile C A L I F O R N I A www.buttecounty.net/dds www.buttegeneraIplan.net ADMINISTRATION " BUILDING * PLANNING MINIMUM EROSION AND SEDIMENT CONTROLS FOR PROJECTS DISTURBING LESS THAN ONE ACRE The BMP's (Best Management Practices) listed below must be in place during the rainy season (October 15 through April 15) and may be required at other times based on weather and site conditions throughout the year. The BMP's listed are minimum requirements and additional BMP's could be required based on site conditions. • Stabilized entry: Provide minimum 3" to 6" fractured rock 50' long x,15' wide by 6" deep over construction grade fabric. • All soils tracked onto paved roadways must be cleaned up on a daily basis. When streets are wet or during a rain event there shall be no tracking of soils onto the street. • Wattles installed properly behind curb or sidewalks. • Rock bags (minimum 2 per side) at all drain inlet locations within 150' of the project site. • Internal filters placed inside each drain inlet. • Trash bars across the back of all drain inlets. • Stabilize all disturbed soils in the front yard areas within 15' of the back of curb or sidewalk. (Straw or erosion blankets may be used for this application) • Stabilize all slopes where erosion could occur and cause silt run off. (Straw, visqueen or erosion blankets may be used for this application) • All paint, fuel, construction products etc. shall be stored in a covered location away from sidewalks and storm drain inlets. • Portable chemical toilets if provided on the site must be kept off of streets and sidewalks and at least 50' from the nearest storm drain inlet. • All trash must be collected and stored properly. Do not let items such as drywall mud boxes, paint buckets, cleaning material containers etc. come in contact with any rainfall or storm water runoff. • Provide a designated area for concrete washout. Hay bales lined with visqueen may be used for this application. Rollaway bins may also be used. All concrete washout systems shall be placed off of the paved streets. • After installation of the above items is complete a maintenance program needs to be developed to insure the continued effectiveness of your BMP's. C:\Users\nnauIdin\Desktop\Erosion & Sediment -Control Measures.doc Lot I Lot 2 House Waddle over night 0000 0a 0o 0000 0000 0000 0000 0oaq 0000 0000 Drain Inlet Lot 3 Gravel filled bags or wattles with filter fabric over grate Waddles all around lot or silt fence (depending on slope) Imbed silt fence min 6 Inch below ground surface Rock cleanoff area Storm drain Sidewalk �T Gravel fitted bags with filter fabric Street to be clean and free of any materials from the site . r - i I i Porta -Potty minimum 50 ft from storm draln i BUTTE COUNTY DEPARTMENT OF08VEL4PMENT SER1/10ES:-B.UJLD1NG .CONSTRUCTION .DEBRISRECOVERY FINAL REPORT Final inspection will not -be scheduletf uh6l`coriipleted rt�port submitted APN: Building Permit# O N ' Submit completed'form in person or by mail to: 'Butte County Development Services - Building 7 County Center Drive Oroville; CA 95965 weer ame: Owner phone: ( ) Jobsite Address: Project Typo:JD Construction.: O.De plition Jobsite 'Contact: Comairy: P Jalasite 119.: ( ) MATERIAL Reuse :Reoycie° .otos-al Tonnage. . 76e2a ACTUAL FA.{.:.:' S1Ct.C�E..eRp.16iDR USED. Inert Material (concrete, asphalt) Lumber Plant/Tree Debris: D,ry Wall: - Metal....,.. ,...._. ........ :...: Cardboard ' Other. L Other. Total toris of material.disposed,.of (not.recyoeid or redaed) fi copies f v� eta eighf. r eceipts, gate tags, or Total tons of material not disposed :(eittierrecycled�of: "reused] oilier ve. '.: ,g information for all materials Percent recycled reused °%. that were reused, recycled or disposed. Please sign indicating that-the.above.information is true and correct to:'he'best o your:knowtedge: Applicant (Owner or Contractor):. PAW. •� F• Circle which Final Report returned with cotirtYrents:: (Initial) Date: Final Reiort_approved:(BiiildiKg Inspeetor�:. ;per; K:\BUILDING\2011 \Approved forms\Res. foims\Waste Diversion=Recycling forrris:doc Structural Calculation Package, Client Information Project Information Pacific Modern Homes Johnson Garage ' PO Box 670 Chico, California EIk,Grove, CA 95759 Plan 9237 (916) 685-9514 I APN 047-740-006 Table of Contents .Section Title Page # . Comments: Cover Sheet 1 Loading and Soil Information 2 USGS Design Maps Summary Report 4 . Beam Specifications 5 Header and Footing Specifications i 6 ' Enercalc Printouts 7 Column Specifications 9 Diaphragm Calculations 10 Shear Wall Table 12 Holdown Table 13 Shear Wall Calculations 14 B17-03,48,. 