Loading...
HomeMy WebLinkAboutB17-0440 024-240-060 (2)I BUTTE COUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES 1 INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot uarantee inspections on the date requested Office: 530.538.7601 Fax: 530.538.77 85 www.ButteCountv.net/dds Permit No: B17-0440 Issued: 4/18/2017 APN: 024-240-060 Address: 31 MIDDLE HONCUT RD, HONCUT Owner: KELLEY FAMILY TRUST Permit Type: LIMITED AG Description: LTD AG BLD (2400) NO ELEC NO PLUMB Flood Zone: A SRA Area: No SETBACKS for Zoninfy. AG_ SRA. PW Front: 20 Centerline of Road: Rear: 25 SRA: Street: 20 AG: Interior 25 Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Inspection Type IVR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above ar igned Pre -Slab 124 it l Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin /Unde inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 ShearwallB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 417 Manometer Test Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimming Pools Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 1 507 Manufactured Homes Setbacks 131 Blockin /Unde inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirting/Steps/Landings 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL -rrolect anal is a cermn:ate of vccupancy foresiaennai vmy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY P Y FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION I - s f Bruckenstein Welding. & Ins ections 25 Count' Road 30 %81 Glenn, CA. 95943 CERTIFICATE OF BOLTING INSPECTION Date: 6-5-17 Project: Rich Kelly Shop Inspector. Mark Bruckenstein • Bolt Size Req'd Tension Test Torque Turn of the Nut Impact Test (in dia) (lbs) (ft -lbs) , (turn past snug) (sec) 5/8" 19,000 +S% %" 28,000+5% n/a ` 1/3 -n/a . 7/8" 391000+5% 1" 51,000+5% DESCRIPTION OF WORK, I i Arrived at the jobsite at 0530 hours to perform special inspection of high strength bolting at the Rich Kelly Shop. Before tightening the bolts we verified that the materials used in this'asserribly were in conformance with the requirements of section 2111olts, Nuts, Washers and Paint) and section 3 (Bolted Parts) of the RCSC Specifications. The bolts used in this structure were A325 grade high strength bolts without hardened steel washers beneath hardened steel nuts. JX} Turn of the Nut - No washers were used in this assembly, so the Tum -of -Nut Tightening method was used per Section 9.2.1 A representative sample of 3 bolts from each diameter; length, and grade used in this structure were tightened in the Skidmore Wilhelm tension -indicating device. This was done to verify the estimated snug tight condition and to ensure that the controlling turns past snug -tight per Table 7.1 will develop a tension not less than five, percent greater than the tension required by Table 8.1 of the RSCS specifications. Wealso yelled that there was no rotation of any of the bolts during the tightening operation. Each bolt assembly was installed and tightened to a snug-tighi condition by the contractor prior to tightening. There were a total of 72 bolts in the structure, all were tightened using the above mentioned procedure. Based on the above mentioned procedure, it our judgment that all A325 high;sfrei�gtFi tioftJrisWled in the structure have been property tensioned in accordance with the RCSC Specifications for Stnictura Joints=.contained in the RISC Manual for Steel Construction. C" 0704M61 . QC9 EXP. 4fi�--t2ols Charles J. Roberts, PE Mark Bruckensteln, Inspector C-038692 Exp.'3/31/19 Ph: 530-521-5959 email: bwimarkb@gmaiLcom e