HomeMy WebLinkAboutB17-0387 024-040-064BUILDER/ CONTRACTOR RESPONSIBILITIES Drawing Validity — These drawings, supporting structural calculations and design certification are based on the Shop Primed Steel — All structural members of the Metal Building System not fabricated of corrosion resistant order documents as of the date of these drawings. These documents describe the material supplied by the material or protected by a corrosion resistant coating are painted with one coat of shop primer meeting the manufacturer as of the date of these drawings. Any changes to the order documents after the date on these performance requirements of SSPC Paint Specification No. 15. All surfaces to receive shop primer are cleaned of drawings may void these drawings, supporting structural calculations and design certification. The loose rust, loose mill scale and other foreign matter by using, as a minimum, the hand tool cleaning method Builder/Contractor is responsible for notifying the building authority of all changes to the order documents which SSPC—SP2 (Steel Structures Painting Council) prior to painting. The coat of shop primer is intended to protect the result in changes to the drawings, supporting structural calculations and design certification. steel framing for only a short period of exposure to ordinary atmospheric conditions. Shop Primed steel stored in F3 the field pending erection should be kept free of the ground and so positioned as to minimize water—holding Builder Acceptance of Drawings — Approval of the manufacturer's drawings and design data affirms that the pockets, dust, mud and other contamination of the primer film. Repairs of damage to primed surfaces and/or manufacturer has correctly interpreted and applied the requirements of the order documents and constitutes removal of foreign material due to improper field storage or site conditions are not the responsibility of the Builder/Contractor acceptance of the manufacturer's interpretations of the order documents and standard product manufacturer. The Manufacturer is not responsible for deterioration of the shop coat of primer or corrosion that specifications, including its design, fabrication and quality criteria standards and tolerances. (AISC code of may result from exposure to atmospheric and environmental conditions, nor the compatibility of the primer to any standard practice Sept 86 Section 4.2.1) (Mar 05 Section 4.4.1) field applied coating. Minor abrasions to the shop coat (including galvanizing) caused by handling, loading, shipping E4 unloading and erection after painting or galvanizing are unavoidable. Touch—up of these minor abrasions is the Code Official Approval — It is the responsibility of the Builder/Contractor to ensure that all project plans and responsibility of the End Customer (MBMA 06 IV 4.2.4) specifications comply with the applicable requirements of any governing building authority. The Builder/Contractor PROJECT NOTES is responsible for securing all required approvals and permits from the appropriate agency as required. FRAME CROSS SECTION 0 Material properties of steel bar, plate, and sheet used in the fabrication of built—up structural framing members Builder is responsible for State, Federal and OSHA safety compliance — The Builder/Contractor is responsible for conform to ASTM A529, ASTM A572, ASTM A1011 SS, or ASTM A1011 HSLAS with a minimum yield point of 50 applying and observing all pertinent safety rules and regulations and OSHA standards as applicable. ksi. Material properties of hot rolled structural shapes conform to ASTM A992, ASTM A529, or ASTM A572 with a minimum specified yield point of 50 ksi. Hot rolled angles, or other than flange braces, conform to ASTM 36 Building Erection — The Builder/Contractor is responsible for all erection of the steel and associated work in minimum. Hollow structural shaped conform to ASTM A500 grade b, minimum yield point is 42 ksi for round compliance with the Metal Building Manufacturers drawings. Temporary supports, such as temporary guys, HSS and 46 ksi for rectangular HSS. Material properties of cold form light gage steel members conform to the braces, false work or other elements required for erection will be determined, furnished and installed by the requirements of ASTM A1011 SS Grade 55 or ASTM A1011 HSLAS Class 1 Grade 55, with a minimum yield point erector. (AISC Code of Standard Practice Sept 86 Section 7.9.1) (Mar 05 Section 7.10.3) of 55 ksi. Discrepancies — Where discrepancies exist between the Metol Building plans and plans for other trades, the Metal Building plans will govern. (AISC Code of Standard Practice Sept 86 Section 3.3) (Mar 05 Section 3.3) accordance with the "Specification for Structural Joints using ASTM A325 or A490 bolts, June 30, 2004". Pretensioning methods, including turn—of—nut and calibrated wrench are not required unless noted otherwise. Materials by Others — All interface and compatibility of any materials not furnished by the manufacturer are the responsibility of and to be coordinated by the Builder/Contractor or A/E firm. Unless specific design criteria The manufacturer does not assume an responsibility for the erection nor field supervision of the structure and Y P Y P concerning any interface between materials if furnished as a part of the order documents, the manufacturers or any special inspections (including inspection of the high strength bolts or field welds) as required during assumptions will govern. erection. The coordination and the costs associated for setting up and Special Inspections are the responsibility of the Erector, Owner, Architect, or Engineer of Record. Correction of Errors — Normal erection operations include the correction of minor misfits by moderate amounts of reaming, chipping, welding or cutting and the drawing of elements into line through the use of drift pins. Design is based upon the more severe loading of either the roof snow load or the roof live load. Errors which cannot be corrected by the foregoing means or which require major changes in the member configuration should be reported immediately to the owner and fabricator by the erector, to enable whoever is Loads, as noted, are given within order documents and are applied in general accordance with the applicable responsible either to correct the error or to approve the most efficient and economical method of correction to provisions of the model code and/or specification indicated. Neither the manufacture nor the certifying engineer be used by others. (AISC Code of Standard Practice Sept 86 Section 7.12)(Mor 05 Section 7.14) declares or attests that the loads as designated are proper for the local provisions that may apply or for site specific parameters. The manufacturer's Engineer's certification is limited to design loads supplied by an Modification of the Metal Building from Plans — The Metal Building supplied by the manufacturer has Architect and/or engineer of record for the overall construction project. been designed according to the Building Code and specifications and the loads shown on this drawing. Modification of the building configuration, such as removing wall panels or braces, from that shown on these This project is designed using manufacture's standard serviceability standards. Generally this means that all plans could affect the structural integrity of the building. The Metal Building Manufacturer or a Licensed stresses and deflections are within typical performance limits for normal occupancy and standard metal building Structural Engineer should be consulted prior to making any changes to the building configuration shown on products. If special requirements for deflections and vibrations must be adhered to, then they must be clearly these drawings. The Metal Building Manufacturer will assume no responsibility for any loads applied to the stated in the contract documents. building not indicated on these drawings. X—bracing (if applicable) is to be installed to a taut condition with all slack removed. Do not tighten beyond Safety Commitment —The Metal Building Manufacturer has a commitment to manufacture quality building this state. components that can be safely erected. However, the safety commitment and job site practices of the erector are beyond the control of the building manufacturer. It is strongly recommended that safe working conditions The design collateral load has been uniformly applied to the design of the building. Hanging loads are to be and accident prevention is the top priority of any job site. Local, State and Federal safety and health attached to the purlin web. This may not be appropriate for heavily concentrated loads. Any attached load in standards, whether standard statutory or customary, should always be followed to help ensure worker safety. excess of 150 pounds shall be accounted for by special design performed by a licensed engineer using Make certain all employees know the safest and most productive way to erect a building. Emergency procedures concentrated loads and may require separate support members within the roof system. should be known to all employees. Daily meetings highlighting safety procedures are also recommended. The use of hard hats, rubber sole shoes for roof work, proper equipment for handling material, and safety nets where This metal building system is designed as enclosed. All exterior components (i.e. doors, windows, vents, etc.) applicable, are recommended. For purposes of determining lift requirements, no bundles supplied by the must be designed to withstand the specified wind loading for the design of components and cladding in manufacturer will exceed 4000 lbs. For further information also reference the bill of materials for individual accordance with the specified building code. Doors are to be closed when a maximum of 50% of design wind member weights of other structural members. If additional information is required contact the customer service velocity is reached. department. BAS BAST Expandable Main frames Foundation Design — The Metal Building Manufacturer is not responsible for the design, materials and The rigid frame at line 1 and 5 are designed to receive additional bay 30 feet measuring from center line REs workmanship of the foundation. Anchor rod plans prepared by the manufacturer are intended to show only of the column to the steel line of the additional bay. Corresponding frame reactions are calculated based location, diameter and projection of the anchor rods required to attach the Metal Building System to the upon actual tributary area. sYs foundation. It is the responsibility of the end customer to ensure that adequate provisions are made for specifying rod embedment, bearing values, tie rods and or other associated items embedded in the concrete sEls foundation, as well as foundation design for the loads imposed by the Metal Building System, other imposed Gutter note loads, and the bearing capacity of the soil and other conditions of the building site. (MBMA 06 Sections 3.2.2 Using Northern 7 x 7 utter with 4 x 5 downspouts, the roof drainage system has been designed usingBLD 9 9 P g Y 9 the method outlined in the MBMA Metal Building Systems Manual. Downspout locations have not been BASI and A3 located on these drawings. The downspouts are to be placed on the building sidewalls at a spacing not Dissimilar Materials — Never allow your roof to come in contact with, or water runoff from, any dissimilar metal to exceed spacing 120 feet with the first downspout from both ends of the gutter run within 30 end the Downspout that does the will be in S It d : t t d lumber Calcium used in concrete mortar feet of end. spacing not exceed maximum spacing compliance DESIGN LOADING THIS STRUCTURE IS DESIGNED UTILIZING THE LOADS INDICATED AND APPLIED AS REQUIRED BY: CBC 16 THE BUILDER IS TO CONFIRM THAT THESE LOADS COMPLY WITH THE REQUIREMENTS OF THE LOCAL BUILDING DEPARTMENT. FRAME / ROOF DEAD LOAD 2,140 PSF SUPERIMPOSED COLLATERAL (LIGHTS) 3.5 PSF ROOF LIVE LOAD RISK CATEGORY SNOW LOAD GROUND SNOW LOAD (Pg) SNOW LOAD IMPORTANCE FACTOR (Is) FLAT ROOF SNOW LOAD (Pf) SNOW EXPOSURE FACTOR (Ce) THERMAL FACTOR (Ct) 20.00 PSF (REDUCIBLE) II — Normal 0.0000 PSF 1.0000 0 PSF 1.0 WIND LOAD ULTIMATE WIND SPEED 110 MPH NOMINAL WIND SPEED (Vasd) 85 MPH (IBC SECTION 1609.3.1) SERVICEABILITY WIND SPEED 72 MPH WIND EXPOSURE CATEGORY C TOPOGRAPHICAL FACTOR 1.0 INTERNAL PRESSURE COEFFICIENT (GCpi) 0.18 /-0.18 ZONE 4, COMPONENT WIND LOAD < 10FT2 26.047 PSF PRESSURE -28.218 PSF SUCTION ZONE 5, COMPONENT WIND LOAD < 10FT2 26.047 PSF PRESSURE -34.665 PSF SUCTION ZONES PER ASCE 7-10; FIG. 30.4-1 ZONES PRESSURES SHOWN ARE UN—FACTORED RAIN INTENSITY 5—MINUTE DURATION, 5—YEAR RECURRENCE (11) 3.3 IN/HOUR SEISMIC LOAD SEISMIC IMPORTANCE FACTOR (le) 1.00 Ss 0.5835 SDs 0.5183 S1 0.2679 SDS 0.3321 SITE CLASS D STIFF SOIL SEISMIC DESIGN CATEGORY D ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE DRAWING INDEX ISSUE PAGE DESCRIPTION 0 C1 COVER SHEET 0 F1 ANCHOR BOLT PLAN 0 F2 ANCHOR BOLT REACTIONS 0 F3 ANCHOR BOLT DETAILS 0 E1 ROOF FRAMING PLAN 0 E2 FRONT SIDEWALL 0 E3 BACK SIDEWALL 0 E4 LEFT ENDWALL 0 E5 RIGHT ENDWALL 0 E6—E8 FRAME CROSS SECTION 0 DET1-12 STANDARD DETAILS 0 R1 —R8 INSTALLATION SHEETS DRAWING STATUS 1:1 FOR APPROVAL THESE DRAWINGS, BEING FOR APPROVAL, ARE BY DEFINITION NOT FINAL, AND ARE FOR CONCEPTUAL REPRESENTATION ONLY. THEIR PURPOSE IS TO CONFIRM PROPER INTERPRETATION OF THE PROJECT DOCUMENTS. ONLY DRAWINGS ISSUED "FOR ERECTOR INSTALLATION" CAN BE CONSIDERED AS COMPLETE. F FOR CONSTRUCTION PERMIT THESE DRAWINGS, BEING FOR PERMIT, ARE BY DEFINITION NOT FINAL. ONLY DRAWINGS ISSUED "FOR ERECTOR INSTALLATION" CAN BE CONSIDERED AS COMPLETE. 