047-740-006 A4 , \•i 1f; 0`1 2017 ' GAR (1024) MJ ELEC , PC ii ] All calculations conform to- the 2016 CBC, 2015 IBC, "2015 NDS, and ASCE 7=10 Norman Scheel Structural Engineer 5022 'Sunrise Boulevard - QRpfE Fair Oaks, CA 95628 J. ��° w (916) 536-9585 " 0.256. m Exp. 12/31/17 Issue and Revision Dates s 1/26/2017 First Issue Date �j7CT11%*Ap�P 0F.CAI.�i� Calculations Revised i FEB Q7 2017 ' 17 0-3K� PERMIT # January 26, 2017 BUTTE COUNTY DEVELOPMENT SERVICES lY REVIEWED FOR .lob Number . 17040 CODE COMPLIANCE Project Manager Steve Smith 1126/2017 DatePage r DATE RY '—L` . Number 1 of 20 .,"Calculated Wirid,,Load.atiEach4DiapragrrixPeevel Hei,ght-From i; '`Wind Load 1 ` `. Mind:Load;ll Level; LevehlNrdth - ".Level Depth Diaphragm"Type - idge,;li.With'; r i.Base "tot'X.azis to..X,axis' '1 32.00 32.00 11.5 Roof Y axis 4343 4675 Soil information Foundation Designed fo'r 2016 CBC Minimums Report Number ? Date ' Footing Depth = 12 y Footing Width = 12 Soil Pressure ' = 1500 4 , i r Job Number 17040 in Project Manager 17040 in Date 1/2612017 psf,,Page Number 2 of 20 ' 1 7, 1 ♦ Loading Information • Roof Loads. Floor Loads Roofing = 10.0 psf Sheathing _ 2.3 psf Sheathing = 1,5 psf Framing = 5.0 psf Framing = 2.5 • ' psf Insulation = 3.2 psf Insulation = 3.2 psf Ceiling = 2.5 psf Ceiling = 2.5 psf Misc. = 2.0 psf Misc. _ '6.3 psf Wall ( Seismic only = 10.0 psf Wall( Seismic only) ' = 5.0 psf ' s Roof Dead Load = 26.0 psf Floor Dead Load ' ` = 15.0. psf Roof Live Load' = 20.0, psf- Floor Live Load = 40.0 ' psf Snow Load = 00 psf Total DL ( Seismic) • = 25.0 psf Total DL ( Seismic) ; ' = 31.0 psf Wind Loading MWFRS (Envelope Procedure) Chapter 28, Basic Wind Speed = ' 110 mph (V ultimate) Exposure Category = C Risk Category = Il , Case 1, Case 2 End Zone. of Wall _ A .. 28.12. psf A 28.12 psf End Zone of Roof = B 19.27 psf B 19.27 psf Interior Zone of Wall - C 22.39 psf C 22.39 psf Interior Zone of Roof = D 15.36 psf D 15.36 psf End Zone of Windward Roof = E 2.21 psf ' E 10.81. psf ' End Zone of Leeward Roof _ F -17.06 psf _ F -8:46 psf Interior Zone of Windward Roof = y G • 0.78 psf, G 9.37 psf Interior Zone of Leeward Roof _.. t r H -,-14Y1 psf H -5.99 psf End Zone of Windward Roof Overhang = . Ear, -9.90 psf' Eoh -9.90 psf Interior Zone of Windward Roof Overhang = Goh -11.33 psf Goh -11.33 psf .,"Calculated Wirid,,Load.atiEach4DiapragrrixPeevel Hei,ght-From i; '`Wind Load 1 ` `. Mind:Load;ll Level; LevehlNrdth - ".Level Depth Diaphragm"Type - idge,;li.With'; r i.Base "tot'X.azis to..X,axis' '1 32.00 32.00 11.5 Roof Y axis 4343 4675 Soil information Foundation Designed fo'r 2016 CBC Minimums Report Number ? Date ' Footing Depth = 12 y Footing Width = 12 Soil Pressure ' = 1500 4 , i r Job Number 17040 in Project Manager 17040 in Date 1/2612017 psf,,Page Number 2 of 20 Site Clasification Risk Category Seismic Design Category Importance Factor Response Modification Factor System Civerstrength Factor Rho Factor (p) Spectral Response Short Period Spectral Response Long Period Spectral Response Short Period Spectral Response Long Period Seismic Response Coefficient Maximum Seismic Response Coefficient Minimum Seismic Response Coefficient Loading Information - Seismic Loading Equivalent Lateral Force Procedure (Section 12.8 ASCE7-10) D Section 11.4.2 ASCE 7-10 " O.Ov p� ,A, = H" Table 1.5-2 ASCE 7-10 V 1/N D Section 11.6 ASCE 7-10 1.00 Section 11.5 ASCE 7-10 R = 6.5 Bearing wall System #15 Table12.2-1 ASCE 7-10 CIO = 3.0 Bearing wall System #15 Table12.2-1 ASCE 7-10 P = 1.3 Reliabilty Redundancy Factor Section XX>X ASCE 7-10 Ss = 0.617 Seismic ground motion maps chapter 22 ASCE7-10 SI = 0.276 Seismic ground motion maps chapter 22 ASCE?-10 SDs = 0.537 Seismic ground motion.maps chapter 22 ASCE7-10 SDI _ 0.340 Seismic ground motion maps chapter 22 ASCE?-10 CS = 0.083 Seismic Response Coefficient section 12.8 ASCE?-10 CS max = 0.267 Seismic Response Coefficient section 12.8 ASCE7-10 Cs min = 0.01 Seismic Response Coefficient section 12.8 ASCE?