HomeMy WebLinkAboutB17-0472 029-240-019 (2)i
h
Job number >> 16-063 DATE 2/ 1/17
Structural Calculations for
Lundberg Residence
1295 Ricvale Hwy.
Richvale, Ca. iiAb��
Gary Hawkins
Architect
3095 Ceres Ave. Ste 135
Chico, Ca. 95973
(530) 892-2700
(530) 893-0532 Fax
i
No. C18693 �
PERMIT # r- 1 :7 C) Z
BUTTE COUNTY DEVELOPMENT SERVICES
REVIEWED
COr OMP ANNE
DA BY
t
i--; LtEEff- <---
CALCDATA
11/13/91
Rev 9-20-99 Calculation data
Description >>
>>
------------------------------------------------------------------------
'Jurisdiction
Butte County
Code referenced
2016 CRC
Wind loading
Basic wind speed
110 MPH
Exposure
C
Seismic loading ,
Site Class
D
Site Design Catagory
D
Gravity loading
Roof live load . :
20 PSF '
Floor live load :
40 PSF ,
Balcony live load:
n/a PSF
Soil data
Allowable bearing:
1500 PSF
'
a
LOADS 4:22 PM
------------------- ----------------------------------------------------
REV 8-13-92 LOAD SUMMARY MODULE ' ' 2/ 1/17
-----------------------------------------------------------------------r
DESCRIPTION >>
»
-----------------------------------------------------------------------
ASSEMBLY >roof
SLOPE > 9.00IN 12 > 18.93 DEGREES
NO. DESCRIPTION UNIT WT. PITCH? ADJ.-WT.
12 Comp shingles 3.00 3.00
22 15/32" PLYWOOD 1.50 1.50
39 2 X 6.- 29" 1.10 1.10 `
38 2 X 6 - 16" 1.70 1.70-
60 INSULATION R38 2.20 2.20
62 MISC. 1.00 1.00
69 MISC. 2.00 2.00 -
83 1/2" GYPSUM BD 2.50 2.50
------------------------------------------------------------------------
DL 15.00 USE: 15.00 PSF
LL 20.00 PSF
------------------------------------------------------------------------
TL 35.00 PSF
ASSEMBLY >wall
SLOPE > IN 12 > DEGREES
NO. DESCRIPTION UNIT WT. PITCH? ADJ.•WT.
85 1/8" PLASTER 10.00 10.00
39 2 X 9 - 16" 1.10 1.10
57 INSULATION R13 .70 .70
69 MISC. 2.00 2.00
83 1/2" GYPSUM BD 2.50 2.50
DL 16.30 USE: 17.00 PSF
LL PSF
------------------------------------------------------------------------
TL 17.00 PSF
' 3-0235 — 50 SHEETS — 5 SQUARES'
COMET 3-0236 — i00 SHEETS — 5 SQUARES �
3-0237 — 200 SHEETS — 5 SQUARES
3-0137 — 200 SHEETS —FILLER
va
`e
E g
h
Pdoject:, ,
LENGTHS
Location: RB -1
5.875 ft from left support
Roof Beam
LL=
[2013 California Building Code(2012 NDS)]
psf
3.125 IN x 12.0 IN x 11.75 FT
DL=
24F -V4 - Visually Graded Western Species - Dry Use
At support.
d Section Adequate By: 99.2%
TW =
Controlling Factor: Moment
ft
DEFLECTIONS Center
Live Load 0.16 IN U888
Rea d'
Dead Load 0.13 in
Section Modulus:
Total Load 0.29 IN U488
75 in3
Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U240
REACTIONS 6 B
37.5 in2
Live Load 1763 Ib 1763 Ib
221.12 in4
Dead Load 1,441 Ib 1441 Ib
Moment:
Total Load 3204 Ib 3204 Ib
18750 ft -Ib
Bearing Length Pin 1.58 in
-3204 lb
BEAM DATA
Span Length 11.8 ft
0
Unbraced Length -Top 0 ft
Unbraced Length -Bottom 0 ft
Roof Pitch 4 :12
Roof Duration Factor 1.25
MATERIAL PROPERTIES
24F -V4 - Visually Graded Western Species
Base Values AA'usted
Bending Stress: Fb = • 2400 psi Controlled by:
Fb_cmpr = 1850 psi Fb' =
3000 psi
Cd=1.25
Shear Stress: Fv = 265 psi Fv' =
331 psi
Cd=1.25
Modulus of Elasticity: E = . 1800 ksi E'=
1800 ksi
Comp. -L to Grain: Fc --L= ; 650 psi Fc -1' =
650 psi
Controlling Moment: 9411 ft -Ib
LENGTHS
AND LOADS
5.875 ft from left support
Roof Live Load:
LL=
Created by combining all dead and live loads.
psf
Controlling Shear: -3204 Ib
DL=
15
At support.