1XI FOR ERECTOR INSTALLATION FINAL DRAWINGS FOR CONSTRUCTION. UMN LINE 1-6 SWA&SWC C FORCE RESISTING SYSTEM* C4 B3 PONSE MODIFICATION COEFFICIENT(R) 3,5 3.25 ENGINEERING SEAL TEM OVER—STRENGTH FACTOR(,2o) 3.0000 2.0000 MIC RESPONSE COEFFICIENT(Cs) 0.148 0.16 THIS CERTIFICATION COVERS PARTS MANUFACTURED AND DELIVERED BY THE MANUFACTURER ONLY, G DESIGN BASE SHEAR (V) TRANSVERSE 12.23(k) LONGITUDINAL10.07 (k) AND EXCLUDES PARTS SUCH AS DOORS, WINDOWS, C STRUCTURAL SYSTEM (FROM ASCE 7-10 TABLE 12.2-1) FOUNDATION DESIGN AND ERECTION OF THE BUILDING. THE TRANSVERSE DIRECTION IS PARALLEL TO THE RIGID FRAMES THESE DRAWINGS AND THE METAL BUILDING SYSTEM THE LONGITUDINAL DIRECTION IS PERPENDICULAR TO THE RIGID FRAMES THEY REPRESENT ARE THE PRODUCT OF AN AFFILIATE OF NCI GROUP, INC. — 10943 N. SAM HOUSTON including but not limited to. Copper and Arsenic a s use in reg e cause with the building code. The gutter and downspout system as provided by the manufacturer is designed to and grout. accommodate 3.3 in/hr rainfall intensity as it corresponds to a 5 year recurrence interval. 1 d 7 ' ill corrosion of the conditions and if found, they should be removed. Debris Removal — Any foreign debris such as sawdus , it , anima roppings, e c. w roof, gutters, trim, etc. if left on building surfaces for a long enough time. The roof should be periodically inspected for such conditions and if found, they should be removed. Rev. 8/12/14 PARKWAY W., HOUSTON, TX 77064. THE PROFESSIONAL ENGINEER WHOSE SEAL APPEARS HEREON IS EMPLOYED BY AN AFFILIATE OF NCI GROUP, INC. AND IS NOT THE ENGINEER—OF—RECORD FOR THE OVERALL PROJECT. BUILDING SIZE: 60'-0" x 120'-0" x 22'-0" 1.0:12 - -- - ISSUE DATE DESCRIPTION BY CK'D DSN T -- A STAR BUILDING SYSTEMS 8600 SOUTH 1-35 SERVICE ROAD 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR OKLAHOMA CITY, OK 73149-�, , A RobertsonCeco Company (800)-879-782.8 PROJECT: LEVI ROSSER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. PHASE 1 OWNER: JASBIR KULLAR BUILDING ID A JOB NUMBER 15-B-65255 SHEEP NUMBER ISSUE C1 0 Feb 05, 2017 low 0 I 0 N v 1'-2" 30'-0" 28'-10" 2 30'-0" 120'-0" OUT -TO -OUT OF STEEL n 30'-0" 119 5 30'-0" 28-10, _ , 1'-2" C x—L5racing 28'-10 11'-6" 16'-0" J 16'-0" 11'-6" W 1'-2" W 30,-0" 30,-0 30,-0" 30,-0" V) II O O � O I I o O N I O O I 0 B 0 I 0 N v 1'-2" 30'-0" 28'-10" 2 30'-0" 120'-0" OUT -TO -OUT OF STEEL n 30'-0" 119 5 30'-0" 28-10, _ , 1'-2" (U U U ANCHOR BOLT PLAN ISSUE DATE DESCRIPTION BY CK'D DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR "19 5 0 0 I N O I 0 N 0 0 I N �m STAR BUILDING SYSTEMS 8600 SOUTH I-35 SERVICE ROAD A RobertsonCeco Company OKLAHOMA CITY, OK 73149 (800)-879-7828 PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC TOWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEEP NUMBER ISSUE 1/23/17 N.T.S. 1 a 15—B-65255 F1 0 O Dia= 5/8" * Dia= 3/4" Feb 05, 2017 0) x—L5racing 28'-10 11'-6" 16'-0" T 2'-6" 2'-6" 16'-0" 11'-6" 28'-10" 1'-2" 30,-0" 30,-0 30,-0" 30,-0" (U U U ANCHOR BOLT PLAN ISSUE DATE DESCRIPTION BY CK'D DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR "19 5 0 0 I N O I 0 N 0 0 I N �m STAR BUILDING SYSTEMS 8600 SOUTH I-35 SERVICE ROAD A RobertsonCeco Company OKLAHOMA CITY, OK 73149 (800)-879-7828 PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC TOWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEEP NUMBER ISSUE 1/23/17 N.T.S. 1 a 15—B-65255 F1 0 O Dia= 5/8" * Dia= 3/4" Feb 05, 2017 0) I _. NOTES FOR REACTIONS DATE BUILDING REACTIONS ARE BASED ON BY I THE FOLLOWING BUILDING DATA: t DSN WIDTH (FT) = 60 LENGTH (FT) = 120 EAVE HEIGHTFT) = 22 / 22 ROOF SLOPE rise/ 12) = 1.0:12 / 1.0:12 DEAD LOAD psf = 2.140 COLLATERAL LOAD (psf) = 3.5 ROOF LIVE LOAD (psf) = 20.00 (REDUCIBLE) FRAME LIVE LOAD ( sf) = 12 ROOF SNOW LOAD psf) = 0 GROUND SNOW LOAD (psf) = 0.0000 WIND SPEED (MPH = 110 NOMINAL WIND SP ED(Vosd) = 85 MPH (IBC SECTION 1609.3.1) SERVICEABILITY WIND SPEED = 72 MPH WIND CODE = CBC 16 EXPOSURE = C CLOSED/OPEN = Closed IMPORTANCE - WIND = 1.00 IMPORTANCE - SEISMIC = 1.00 SEISMIC ZONE = D ANCHOR BOLT SUMMARY Dia Proj FRAME LINES: 1 2 3 4 5 H �V RIGID FRAME: ANCHOR BOLTS & BASE PLATES IV (h)Rigid frame at endwall *See RF reactions table for vertical and horizontal reactions in plane of the rigid frame. ISSUE DATE Qty Locate (in) Type (in) BY I CK'D t DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR I PNR I SSR O 8 Jamb 5/8" F1554 2.00 Frm Col Anc._Bolt Base -Plate (in) Grout O 16 Endwall 5/8" F1554 2.00 Line Line Qty Dia Width Length Thick (in) 0 40 Frame 3/4" F1554 2.50 1* D 4 0.750 6.000 9.500 0.375 0.0 GENERAL NOTES 1 * A 4 0.750 6.000 9.500 0.375 0.0 1. THE REACTIONS PROVIDED ARE BASED ON THE ORDER DOCUMENTS AT THE TIME OF MAILING. ANY CHANGES TO BUILDING LOADS 1 * Frame lines: 1 2 4 5 OR DIMENSIONS MAY CHANGE THE REACTIONS. THE REACTIONS WILL BE SUPERSEDED AND VOIDED BY ANY FUTURE MAILING. 2. REACTIONS ARE PROVIDED AS UN -FACTORED FOR EACH LOAD RIGID FRAM E: ANCHOR BOLTS & BASE PLATES GROUP APPLIED TO THE COLUMN. THE FOUNDATION ENGINEER WILL APPLY THE APPROPRIATE LOAD FACTORS AND COMBINE THE Frm Col Anc._Bolt Base (in) Grout REACTIONS IN ACCORDANCE WITH THE BUILDING CODE AND Line Line Qty Dia -Plate Width Length Thick (in) DESIGN SPECIFICATIONS TO DETERMINE BEARING PRESSURES AND CONCRETE DESIGN. THE FACTORS APPLIED TO LOAD GROUPS FOR THE STEEL COLUMN DESIGN MAY BE DIFFERENT THAN THE 3 D 4 0.750 6.000 9.500 0.375 0.0 FACTORS USED IN THE FOUNDATION DESIGN. 3 A 4 0.750 8.000 10.00 0.375 0.0 3. THE MANUFACTURER DOES NOT PROVIDE "MAXIMUM" LOAD COMBINATION REACTIONS. HOWEVER, THE INDIVIDUAL LOAD REACTIONS PROVIDED MAY BE USED BY THE FOUNDATION ENGINEER RIGID FRAME: BASIC COLUMN REACTIONS (k ) TO DETERMINE THE APPLICABLE LOAD COMBINATIONS FOR HIS/HER DESIGN PROCEDURES AND ALLOW FOR AN ECONOMICAL FOUNDATION Frame Column -----Dead-----Collateral- ----- Live ------Wind_Left1- -Wind_Right1- --Wind-Left2- DESIGN Line Line Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert 4. THE METAL BUILDING MANUFACTURER IS RESPONSIBLE FOR THE 1* D 1.1 2.9 1.4 3.2 4.7 10.8 -11.3 -19.2 -0.1 -11.6 -10.8 -11.4 DESIGN OF THE ANCHOR BOLT DIAMETER ONLY TO PERMIT THE 1 * A -1.1 2.9 -1.4 3.2 -4.7 10.8 0.1 -11.6 11.3 -19.2 -0.4 -3.8 TRANSFER OF FORCES BETWEEN THE BASE PLATE AND THE 3 D 1.1 2.9 1.4 3.2 4.8 10.8 -11.4 -19.2 -0.3 -11.6 -10.8 -11.4 ANCHOR BOLT IN SHEAR, BEARING AND TENSION, BUT IS NOT 3 A -1.1 3.1 -1.4 3.2 -4.8 10.8 0.2 -11.6 11.5 -19.2 -0.4 -3.8 RESPONSIBLE FOR THE ANCHOR BOLT EMBEDMENT FOR TRANSFER OF FORCES TO THE FOUNDATION. THE METAL BUILDING Frame Column -Wind_Right2- --Wind_Long1---Wind_Long2- -Seismic-Left Seismic -Right -Seismic-Long MANUFACTURER DOES NOT DESIGN AND IS RESPONSIBLE FOR Line Line Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert .NOT THE DESIGN, MATERIAL AND CONSTRUCTION OF THE FOUNDATION 1* D 0.4 -3.8 -1.6 -21.3 -2.1 -18.1 -1.6 -1.1 1.6 1.1 0.0 -4.4 EMBEDMENTS. THE END USE CUSTOMER SHOULD ASSURE HIMSELF 1* A 10.8 -11.4 2.1 -18.3 1.6 -21.4 -1.6 1.1 1.6 -1.1 0.0 -4.5 THAT ADEQUATE PROVISIONS ARE MADE IN THE FOUNDATION 3 D 0.2 -3.8 -1.7 -21.2 -2.3 -18.1 -1.4 -1.0 1.4 1.0 0.0 -4.4 DESIGN FOR LOADS IMPOSED BY COLUMN REACTIONS OF THE 3 A 11.0 -11.4 2.3 -13.8 1.7 -17.0 -1.5 1.0 1.5 -1.0 0.0 0.0 BUILDING, OTHER IMPOSED LOADS, AND BEARING CAPACITY OF THE SOIL AND OTHER CONDITIONS OF THE BUILDING SITE. 1 * Frame lines: 1 2 4 5 ENDWALL COLUMN: BASIC COLUMN REACTIONS (k ) IT IS RECOMMENDED THAT THE ANCHORAGE AND FOUNDATION OF THE BUILDING BE DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER EXPERIENCED IN THE DESIGN OF SUCH STRUCTURES, Wind Wind (SECTION A3 MBMA 2006 METAL BUILDING SYSTEMS MANUAL) Frm Col Dead Press Suct 5. BOTTOM OF ALL BASE PLATES ARE AT THE SAME ELEVATION. Line Line Vert Horz Horz (UNLESS NOTED) 1 C 0.3 -4.8 5.2 6. ANCHOR RODS ARE ASTM F1554 GRADE 36 MATERIAL UNLESS 1 B 0.3 -4.8 5.2 NOTED OTHERWISE. 5 B 0.3 -4.8 5.2 5 C 0.3 -4.8 5.2 ENDWALL COLUMN: ANCHOR BOLTS & BASE PLATES BUILDING BRACING REACTIONS Frm Col Anc._Bolt Base_Plote (in) Grout Reactions inlane of wall p Line Line Qty Dia Width Length Thick (in) f Reactions(k) Panel -Shear Wall - Loc Line Col Wind - -Seismic - (Ib/ft) Line Horz Vert Horz Vert Wind Seis Note 1 C 4 0.625 6.000 10.00 0.375 0.0 1 B 4 0.625 6.000 10.00 0.375 0.0 L -EW 1 (h) 5 B 4 0.625 6.000 10.00 0.375 0.0 F -SW A 1,2 6.4 * 5.0 * 5 C 4 0.625 6.000 10.00 0.375 0.0 R_EW 5 (h) B_SW D 3,2 6.4 * 5.0 (h)Rigid frame at endwall *See RF reactions table for vertical and horizontal reactions in plane of the rigid frame. ISSUE DATE DESCRIPTION BY I CK'D t DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR I PNR I SSR -STAR- ► , PROJECT: LEVI ROSSER STAR BUILDING SYSTEMS A RobertsonCeco Company 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 LUMN LINE CUSTOMER: ROBBER ENTERPRISES INC I OWNER: JASBIR KULIAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE 1/23/17 N.T.S. 1 a 15-13-65255 F2 0 Feb 05, 2017 )ia= 5/8" c - n v cn DETAIL A Dia= 3/4" w� 6" 1 —2 DETAIL B Dia= 3/4" 6„ -T- CN r- 2 2 See Plan DETAIL C Dia= 3/4" 8„ -T- CD �I� DETAIL D 10 1/4" 4" 3" 10 1/4" 10 1/4" SW SW SW Framed Opening Width 1 3/4 1 3/4 ARDiaFromed Opening AR Layout 5/8111 Dia= 5/8" DETAIL E SW 1 1/4 Door Opening Width 1 1/4 ISSUE DATE N Equal Equal 0 1/23/17 � q q V N ,a + Steel Line + + AR Dial Walk Door AR Layout 1/2 ;1 DESCRIPTION FOR ERECTOR INSTALLATION -STAR - PROJECT: LEVI ROSSER STAR BUILDING SYSTEMS A aorP,t=onC:<o Comp,ny CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBERSHEET NUMBER ISSUE i a 15—B-65255 F3 0 Feb 05, 2017 I1� 0 I N O N w O U I � O Ln O 0 I O N w O U I � o � rO =D cn Li O O O O n N 2 30'-0" RF1-1 E-3 GENERAL NOTES: 1. INSTALL ALL PURLIN AND FLANGE BRACES (FB) AS SHOWN. 2. ROOF PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. STRUT PURLINS, IF PROVIDED, MUST BE INSTALLED AND FASTENED TO ROOF SHEETING PER PBR PANEL ROOF DETAIL. 4. DO NOT ADD ANY ADDITIONAL ROOF OPENINGS WITHOUT BUILDING MANUFACTURER APPROVAL OR PROFESSIONAL ENGINEER APPROVAL. 5. DO NOT STACK SHEET BUNDLES ON ROOF. ONLY RAISE INDIVIDUAL SHEETS AS NEEDED. 6. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. RF3-1 30'-0" F-9 120'-0" OUT—TO—OUT OF STEEL n RF? —1 P-2 T C JOB NUMBER SHEET NUMBER RF3-2 i PART LENGTH E1 P-1 10X25Z13 33'- P-3 Typ 1/2)) cg_� ce_4 RF3— 1 OX25Z13 34-7 1/211 P-3 RF3-1 3'-1 3/4", 3'-1 3/4" L-4 30'-0" F-9 RF3-1 30'-0" E-1 5 RF1-1 1 RF2-4 1'-5 3 4 1'-5 3/4" ROOF FRAMING PLAN ISSUE 0 E-5 RF3-1 3'-1 3/4', 3'-1 3/4" DATE DESCRIPTION 1/23/17 FOR ERECTOR INSTALLATION E-3 L O I 0 N -2 K�1-1 0 0 N 0 I O N C w O U I Q o � I O O 0 F675—B (9) O I N O I N SPECIAL BOLTS ROOF PLAN o ID QUAN TYPE DIA LENGTH WASH 1 4 A325 1 2" 1 1 4° 0_ MEMBER TABLE ROOF PLAN BUILDING ID JOB NUMBER SHEET NUMBER MARK i PART LENGTH E1 P-1 10X25Z13 33'- 1 1/2)) P-2 1 OX25Z13 34-7 1/211 P-3 1 OX25Z13 34-7 1/2 P-4 1 OX25Z 13 33'- 1 1/2 E-1 1OES1L14 29'-11 1/2" E-2 10ES 1 L14 29'-11 1/2" E-3 10ES11-14 29'-11 1/2" E-4 10ES1L14 29'-11 1/2" E-5 IOES1L14 29'-11 1/2" CB -3 1/2" DIA. ROD 35'-3" CB -4 1/2" DIA. ROD 32'-0" CONNECTION PLATES ROOF PLAN ❑ ID MARK PART 1 SC18 � - NOTE: I LTP ; S TO BE FIELD LOCA -ED I I &FIELD CUT (BY OTHERS) INSTALLATIOM MUST COMPLY �L J WITH OSHA REQUIREMENTS ROOF SHEETING PANELS: 26 Gauge PBR Galvalume BY CK'o DSN A� STAR BUILDING SYSTEMS PNR PNR SSR �p A Ro6ertsonCeco Company PROJECT: LEVI ROSSER CUSTOMER: ROSSER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/117 N.T.S. 