-10 Vertical,;Distribution.of':SeisrriicAForceskC,' 4°(12x8:3) ? •; ;, . fHotizontail Distribution:ofiSeiisniic,Forces,'}VX' , (1:248:4) ,. )• Height. -From:- :Area of :weight 1, c Level; Levels l3ase i 'Diaphragm it2t (psf) , is : r tW "`V C UL Vx .1 w 12 1024 31 365056. 1.00 -1 31744 0.0827 1.0000 2388 2388 r Job Number 17040 Project Manager, 17040 Date 1/26/2017 Page Number 3 of 20 4, Design Aaps°•Summary Re orD -User-Specified Input t ; Report Title. Johnson'Garage }' ' r Thu Januarv.26, 2017'19-_45:02 UTC i ,(, �. + 46ilding*Code Reference Document' ASCE 7 10 Standard . - w (which -utilizes USGS hazard data available in 2008) Site Coordinates;.39.80912°N,-121.8906OW Site Soil, Classification Site Class D — "Stiff Soil"' w Risk Category •I/II/III s, . 7, ,•' .:7•t ••Eialjh 90a-`{ wsr ,`'E.� �'�y-�"y ^r r 5}r #`T" 'yl:!• r- y••�✓+�'c..ti y, yfi'tiuim 'L'�r:•q. "t� 2 S u.{ JI ¢" 5W t �G T. KA�ti •� k 1A �i �` ,L'. "1� A �.-''�Y. P 5•,,—`�SjSffi '-1 rfb°•••Y0: !". M, 4 , 2 �I d� -U:_ '� .� '.,,' .,,.,. m k. a_+ F ,%+... +• � ,i ,�`...ba Lt's s'i�v'2r�•^• .•a,...- `u:S3 45%� rr � }, t$ ' USGS-Provided • Output r • , � , � F,� ," 5 � � . SS jj .0.617 9 Sns = 0.806 9 ? SSm0.537 g 4. ., ' F ' S, = 0.276 'g S„; = 0.510 9 So; "=' t 0.340 ,. For information"on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and d motions in the direction of maxinurn horizontal response, please return to the application and deterministic°groun select the "2009 NEHRP" building code reference docum4nt.> r • ,' 14CE'R Response Spectrum~'Design Response Spectrum Or Bet • r.0:ae' 4•4��' i,r't� .H O:a4 •,r p' , e' 0. Z7 " k 0.10' r r o f 05 . �; r O �d 0. , 1 0.00.0.00 7t. 6.00 0.20 • 0,40 0,60 0.00 1,00` 1.20 1.40 2. 1.60 -1 :8D 00 0,00 0.20.0.400.60 `0.60 1,00 1,20 1.46 1.00 1.00 ZOO,. tij 4 i"' Period. T(scc) Peri, T`(sec), For PGAM,`T�, C ,and CR, values, please view.the detailed report i, t 4 • 2 �J• 1 s ^ 4 f i .:7•t ••Eialjh 90a-`{ wsr ,`'E.� �'�y-�"y ^r r 5}r #`T" 'yl:!• r- y••�✓+�'c..ti y, yfi'tiuim 'L'�r:•q. "t� 2 S u.{ JI ¢" 5W t �G T. KA�ti •� k 1A �i �` ,L'. "1� A �.-''�Y. P 5•,,—`�SjSffi '-1 rfb°•••Y0: !". M, 4 , 2 �I d� -U:_ '� .� '.,,' .,,.,. m k. a_+ F ,%+... +• � ,i ,�`...ba Lt's s'i�v'2r�•^• .•a,...- `u:S3 45%� rr � }, t$ ' USGS-Provided • Output r • , � , � F,� ," 5 � � . SS jj .0.617 9 Sns = 0.806 9 ? SSm0.537 g 4. ., ' F ' S, = 0.276 'g S„; = 0.510 9 So; "=' t 0.340 ,. For information"on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and d motions in the direction of maxinurn horizontal response, please return to the application and deterministic°groun select the "2009 NEHRP" building code reference docum4nt.> r • ,' 14CE'R Response Spectrum~'Design Response Spectrum Or Bet • r.0:ae' 4•4��' i,r't� .H O:a4 •,r p' , e' 0. Z7 " k 0.10' r r o f 05 . �; r O �d 0. , 1 0.00.0.00 7t. 6.00 0.20 • 0,40 0,60 0.00 1,00` 1.20 1.40 2. 1.60 -1 :8D 00 0,00 0.20.0.400.60 `0.60 1,00 1,20 1.46 1.00 1.00 ZOO,. tij 4 i"' Period. T(scc) Peri, T`(sec), For PGAM,`T�, C ,and CR, values, please view.the detailed report i, t 4 • 2 Job Number 17040 Project Manager Steve Smith Date 112612017 Page Number 5 of 20 Beam Specifications Beam-# Size Grade and Type Location Beam #1 6x12 No. 1 D.F.L. 16' GARAGE DOOR HEADER Beam #2 6x12 No. 1 D.F.L. 8' GARAGE DOOR HEADER Beam #3 6x12 No. 1 D.F.L. 10' GARAGE DOOR HEADER Job Number 17040 Project Manager Steve Smith Date 112612017 Page Number 5 of 20 Header Specifications Size Grade and Type Length Level 6x12• No. 1 D.F.L. 4'-0" .Roof Load Only Footing Specifications'. Footing Width a = 12 in Allowable Soil Bearing Pressure = 1500 psf Footing Depth = 12 in Maximum allowable load on footing = 1500 plf Minimum # Bars = 1 Top and Bottom Maximum point load on continuous footing = 5242 # Size of Bars = 4 'Area of steel used for calculations = 0.20 int Pad footing Specifications. Footing # Size Depth . Rebar Maximum Load 1 , r W. • 1 .Job Number 17040 Project Manager Steve Smith Date 1126/2017 T I Page Number 6 of 20 Norm -Scheel Structural Engineer Project Title: Johnson Garage 5022 Sunrise Blvd. Engineer: SS Project ID: 17040 Fair Oaks, CA 95628 Project Descr: PMHI Description: 17040 BEAMS 1-3 AND HDR Wood Beam .Design .: BEAM 1 Calculat)ons; ertNDS2012,':1B'C720.12,iCBC2011; 'SCE7=10 BEAM Size : 6x12, Sawn, Fully Unbraced Using Allowable Stress Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species : Douglas Fir - Larch Wood Grade : No.1 Fb - Tension 1350 psi Fc -'Prll 925 psi Fv 170 psi Ebend- xx 1600 ksi Density 31.2 pcf Fb - Compr 1350 psi Fc - Perp 625 psi Ft 675 psi Eminbend - xx 580 ksi Applied Loads Unif Load: D = 0.0250, Lr = 0.020 k/ft, Trib= 5.50 ft Design Summary 306.24 psi at Max fb/Fb Ratio = 0.465: 1 fb : Actual : 783.97 psi at 8.000 ft in Span # 1 Fb : Allowable: 1,687.50 psi Load Comb: +D+Lr+H Max fv/FvRatio = 0.196: 1 fv : Actual : 41.63 psi at 0.000 ft in Span # 1 Fv : Allowable: 212.50 psi Load Comb: +D+Lr+H Max Reactions (k) 2 L Lr S W E Left Support 1.10 0.88 Right Support 1.10 0.88 16.0 ft, 6x12 H Downward L+Lr+S 0.146 in Downward Total 0.329 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Defl Ratio 1313 >480 Total Defl Ratio 583 >240 W ood;BeamkDesign BEAM 2 • ', ' r„ ' `' , ' ` ;' •, '' " '' � =.C-alciilationszper_ND5`:2012;�1BC:201'2,�CB.C'�01'3,'ASCE J-1'0 BEAM Size: 6x12, Sawn, Fully Unbraced Using Allowable Stress Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: Douglas Fir - Larch Wood Grade : No.1 Fb - Tension 1350 psi Fc - Prfl 925 psi Fv 170 psi Ebend- xx 1600 ksi Density 31.2 pcf Fb - Compr 1350 psi Fc - Perp 625 psi Ft 675 psi Eminbend - xx 580 ksi Applied Loads Unit Load: D = 0.0250, Lr = 0.020 k/ft, Trib= 5.50 ft Design Summary 306.24 psi at Max fb/Fb Ratio = 0.116: 1 fb : Actual : 195.99 psi at 4.000 ft in Span # 1 Fb: Allowable: 1,687.50 psi Load Comb: +D+Lr+H Max fv/FvRatio = 0.085: 1 fv : Actual : 18.00 psi at 0.000 ft in Span # 1 Fv : Allowable: 212.50 psi Load Comb: +D+Lr+H Max Reactions (k) D L Lr S w E Left Support 0.55 0.44 Right Support 0.55 0.44 D 0.1375 L 0.110) IV il -1 MIR 8.0 ft. 6x12 H Downward L+Lr+S 0.009 in Downward Total 0.021 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Defl Ratio 10505 >480 Total Defl Ratio 4669 >240 "-Woo.d=BeamsDeg gn:: ' BEAM 3 ZCalculations per=NDS2012,.�IBC7201:2,:':CBC:2013,:-AS'CE7=1'0 BEAM Size: 6x12, Sawn, Fully Unbraced Using Allowable Stress Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species : Douglas Fir - Larch Wood Grade: No.1 Fb - Tension 1350 psi Fc - Prll 925 psi Fv 170 psi Ebend- xx 1600 ksi Density 31.2 pcf Fb - Compr 1350 psi Fc - Perp 625 psi -Ft 675 psi Eminbend - xx 580 ksi Applied Loads Unif Load: D = 0.0250 Desian Summary Max fb/Fb Ratio fb : Actual : Fb: Allowable: Load Comb: Max fv/FvRatio = tv : Actual : Fv : Allowable: Load Comb: Max Reactions (k) D L Lr s w E Left Support 0.69 0.55 Right Support 0.69 0.55 D(0.1375) Lr(0.1101 ...'.•,.a-�ri. e^.v.`Svad ..' .:.,....1'.:L--..^A:'"..�T"°rv-...T.-......�r11iCu'=.a L 10.0 ft, 6x12 H Downward L+Lr+S 0.022 in Downward Total 0.050 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Defl Ratio 5378 >480 Total Deft Ratio 2390 >240 Lr = 0.020 k/ft, Trib= 5.50 ft 0.181. 1 306.24 psi at 5.000 ft in Span # 1 1,687.50 psi +D+Lr+H 0.112: 1 23.87 psi at 9.067 ft in Span # 1 212.50 psi +D+Lr+H Max Reactions (k) D L Lr s w E Left Support 0.69 0.55 Right Support 0.69 0.55 D(0.1375) Lr(0.1101 ...'.•,.a-�ri. e^.v.`Svad ..' .:.,....1'.:L--..^A:'"..�T"°rv-...T.-......�r11iCu'=.a L 10.0 ft, 6x12 H Downward L+Lr+S 0.022 in Downward Total 0.050 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Defl Ratio 5378 >480 Total Deft Ratio 2390 >240 Norm Scheel Structural Engineer, 5022 Sunrise Blvd. Fair. Oaks, CA 95628 Project Title: Johnson Garage Engineer: SS Project Descr. PMHI Project ID: 17040 Wood ;Beam :Desi.gn .: 4' HDR `Calculations;perfNDS201'2i TIBC:2012,=CBC'2013, rASCE::7=1'0 BEAM Size: 6x12, Sawn, Fully Unbraced Using Allowable Stress Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species : Douglas Fir - Larch Wood Grade: No.1 Fb -Tension 1350 psi Fc - Prll 925 psi F%, 170 psi Ebend- xx 1600 ksi Density 31.2 pcf Fb - Compr 1350 psi Fc - Perp 625 psi Ft 675 psi Eminbend - xx 580 ksi Applied Loads Unif Load: D = 0.0250, Lr = 0.020 k/ft, Tdb= 17.50 ft Desion Surnmary ` " - nm 437611 nn nsm Max fb/Fb Ratio 0.092: 1 fb : Actual : 155.90 psi at 2.000 ft in Span# 1 Fb: Allowable: 1,687.50 psi Load Comb: +D+Lr+H Max fv/FvRatio = 0.093: 1 fv : Actual: 19.67 psi at. 0.000 ft in Span # 1 Fv : Allowable: 212.50 psi Load Comb: +D+Lr+H Max Reactions (k). D L Lr S W E H Downward L+Lr+S 0.002 in Downward Total 0.004 in Left Support 0.88 0.70 Upward L+Lr+S 0.000 in Upward Total 0.000 in Right Support, 0.88 0.70 Live Load Defl Ratio 26414 >480 