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE i a 15—B-65255 E1 0 Feb 05, 2017 0 rl I GIRT LAPS 0 r� co I 30'-0" 2 30'-0" 120'-0" OUT—TO—OUT OF STEEL i 30'-0" I 30'-0" 5 I I L I L -� RFI -1 RF3-1 RF2-4 RF3-1 RF1-1 11'-6" 16'-0" N 1 N 16'-0" 11'-61$ 2'-5 3/4"1 2 2'-5 3 4" ll °-5 3/4°° 2'-5 3/4" SIDEWALL FRAMING: FRAME LINE H 1 2 3 (Gutter with 3 downspouts) F1362—BL HW4062 F1361—B F1361—BL F1362—BR F1362—BL 2'-5 3/4", 2'-5 3/4" 4 EXPANSION (F1364-13, F1363-13) F1362—BR � 13❑61—BR F73 GENERAL NOTES: 1. INSTALL ALL GIRTS AND FLANGE BRACES (FB) AS SHOWN. 2. WALL PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. OTHER THAN FOR WALK DOORS AND WINDOWS SHOWN ON THE CONTRACT, DO NOT ADD ADDITIONAL WALL OPENINGS WITHOUT APPROVAL OF BUILDING MANUFACTURER OR PROFESSIONAL ENGINEER. 4. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. SIDEWALL SHEETING & TRIM: FRAME LINE A PANELS: 76 Gcuce PBP, — Polar dVh'Ae ISSUE DATE DESCRIPTION BY I CK'D DSN STAR BUILDING SYSTEMS 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR O� A RobertsonCeco Company PROJECT: LEVI ROSSER MEMBER TABLE FRAME LINE A MARK PART LENGTH DJ -1 1 OF35C 14 15'-0" DJ -2 1 OF35C 14 15'-0" DJ -3 1 OF35C 14 15'-0" DJ -4 1OF35C14 15-0" JB -1 10F35C14 6'-1 1/4" JB -2 1 OF35C 14 6'-1 1 /4" JB -3 10F35C14 6'-1 1/4" JB -4 10F35C14 6'-1 1/4" DH -1 1OF25C14 16'-0" E-1 10ES1L14 29'-11 1/2" E-3 10ES1 L14 29'-11 1/2" E-4 IOES1L14 29'-11 1/2" E-5 10ES 1 L14 29'-11 1 2" G-9 1OX35Z12 32'-5 1 2" G-10 10X25Z14 32'-51/21) G-11 10X35Z14 13'-8" G-12 10X25Z14 34'-11 1/2" G-13 10X25Z14 4'-4 1/2" G-14 1OX25Z14 N 1/2" G-15 1 OX35Z 14 rj N 10X35Z12 32'-5 1/2" G-17 10X25Z 14 32'-5 1/2" CB -1 5/8" DIA. ROD 35'-9" CD I O I I F981 F981 N F481 F481 1 00 0 00 00 00 00 00 00 LL_Lei � 0-) C-) LL_ d- -1- lj_ o-) N F73 GENERAL NOTES: 1. INSTALL ALL GIRTS AND FLANGE BRACES (FB) AS SHOWN. 2. WALL PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. OTHER THAN FOR WALK DOORS AND WINDOWS SHOWN ON THE CONTRACT, DO NOT ADD ADDITIONAL WALL OPENINGS WITHOUT APPROVAL OF BUILDING MANUFACTURER OR PROFESSIONAL ENGINEER. 4. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. SIDEWALL SHEETING & TRIM: FRAME LINE A PANELS: 76 Gcuce PBP, — Polar dVh'Ae ISSUE DATE DESCRIPTION BY I CK'D DSN STAR BUILDING SYSTEMS 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR O� A RobertsonCeco Company PROJECT: LEVI ROSSER MEMBER TABLE FRAME LINE A MARK PART LENGTH DJ -1 1 OF35C 14 15'-0" DJ -2 1 OF35C 14 15'-0" DJ -3 1 OF35C 14 15'-0" DJ -4 1OF35C14 15-0" JB -1 10F35C14 6'-1 1/4" JB -2 1 OF35C 14 6'-1 1 /4" JB -3 10F35C14 6'-1 1/4" JB -4 10F35C14 6'-1 1/4" DH -1 1OF25C14 16'-0" E-1 10ES1L14 29'-11 1/2" E-3 10ES1 L14 29'-11 1/2" E-4 IOES1L14 29'-11 1/2" E-5 10ES 1 L14 29'-11 1 2" G-9 1OX35Z12 32'-5 1 2" G-10 10X25Z14 32'-51/21) G-11 10X35Z14 13'-8" G-12 10X25Z14 34'-11 1/2" G-13 10X25Z14 4'-4 1/2" G-14 1OX25Z14 34'-11 1/2" G-15 1 OX35Z 14 13'-8" G-16 10X35Z12 32'-5 1/2" G-17 10X25Z 14 32'-5 1/2" CB -1 5/8" DIA. ROD 35'-9" 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 CUSTOMER: ROBBER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER 1/23/17 N.T.S. 1 a 15—B-65255 SHEET NUMBER ISSUE E2 0 CONNECTION PLATES FRAME LINE A ❑ ID MARK PART 1 SC584—L 2 SC584—R Feb 05, 2017 0 i CD co N I� N 0 co I 5 120'-0" OUT—TO—OUT OF STEEL 1 � 3 2 30'-0" 30'-0" 30'-0" 30'-0" 1'-2„ 1,_2„ I -Ea J24 F-1 J4 E-2 E-2 E-3 I I I I I RF1-1 RF3-1 RF2-1 RF3-1 RF1-1 GIRT 2'-5 3/4", 2'-5 3/4"1 2'-5 3/4"1 LAPS 1 2'-5 3/4" 2'-5 3/4" 2'-5 3/4" F1362—BL F1361—BL ❑ C GENERAL NOTES: 1. INSTALL ALL GIRTS AND FLANGE BRACES (FB) AS SHOWN. 2. WALL PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. OTHER THAN FOR WALK DOORS AND WINDOWS SHOWN ON THE CONTRACT, DO NOT ADD ADDITIONAL WALL OPENINGS WITHOUT APPROVAL OF BUILDING MANUFACTURER OR PROFESSIONAL ENGINEER. 4. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. SIDEWP,LL FRAMING: FRAME LINE D 3 (Gutter with 3 downspouts) HW4062. F1361—B F1362—BR F1362—BL EXPANSION (F1364—B, F1363—B) F1361—BR 110 F73 SIDEWALL SHEETING &TRIM: FRAME LINE D PANELS: 26 Gauge PBR —Polar White SSUE DATE DESCRIPTION BY CK'D I DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR d; STAR BUILDING SYSTEMS A RobertsonCeca Company MEMBER TABLE FRAME LINE D G-18 G-19 G-19 G-20 E-1 � G-19 G-20 1/2)) G-18 H2 G-19 29'-11 1/2" E-3 10ES11-14 03 I I I I I RF1-1 RF3-1 RF2-1 RF3-1 RF1-1 GIRT 2'-5 3/4", 2'-5 3/4"1 2'-5 3/4"1 LAPS 1 2'-5 3/4" 2'-5 3/4" 2'-5 3/4" F1362—BL F1361—BL ❑ C GENERAL NOTES: 1. INSTALL ALL GIRTS AND FLANGE BRACES (FB) AS SHOWN. 2. WALL PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. OTHER THAN FOR WALK DOORS AND WINDOWS SHOWN ON THE CONTRACT, DO NOT ADD ADDITIONAL WALL OPENINGS WITHOUT APPROVAL OF BUILDING MANUFACTURER OR PROFESSIONAL ENGINEER. 4. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. SIDEWP,LL FRAMING: FRAME LINE D 3 (Gutter with 3 downspouts) HW4062. F1361—B F1362—BR F1362—BL EXPANSION (F1364—B, F1363—B) F1361—BR 110 F73 SIDEWALL SHEETING &TRIM: FRAME LINE D PANELS: 26 Gauge PBR —Polar White SSUE DATE DESCRIPTION BY CK'D I DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR d; STAR BUILDING SYSTEMS A RobertsonCeca Company MEMBER TABLE FRAME LINE D MARK PART LENGTH E-1 10ES1 L14 29-11 1/2)) E-2 1 OES 1 L14 29'-11 1/2" E-3 10ES11-14 29'-11 1/ 2" G-18 1OX25Z13 32'-5 1 'I G-19 10X25Z 14 34'-111 2" G-20 10X25Z13 32'-5 1 2" CB -2 5/8" DIA. ROD 36'-9" 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER 1/23/17 N.T.S. 1 a 15—B-65255 SHEET NUMBER ISSUE E3 0 Feb 05, 2017 'z�r1" 12 0 0 I CD co I 1 N f-_ N GENERAL NOTES: 1. INSTALL ALL GIRTS AND FLANGE BRACES (FB) AS SHOWN. 2. WALL PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. OTHER THAN FOR WALK DOORS AND WINDOWS SHOWN ON THE CONTRACT, DO NOT ADD ADDITIONAL WALL OPENINGS WITHOUT APPROVAL OF BUILDING MANUFACTURER OR PROFESSIONAL ENGINEER. 4. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. 60'-0" OUT—TO—OUT OF STEEL 20'-0" 20'-0" 20'-0" RAI -1 'Al —1 12 �o 1 t �}— D %B34 v ' — G-5 G-8 00 ' r,-2 II 4�D16 C6 3❑ G-1 G-5 G-4 I I EC -1 EC -1 ENDWALL FRAMING: FRAME LINE 1 G-7 i, II II c -s D16 op 4 Q Q Q F1 672—B F2379—L F1667 D F1667 F237g_R F1667 L _ F16,67—R F73 ENDWALL SHEETING &TRIM: FRAME LINE 1 PANELS: 26 Gauge PBR —Polar White ISSUE DATE DESCRIPTION 0 1/23/17 FOR ERECTOR INSTALLATION 12 -STAR BEARING FRAME ONLY! BOLT TABLE WASHER TO BE USED AT ENDWALL COLUMN TO ENDWALL FRAME LINE 1 RAFTER CONNECTION. USE ONE WASHER ON COLUMN SIDE. LOCATION WASHER NOT NEEDED ON CLIP SIDE. Columns Raf STAR BUILDING SYSTEMS Roe.,.=o, ego C,,,oan, PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. UAN TYPE DIA LENGTH 8 A325 112" 1 174—" MEMBER TABLE FRAME LINE 1 BUILDING ID JOB NUMBER SHEEP NUMBER MARK 1 �r LENGTH E4 EC -1 r1 W10X12 22'-7 L 11 16 G-1 8X25Z12 18'-9 3/4 " G-2 8X25Z14 18'-9 3/4" G-3 8X25Z16 19-7 3/4" G-4 8X35713 19'-4" G-5 8X25Z14 19'-4" G-6 8X25712 y 3/4" G-7 8X25214 18'-9 3/4' G-8 8X25Z16 19'-7 3/4" t- �- C O _ I O y r- I I N N I N N N ) N ;� N N N � N N N N N N N N N N N N N N N N N NN N F73 ENDWALL SHEETING &TRIM: FRAME LINE 1 PANELS: 26 Gauge PBR —Polar White ISSUE DATE DESCRIPTION 0 1/23/17 FOR ERECTOR INSTALLATION 12 -STAR BEARING FRAME ONLY! BOLT TABLE WASHER TO BE USED AT ENDWALL COLUMN TO ENDWALL FRAME LINE 1 RAFTER CONNECTION. USE ONE WASHER ON COLUMN SIDE. LOCATION WASHER NOT NEEDED ON CLIP SIDE. Columns Raf STAR BUILDING SYSTEMS Roe.,.=o, ego C,,,oan, PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. UAN TYPE DIA LENGTH 8 A325 112" 1 174—" MEMBER TABLE FRAME LINE 1 BUILDING ID JOB NUMBER SHEEP NUMBER MARK 1 PART LENGTH E4 EC -1 r1 W10X12 22'-7 11 16 G-1 8X25Z12 18'-9 3/4 " G-2 8X25Z14 18'-9 3/4" G-3 8X25Z16 19-7 3/4" G-4 8X35713 19'-4" G-5 8X25Z14 19'-4" G-6 8X25712 18'-9 3/4" G-7 8X25214 18'-9 3/4' G-8 8X25Z16 19'-7 3/4" 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBER SHEEP NUMBER ISSUE 1 A 15-8-65255 E4 0 CONNECTION PLATES FRAME LINE 1 ❑ ID I MARK PART 1 Z16X 2 di 3 r1 4 SC -5 Feb 05, 2017 'z�—f1" 12 GENERAL NOTES: 1. INSTALL ALL GIRTS AND FLANGE BRACES (FB) AS SHOWN. 2. WALL PANEL PROVIDES STRUCTURAL STABILITY TO THE BUILDING. 3. OTHER THAN FOR WALK DOORS AND WINDOWS SHOWN ON THE CONTRACT, DO NOT ADD ADDITIONAL WALL OPENINGS WITHOUT APPROVAL OF BUILDING MANUFACTURER OR PROFESSIONAL ENGINEER. 4. AFTER INSTALLATION, WIPE ALL PANELS CLEAN OF METAL SHAVINGS CAUSED BY DRILLING. 60'-0" OUT—TO—OUT OF STEEL T -— C— 20' 0" 20'-0" 20'-0" RAI —I 10 RAI —1 D � 834 G-8 7 I EC -1 ENDWALL FRAMING: FRAME LINE 5 G-7 i I I c -s HIT7bb F2379—L F1667 — C~' F1672—B F166� �� = C El 667 F2379—R 667—R D El F73 ENDWALL SHEETING & TRIM: FRAME LINE 5 PANELS: 26 Gauge PBR — Polar White 1 " li:� 12 12 BEARING FRAME ONLY! BOLT TABLE WASHER TO BE USED AT ENDWALL COLUMN TO ENDWALLFRAME LINE 5 LOCATION RAFTER CONNECTION. USE ONE WASHER ON COLUMN SIDE. Columns Raf WASHER NOT NEEDED ON CLIP SIDE. F ISSUE DATE DESCRIPTION BY CK'D I DSN e STAR BUILDING SYSTEMS 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR pp A RobertsonCeco Company PROJECT: LEVI ROSSER UAN TYPE DIA LENGTH 8 A325 1/2" 1174 MEMBER TABLE FRAME LINE 5 MARK PART LENGTH EC -1 G-1 G-2 G-3 G-4 W 10X 12 8X25Z12 8X25Z14 8X25Z16 8X35Z13 22'-7 18'-9 18'-9 19'-7 19'-4" 11 16 3 4" 3/4" 3/4" G-5 G-6 G-7 G-8 8X25214 8X25212 8X25Z14 8X25Z16 19'-4" 18'-9 18'-9 19'-7 3/4" 3/4" 3/4" CONNECTION PLATES FRAM E LINE 5 ❑ ID I MARK PART 1 Z 1 BX 2 d1 3 rl 4 SC -5 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 CUSTOMER: ROBBER ENTERPRISES INC (OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER 1/23/17 N.T.S. 1 a 15—B-65255 SHEET NUMBER ISSUE E5 0 Feb 05, 2017 SPLICE PLATE & BOLT TABLE Mark Qty Web Plate Mark Top Bot Int Type Dia Length Width Thick Length SP -1 4 4 0 A325 3/4" 2 1/4" 6" 5/8" 2'-4" SP -2 4 4 0 A325 3/4" 2" 6" 1/2" 1'-7 7/8" BASE PLATE TABLE Col Plate Size Mark Width Thick Length BP -1 6" 3/8" 9 1/2" OFLANGE BRACES: BOTH SIDES(UNLESS NOTED) FBxxA(1): xx=length(in) A — L2X2X 14G 0 I ,Z:�1" 12 3" 26 Gauge PBR, Galwalume —1 10 1/4'' B FB6-2 0� 291-7 1 4„ 6@4'-9916„ W/SC1 FB6-1 7 FB31.8A 1 } �r F675—B 7 7 i1,-41' 11_'-4f' FB31.8A 1 FB31.BA(1)"� o o B/SC 1 F 61 MEMBER TABLE Mark Web Depth Web Plate Outside Flange Inside Flange Start End Thick Length 0 1/23/17 W x Thk x Len th W x Thk x Len th RF1-1 9.0/23.0 0.156 231.3 6 x 1/4" x 120.0 6 x 1/4",X120.2 23.0/23.0 0.185 24.5 6 x 5/16" x 133.9 6 x 5/16 x 111.5 STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, JUNE 30, 2004". 6x5/16 x33.6 RF1-2 21.0/13.0 0.185 87.6 6 x 1/4 if x 205.9 6 x 5/16" x 88.0 13.0/13.0 0.134 120.0 6 x 5/16" x 120.0 6 x 1/4" x 238.9 13-0/13.0 0.156 120.0 6 @ 4 _9 9/16„ W/sc I 6-1 FB31.8 A 1) FB32A 1) FB6-3 3" 1 I__5_ Q Lq N m Li 0 1/4 31 1"t�_,_,, 12 0 I Co I Feb 05, 2017 FRAME CROSS SECTION: ISSUE DATE FRAME EINE 1 5 DESCRIPTION BY CK'D DSN GENERAL NOTES: 1, ALL BOLTED JOINTS WITH A325M-09 TYPE 1 BOLTS GREATER THAN 112" DIAMETER ARE "SP "SPECIFICATION 0 1/23/17 FOR ERECTOR INSTAL CATION PNR PNR SSR A STAR BUILDING SYSTEMS 86 — 00 SOUTH 135 SERVICE ROAD SPECiFIED SUPERLOK PRETENSIONED JOINTS IN ACCORDANCE WITH THE FOR � : STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, JUNE 30, 2004". A RobertsonCeco Company OKLAHOMA CITY, OK 73149 PRETENSIONING CAN BE ACCOMPLISHED BY USING THE TURN—OF—NUT METHOD OF (800)-879-7828 TIGHTENING, CALIBRATED WRENCH, TWIST OFF TYPE TENSION CONTROL BOLTS OR DIRECT TENSION INDICATOR SUPERLOK ACCEPTABLE TO THE INSPECTING AGENCY AND BUILDING OFFICIAL. INSTALLATION INSPECTION REQUIREMENTS FOR PRE—TENSIONED JOINTS PROJECT: LEVI ROSSER (SPECIFICATION FOR STRUCTURAL JOINTS SECTION 9.2) USING TURN—OF—NUT METHOD IS SUGGESTED. THE CONNECTIONS ON THIS PROJECT ARE NOT SLIP CLITICAL. CUSTOMER: ROBBER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US 2. ALL FIELD CONNECTIONS OF SECONDARY FRAMING SHALL BE BOLTED WITH A325 BOLTS. CAD DATE SCALE PHASE BUILDING ID JOB. NUMBER SHEET NUMBER ISSUE 3. INSTALL ALL FLANGE BRACES ON COLUMN AND RAFTER SUPERLOK SHOWN 1/23/17 N.T.S. 1 A 15-8-65255 E6 0 Feb 05, 2017 SPLICE PLATE & BOLT TABLE CK'D Plate Size U- Ir k Mark Thick Length Qty Top Bot Int Type Dia Length Width Thick Length SP -1 x x 4 4 0 A325 3/4" 2 1/4" 6" 5/8" 2'-4" SP -2 4 4 0 A325 3/4" 2„ 6„ 1/2 1-7, 7/8" P-3 4 4 0 A325 3/4 2 1/4 „ 8 5/8 2'- 4 BASE PLATE TABLE Web Depth Col CK'D Plate Size U- Ir k Width Thick Length BP -1 6„ 3/8" 9 1/2" BP -2 8" 3/8„ 10" OFLANGE BRACES: BOTH SIDES(UNLESS NOTED) FBxxA(1): xx=length(in) A - L2X2X14G 0 I 101 O I I i-- N N ►,r► inrn 7A nl r IVILIVIULI\ Mark Ir%ULL Web Depth Web Plate CK'D Outside Flange W x Thk x Len th Inside Flange W xThk x Length Start End Thick Length RF2-1 SSR 9.0/16.3 16.3/23.0 0.156 0.185 1210 111.2 6 6 x x 1/4"x 5/16,, 120.0 x 133.8 6 6 x x 1 4",,x 5/16" 120.2 x 111.4 23.0/23.0 0.185 24.5 6 x 5/16 x 33.6 RF2-2 21.0/13.0 0.185 87.6 6 x 1/4 11 x 205.9 6 x 5/16" x 88.0 13.0/13.0 0.134 120.0 6 x 5/16" x 120.0 6 x 1/4" x 238.9 RF2-3 13.0/13.0 13.0/13.0 0.156 0.156 120.0 120.0 6 x 5/16" x 120.0 6 x 1/4" x 238.9 13.0/13.0 0.134 120.0 6 x 1/4" x 120.0 6 x 5/16' x 87.9 13.0/21.0 0.185 87.5 6 x 3/8 x 85.7 RF2-4 23.0/23.0 0.185 24.5 8 x 3/8" x 33.7 8 x 1/2 x 111.5 23.0/16.3 0.185 111.3 8 x 3/8" x 24.0 8 x 3/8" x 120.2 16.3 9.0 0.156 12x.0 8x38"x229.8 F675 -B 2g'_7 1 4" 29'-7 1 4„ 3„ 26 Gauge PBR, St Galvalume 1'-4" 1'- 6@ 4)_9 g 16„ 6@ 4- 9 9 16 „ ,Zf i 12 FB31,8A 1 FB31.BA 1 0 1 FB31.8A 1) �) �--- FB31.8A 1) FB31.8A 1 1.8A 1� FB31.8A � � � ) FB31.8A 1) FB _2 FB32A 1) FB3 ` , r _ 32A 1) FB6-3 FB6 iN�7 r U3 NTI N11 U3 j RF2-2 u2 � RF2-3 Ln N M I im GENERAL NOTES: 1. ALL BOLTED JOINTS WITH A325M-09 TYPE 1 BOLTS GREATER THAN 1/2" DIAMETER ARE SPECIFIED SUPERLOK PRETENSIONED JOINTS IN ACCORDANCE WITH THE "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, JUNE 30, 2004". PRETENSIONING CAN BE ACCOMPLISHED BY USING THE TURN -OF -NUT METHOD OF TIGHTENING, CALIBRATED WRENCH, TWIST OFF TYPE TENSION CONTROL BOLTS OR DIRECT TENSION INDICATOR SUPERLOK ACCEPTABLE TO THE INSPECTING AGENCY AND BUILDING OFFICIAL. INSTALLATION INSPECTION REQUIREMENTS FOR PRE -TENSIONED JOINTS (SPECIFICATION FOR STRUCTURAL JOINTS SECTION 9.2) USING TURN -OF -NUT METHOD IS SUGGESTED. THE CONNECTIONS ON THIS PROJECT ARE NOT SLIP CLITICAL. 2. ALL FIELD CONNECTIONS OF SECONDARY FRAMING SHALL BE BOLTED WITH A325 BOLTS. 3. INSTALL ALL FLANGE BRACES ON COLUMN AND RAFTER SUPERLOK SHOWN i n U; I U_ >z 00 W U � z cID Q w C)-) J U 1'-11 9/16" 2'- 4" 2 Bolts Unless Noted on Erection Drawings Purlin / Girt Clip, Shop Welded -- -- --- ----- --- - ---- ----------------- - - - - - - IC I I I il� I �� � I Flange Brace Clip SC , dee hoc Shop Welded X61 ' All Bolts are 1/2" x 1 1/4" A325 Without Washers FB6 Flange Brace Detail w U z Q0 Q W N J N U 54'-4 CLEARANCE +/- 60'-0" OUT -TO -OUT OF STEEL FRAME CROSS SECTION FRAME LINE 3 ISSUE DATE DESCRIPTION BY I CK'D DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PN SSR PROJECT: LEVI ROSSER 00 w U � z I ¢ w I q d-' l N t R2 i0l 1'-11 7 8" 10 1/4" STAR BUILDING SYSTEMS A RobertsonCeco Company 12 0 I Q0 I 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 CUSTOMER: ROBBER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEEP NUMBER ISSUE 1/23/17 N.T.S. 1 a 15-B-65255 E7 0 Feb 05, 2017 SPLICE PLATE & BOLT TABLE Qty Mark Top Bot Int Type Dia Length Width Thick Length SP -1 4 4 0 A325 3/4" 2 1/4" 6" 5/8" 2'-4" SP -2 4 4 0 A325 3/4" 2" 6" 1/2" 1'-7 7/8" BASE PLATE TABLE Col Plate Size Mark Width Thick Length RP -1 6" 3/8" 9 1 /2" FLANGE BRACES: BOTH SIDES(UNLESS NOTED) FBxxA(1): xx-length(in) A — L2X2X14G O I 101 „ „ 29'--7 1 4 26 Gauge PBR, Galwalume 6@4,-9916„ F675—B 111-4 1 1-41' 31.8A 1 FB31.8A 1 � FB31.8A 1) FB �) FB31.8A 1 FB31.8A 1) FB31.8A(1) MEMBER TABLE Mark Web Depth Web Plate Outside Flange W x Thk x Length Inside Flange W x Thk x Length Start End Thick Length RF3-1 RF3-2 9.0/23.0 23.0/23.0 21.0/13.0 13.0/13.0 13.0/13.0 0.156 0.185 0.185 0.134 0.156 231.3 24.5 87.6 120.0 120.0 6 x 1/4" x 120.0 6 x 5/16" x 133.9 6x5/16"x33.6 6 x 1/4" x 205.9 6 x 5/16" x 120.0 6 x 1/4" x 120.2 6 x 5/16" x 111.5 6 x 5/16" x 88.0 6 x 1/4" x 238.9 29'-7 J 4" 3„ 6@ 4g 9/16„ FP71 QA/l\ `` B —1 L"-,— I 1 I1'-11 9/16" 54'-4 3/8 1'-11 q 16" GENERAL NOTES: 1. ALL BOLTED JOINTS WITH A325M-09 TYPE 1 BOLTS GREATER THAN 112" DIAMETER ARE SPECIFIED SUPERLOK PRETENSIONED JOINTS IN ACCORDANCE WITH THE "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, JUNE 30, 2004". PRETENSIONING CAN BE ACCOMPLISHED BY USING THE TURN—OF—NUT METHOD OF TIGHTENING, CALIBRATED WRENCH, TWIST OFF TYPE TENSION CONTROL BOLTS OR DIRECT TENSION INDICATOR SUPERLOK ACCEPTABLE TO THE INSPECTING AGENCY AND BUILDING OFFICIAL. INSTALLATION INSPECTION REQUIREMENTS FOR PRE—TENSIONED JOINTS (SPECIFICATION FOR STRUCTURAL JOINTS SECTION 9.2) USING TURN—OF—NUT METHOD IS SUGGESTED. THE CONNECTIONS ON THIS PROJECT ARE NOT SLIP CLITICAL. 2. ALL FIELD CONNECTIONS OF SECONDARY FRAMING SHALL BE BOLTED WITH A325 BOLTS. 3. INSTALL ALL FLANGE BRACES ON COLUMN AND RAFTER SUPERLOK SHOWN CLEARANCE +/- 60'-0" OUT—TO—OUT OF STEEL FRAME CROSS SECTION: FRAME LINE 2 4 ISSUE DATE DESCRIPTION 0 1/23/17 FOR ERECTOR INSTALLATION BY CK'D DSN PNR PNR SSR PROJECT: LEVI ROSSER STAR BUILDING SYSTEMS A eose,i=once:o Company CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. 10 1/4" 12 O I 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE 1 n 15—B-65255 E8 0 Feb 05, 2017 Steel Line (1) #113 1/4 (2) 1/2 3) x 1 1/4 A325 Bolts ------- - ----------------- Co� o RA --/ Rake Angle Rigid Frame Rafter 1/2 71 x 1 1/4 )) A325 Bolts (Typ.) (U.N.) 0 Purlin Flange Brace As Required A � O ROOF PURLIN TO ENDWALL RIGID FRAME SIDEWALL GIRT SC5 -"- CLIP Sheeting r1 Clip 1/2" x 1 1/4" A325 Bolts (Typ.) (U.N.) RIGID FRAME COLUMN ENDWALL GIRT D 16 CORNER COLUMN TO WALL GIRT (2) I/ Y, 1 1 /4" A325 M. Boli Purlin ' Purlin, Clip - 2„ 2» 3116' Plate S/16" 3 Cold Formed Rafter Section A Anti—Rol 3116 PIC Rafter Ii1 of Rafter O OPurlin Clip 3/16" Plate Anti—Roll Clip 316 Plate 3 16" 3 3/16 3 Main Frame Rafter Section A E PURLIN ANTI—ROLL CLIP n -u-4 -0 EN G'dVAL L (6) 1/2 11 x 1 1/4 11 A325 Bolts (Typ.) (U.N.) RIGID FRAME RAFTER — CONNECTION PLATE-- ENDWALL COLUMN UB34ENDWALL RAFTER TO COLUMN C7 EW GIRT TO RIGID FRAME COLUMN �� -0 E3 ENDWALL COLUMN BASEPLATE PLAN ELEVATION BASE PLATE FOR ENDWALL COLUMN F_NIF) \A/A i I gni I IKANI 1 I V V V Y/ \ L_ L \J I I \ 1 .J 1/2 1) 0 x 1 1/4" A325 BOLTS D ENDWALL COLUMN TO WALL GIRT n_or Jamb Plan E BASE PLATE FOR DOOR JAMB ISSUE DATE DESCRIPTION BY CK'D DSN Am STAR Dl�ILDING SYSTEMS 8800 SOUTH I-35 SERVICE ROAD ' A RobertsonCeco Company OKLAHOMA CITY, OK 73149 (800)-879-7828 Feb 05, 2017 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR PROJECT: LN ROSSER �OFESSrp�, CUSTOMER: ROSSER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US C06157ITI CAD DATE 1/23/17 SCALE N.T.S. PHASE 1 BUILDING ID A JOB NUMBER 15—B-65255 SHEET NUMBER DET1 ISSUE 0 _ �@ �OF CA11F��� Eave Strut Roof Purlin Flange Brace Clip EAVE STRUT RF Column Flange Brace (As Required) 0 Additional 0 Flange Brace (As Required) Eave Strut C) v SC18 Sci a Additional -4-4- Flange Brace 0 (As Required) > ange race 0 0Rigid —1 /2"0 x 1 1 4 Frame A,325 BOLTS RF Rafter C 0 L U M N Column Rigid Frame Wall Girt 1/2 0 x 1 1/4" Column Flange Brace Clip --------- ----------------------- A325 BOLTS 1/2" x 1 1/4" A325 Bolts 1/2 x 1 1/4 A325 Bolts 1/2 x 1 1/4 A325 Bolts (Typ.) (U.N.) (Typ.) (U.N.) SECTION ELEVATION (Typ.) (U.N.) G2 ROOF PURLIN TO INTERIOR FRAME RAFTER 2 WALL GIRT TO RIGID FRAME COLUMN E A VE STRUT TO J4 RIDD FRAME J24 FAVE STRUT TO RIGID FRAME Door Jamb Wall Girt Door Header Door Jamb *Column WF or Wall Girt ROD Cee Bracing Pad (If Req'd) Welded Clip Hillside Washer E!) Welded Clip Door Jamb Wall Girt Welded Clip Nut Opening Similar connection Width o for Rafter. Door Jamb Flat 1/2" x 1 1 /4" A325 Bolts 1/2 x 1 1/4 A325 Bolts 1/2 x 1 1/4 A325 Bolts Insert Rod Through Slot in Web. Washer (Typ.) (U.N.) (Typ.) (U.N.) (Typ.) (U.N.) Then Assemble Hillside Washer, Flat Washer, and Nut. WALL GIRT TO DOOR JAMB DOOR JAMB TO WALL GIRT M j DOOR HEADER TO DOOR JAMB 0 DIAGONAL ROD ISSUE DATE DESCRIPTION BY CKD DSN STAR BUILDING SYSTEMS 8600 SOUTH 1-35 SERVICE ROAD 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR A RobertsonCeco Company OKLAHOMA CITY, OK 73149 (800)-879-7828 Feb 05, 2017 PROJECT: LEVI ROSSER CUSTOMER: ROSSER ENTERPRISES INC TOWNER: JASBIR KULLAR / . �e 4 LOCATION: GRIDLEY, CA 95948-9447 US 061574 CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE CIVIL 1/23/17 N.T.S. 1 A 15—B-65255 D ET2 0 cir C Rigid Frame Column () = Refer To Anchor Bolt Plan R2 ANCHOR BOLTS AT SIDEWALL COLUMNS Gutter C_ Trim Profile (Between Eave Closure See Sheeting > 1:12 and Roof Panel) Lay ut F312 Fastener #4 Classic 4-14 x J" LL Fastener #3 SD W/Washer 12-14 x 14" LL = SD W/Washer Q at 5-7-5 O.C. J-14 x J" LL PBR Roof Panel SD W/Washer a� un c 0 J-14 x J" LL -14 x IJ O d o C � N Z o N Finished Floor F321 Field Splice Lr a o / Cn r` a� F320 = 10'_6" F313 = 14'-6" O 4" Downspout Field Splice #14 1/8 x 3/16" Pop Rivet A field splice is required for eave heights greater than 16'-0". Cut a 10'-6" or 14'-6" length of downspout. Always measure the required length starting at the swaged end. After cutting to length, insert the swaged end of the cut downspout into the top of the lower downspout. Secure with pop rivets. 4" x 5" Roll Form Downspout TRIM 96 PBR Wall Panel Formed Base Trim F73 F73 Formed Base Tri 7A 1 /4" SD W/Washer C. to Fastener Minimum D.C. Maximum y Metal Building Mfr.) Without Panel Recess TRIM -39 Back Gutter (Shape May Vary) Bend 1 Tab 3 M m View Cn 2 Tab Front J DS Width t p o View Field Bevel Cut Top of Downspout Downspout V DS Depth DownSDOUt To Gutter Attachment Detail Refer to the building erection drawings for the location and spacing of the downspouts. 2. Locate all downspouts over a major panel rib if possable. 3. Make a cardboard template of the downspout shape . Place the template on the bottom of the gutter and trace the outline. Remove the template and draw a line from corner to corner, forming an "X" pattern. 4. Drill a whole at the center of the "X". Using tin snips, cut along the lines of the X only. Do not cut along the outside lines of the downspout square. 5. Bend each triangular tab down toward the ground, 90 Degrees to the bottom of the gutter. 6. Position the top of the downspout under the gutter. Make sure all four gutter tabs are on the inside of the downspout. 7. Install Fastener #14 through the downspout into the gutter tab. Only the two sides and the front of the downspout will receive fasteners. SSUE DATE 0 1/23/17 TRIM 98 PBR Panel Fastener #4A 1/4"-14 x 7/8" SD W/Washer at 1'-8 O.C. Field remove bearing leg as required Corner Trim F830 or F862 �vPanelV Rib Note: Standard panel location for Start and End panels is � panel rib at steel line. Refer to erection Drawings for panel location and Corner Trim piece mark. Outside Corner Trim — PBR Wall Panel TRIM_186 Downspout Kickout 4" x 5" Roll—Form Downspout Strap F797 TRIM 123 Downspout F320 OR F� Downspout Sti F797 Fastener ME Downspout Strap Attachment Detail 4" x 5" Roll—Form Die -Formed Metal Eave Closure PBR Wall & Roof Panel - Northern Gutter Stitch Screw TRIM -81 GPR02016 ate Feb'15 R05 at Both Sides „ Tape Sealer HW507 of High Rib 1 Extend to Point Beyond Eave Strut End View Gutter Strap DETAIL "A" Eave Panel Side Lap * Piece Mark Trim Profile Northern Cascading F1361 Classic F391 Contoured F2061 Signature F394 Tube Sealant HW54_ Trim Profile (Between Eave Closure See Sheeting > 1:12 and Roof Panel) Lay ut F312 Fastener #4 Classic 4-14 x J" LL Fastener #3 SD W/Washer 12-14 x 14" LL at V-0 O.C. SD W/Washer Eave Strut (2) Fastener #4 at 5-7-5 O.C. J-14 x J" LL PBR Roof Panel SD W/Washer at Both Sides of High Rib (1) Fastener #4 Fastener #4A J-14 x J" LL -14 x SD W/Washer SD W/Washer * * Piece Mark Trim Profile <= 1:12 > 1:12 Cascading F312 F550 Classic F312 F550 Contoured F2111 F550 Signature F312 F550 Each Side Lap *Gutter) 7A Fastener #1 (See Erection Dwgs FasteFaste x #1 For Piece Mark) her 1411 **Gutter Support at SD W/WasW/Was O.C. (See Erection Dwgs Eave Strut For Piece Mark Flashing profile may vary and Spacing) PBR Wall Panel Eave Closure E dependent upon project order. Metal Metal Attachment as illustrated are SECTION AT EAVE W/ NORTHERN GUTTER