Total Defl Ratio 11739 >240 Post Supporting Beams Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 9 of 20 Post Calculations for Beams and Girders Lumber C CSI Calculations Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 9 of 20 Diaphragm Calculations Diaphragm Level 1 'X" Axis 4 Sub -Diaphragms X Axis Grid Lines Wind Load Seismic Load Diaphragm Block Diaphragm Width Depth Nailing Left Right Bottom Top Left Right Left Right Shear (plf) Diaphragm DO 32.00 32.00 A : B 1 2 2171 2171 1194 1194 68 No 8d @ 6" o.c. i , E F i Check Hole.in Diaphragm Grid Lines { Maximum Foice Hole # Width Depth Left Right Bottom Top At Comer # Nailing Strapping Diaphragm Deflection at Cantilevered Diaphragms Diaphragm Specifications Diaphragm Blocked Calculated Deflection Allowable Deflection Roof • 15/32" APA' Rated Sheathing Panel ID 32/16 " 8d Nails @ 6" o. c. Edge and 12"o. c. Field Panels to be applied perpendicular to framing members " Job Number. 17040 Project Manager Steve Smith. Date 1/26/2017 Page Number 10 of 20 Diaphragm Calculations Diaphragm Level 1 "Y" Axis Sub -Diaphragms X Axis Grid Lines Wind Load Seismic Load Diaphragm Block Diaphragm Width . Depth Nailing Left Right Bottom Top Left Right Left Right Shear (plf Diaphragm Dyl 32.00 32.00 A B 1 2 2692 2692 1194 1194 84 No 8d @ 6" o.c. Check Hole in Diaphragm Hole # Width Depth Grid Lines Maximum Force Nailing Strapping Left Right Bottom Top At Comer # r Diaphragm Deflection at Cantilevered Diaphragms Diaphragm Specifications Diaphragm Blocked Calculated Deflection Allowable Deflection Roof 15/32" APA Rated Sheathing Panel ID 32116 8d Nails @ 6" o.c. Edge and 12"o.c. Field Panels to be applied perpendicular to framing members Job Number 17040 Project Manager Steve Smith Date 1/2612017 Page Number 11 of 20 15/32" APA rated sheathing both faces with 10d nails at 2" o.c. edge and 12" o.c. field. 1540 2154 3x framing members at adjoining panel edges 3/4" � x 12"long Anchor Bolts @ 16" o.c. 3x sill plate 19/32" APA rated sheathing both faces with 10d nails at 2" o.c. edge and 12" o.c. field. J 1740 2434 3x framing members at adjoining panel edges 3/4" x 12" long Anchor Bolts @ 16" o.c. 3x sill plate Notes 1) Where panels applied on both faces of a wall and nail spacing is less than 6 inches o.c. on either side, panel joints shall be offset to fall on different framing members, or framing shall be 3 -inch nominal or thicker at adjoining panel edges and nails on each side shall be staggered 2) Galvanized nails shall be hot dipped or tumbled. 3) Framing members or blocking required at all panel edges in shear wall. 4) All shear wall values are based on 16" o.c. stud spacing. 5) 2 anchors minimum per shear wall. 6) All Framing members used in the construction of shear walls to be Douglas Fir Larch. 7) 3"x3"x1/4" steel washers required at all anchor bolts used in shear Job Number 17040 walls. Washeredge shall be within 1/2" of sheathing slotted washers are Project Manager Steve Smith permitted. Date 1/26/2017 Page Number 12 of 20 Shear Wall Schedule Seismic Design Category A, B, C, D, E, & F 2016 CBC 2015 IBC Shear Wall Seismic Wind Specifications Type Capacity Capacity A 260 365 3/8" APA rated sheathing one face with 8d nails at 6" o.c. edge and 12" o.c. field. 5/8" � x 12" long Anchor Bolts @ 48" o.c. 2x sill plate g 380 532 3/8" APA rated sheathing one face with 8d nails at 4" o.c. edge and 12" o.c. field. 3x framing members at adjoining panel edges or dbl. studs w/ 16d.@ 4" o.c. 5/8" � x 12" long Anchor Bolts @ 32" o.c. 2x sill plate C 490 685 3/8" APA rated sheathing one face with 8d nails at 3" o.c. edge and 12" o.c. field. 3x framing members at adjoining panel edges or dbl. studs w/ 16d @ 3" o.c. 5/8" � x 12" long Anchor Bolts @ 32" o.c. 2x sill plate 3/8" APA rated sheathing one face with 8d nails at 2" o.c. edge and 12" o.c. field. 640 895 3x framing members at adjoining panel edges 5/8" � x 12" long Anchor Bolts @ 16" o.c. 3x sill plate, 15/32" APA rated sheathing one face with 10d nails at 2" o.c. edge and 12" o.c. field. E 770 1077 3x framing members at adjoining panel edges 5/8" � x 12" long Anchor Bolts @ 16" o.c. 3x sill plate 19/32" APA rated sheathing one face with 10d nails 'at 2" o.c. edge and 12" o.c. field. F 870 1217 3x framing members at adjoining panel edges 5/8" � x 12" long Anchor Bolts @ 16" o.c. 3x sill plate 3/8" APA rated sheathing both faces with 8d nails at 3" o.c. edge and 12" o.c. field. G 980 1370 3x framing members at adjoining panel edges 5/8" � x 12" long Anchor Bolts @ 16" o.c.