applicable for all profiles DESCRIPTION BY CK'D DSN FOR ERECTOR INSTALLATION PNR PNR SSR e. STAR BUILDING SYST€MS 8600 SOUTH I-35 SERVICE ROAD A RobertsonCeco Company OKLAHOMA CITY, OK 73149 (800)-879-7828 PROJECT: LEVI ROSSER CUSTOMER: ROSSER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE i a 15—B-65255 DET3 0 Feb 05, 2017 Field Notch top flanges (Note; Notch out hem leg at Northern gutters) T2) 1/4" bead runs -J of Tube Sealant Eave Gutter (Profile varies, Northern F1361 Shown) (10)Fastener #14 (11 )Fastener #14 required at lap required at lap Standard Northern F1308 F1361 Fastener #14 1/0 " 0 x 3/16" 2 O.C. max. (For placement see details below) 1" max. 2,° o.c. max. Typical Spacing Eave Gutter End Lap Installation Cascadinq Standard and Northern Gutter — PBR Roof Fastener #4- 1/4"-14 x 7/8" LL SD W/Washer at 1'-0 O.C. Tape Sealer HW506 - Rake Trim. Northern F1667 (shown) Northern Large F1755 See Below Rake Trim Outside Foam Closure up to 4:12 roof slope Fastener #4A 1/4"-14 x 7/8' TRIM -503 Fastener #17A 12-14 x 1-1/4" SD W/Washer (1) Per Conn. At Each Purlin Roof Panel Fastener #17A 12-14 x 1-1/4" SD W/Washer RA1e Angle Rake Slide Trim F215 Rnl„o Trim Outside Foam Closure up to 4:12 roof slope SD W/Washer Fastener #4A at 1'-0 O.C. Standard 1/4"-14 x 7/8” Alternate For roof runs of SD W/Washer For roof runs 100' or less at 1'-0 O.C. greater than 100' Note: For some special conditions the outside rib of the finish panel may fall short of the rake trim. Use the rake extension trim for this condition. Field cut the rake trim and rake extension trim if required. Rake Detail — PBR Roof Cascadinq Northern and Northern Large Rake Trim — Sheeted Wall TRIM -544 Tape Sealer HW506 Mitered Rake Trim Northern F1 667L (Shown) F1 667R (Opposite) Northern Large F1755L (Shown) F1755R (Opposite) Field Notch Iii 8�� Fastener #4 1/4"-14 x 7/8" LL SD W/Washer 3" O.C. max, (6 req'd, Trim Color) Rake End Cap F2379L (Shown) F2379R (Opposite) (3) Fastener #4 1/4"-14 x 7/8" (Rake to Peak Box) Tape Sealer HW506 * Peak Box — (See Erection Dwgs for Piece Marks) Fastener #4A - 1/4"-14 x 7/8 SD W/Washer at eachP anel rib W ffl 1 Min. Fastener #4 1/4"-14 x 7/8" LL SD W/Washer at 1'-0 O.C. Roof Panel -\-Rake Angle Fastener #17A 12-14 x 1-1/4" SD W/Washer Outside Panel Closure up to 4:12 RS Piece Mark \• Wall Panel 1.) Apply Tube Sealant to End Cap bottom and side tabs. Install �td q Field Cut flush Cap Cap 8-1/4" in from end of Gutter. Inspect after installing and seal F1585 F1672 F1760 any gaps with Tube Sealant. with or Trim Face of Panel Fastener #14 Northern 2.) Attach Eave Gutter to Roof Panel to ating end 1-1 /4" Mitered Northern Eave Gutter Fastener 1/8"0 x #14 3/16 1/8"0 x 3/16"F1361 F13fi2R (Shown) R (Shown) 2 O.C. max. 2" O.C. max. F1 362L (Opposite) F1361 L (Opposite) (7) at Northern (11) at Northern Northern Larae Northern Large (12) at Northern Large (18) at Northern Large F1409R (Shown) F1408R (Shown) Column Low Eave Rake Corner with Eave Gutter F1409L (Opposite} F1408L (Opposite) Field Notch lips Gutter (3) Fastener #4 1/4"-14 x 7/8" (Rake to Peak Box) Tape Sealer HW506 * Peak Box — (See Erection Dwgs for Piece Marks) Fastener #4A - 1/4"-14 x 7/8 SD W/Washer at eachP anel rib W ffl 1 Min. Fastener #4 1/4"-14 x 7/8" LL SD W/Washer at 1'-0 O.C. Roof Panel -\-Rake Angle Fastener #17A 12-14 x 1-1/4" SD W/Washer Outside Panel Closure up to 4:12 RS Piece Mark \• Wall Panel 1.) Apply Tube Sealant to End Cap bottom and side tabs. Install �td q End Cap Cap 8-1/4" in from end of Gutter. Inspect after installing and seal F1585 F1672 F1760 any gaps with Tube Sealant. F160 F4153 F381 F1024 Contoured 2.) Attach Eave Gutter to Roof Panel to ating end 1-1 /4" past face F2372 F2460 Si nature F916 F3853 1-1 4" of Panel or Trim. (See Gutter Placement) Downspout Strap _ (F797, F81 3.) Align edges of Eave Gutter and Rake Trim and attach Rake Steel Face of Panel Trim as shown. Apply Tube Sealant along edges to seal. Line Masonry Wall Attachment or Trim 4.) See Eave and Rake Construction Details included with Erection (2) each side F81 Fastener #55 Drawings for attachment of Eave Gutter and Rake Trim to Roof Gutter Placement and Walls. Column Low Eave Rake Corner with Eave Gutter Cascading Northern and Northern Large — PBR Roof TRIM -505 (3) Fastener #4 1/4"-14 x 7/8" (Rake to Peak Box) Tape Sealer HW506 * Peak Box — (See Erection Dwgs for Piece Marks) Fastener #4A - 1/4"-14 x 7/8 SD W/Washer at eachP anel rib W ffl 1 Min. Fastener #4 1/4"-14 x 7/8" LL SD W/Washer at 1'-0 O.C. Roof Panel -\-Rake Angle Fastener #17A 12-14 x 1-1/4" SD W/Washer Outside Panel Closure up to 4:12 RS Flashing profile may vary dependent upon project order. Attachment as illustrated are applicable for all profiles. Peak Box Detail — PBR Roof Wall Stitch Screw (1) per F797 (2) per F81, F903, F1829 Downspout Strap�, Piece Mark \• Wall Panel Trim Profile Std �td q Northern Nol ern Cascadinq-F1519 FOR ERECTOR INSTALLATION F1585 F1672 F1760 Classic F160 F4153 F381 F1024 Contoured F2219 F2285 F2372 F2460 Si nature F916 F3853 F236 F1018 Flashing profile may vary dependent upon project order. Attachment as illustrated are applicable for all profiles. Peak Box Detail — PBR Roof Wall Stitch Screw (1) per F797 (2) per F81, F903, F1829 Downspout Strap�, DATE \• Wall Panel (F797, F81 BY CK'D (Varies) F1829, F903) 1/23/17 FOR ERECTOR INSTALLATION Fastener #14 Downspout 1/8"0 x 3/16" Wall Panel Attachment (1 ) each side F797 (2) each side F81 Not provided by Metal F903 F1829 Building Manufacturer a .d .. .•a a a, - .,d .. a < , e • _. a p. �d Downspout Strap _ (F797, F81 Masonry F1829, F903) Fastener #14 1/8"0 x 3/16" Masonry Wall Attachment (1) each side F797 (2) each side F81 Fastener #55 F903, F1829 12-24 x 1-1/4" DP5 Main Frame -� Column Downspout Strap (F797) F81 F1829, F903) T Fastener #14 1/8"0 x 3/16,, (1) each side F797 Column Attachment (2) each side F81 F903, F1829 Downspout Strap Attachment to Wall TRIM 511 F_�ve StI SECTION Conne( hor Jc 1/2 1) x 1 1 /4" A325 Bolts (typ) CD DOOR JAMB TO EAVE STRUT ELEVATION Top Flange Top Flange O O Top Bolts - See Rigid Frame Top Bolts - See Rigid Frame Drawings For Size Drawings For Size Web Web Intermediate Bolts Intermediate Bolts O (As Required) O O (As Required) See Rigid Frame Drawings For Size See Rigid Frame Drawings For Size 0 0 0 0 Bottom Bolts - See Rigid Frame Bottom Bolts - See Rigid Frame Bottom Flange Drawings For Size Bottom Flange o o Drawings For Size o � 00 Oo \\-Extension Beyond Flange Is Optional, At Top & Bottom. U2 BOLTS FOR RIGID FRAME RAFTER TRIM 547 AT BUILDING PEAK ISSUE DATE DESCRIPTION NUMBER BY CK'D DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR U 3 BOLTS FOR RIGID FRAME RAFTER TO COLUMN CONNECTION STAR BUILDING SYSTEMS A kobert:.onreca Company PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. 8600 SOUTH I-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBERSHEEP NUMBER ISSUE 1 a 15—B-65255 DET4 0 Feb 05, 2017 7" 5" 7" 5" 7" 12" 12" 12" A 2 1/2' 12" 12„ B "PBA"/"AVP" Panel "PBR" Panel 12" "PBR" Panel Bearing Leg Member Screw 12-14 x 1 1/4"SD 12" O.C. at Each Member „ PBU Panel —Extended Leg "PBU" Panel Bearing Leg anel Stitch Screw 4� —Stitch Screw 1/4-14 x 7/8" 1/4-14 x 7/8" _ Sheeting Direction SD, at 20" O.C. _ Sheeting Direction SD, at 20" O.C. Sheeting Direction 0 = At Base, Rake, Eave, and 12" "RVPBR" Panel Fastener #4 1/4-14 x 7/8" LL SD W/ Washer at 6" O.C. 12" Fastener#4 1/4-14 x 7/8" LL SD W/ Washer (16) Required 2 Runs 1/4" Bead Tube Sealant F675 1/2 2" Lap Section A Mid Span End Laps IBMA 12" 12" 12" �B = At Intermediate Member, B A B >> and at Optional Liner Panel RVPBU1? Panel Fastener Location for Panel At Wa PBR Panel Expansion Ridge GPR06001 DATE Oct. '14 REV. 01 Expansion Ridge Flashing F675 Fastener #4 1/4-14 x 7 8" LL SD W/ Washer (8 Per Side Standard Grade Description FastenerNumber Application 1/4"— 14 x 7/8" 4A Stitch & Trim Screw 12-14 x 1 1/4" 17A Member Screw 12-14 x 1 1/2" 17B Member Screw 12-14 x 2" 28 Member Screw Long Life Description Fastene Number Application 1/4 14 x 7/8" 4 Stitch & Trim Screw 12-14 x 1 1/4" 3 Member Screw 12-14 x 1 1/2" 3A Member Screw 12-14 x 2" 58 Member Screw d— Sh( VGIUII fn All Roof Members Except As Noted Below 12" 12 12" 12" 2 1/2" 7" 5" 7" 5" 7" Stitch Screw 1/4-14 x 7/8" At 20" O.C. Detail "A" Member Screl^lo 12-14 x 1 at 5", 7") 5 Two Continuous Layers 21 X211 HW507 Tape Sea Roc Par Sheeting Direction Detail "A" At Eave Strut, Panel End Lap, and Peak Purlin Section Thru Panel End Laps fastener Location for "PBR" Roof Panel TRIM -1 74 AHI ire Formed Base Trim PW02010 uAIt PBR Panel Details nt� I��. Set) 10 QO Tape Sea Note: Building Slab Standard details call for 1 1/4" fasteners as member screws by default. Member screws may be 1 1/4 1 1/2 or 2" depending on insulation application, or customer request. Self—Drilling Screw Application SCRW1 ISSUE DATE DESCRIPTION 0 1/23/17 FOR ERECTOR INSTALLATION Out to out of concrete <1 F73 F73 F_'7 F73 o Building Slab U " w A" Formed Base Trim x 20'-0" (Typical) o F73, square cut at both ends Im A" o o Edge of slab o \`L F73 Note: Opening F73 Field cope o Note: "A.. r,, Bottom leg 1. Use of sheetingg notch in At inside Corners Concrete is not recommended. 2. Attachment of trim to Concrete is by others. 3. Formed base trim is provided in F73 ti�y>>, 20'-0" lengths (std.), field �\<11 cut as req d. .�� out to out of Out to out of concrete Concrete Formed Base Trim Typical Layout 5/8'. 1. 1/4 Dia. Anchor (min.) at 36" O.C. (min.) HW1112 not by Bldg Mfr. M '` Fin. Flr. N 9 Fastener #14A ,: F 1/8" x 3/8" `D Concrete (2) Required 17/8- F73 F73 Section "A" - Formed Base Trim Typical Outside Corner Application BY CK'o oSN �o STAR BUILDING SYSTEMS PNR PNR SSR OO A RobertsonCeco Company PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. Expansion Ridge Tape Sealer H W506 Fastener #3 12-14 x 14" LL SD W/Washer 3 Per Closure „ 7 _t 2" PBR Roof Panel Fastener #4 1/4-14 x 7" LL SD W/Washer at 6" O.C. F6752 It Sym. I I I Back—Up Plate HW2998 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID 1 A JOB NUMBER 15—B-65255 Roof Pane TRIM -175 Page GPR06002 Date Rev. Nov'141 02 Outside Metal Closure HW4041 or HW4040 Back—Up Plate HW2998 Expansion Ridge Flashing F675 SHEET NUMBER ISSUE DETS o PBR Roof Panel Peak Purlin Feb 05, 2017 T I 10'-0" 10'-0" Note: Bend end skirt gutter assembly to follow exact roof slope. Sealant )7 This detail is for your convenience only. Ridge vents are not covered under weather tightness warranties. The building manufacturer does not recommend the use of a ridge ventilator on roof systems over 200' in width or with a roof slope less than 1:12 or greater than 6:12. Ridge Vent Installation DRAWING NO. PBR Panel GPR12012 Vent Die Formed Ridge Cap F52 (5:12 Max) End Skirt Gutter r*Not by Bldg. Mfr. Die Formed Ridge �'�� F52 (� PBR Roof Panel Outside Closure HW456 with Tape Sealant top and bottom Endcap tnocap 651 : 2 (6 Fastener #14 4:12 1>8 x 3/16 3:12 Pop Rivet 2: Ventilator End Skirt Gutter End Cap Modification Detail (2) are included w/ each End cap is factory cut for 1:12 roof slope. vent, by vent manufacturer Field cut end cap for slopes greater than 1:12. —`I� 4a Gap Position End Cap Skirt Detail Pull Bar Link Ro l 1_4" Gap F-77 7vi Pull Bar '—r—r 771 Pull Bar Connection Detail Install the first vent in a continuous run and attach in place with closer, sealer and end cap skirts installed. (note direction of pull). Position the second vent in line with the first and leave a gap between the two approximately 4". Reach under the second vent and grasp the pull bar link rod. Pull the link rod toward the pull bar of the first vent and insert the rod into the end of the pull bar. Secure with washer and hairpin clip supplied. Push the second vent toward the first until) the endcaps butt together. As the second vent moves toward the first, the damper will rise to assume the same position as the first vent. Install closures under the second vent and position third vent in line and repeat the above process untill all vents in the continuous run are installed. The number of vents that can be linked together is controlled by the type of opening operator. This detail is for your convenience only. Ridge vents are not covered under weather tightness warranties. The building manufacturer does not recommend the use of a ridge ventilator on roof systems over 200' in width or with a roof slope less than 1:12 or greater than 6:12. Ridge Vent to Ridge Vent Ill nstaation DRAWING NO. PBR Panel GPR12015 n - - 4 `'titch Screw 4 x 7/8" 0. C. 9" OR 12" X 10'-0" RIDGE VENTILATOR FOR "PBR" ROOF SYSTEM Member Screw 4x NS2) - -- ---- - 456 with Tape Sealant top and bottom Drnfnrmnd for 'oof slo 2:12 3:12 4:12 5:12 6:12 Scribe Line End Cap Turn ventilator over and place gently on its top. Note that the end cap is pre—formed for a 1:12 roof pitch. The five bench mark dots represent 2:12, 3:12, 4:12, 5:12 and 6:12 roof pitches. Draw a line between indicated corners and the appropriate dot for the roof pitch. Cut and remove that portion of the end cap. On 5:12 and 6:12 roof pitches see vent manufacturer's special instructions for the installation of the vent skirt. The end cap is now ready to recieve the end skirt. End Skirt Gutter (6 Fastener #14 1 8 x 3/16" Pop Rivet End Cap (6) Fast 1 8 x 2 Pop Riv( ", -r Position end skirt onto end cap. Be sure the down—turned angle of the end skirt is inside of and up against the end cap. Attach end skirt to ventilator end cap with Fastener #14 in six places. Cable Clamp— Pulley with Eyebolt Attached This detail is for your convenience only. Ridge vents are not covered under weather I Cable Clamp tightness warranties. The building manufacturer does not recommend the use of a ridge ventilator on roof systems over 200' in width or with a roof slope less than 1:12 or greater than 6:12. Ridge Vent Installation DRAWING NO. Pulley PBR Panel GPR12016 Eyebolt Vent Operator Attachment with Sidewall Cable Assembly Vent * Not By Metal Bldg Manufacturer Up to 2 Vents may be linked Using Vent Operator HW722 * Support Angle Pulley with Eyebolt Attached ISSUE DATE DESCRIPTION BY CK'D DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR Am STAR BUILDING SYSTEMS 8600 SOUTH I-35 SERVICE ROAD ��F=I OKLAHOMA CITY, OK 73149 A RabertsanCeca Company F'19A (800)-879-7828 PROJECT: LEVI ROSSER CUSTOMER: ROBBER ENTERPRISES INC I OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEEP NUMBER ISSUE 1/23/17 N.T.S. 1 n 15—B-65255 DET6 0 GPR12100 )ate Rev. Dec 12100 00 Eave Strut Feb 05, 2017 UUIDANCE ON LTP PLAC[MENT BACKGROUND: UNDERWRITERS LABRATORY CONSTRUCTION LISTINGS AVAILABLE TO NCI REQUIRE METAL ROOF PANELS AND LTPS TO BE IN AT LEAST A TWO SPAN CONDITION. SINGLE SPAN PANELS ARE NOT ACCEPTABLE. THIS IS ALSO GOOD ENGINEERING PRACTICE AS A SINGLE SPAN PANEL WILL FAIL BY THE SCREWS PULLING THROUGH THE PANEL AT THE EDGES. NONE OF OUR LOAD TABLES ARE BASED ON THIS FAILURE MODE. THE INTERNATIONAL BUILDING CODE SECTION 2609 PROVIDES RESTRICTIONS ON THE PLACEMENT OF "LIGHT—TRANSMITTING PLASTIC ROOF PANELS" COMMONLY REFERRED TO AS LTPS. THE PURPOSE IS TO LIMIT FIRE EXPOSURE TO ADJACENT BUILDINGS. IF A BUILDING BEING DESIGNED BY NCI IS INTENDED TO BE CLOSER THAN 10' FROM AN ADJACENT BUILDING AND THERE ARE OPENINGS, ALONG THE ADJACENT WALL, THAT ARE REQUIRED TO BE FIRE PROTECTED THEN LTPS ARE NOT PERMITTED WITHIN 6' OF THE EAVE. (IBC06 SECTION 2609.3 AND 704.8) IT IS ALSO GOOD ENGINEER PRACTICE TO NOT PLACE LTPS NEAR THE EAVE OF A BUILDING. SAFETY IS A TOP CONCERN AT NCI. THEREFORE THE STANDARD LTP LOCATION FOR NCI WILL NOT BE CLOSER THAN TWO PURLIN SPANS OR 6 FROM THE EAVE. THE INTERNATIONAL BUILDING CODE SECTION 2609.2 ALSO STATES THAT THERE SHALL BE A MINIMUM SEPERATION BETWEEN ADJACENT LTPS OF 4'. THIS PROVISION DOES NOT APPLY TO LOW HAZARD BUILDINGS LESS THAN 5000 SQ FT THAT HAVE A MINIMUM FIRE SEPERATION FROM ADJACENT BUILDINGS OF 10'. FALL PROTECTION: OSHA REQUIRES SKYLIGHTS BE GUARDED TO PROTECT PEOPLE FROM FALLING THROUGH THEM WITH ONE OF SEVERAL METHODS OF FALL PROTECTION. THESE METHODS ARE OUTLINED IN OSHA 29CFR 1910.23(a)(4) SKYLIGHT SCREENS, 1910.23(e)(8) SLATWORK, 1926.500(b)(4) RAILING, 1926.502(b) GUARDRAIL SYSTEM, (c_) SAFETY NET SYSTEMS, (d) PERSONAL FALL ARREST SYSTEMS, POSITIO ING DEVICE SYSTEM, (f) WARNING LINE SYSTEM, (g) CONTROL ACCESS ZONE, (e) hSAFETY MONITOR, (i) COVERS. oenici vnnr JVT'TTLI Do Not Cut Purlins All panel supports are to be field cut and located at the some elevation as the top of the purlins. Support framing will be 8", Cee cold form material. M PBR Single Span Panel Support Frame Type WARNING: LIGHT TRANSMITTING PANELS (LTP9S) ARE NOT DESIGNED OR INTENDED TO BEAR THE WEIGHT OF ANY PERSON WALKING, STEPPING, STANDING, OR RESTING ON THEM. THE MANUFACTURER DISCLAIMS ANY WARRANTY OR REPRESENTATION EXPRESSED OR IMPLIED THAT ANY PERSON CAN SAFELY WALK, STEP, STAND, OR REST ON OR NEAR THESE LIGHT TRANSMITTING PANELS, OR THAT THEY COMPLY WITH OSHA REGULATION. THIS LETTER IS AN UPDATE ON THE LTP PLACEMENT OPTIONS THAT ARE IN COMPLIANCE WITH THE INTERNATIONAL BUILDING CODE, UNDERWRITERS LABRATORY AND GOOD ENGINEERING PRACTICES. (1) SINGLE SPAN METAL OR LTP PANELS SHOULD NOT BE USED. THE MINIMUM NUMBER OF SPANS FOR ANY PANEL IS TWO. (2) LTPS SHOULD NOT BE PLACED WITHIN 6' OF THE BUILDING EAVE. (3) THERE SHOULD BE 4' OF METAL PANEL SEPARATING ADJACENT LTPS. GIVEN THIS GUIDANCE, THE FOLLOWING TABLE ILLUSTRATES THE MAXIMUM DENSITY OF LTPS FOR VARYING ROOF SPANS WITH A 5' PURLIN SPACING AND TWO SPAN MINIMUM CONDITION. SMALLER PURLIN SPACING CAN BE USED TO OBTAIN THE REQUIRED TWO SPAN CONDITIONS. *SIMPLE SPAN METAL PANELS OR LTPS ARE PERMITTED WITH ADDITIONAL FRAMING WHICH CREATES A TWO SPAN CONDITION. THE ATTATCHED DETAILS ILLUSTRATES THE FRAMING NECESSARY TO CREATE A TWO SPAN CONDITION FOR A SINGLE SPAN PANEL OR LTP. MAXIMUM LTP DENSITY AND LOCATION FOR VARYING ROOF PLANE WIDTHS (GABLE BUILDING) BLDG WIDTH ROOF PLANE WIDTH PANEL SPANS 5 10 15 PURLIN 20 25 LOCATION 30 35 40 45 50 20 10 2 PBR PBR 30 15 3 PBR PBR LTP* 40 20 4 PBR PBR LTP LTP 50 25 5 PBR PBR LTP LTP PBR* 60 30 6 PBR PBR LTP LTP PBR PBR 70 35 7 PBR PBR LTP LTP PBR* LTP LTP 80 40 8 PBR PBR LTP LTP PBR PBR LTP LTP 90 45 9 PBR PBR LTP LTP PBR PBR LTP LTP PBR* 100 50 10 PBR PBR LTP LTP PBR PBR LTP LTP PBR PBR MAXIMUM LTP DENSITY AND LOCATION FOR VARYING ROOF PLANE WIDTHS (SINGLE SLOPE BUILDING) BLDG WIDTH ROOF PLANE WIDTH PANEL SPANS S 5 10 15 PURLIN 20 25 LOCATION 30 35 40 45 50 10 10 2 PBR PBR 15 15 3 PBR PBR PBR 20 20 4 PBR PBR PBR PBR 25 25 5 PBR PBR LTP* PBR PBR* 30 30 6 PBR PBR LTP LTP PBR PBR 35 35 7 PBR PBR LTP LTP PBR PBR PBR 40 40 8 PBR PBR LTP LTP PBR* LTP* PBR PBR 45 45 9 PBR PBR LTP LTP PBR* LTP LTP PBR PBR 50 50 10 PBR PBR LTP LTP PBR PBR LTP LTP PBR PBR WALL LTPS ARE NOT SUITABLE FOR ROOF APPLICATIONS. FOR PURLIN SPACING LESS THAN 5', ROOF LTPS MUST BE "FIELD CUT" TO LENGTH (SEE ERECTION DRAWINGS FOR DETAILS). INSULATED PANELS CAN ONLY BE "FACTORY CUT" TO LENGTH. SSUE DATE DESCRIPTION BY CK'D DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR Am STAR BUILDING SYSTEMS 8600 SOUTH I-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 A RobertsonCeco Company (800-879-7828 PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE 1/23/17 N.T.S. 1 a 15—B-65255 DET7 0 Feb 05, 2017 Member Screws At 6" On Center "A" 2" Member Screws At 6" On Center Member Screws ' R" Panel Skylight At 12" On Center SECTION THRU STANDARD SKYLIGHT ROOF,PANEL T r1 I I nsulation II IJUIU LIUn Ii F-75 SECTION A Dan -F - - r`- -I - -1 Member Screws / At 6" On Center nsuiation i rim F-75 STANDARD SKYLIGHT PANEL INSTALLATI01\1 ISSUE DATE DESCRIPTION BY I CK'D I DSN 0 1/23/17 FOR ERECTOR INSTALLATION PNR JPNRI SSR -STM- nsulation STAR BUILDING SYSTEMS A eoceri:aoc.co Company PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBER SHEEP NUMBER ISSUE 1 a 15—B-65255 DE --8 0 Feb 05, 2017 PBR Wall Panel - Three Sided Framed Opening Trim Installation with Field Notch Panel at Head Trim PW07022 Note: Trim Installation can be done by Field Notch Panel as shown on PW07022 & PW07023 OR with Field Notch and Bend Tabs at Head Trim as shown on PW07024 & PW07025. Opening Width + 6" (+1" Lap when req'd) 3" Opening Width 0.1 0 0 ° Head Trim F481 See PW07030 Fastener #14A $" x g" Pop Rivet at 20 O.C. at Cold Form OR Fastener #207 12-24 x 11" Pancake DP5 at 20" O.C. at Hot Rolled ° Bead of HW540 Tube Caulking from Header to Floor (see section) Jamb Trim F482 Jamb Trim F482 or Alternate F484 or Alternate F484 o See PW07029 Finish Floor Line 3" See PW07023 & PW07027 Note: o For "Optional" Channel Closure Trim see PW07028 PBR Wall Panel - Three Sided Framed Opening Field Notch Panel at Head Trim PBR Wall Panel -Three Sided Framed Opening PW07023 Trim Installation with Field Notch and Bend Tabs at Head Trim Note: Trim Installation can be done by Field Notch Panel as shown on PW07022 & PW07023 OR with Field Notch and Bend Tabs at Head Trim as shown on PW07024 & PW07025. Opening Width + 6" (+1" Lap when req'd) Head Trim F481 Front View End View 1" Lap with (2) Fasteners #14 A" x 4" Pop Rivet and HW540 Caulking Opening Width 3" Opening Width 3, Field notch Panel at Head Trim 1" Lap with (2) Fasteners #14 g" x o 41 6 Pop Rivet Typ at Head Trim F481 Head & Jamb Trim = when required. Field See PW07027 notch as required. for Jamb Trim o field cut detail Q 0 Jamb Trim F482 or Alternate F484 no I r 1 Opening Width Note: All trim is to be Note: Field measure Opening Width installed BEFORE blanket and Height before making field cuts insulation is applied to walls. and adjust cut dimensions accordingly. Fastener #14A A" x 8" Pop —' Rivet at 20" O.C. at Cold Form OR Fastener #207 12-24 x 12 " Pancake DP5 at 20" O.C. at Hot Rolled Note: All trim is to be installed BEFORE blanket insulation is applied to walls STANDARD FRAMED OPENING DETAILS (PLOP WALL PANEL) Caulk with HW540 at these edges after installation Note: Panel position is shown with Panel Rib and Opening on 1'-0 module. Location of Rib may vary depending on the Opening Width and location. Field measure before cutting Panel and Trim. PBR Wall Panel - Three Sided Framed Opening PW07024 Field Notch and Bend Tabs at Head Trim e: Trim Installation can be done by Field Notch Panel as shown on PW07022 & PW07C OR with Field Notch and Bend Tabs at Head Trim as shown on PW07024 & PW07025. Field Cut and Remove SSUE DATE DESCRIPTION 0 1/23/17 FOR ERECTOR INSTALLATION MIS Trim Installation can be done by Field Notch Panel as shown on PW07022 & PW07C 0 with 4-1 and Bend Tabs at Head Trim as shown on PW07024 & PW07025. Front View 1" Lap with (2) Fast Pop Rivet. See a� CL PW07025 for details. Do not cut or Note: All trim be rn o c remove back leg installed BEFORE blanket o insulation is applied to walls a I Ben4" Tab 0 1 Bona degrees Note: Panel position is shown with 0 Panel Rib and Opening on V-0 module. 0 Opening Width + 6" (+1" Lap when req'd) Opening Width + 3" Ooenina Width 0 0 Head Trim F481 See P W07030 Fastener #14A J" x J" Pop Rivet at 20" O.C. at Cold Form OR Fastener #207 12-24 x 1i" Pancake DP5 at 20" O.C. at Hot Rolled " Bead of HW540 Tube Caulking—` from Header to Floor (see section) - Jamb Trim F482 Jamb Trim F482 or Alternate F484 or Alternate F484 See PW07029 PW07025 e: Trim Installation can be done by Field Notch Panel as shown on PW07022 & PW07C OR with Field Notch and Bend Tabs at Head Trim as shown on PW07024 & PW07025. 1 2 *Field Cut See PW07025 Remainder and & PW07027 Remove 0 0 Field Notch and Bend „ Opening Width + 6" (+1" Lap when req'd) *Opening Width + 3" 1 *Opening Width 1„ 1� Tab behind Jamb See End Cut Detail #14 A" x 1j" Pop Rivet Head Trim F481 Trim. Attach with I Fastener #14 J" x J'° i„ 1� Opening Width C Front View 1" Lap with (2) Fast e *Note: Field measure Opening Width and cut Head Trim to required length. I-V ners End View 0 1" Lap with (2) Fasteners #14 A" x ," Pop Rivet Typ at Head & Jamb Trim when required. Field notch as required. 0 Note: For "Optional" Channel Closure Trim see PW07028 Finish Floor Line 0 Opening Width r Note: All trim is to be Note: Field measure Opening Width installed BEFORE blanket and Height before making field cuts insulation is applied to walls. and adjust cut dimensions accordingly. End Cut Detail (Viewed from top of Head Trim) Opening Width 1z Field Notch and Bend 1"" Tab behind Jamb Trim. Attach with Fastener #14 x J" Pop Rivet 0 0 F Head Trim F481 See PW07027 for Jamb Trim field cut detail Jamb Trim F482 or Alternate F484 Fastener #14A A" x i" Pop Rivet at 20" O.C. at Cold Form OR Fastener #207 12-24 x 14" Pancake DP5 at 20" O.C. at Hot Rolled 0 1� Tab behind Jamb See End Cut Detail #14 A" x 1j" Pop Rivet Trim. Attach with and HW540 Caulking Fastener #14 J" x J'° i„ 1� Opening Width C Pop Rivet. See a� CL PW07025 for details. Do not cut or Note: All trim be o remove back leg installed BEFORE blanket insulation is applied to walls I Ben4" Tab 1 Bona degrees Note: Panel position is shown with Panel Rib and Opening on V-0 module. Location of Rib may vary depending on Field Cut the Opening Width and location. Field and Remove measure before cutting Panel and Trim. 0 1" Lap with (2) Fasteners #14 A" x ," Pop Rivet Typ at Head & Jamb Trim when required. Field notch as required. 