•3x sill plate 3/8" APA rated sheathing both faces with 8d nails at 2" o.c. edge and 12" o.c. field. H 1280 1790 3x framing members at adjoining panel edges 5/8" � x 12" long Anchor Bolts @ 16" o.c. 3x sill plate 15/32" APA rated sheathing both faces with 10d nails at 2" o.c. edge and 12" o.c. field. 1540 2154 3x framing members at adjoining panel edges 3/4" � x 12"long Anchor Bolts @ 16" o.c. 3x sill plate 19/32" APA rated sheathing both faces with 10d nails at 2" o.c. edge and 12" o.c. field. J 1740 2434 3x framing members at adjoining panel edges 3/4" x 12" long Anchor Bolts @ 16" o.c. 3x sill plate Notes 1) Where panels applied on both faces of a wall and nail spacing is less than 6 inches o.c. on either side, panel joints shall be offset to fall on different framing members, or framing shall be 3 -inch nominal or thicker at adjoining panel edges and nails on each side shall be staggered 2) Galvanized nails shall be hot dipped or tumbled. 3) Framing members or blocking required at all panel edges in shear wall. 4) All shear wall values are based on 16" o.c. stud spacing. 5) 2 anchors minimum per shear wall. 6) All Framing members used in the construction of shear walls to be Douglas Fir Larch. 7) 3"x3"x1/4" steel washers required at all anchor bolts used in shear Job Number 17040 walls. Washeredge shall be within 1/2" of sheathing slotted washers are Project Manager Steve Smith permitted. Date 1/26/2017 Page Number 12 of 20 Holdown Specifications 2016 CBC 2015 IBC Notes 1) Holdowns may be raised off the sill with no reduction in load. 2) All screws to be Simpson SDS 114"x 2 112". - 3) All holdown post and sill plates are designed to be Douglas Fir Larch. 4) See detail 52 in plans for anchor and footing requirements at holdowns. 5) Connect double holdown studs together with 24-16d sinker nails minimum. y First Floor Holdown Table Holdown Type Holdown Name Holdown Type Holdown Name 1'Z Minimum Required Post 3 Bolt ° de F Capacity' A HDU2-SDS2.5 2-2X4 or 2-2x6 PAB5 5 1/2" 8 1/2" 3075 # B HDU4-SDS2.5 2-2X4 or 2-24 PAB5 5 1/2" 8 1/2" 4565 # C HDU5-SDS2.5 2-2X4 or 2-2x6 PAB5 5 1/2" 8 1/2" 5645# D HDU8-SDS2.5 4X6 PAB7 81/2" 13" 7870# E HDU11-SDS2.5 4X6 PABB 1 10" 15" 9535# F HDU14-SDS2.5 4x8 or 6x6 PABB 1 10" .15" 14445 # Notes 1) Holdowns may be raised off the sill with no reduction in load. 2) All screws to be Simpson SDS 114"x 2 112". - 3) All holdown post and sill plates are designed to be Douglas Fir Larch. 4) See detail 52 in plans for anchor and footing requirements at holdowns. 5) Connect double holdown studs together with 24-16d sinker nails minimum. y Notes 1) Centerline of strap to be center of rim joist. 2) ' Maximum clear span to be 16". 3) All nails to be common wire unless noted otherwise. 4) Minimum post required to be installed in upper and lower wall framing. 5) Connect double holdown studs together with 24-16d sinker nails minimum. r J LI Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 13 of 20 Second Floor Holdown Table Holdown Type Holdown Name Required Length Required Nails Min. Required Post 4 Capacity G CS16 Strap 32" Long 26-8d or 22-10d 2x4 or 2x6 1705 # H MSTC40 Strap 40" Long 36-16d Sinkers ' 2-2X4 or 2-24 3080 # I MSTC52 Strap 52" Long 48-16d Sinkers 4x4 4620 # .1 MSTC66 Strap 66" Long 68-16d Sinkers 4x4 5860 # K CMST14 Strap 76" Long 66-16d 4x4 6490 # L CMST12 Strap 94" Long 86-16d 4x6 9215 # Notes 1) Centerline of strap to be center of rim joist. 2) ' Maximum clear span to be 16". 3) All nails to be common wire unless noted otherwise. 4) Minimum post required to be installed in upper and lower wall framing. 