0 Note: For "Optional" Channel Closure Trim see PW07028 Finish Floor Line 0 Opening Width r Note: All trim is to be Note: Field measure Opening Width installed BEFORE blanket and Height before making field cuts insulation is applied to walls. and adjust cut dimensions accordingly. End Cut Detail (Viewed from top of Head Trim) Opening Width 1z Field Notch and Bend 1"" Tab behind Jamb Trim. Attach with Fastener #14 x J" Pop Rivet 0 0 F Head Trim F481 See PW07027 for Jamb Trim field cut detail Jamb Trim F482 or Alternate F484 Fastener #14A A" x i" Pop Rivet at 20" O.C. at Cold Form OR Fastener #207 12-24 x 14" Pancake DP5 at 20" O.C. at Hot Rolled 0 rn C a� CL 0 BY CK'D DSN PNR PNR SSR A STAR BUILDING SYSTEMS 8600 SOUTH 1-35 SERVICE ROAD -#n 01M.- OKLAHOMA CITY, OK 73149 A RobertsonCeco Company (800)-879-7828 PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC OWNER: JASBIR KULLAR LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER 1/23/17 N.T.S. 1 a 15—B-65255 SHEEP NUMBER ISSUE DET9 0 - Field cut Panel Feb 05, 2017 PBR Wall Panel - Three Sided Framed Opening Jamb Trim Field Cut Details 44" 1 17 Jamb Trim F482 Alternate Jamb Trim F484 Top View Top View 41" 2„ Field Cut and Remove Side View at Head Trim M a� Cr N L.. c (D L a J .+� rn in = + °' C c -r- a) a� o_ O Q) 0- 0 Side View at Sill Trim Note: Field measure Opening Height before making field cuts and adjust cut dimensions accordingly. -,00 PBR Wall Panel - Three Sided Framed Opening PW 77027 "Optional" Channel Closure Trim Opening Width + 7" (+1" Lap when req'd) 31"Opening Width 3J" 2 -4— Cu t 4 Cut and remove remainder of front fold (2) Fasteners #14 " x J" Pop Rivet at lap 1" Lap when required. Field cut and notch as required. Jamb Trim F482 and Alternate Jamb Trim F484 Front View Right Jamb Trim as shown Left Jamb Trim opposite hand Finish Floor Line rIN ° ° ° ro _ —0-T Channel Closure Trim ° See PW07030 (D L Fastener #14A 8" x 8" Pop Rivet at 20" O.C. at Cold Form ° Cs OR .. Fastener #207 12-24 x 12" �+ -CPancake DP5 at 20" O.C. at Hot Rolled Q, E Channel Closure Trim -C O ° Channel Closure Trim ° Cr 0) v See CL PW07029 O 3 29 I 1 I %A FSTANDARD FRAMED OPENING DETAILS (PBR WALL PANEL) i CONT. Finish Floor Line I ° ,end tab down 90 degrees cut and remove Channel Closure Trim and remove re Trim at Jambs PW07028 1" Lap typ at Head & Jamb when required. Field cut to length if req'd and notch. Channel Closure Trim Piece Mark F981 — 8" member F2994 — 8j" member F2991 — 8�" member F2992 — 84" member F982 — 10" member F2993 — 10j" member F169 — 12" member F2995 — 121" member Note: All trim is to be installed BEFORE blanket insulation is applied to walls. Note: Field measure Opening Width and Height before making field cuts and adjust cut dimensions accordingly. ISSUE DATE p 1/23/17 DESCRIPTION FOR ERECTOR INSTALLATION PBR Wall Panel - Three Sided Framed Opening Jamb Trim Installation Fastener #14A J" x J" Pop Rivet at 20" O.C. at Cold Form OR Fastener #207 12-24 x 14" Pancake DP5 at 20" O.C. at Hot Rolled Double Sided Tape (Not by Bld'g Mfg) Blanket Insulation M/z/o/� PBR Wall Panel J Note: Terminate Blanket Insulation at capillary lip of Jamb Trim Field flatten Trim leg when required Jamb Trim F482 (shown) or Alternate Jamb Trim F484 Alternate Jamb Trim F484 Profile Note: All trim is to be installed BEFORE blanket insulation is applied to walls. 15 PBR Wall Panel -Three Sided Framed Opening PW07029 Head Trim Installation Jamb (Cold Form shown Hot Rolled similar) "Optional" Channel Closure Trim See PW07028 for details. J" Bead of HW540 Tube Caulking (Header to Floor) Field Cut Wall Panel Opening Width Note: Panel position is shown with Panel Rib and Opening on 1'-0 module. Location of Rib may vary depending on the Opening Width and location. Field measure before cutting Panel and Trim. PBR Wall Panel Wall Member Screw 12-14 x — at 5"-7"-5" O.C. at Cold Form OR 12-24 x — at 5"-7"-5" O.C. at Hot Rolled Fastener #14A All x V Popes Rivet at 20" O.C. at Cold Form OR Fastener #207 12-24 x 1 i" Pancake DP5 at 20" O.C. at Hot Rolled PW07030 "Optional" \— Header Channel Closure Trim (Cold Form shown See PW0728 for details Hot Rolled similar) E-*.-* k Clr...r 1 ina Note: All trim is to be installed BEFORE blanket insulation is applied to walls BY CK'o oSN STAR BUILDING SYSTEMS PNR PNR SSR —� pp A RobertsonCeco Company PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE 1/23/17 N.T.S. 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE 1 a 15-8-65255 DET10 0 Feb 05, 2017 co i Page Knock Down Walk Door With Jamb Extensions AC05131 PBR Wall Panel - Walk Door & Glass -Front Walk Door With Low Girts Attached to Door Frame ate Rot Trim Installation with Field Notch Panel at Head Trim Girt B a Jamb Extension D Low Girt A IiiCField cut Girt Low Girt Field cut at Door Frame Jamb Jamb Extension SL IFW (See AC05138) ro if Page PWO9022 Date Rev. Mav'14 01 Note: Trim Installation can be done by Field Notch Panel as shown on PW09022 & PWO9023 OR with Field Notch and Bend Tabs at Head Trim as shown on PW09024 & PWO9025. See Note Trim Installation can be done by Field Notch Panel as shown on PW09022 & PW09023 OR with Field Notch and Bend Tabs at Head Trim as shown on PW09024 & PWO9025. Width Door Width + i 0 0 O Door Frame Jamb 1'-6 for each SideLite) 1" Head Trim F481 Note: 0 0 Note: All trim is to be — Jamb I See PW09030 z� before making field cuts and Door Width 3 (+ 1 —6 for each SideLite) 1 2 adjust o Extension Fastener #12A I Feb 05, 2017 o 0 I 12-14x1 ( I I o� p 1 3" Fastener #14A g" x13 Rivet at 20 O.C. Po Rlv P C Pancake SD i 0 Y o RcrFESS 1 o ° Door Frame Jamb W/O Washer O °o OWNER. JASBIR KULLAR O CD o`` cCO 0 n (10 Req d) � m 0 LOCATION: GRIDLEY, CA 95948-9447 US p o ° Walk Door Clip CAD DATE See PW09027 i PHASE o Jamb Trim F482 Jamb Trim F482 o (WDC8,WDC10,WDC12) for Jamb Trim °'o al F484 or Optional F484 or Optional p 0 ° Jamb Extension Isometric N.T.S. 1 A 0 See Walk Door Angle (WDA) HW9582 for 84" Door Frames or Optional F484 o PWO9029 or PW09031 See Detail B. Used to 0 I Brace Strike Side of Door HW9876 for 104" Door Frames 0 o 0 Jamb When low Girt at HW9877 for 124" Door Frames 1 Finish Floor Line I o Elevation 2'-6" thru 4'-6" 0 is not Present o _ 0 Attachment to Concto not b e N ote: r Y � � 0 i� Metal Bld . Mfr. If Girt has a h 9 3 " Flan e Field 9 p° Notch Jamb Extension Channel —Y to Clear Girt lip. Do not Notch in li `o 6 41 I ° Ln O p Framing ElevationI o D I O Girt o Cnp SL ° I 0 - Fastener 12A -r"o I 12-14 x 1„ Pancake ,,,� i_ SD W/O Washer j (two at Each Girt Flange) _ Door Frame Door Frame _J T f) Jamb Header Section B 2 —� Section H�— A Fastener #12A Walk Door Clip 12-14 x 1” Pancake (WDC8,WDC10,WDC12) SD W/O Washer (two per Each Side of (2) Fastener #1B Strike Side of Door Frame 4-14 x 14" SD W/O Washer Jamb leg) WDA Strike Side of Walk Door Angle Door Frame Jamb Detail B STANDARD WALK DOOR (KNOCK DOWN) WITH PBR WALL PANELS Door Width + 61" (+ 1'-6 for each SideLite) 1" Door Width + 31" (+ 1'-6 for each SideLite) 14" See PW09023 & PW09027 PBR Wall Panel - Walk Door & Glass- Front Walk Door Field Notch Panel at Head Trim Page PW09023 PBR Wall Panel - Walk Door & Glass -Front Walk Door Date Rev. Dec '11100 Trim Installation with Field Notch and Bend Tabs at Head Trim Note: Trim Installation can be done by Field Notch Panel as shown on PW09022 & PW09023 OR with Field Notch and Bend Tabs at Head Trim as shown on PW09024 & PWO9025. 1 Door Width (+ 1'-6 for each SideLite) 1" Door Width + 34" (+ 1'-6 for each SideLite) Note: All trim is to be Note: Field measure Door Width and installed BEFORE blanket Height before making field cuts and insulation is applied to walls. adjust cut dimensions accordingly. Trim 0 0 Panel Rib Field Notch Panel as shown Door Width + 3�" ° ° (+ 1'-6 for each SideLite) 1" Door Width + 34" (+ V-6 for each SideLite) 1 " shown on Door Width Door Width + 3Y" (+ 0 for each SideLite) (+ 1'-6 for each SideLite) 1" Head Trim F481 Note: Field 0 Note: All trim is to be installed BEFORE blanket See PW09030 41 before making field cuts and Door Width 3 (+ 1 —6 for each SideLite) 1 2 adjust o 0 LL or PW09032 Feb 05, 2017 0 I 41 0 p 1 3" Fastener #14A g" x13 Rivet at 20 O.C. Po Rlv P — i 0 Y o RcrFESS ° installation. O °o OWNER. JASBIR KULLAR O CD 4" Bead of HW54— Tube Caulking from Header to Floor (see section) � m 0 LOCATION: GRIDLEY, CA 95948-9447 US p Head Trim F481 CAD DATE See PW09027 i PHASE o Jamb Trim F482 Jamb Trim F482 SHEET NUMBER ISSUE for Jamb Trim °'o al F484 or Optional F484 or Optional p 0 ° i cut detail field Jamb Trim F482 N.T.S. 1 A 0 See 0 �r�FCAUFa�� or Optional F484 o PWO9029 or PW09031 0 I I Fastener #14A x" 0 o 0 Pop Rivet at 20" O.C. 0 1 Finish Floor Line I o 1 Door Width (+ 1'-6 for each SideLite) 1" Door Width + 34" (+ 1'-6 for each SideLite) Note: All trim is to be Note: Field measure Door Width and installed BEFORE blanket Height before making field cuts and insulation is applied to walls. adjust cut dimensions accordingly. Note: All trim is to be installed BEFORE blanket insulation is applied to walls. Field notch Panel at Head Trim PW09024 Date Rev. May'14 01 e: Trim Installation Panel Rib Field Notch Panel as shown Door Width + 3�" with Field Notch (+ 1'-6 for each SideLite) 1" at Head Trim as shown on Door Width Door Width + 3Y" (+ 0 for each SideLite) (+ 1'-6 for each SideLite) 1" Note: Field 0 Note: All trim is to be installed BEFORE blanket 41 before making field cuts and insulation is applied to walls. adjust o 0 LL A RobertsonCeco Company (800)-879-7828 Feb 05, 2017 0 I 41 'these p p — Caulk edges Y o RcrFESS ° installation. °o OWNER. JASBIR KULLAR �— CD � m 0 LOCATION: GRIDLEY, CA 95948-9447 US p CAD DATE ° I— PHASE o O SHEET NUMBER ISSUE i� CD I 1/23/17 N.T.S. 1 A 0 f 0 �r�FCAUFa�� o I 0 o 0 0 o _ 0 I � � i� I I o I ° i� Field cut Panel Note: All trim is to be installed BEFORE blanket insulation is applied to walls. Field notch Panel at Head Trim PW09024 Date Rev. May'14 01 e: Trim Installation can be done by Field Notch Panel as shown on PW09022 & PW090 OR with Field Notch and Bend Tabs at Head Trim as shown on PWO9024 & PWO9025. 0 after DATE Door Width (+ 1'-6 for each SideLite) A STAR BUILDING SYSTEMS 8600 SOUTH 1-35 SERVICE ROAD L 0 0 Door Width + 3Y" (+ 0 for each SideLite) SSR Note: Field 0 Note: All trim is to be installed BEFORE blanket Height before making field cuts and insulation is applied to walls. adjust cut dimensions accordingly. A RobertsonCeco Company (800)-879-7828 Feb 05, 2017 t - 0 O 41 'these lf7 p — Caulk edges Y o RcrFESS = installation. °o OWNER. JASBIR KULLAR 061574 � m 0 LOCATION: GRIDLEY, CA 95948-9447 US p CAD DATE ° I— PHASE o JOB NUMBER SHEET NUMBER ISSUE i� CD I 1/23/17 N.T.S. 1 A 15-3-65255 DET11 0 �r�FCAUFa�� I Note: Panel position is shown with Panel Rib and Door on 1'-0 module. Location of Rib may vary depending on the Door Width and location. Field measure before cutting Panel and Trim. Door Width + 6 " (+ 1'-6 for each SideLite) 1 Door Width + 31" (+ 1'-6 for each SideLite) 1" See PW09025 & PW09027 0 0 0 0 Head Trim F481 Field Notch and See Bend 11" Tab PW09030 behind Jamb or PWO9032 Trim. Attach ° with Fastener #14 8„ x" Fastener #14A g" x Pop Rivet. See Po Rivet at 20" O.C. P PWO9025 for details. p O 4" Bead of HW54— Tube Caulking—" from Header to Floor (see section) Jamb Tri F482 Jamb Trim F482 ° or Optional F o 484 r Optional F484 0 0 See o PWO9029 0 or PWO9031 Finish Floor Line 01 1 1 1 1 1 10 1 DATE Door Width (+ 1'-6 for each SideLite) A STAR BUILDING SYSTEMS 8600 SOUTH 1-35 SERVICE ROAD 1" 0 Door Width + 3Y" (+ 1'-6 for each SideLite) SSR Note: Field measure Door Width and Note: All trim is to be installed BEFORE blanket Height before making field cuts and insulation is applied to walls. adjust cut dimensions accordingly. SSUE DATE DESCRIPTION BY CK'D DSN A STAR BUILDING SYSTEMS 8600 SOUTH 1-35 SERVICE ROAD 0 1/23/17 FOR ERECTOR INSTALLATION PNR PNR SSR OKLAHOMA CITY, OK 73149 A RobertsonCeco Company (800)-879-7828 Feb 05, 2017 PROJECT: LEVI ROSSER RcrFESS CUSTOMER: ROSSER ENTERPRISES INC OWNER. JASBIR KULLAR 061574 LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE PHASE BUILDING ID JOB NUMBER SHEET NUMBER ISSUE 1/23/17 N.T.S. 1 A 15-3-65255 DET11 0 �r�FCAUFa�� PBR Wall (Panel - Walk Door & Glass -Front Walk Door Field Notch and Bend Tabs at Head Trim age WO9025 PBR Wall Panel - Knock Down Walk Door PagePW09031 PBR Wall Panel - Knock Down Walk Door Page W09032 ate Rev. Date Rev. Date Rev. Dec '11 00 Jamb Trim Installation Mar'15 02 Head Trim Installation Mar'15 02 Note: Trim Installation can be done by Field Notch Panel as shown on PW09022 & PWO9023 OR with Field Notch and Bend Tabs at Head Trim as shown on PWO9024 & PW09025. 12" Door Width + 61)" (+ 1'-6 for each SideLite) Door Width + 32" (+ 1'-6 for each SideLite) 1 JOB NUMBERSHEEP � I Panel Rib Head Trim F481 A 15-B-65255 DET12 C 1„ Front View See End Cut Detail 12" Opening Width Do not cut or remove back leg 8 I Bend 12" Tab 1 5„ down 90 degrees a Field Cut and Remove �_7 End View Note: All trim is to be installed BEFORE blanket insulation is applied to walls Note: Panel position is shown with Panel Rib and Door on 1'-0 module. Location of Rib may vary depending on the Door Width and location. Field measure before cutting Panel and Trim. End Cut Detail 1 JOB NUMBERSHEEP � I Panel Rib (Viewed from top of Head Trim) A 15-B-65255 DET12 C 1„ Door Width + 32" CD (n (+ 1'-6 for each SideLite) 12 Door Width + 32" (+ 1'-6 for each SideLite) Door Width (+ 1'-6 for each SideLite) 1" Field Notch end Bend 11 Tab 41 0 Trim. behind Jamb T . Attach with m t` o 0 I as ener #14 x i83„ Po Rivet Ft 8 P p Side View at Sill Trim � o Jamb Trim F482 and Note: Field measure Door Height before Optional Jamb Trim F484 O cuts and adjust cut dimensions o � � so that Jamb Trim fits to Head Right Jamb Trim as shown Trim & at 11" below Finish Floor Line. Left Jamb Trim opposite hand giro- °-ice O Head Trim F481 0 o See PWO9027 for Jamb I o Trim field cut detail a Jamb Trim F482 I I or Optional F484 o Fastener #14A8” x $" Field cut Panel Pop Rivet at 20" O.C. I r` STANDARD WALK DOOR (KNOCK DOWN) WITH PBR WALL PANELS HW54_ Urethane Tube Sealant J"O Bead Header to Floor RA1 Sheeting Angle From base to 7'-6" girt Field notch at girt and base member, attach with (2) Fastener 12A 12-14 x 1" Pancake SD W/0 Washer at each member Fastener #14A J"o x J" Pop Rivet SS at 1'-8" O.C. Double Sided Tape (Not by Bld'g Mfg) Blanket Insulation -, at capillary lip of JambTrim Field flatten Trim leg when required Jamb Trim F 82 shown 4 (shown) or Optional Jamb Trim F484 Walk Door Jamb (Profile may vary) Field Cut Wall Panel Door Width Door Width + 31" Optional Jamb Trim F484 Profile Note: Panel position is shown with Panel Rib and Door on 1'-0 module. Note: All trim is to be Location of Rib may vary depending on installed BEFORE blanket the Door Width and location. Field insulation is applied to walls. measure before cutting Panel and Trim. ISSUE DATE DESCRIPTION 0 1/23/17 FOR ERECTOR INSTALLATION 12- 12-1 Note: All trim is to be installed BEFORE blanket insulation is applied to walls. PBR Wall Panel - Walk Door & Glass -Front Walk Door Jamb Trim Field Cut Details 41„ 41„ a a 12" 12" Optional Jamb Trim F484 Jamb Trim F482 Top View Top View 0 0 4n„ 0 0 a o 4 C: c o L o o 0 o L o LL_ o U 0 0 0 0 Side View at Head Trim LO I i� Page PW09027 Date Rev. Dec'11 00 BY CK'o DSN1 � STAR BUILDING SYSTEMS PNR PNR SSR A RobertsonCeco Company PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE: 1/23/17 N.T.S. 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE 1 JOB NUMBERSHEEP � I ISSUE 1 A 15-B-65255 DET12 0 CD (n 'I t` Side View at Sill Trim Jamb Trim F482 and Note: Field measure Door Height before Optional Jamb Trim F484 making field cuts and adjust cut dimensions Front View accordingly so that Jamb Trim fits to Head Right Jamb Trim as shown Trim & at 11" below Finish Floor Line. Left Jamb Trim opposite hand BY CK'o DSN1 � STAR BUILDING SYSTEMS PNR PNR SSR A RobertsonCeco Company PROJECT: LEVI ROBBER CUSTOMER: ROBBER ENTERPRISES INC LOCATION: GRIDLEY, CA 95948-9447 US CAD DATE SCALE: 1/23/17 N.T.S. 8600 SOUTH 1-35 SERVICE ROAD OKLAHOMA CITY, OK 73149 (800)-879-7828 OWNER: JASBIR KULLAR PHASE BUILDING ID JOB NUMBERSHEEP NUMBER ISSUE 1 A 15-B-65255 DET12 0 Feb 05, 2017 eve )oor ie GENERAL NOTES P V :` 1. GENERAL F5 5-0" X 5'-0" X 70" ALL WORK SHALL CONFORM TO THE 2016 CBC AND ALL APPLICABLE LOCAL CODES. Ldo ' 0 U THE ENGINEER HAS PROVIDED AND IS RESPONSIBLE FOR SPECIFIC STRUCTURAL ITEMS ONLY, ALL OTHER REQUIREMENTS FIREPROOFING, DRAINAGE, HANDICAP ACCESSIBILITY, EGRESS 5/8" DIA OF THE BUILDING CODE INCLUDING WATERPROOFING, DESIGN REQUIREMENTS NOT SPECIFICALLY SHOWN IN THE STRUCTURAL D REQUIREMENTS, PARKING, AND ALL OTHER DESIGN CALCULATIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR OR OWNER. SHOULD ANY CHANGES BE MADE TI-�1Tff---` 6" FROM THE DESIGN AS SPECIFIED IN THESE DOCUMENTS WITHOUT THE WRITTEN APPROVAL FROM THE ENGINEER, THEN AT SIM CONDITION o THE ENGINEER WILL ASSUME NO RESPONSIBILITY FOR ANY ELEMENT OR SYSTEM OF THE STRUCTURE. 3/4" DIA THE DRAWINGS AND CALCULATIONS REPRESENT THE FINISHED STRUCTURE, AND, UNLESS SPECIFICALLY NOTED CONTRACTOR IS RESPONSIBLE FOR THE METHOD OF o OTHERWISE, DO NOT SHOW THE METHOD OF CONSTRUCTION. THE CONSTRUCTION, AND SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE PUBLIC, CONSTRUCTION WORKERS, I 0 AND THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE FORMING, SHORING, BRACING, N SCAFFOLDING, ETC. 5/8" DIA IF A PARTICULAR FEATURE OF CONSTRUCTION IS NOT FULLY SHOWN ON THE DRAWINGS OR IN THE CALCULATIONS, SAME CHARACTER AS SIMILAR CONDITIONS THAT ARE SHOWN ON THE DESIGN THEN IT SHALL BE CONSTRUCTED IN THE DOCUMENTS. ANY CONDITIONS NOTED AS EXISTING MUST BE FIELD VERIFIED BY THE CONTRACTOR, AND ANY DISCREPANCIES MUST J � w BE BROUGHT TO THE ATTENTION OF THE ENGINEER WITHOUT PROCEEDING WITH CONSTRUCTION PRIOR TO THE F cn REVIEW OF THE ENGINEER. ALL WATERPROOFING AND FLASHING (ROOFS, FOUNDATIONS, GARAGE FLOORS, ETC...) IS THE RESPONSIBILITY OF THE 0 H _ CONTRACTOR OR OWNER. O I SPECIAL INSPECTION: SPECIAL INSPECTION PER SECTION 1704 OF THEo 0 � N CBC SHALL BE PROVIDED FOR THE FOLLOWING TYPES OF CONSTRUCTION: �I HIGH STRENGTH BOLTING OF METAL BUILDING ABOVE o THE SPECIAL INSPECTOR SHALL BE ACCEPTABLE TO THE ENGINEER OF RECORD 0 I AND BUILDING DEPARTMENT, SHALL BE ICBO QUALIFIED, AND THEIR EXPERIENCE 0 B SHALL BE COMMENSURATE WITH THIS TYPE OF PROJECT. 2. SITE WORK / FOUNDATIONS L L ASSUMED MAXIMUM SOIL BEARING = 1500 PSF (NO SOILS REPORT PROVIDED) _ 0 FOUNDATIONS SHALL NOT BE SCALED FROM PLAN OR DETAIL DRAWINGS. I 0 Q N FILL MATERIAL SHALL BE FREE FROM DEBRIS, VEGETATION, AND OTHER FOREIGN SUBSTANCES. USE 4" DIAMETER PERFORATED PIPE SUB -DRAIN BEHIND ALL RETAINING WALLS. SLOPE PIPE TO DRAIN TO DAYLIGHT. A 3. CONCRETE / REINFORCING CONCRETE SHALL HAVE A MINIMUM 28 DAY STRENGTH OF 3,000 PSI U.N.O. (DESIGNED BASED ON 2500 PSI MIN.) ALL CEMENT USED SHALL CONFORM TO ASTM C-150 AND SHALL BE TYPE II OR TYPE III LOW ALKALI. C) AGGREGATE SHALL CONFORM TO ASTM C-33 AND SHALL NOT CONTAIN MATERIALS WHICH ARE ALKALI REACTIVE AS DETERMINED BY ASTM C-227, 289, AND 295. IF TEST DATA IS UNAVAILABLE IN REGARDS TO ALKALI REACTIVE JJ MATERIALS, PROVIDE CEMENT WITH A MAXIMUM ALKALI CONTENT LESS THAN 0.45% BY WEIGHT. CONCRETE EXPOSED TO FREEZING OR THAWING SHALL BE PROTECTED IN ACCORDANCE TO THE LATEST EDITION OF THE ACI CODE AND CBC APPENDIX, CHAPTER 19. O m REINFORCEMENT COVER SHALL BE AS FOLLOWS: 0 CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO SOIL: 3" " ` i;i,l;..! .`•• CONCRETE WITH SOIL OR WEATHER EXPOSURE: #5 BARS AND SMALLER 1 %2" Q #6 BARS AND LARGER 2" L CONCRETE WITHOUT SOIL OR WEATHER EXPOSURE: 3/4" REINFORCEMENT SHALL BE GRADE 60 PER ASTM A615 U.N.O. LAP REINFORCING 40 BAR DIAMETERS U.N.O. #5 AND LARGER REBAR SHALL NOT BE RE-BENT. W G ALL REINFORCING STEEL AND ANCHOR BOLTS SHALL BE ACCURATELY LOCATED AND ADEQUATELY SECURED IN POSITION �. BEFORE AND DURING CONCRETE PLACEMENT. ANCHOR BOLTS SHALL BE ASTM A 307 AND SHALL BE PROVIDED NEW, W/O EXCESSIVE RUST. STRUCTURAL PLAN NOTES: 1. VERIFY ALL DIMENSIONS, ELEVATIONS, COLUMN LOCATIONS, AND EDGE OF SLAB LOCATIONS WITH METAL BUILDING DRAWINGS BY STAR BUILDINGS CORP., STAMPED AND SIGNED BY AN ENGINEER LICENSED IN CALIFORNIA 2. ALL ANCHOR BOLTS SHALL BE INSTALLED USING THE LAYOUT PROVIDED BY STAR BUILDINGS CORP. STAR BUILDINGS HAS PROVIDE ANCHOR BOLT DIAMETER REQUIREMENTS FOR ALL COLUMN LOCATIONS. ALL ANCHOR BOLTS SHALL BE EMBEDDED INTO CONCRETE FOOTING PER DETAIL 1 /S1. 3. SUMMIT STRUCTURAL DESIGN HAS NOT DESIGNED THE SLAB ON GRADE, HOWEVER AT A MINIMUM THE FOLLOWING IS RECOMMENDED: 6" THICK SLAB ON GRADE WITH #4 AT 18" O.C. E.W. PLACED AT THE CENTERLINE OVER 4" AGGREGATE BASE. USE MOISTURE BARRIER (ASTM E 1745) WHERE FLOORING OR MOISTURE SENSITIVE EQUIPMENT WILL OVERLAY CONCRETE SLABS. USE CRACK CONTROL JOINTS AS REQUIRED TO AVOID UNINTENTIONAL CRACKING. IF LOADING IS TO EXCEED 250 PSF A DESIGN FOR THE SLAB ON GRADE SHALL BE REQUIRED. TYP F5 F5 F5 F5 F5 RAMP EDGE OF SLAB AT 8" ROLL UP DOOR OPENINGS DRAINAGE BY OTHERS - 3 4" =11 = ALL DIMENSIONS INCLUDING ANCHOR BOLT LOCATIONS AND SPACING SHALL BE TAKEN FROM THE FINAL "FOR CONSTRUCTION" SET OF METAL BUILDING MFR DRAWINGS. FOUNDATION DRAWINGS ARE GENERAL IN NATURE AND ONLY REPRESENT FOUNDATION SIZES, REINFORCING, AND ANCHOR ROD EMBEDMENT. FOUNDATION PLAN SCALE: 1/8" = 1'-0" SLAB ON GRADEOF COLUMN PER PLAN EDGE OF STEEL —� STEEL COLUMN, N BY OTHERS SLAB ON GRADEjvI--ff 6" AT SIM CONDITION o #4 VERT. 12"(�AT 24" O.C. A.B. PER PLAN _I (@ 2 -POUR (FOUNDATION) (VARIES HOOK REINFORCING AROUND r • • (2) #4 CONT. TOP AND BOTT 1'-0" FOOTING AT ROLL UP DOOR 5 NO SCALE S1 I 0 N EDGE OF STEEL A.B. PER PLAN WHERE OCCURS SLAB ON GRADE PER n � LAN WHERE OCCURS DRAINAGE BY OTHERS - P V :` REINFORCING F5 5-0" X 5'-0" X 70" w Ldo EMBEDMENT 0 U co 5/8" DIA o 000bd� n = ~ B SLAB ON GRADE TI-�1Tff---` 6" 20" AT SIM CONDITION o #4 VERT. 12"IAT 24" O.C. 3/4" DIA -I (@ 2 -POUR FOUNDATION) (4) (1) #4 CONT. 1'-0" 4 TOP AND BOTT CONTINUOUS FOOTING 4 NO SCALE S1 EQUAL EQUAL DIM PER SCHEDULE DETAIL AT SPREAD FOOTING NO SCALE BOLTS AT HAIRPIN TIE -1I II- SLAB ON GRADE PER PLAN • J I- OZwJ mwm� :2 LLJ o 0 Lu zwLd ocf) Q • REINFORCING PER SCHEDULE 3" CLR NOTE: SEE ANCHOR BOLT SETTING PLAN PROVIDED BY STAR METAL BUILDING CORP. FOR ANCHOR BOLT SPACING. VERIFY ALL NON-STRUCTURAL BOLTS FOR OPENINGS AND DOORS WITH OWNER AS THEY MAY OR MAY NOT HAVE BEEN SHOWN ON THIS PLAN. FOOTING SCHEDULE MARK (DIM X) X (DIM Y) X (THICKNESS) REINFORCING F5 5-0" X 5'-0" X 70" 10 4 E.W., TOP & BOTT. FOOTING SCHEDULE NO SCALE ANCHOR ROD SHALL CONFORM TO ASTM F1554 GR. 36 WITH STD FLAT WASHER SECURED WITH DOUBLE HEAVY HEX NUTS, TYPICAL NOTE: SEE ANCHOR BOLT SETTING PLAN PROVIDED BY STAR METAL BUILDING CORP. FOR ANCHOR BOLT SPACING. VERIFY ALL NON-STRUCTURAL BOLTS FOR OPENINGS AND DOORS AS THEY MAY OR MAY NOT HAVE BEEN SHOWN ON THIS PLAN. ANCHOR BOLT SCHEDULE NO SCALE a oQWESS/o,v C. LAJ N 6 88cz * 30 18 q�FOF CAO o2/z7 THESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE ONLY WITH THE ATTACHED STRUCTURAL CALCULATIONS ANCHOR BOLT SCHEDULE A.B. TYPE A.B. SIZE EMBEDMENT A (4) 5/8" DIA 9" B (4) 3/4" DIA 20" C (4) 3/4" DIA 20" D (4) 3/4" DIA 20" E (2) 5/8" DIA 9" ANCHOR ROD SHALL CONFORM TO ASTM F1554 GR. 36 WITH STD FLAT WASHER SECURED WITH DOUBLE HEAVY HEX NUTS, TYPICAL NOTE: SEE ANCHOR BOLT SETTING PLAN PROVIDED BY STAR METAL BUILDING CORP. FOR ANCHOR BOLT SPACING. VERIFY ALL NON-STRUCTURAL BOLTS FOR OPENINGS AND DOORS AS THEY MAY OR MAY NOT HAVE BEEN SHOWN ON THIS PLAN. ANCHOR BOLT SCHEDULE NO SCALE a oQWESS/o,v C. LAJ N 6 88cz * 30 18 q�FOF CAO o2/z7 THESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE ONLY WITH THE ATTACHED STRUCTURAL CALCULATIONS REVISIONS: DATE: 4 09/27j17 SCALE: 1/8" '1'-0" DRAWN BY: ACJ JOB N�IkI�/IBER: 17-142 SHEff: si J uj s z °° Lo � Ili L L Q Ilei? C) W z JJ � O m E 0 � J Ur Q L W G O �. Qory- r%4z z o� DQ C) Lu Lu O lzt 00 LL ��-I REVISIONS: DATE: 4 09/27j17 SCALE: 1/8" '1'-0" DRAWN BY: ACJ JOB N�IkI�/IBER: 17-142 SHEff: si