5) Connect double holdown studs together with 24-16d sinker nails minimum. r J LI Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 13 of 20 Shear Wall -Data and Uplift Calculations Seismic Dead Load Additional Wall # Shear Wall Calculations Holdown Holdown l pIf Uplift Left Uplift Right Left U pig Right Type Left Type Right Grid Line Data and Loads 0.00 0 0.00 384 384 A A Notes: GHd Line = A Wind Load ` 1) All panel edges to be edge nailed = 2692 # Level = 1 Seismic Load 17040 = 1194 # Diaphragm Type = Roof Rho Factor Date = 1.30 Seismic Design Category = D Critical Load = Wind Wind Design = 110 mph Exp. C Total Length of S.W. This Line = 8 ft Shear Wall Data and Base Shear Calculations Wall # Length Height H/W Ratio BS Wind 2W/H BS Seismic S.W. Type Sill Plate x r Waa sheers 1 8.00 11.50 2.00 337 1.00 149 B 2x Sill Plate Yes Shear Wall Data and Uplift Calculations Wind Additional Distance Additional Distance Wall # Dead Load plf Wind Suction pif Uplift Left Uplift Right Uplift Left Left Uplift Right Right 1 555 -79.32 0 0.00 0 0:00 2856 2856 Shear Wall -Data and Uplift Calculations Seismic Dead Load Additional Wall # Distance Additional Distance Uplift Left Uplift Right Holdown Holdown l pIf Uplift Left Uplift Right Left U pig Right Type Left Type Right 1 555 0 0.00 0 0.00 384 384 A A Notes: 1) All panel edges to be edge nailed 2) Job Number 17040 3) Project Manager Steve Smith 4) Date 1/2612017 Page Number 14 of 20 Job Number Project Manager Date Page Number 17040 Steve Smith 1126!2017 15 of 20 Drag Force Ca,iculations Grid Line Data and Loads Grid Line = A Wind Load = 2692 # Level = 1 Seismic Load = 1194 # Diaphragm Type = Roof Rho Factor = 1.30 Seismic Design Category = D Critical Load = Wind Wind Design = 110 mph Exp. C Total Length of S.W. This Line = 8 ft Diaphragm Length = 32 ft Diaphragm Shear = 84 plf Base Shear = 337 plf Drag Forte Diagram Job Number Project Manager Date Page Number 17040 Steve Smith 1126!2017 15 of 20 Shear Wall Data and Uplift Calculations Wind Additional Distance Additional Distance Wall # Dead Load pif Wind Suction plf Uplift Left Left Uplift Right Right Uplift Left Uplift Right 1 204 -18.13 0 0.00 0 0.00 1955 1955 Shear Wall Data and Uplift Calculations Seismic Dead Load Additional Distance Additional Distance Holdown Holdown Wall # If Uplift Left Left Uplift Uplift Left Uplift Right P PiU PiRight 9 Right 9 Type Left Type Right 1 204 0 0.00 0 0.00 410 410 A A Notes: 1) All panel edges to be edge nailed 2) 3) 4) Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 16 of 20 Shear Wall Calculations Grid Line Data and Loads Grid Line = B Wind Load = 2692 # Level = 1 Seismic Load = 1194 # Diaphragm Type = Roof Rho Factor = 1.30 Seismic Design Category = D Critical Load = Wind Wind Design = 110 mph Exp. C Total Length of.S.W. This Line = 12 ft Shear Wall Data and Base Shear Calculations Wall # Length g Height H/W Ratio BS Wind 2W/H BS Seismic S.W. T g Type; 3" x 3" Sill Plate Washers 1 12.00 11.50 2.00 224 1.00 100 A 2x Sill Plate Yes Shear Wall Data and Uplift Calculations Wind Additional Distance Additional Distance Wall # Dead Load pif Wind Suction plf Uplift Left Left Uplift Right Right Uplift Left Uplift Right 1 204 -18.13 0 0.00 0 0.00 1955 1955 Shear Wall Data and Uplift Calculations Seismic Dead Load Additional Distance Additional Distance Holdown Holdown Wall # If Uplift Left Left Uplift Uplift Left Uplift Right P PiU PiRight 9 Right 9 Type Left Type Right 1 204 0 0.00 0 0.00 410 410 A A Notes: 1) All panel edges to be edge nailed 2) 3) 4) Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 16 of 20 Drag Force Calculations Grid Line Data and Loads Grid Line = B Wind Load = 2692 # Level = 1 Seismic Load = 1194 # Diaphragm Type = Roof Rho Factor = 1.30 Seismic Design Category = D Critical Load = Wind Wind Design = 110 mph Exp. C Total Length of S.W. This Line = 12 ft Diaphragm Length = 32 ft Diaphragm Shear = 84 plf Base Shear 224 plf Drag Force Diagram j 0 .............. ... .... .. ........ .. .......... .Z30 -20010 15 20 25 -400 !......... .............. -600 -800 / r. -1000 ..... ......................... ,' -1200......... ..... .............. _.................... ._............................... ............ ... .................. .......:.... ......._._._...... --.... ............... .............. -1400 -1600: -1800....................................... .... ......................... ..........................................•�............... ....................... .... .................. ................ ............ rtl: �i ........ ........... ........ ...... ................ ................ ...... ... _........,.........:..,.._................................................. Strap Locations Drag Truss Loads d, Force Strap Type Label Span Force Uplift Connection to Wall 0. . Job Number 17040 Project Manager Steve Smith Date 1/2612017 Page Number 17 of 20 Wood Strong -Wall Calculations �snung-tvaq��Sesnean:•ans ' - - '.SIMPSON' InstallationDetails e.r 2692 # 1194 # 1.30 Wind 3450 # 0.78 OK Uplift Grid Line Data and Loads 9993 Grid Line = 1 Wind Load SWS618 Level = 1 Seismic Load Diaphragm Type = Roof Rho Factor 6 SDS1l4" x 6 3/4" FOR 12" WIDE SWSB, PROVIDED Seismic Design Category = D Critical Load Wind Design = 110 mph Exp. C Capacity for Strong -Walls 8 SDS114" x 6 3/4" FOR 18" WIDE SWSB, PROVIDED Wood Strong -Wall Specifications Distance to Allowable Load on Wall Dead Load Wall # Wall Specification % of Load ," Wall (ft.) Load (#) W on Wall (#) 1 SWSB18x10 19.00 1575 0.50 1346 200 2 SWS1318x10 30.50 1575 0.50 1346 200 �snung-tvaq��Sesnean:•ans ' - - '.SIMPSON' InstallationDetails e.r 2692 # 1194 # 1.30 Wind 3450 # 0.78 OK Uplift Anchor Type 9993 SWSB18 9993 SWS618 j I j I j I j[-- DOUBLE TOP PLATE WALL FRAMING 6 SDS1l4" x 6 3/4" FOR 12" WIDE SWSB, PROVIDED 8 SDS114" x 6 3/4" FOR 18" WIDE SWSB, PROVIDED ' 12 SDS114" x 6 314" FOR 24' WIDE SWSB. PROVIDED UTILITY CHASE SEE 6/SWSB2 FOR ALLOWABLE HOLE ZONE - PRIOR TO PLACING SWSB BODY ADJACENT STUDS OR PANELS, TIGHTEN THE SLOTTED HOLDOWN NUTS. 1',!,,"MINIMUM CLEAR SPACE FROM THE SIDE IS REQUIRED TO ACCESS NUTS AND ^i WASHERS. HOLDOWN BRACKET •. %HOLDOWN NUT HOLDOWN WASHER - } _ G HEAVY HEX NUT '4 `—TIE OR HAIRPIN WHEN . REQUIRED FOUNDATION (SEE SHEET SWSB1 FOR ANCHORAGE SOLUTIONS) SWSB DESIGNED TO PROVIDE Yb" GAP BETWEEN WOOD AT BOTTOM OF SWSB AND CONCRETE. ENSURE CONCRETE IS LEVEL Job Number 17040 AND SMOOTH BENEATH PANEL. GRIND OR FILL AS NECESSARY. Project Manager Steve Smith Date 1/26/2017 SINGLE STORY SWSB ON CONCRETE - 'L/SWSB2 page, Number 18 of 20 Shear Wall Data and Base Shear Calculations Wall # Length Height H/W Ratio BS Wind 2W/H BS Seismic S.W. Type Sill Plate 3" x 3" Washers 1 10-00 11.50 2.00 269 1.00 119 B 2x Sill Plate Yes Shear Wall Data and Uplift Calculations Wind Additional Distance Additional Distance Wall # Dead Load plf Wind Suction plf Uplift Left Left Uplift Right Right Uplift Left Uplift Right 1 243 -24.93 0 0.00. 0 0.00 2491 2491 Shear Wall Data and Uplift Calculations Seismic Dead Load Additional Distance Additional Distance Holdown Holdown Wall # plf Uplift Left Left Uplift Right Right Uplift Left Uplift Right Type Left Type Right 1 243 0 0.00 0 0.00 644 644 A A Notes: 1) All panel edges to be edge nailed 2) 3) 4) Job Number 17040 Project Manager Steve Smith Date .1126/2017 Page Number 19. of 20 'Shear Wall Calculations Grid Line Data and Loads Grid Line = 2 Wind Load = 2692 # Level = 1 Seismic Load = 1194 # Diaphragm Type = Roof Rho Factor = 1.30 Seismic Design Category = D Critical Load = Wind Wind Design = 110 mph Exp. C Total Length of S.W. This Line _ = 10 ft Shear Wall Data and Base Shear Calculations Wall # Length Height H/W Ratio BS Wind 2W/H BS Seismic S.W. Type Sill Plate 3" x 3" Washers 1 10-00 11.50 2.00 269 1.00 119 B 2x Sill Plate Yes Shear Wall Data and Uplift Calculations Wind Additional Distance Additional Distance Wall # Dead Load plf Wind Suction plf Uplift Left Left Uplift Right Right Uplift Left Uplift Right 1 243 -24.93 0 0.00. 0 0.00 2491 2491 Shear Wall Data and Uplift Calculations Seismic Dead Load Additional Distance Additional Distance Holdown Holdown Wall # plf Uplift Left Left Uplift Right Right Uplift Left Uplift Right Type Left Type Right 1 243 0 0.00 0 0.00 644 644 A A Notes: 1) All panel edges to be edge nailed 2) 3) 4) Job Number 17040 Project Manager Steve Smith Date .1126/2017 Page Number 19. of 20 1 Drag Force Calculations Grid'Line Data and Loads Grid Line = 2 Wind Load = 2692 # Level = 1 Seismic Load = 1194 # Diaphragm Type = Roof Rho Factor = 1.30 Seismic Design Category = D Critical Load = Wind Wind Design = 110 mph Exp. C Total Length of S.W. This Line = 10 ft Diaphragm Length = 32 ft Diaphragm Shear = 84 plf Base Shear = .269 plf Drag'Force Diagram, 1000', i 500 0 5 10 115 20 xS 30 Job Number 17040 Project Manager Steve Smith Date 1/26/2017 Page Number 20 of 20 N `� • ;, t. f..�. N `� Butte County Department of Dev6lopment Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 El SITE PLAN, Assessors Parcel Number: A] F71— 1 D El Permit #:121 F.F21 I V FORM NO DBP -3 f31.7-0 X48 047-740-006 . A4 \'[Afl. 02-. 2017 G AR (1024) AV ELEC Address/ Phone: Site Location: .-C&6tact Name: 5ewev-'Y 306+bv" Phone: UN Page I of I tu'