Tributary Width:
TW =
Created by combining all dead and live loads.
ft
Comparisons with required sections:
Rea d'
Provided
Section Modulus:
37.64 in3
75 in3
Area (Shear):
14.51 int
37.5 in2
Moment of Inertia (deflection):
221.12 in4
450 in4
Moment:
9411 ft -Ib
18750 ft -Ib
Shear:
-3204 lb
8281 Ib
7i� Pa9a
„ r_ Gary Hawkins*
^' Gary Hawkins Architect
3045 Ceres Ave, Suite 135 of
Chico, CA 95973
StruCalc Version 9.0.2.5 2/1/2017 9:31:56 AM
Side One:
LENGTHS
AND LOADS
Roof Live Load:
LL=
20
psf
Roof Dead Load:
DL=
15
psf
Tributary Width:
TW =
8
ft
Side Two:
wD_adj =
245
plf
Roof Live Load:
LL =
20
psf
Roof Dead Load:
DL=
15
psf
Tributary Width:
TW =
7
ft
Wall Load:
WALL =
0
SLOPEIPITCH ADJUSTED
LENGTHS
AND LOADS
Adjusted Beam Length:
Ladj =
11.75
ft
Beam Self Weight:
BSW =
8
plf
Beam Uniform Live Load:
wL =
300
plf
Beam Uniform Dead Load:
wD_adj =
245
plf
Total Uniform Load:
WT =
545
plf
Project:-.
Location: FTG -1
Footing
[2013 California Building Code(2012 NDS)] (/
Footing Size: 2.0 FT x 2.0 FT x 12.00 IN
Reinforcement: #4 Bars @ 8.00 IN. O.C. E/W / (3) min.
Section Footing Design Adequate
FOOTING PROPERTIES
Allowable Soil Bearing
Pressure:
Qs =
1500 psf
Concrete Compressive
Strength:
Pc =
2500 psi
Reinforcing Steel Yield
Strength:
Fy = 40000 psi
Concrete Reinforcement Cover:
c =
3 in
•4.00 sf
Baseplate Bearing:
FOOTING SIZE
Width:
Bearing Required:
W =
2 ft
Length:
Bear -A =
L =
2 ft
Depth:
Depth
= 12 in
Effective Depth to Top
Layer of Steel:
d =
8.25 in
COLUMN AND BASEPLATE
SIZE
Critical Perimeter:
Column Type:
49 in
Wood
Vu2 =
Column Width:
Allowable Punching Shear (ACI 11-35):
m = 4
in
Column Depth:
vc2-b =
n= 4
in
FOOTING CALCULATIONS
60638 Ib
Controlling Allowable Punching Shear:
vc2 =
Bearing Calculations:
PL =
2643 Ib
Ultimate Bearing Pressure:
Qu =
1076 psf
Effective Allowable Soil Bearing Pressure:.
Qe =
1350 psf
Required Footing Area:
Areq =
3.19 sf
Area Provided:
A =
•4.00 sf
Baseplate Bearing:
Bearing Required:
Bear =
6222 Ib
Allowable Bearing:
Bear -A =
44200 ib
Beam Shear Calculations (One Way Shear):
Beam Shear:
Vu1 =
972 Ib
Allowable Beam Shear:
Vc1 =
14850 Ib
Punching Shear Calculations (Two Way Shear):
Critical Perimeter:
Bo =
49 in
Punching Shear:
Vu2 =
4601 Ib
Allowable Punching Shear (ACI 11-35):
vc2-a =
90956 Ib
Allowable Punching Shear (ACI 11-36):
vc2-b =
132413 Ib
Allowable Punching Shear (ACI 11-37):
vc2-c =
60638 Ib
Controlling Allowable Punching Shear:
vc2 =
60638 Ib
Bending Calculations:
Factored Moment:
Mu =
18666 in -1b
Nominal Moment Strength:
Mn =
169965 in -Ib
Reinforcement Calculations:
Concrete Compressive Block Depth:
a =
0.46 in
Steel Required Based on Moment:
As(1) =
0.06 in2
Min. Code Req'd Reinf. Shrink./Temp. (ACI -10.5.4):
As(2) =
0.58 in2
Controlling Reinforcing Steel:
As-reqd =
0.58 in2
Selected Reinforcement: #4's @ 8.0
in. o.c. e/w (3) Min:
Reinforcement Area Provided:
As=
0.59 in2
Development Length Calculations:
Development Length Required:
Ld =
15 in
Development Length Supplied:
Ld-sup =
9 in
Note: Plain concrete adequate for bending,
therefore adequate development length not required.
�
' V, -W f ? Page
J—•���_Gary Hawkins _ p„
n. Gary Hawkins Architect
r � , 3045 Ceres Ave, Suite 135 or
Chico, CA 95973
StruCalc Version 9.0.2.5 2/1/2017 3:10:15 PM
FOOTING LOADING
Live Load:
PL =
2643 Ib
Dead Load:
PD =
1661 Ib
Total Load:
PT =
4304 Ib
Ultimate Factored Load:
Pu =
6222 Ib
Weight to resist uplift w/ 1.5 F.S.:
U.R. =
387 Ib
MA
Butte County Department of Development Services
PERMIT CENTER
7 County Center Drive, Oroville, CA 95965
Main Phone 530.538.7601 Fax 530.538.7785
www.buttecounty.net/dds
PLEASE PRINT CLEARLY
PROPERTY OWNER INFORMATION .
Last Name
Z.ou
First Name
1q;6
Mailing Address
17
City!n�
b R0 v 11. t-�
State
Zip
415—
Phone
Fax
Email
Cell
;ARCHITECT/ENGINEER
..CONTRACTOR
Name
Name
City
�—
Mail' n Addres
ySerpXs
4vE 50e !3�5-
City
Mailing Address
State
C�
Zi
5"97
oto s
Covered A.Cea.:
Fax
City
State
Email
Cell
Ai 4C
fco.t
CA State License No.
Phone —.�
R/ 7 -/19-0
Fax
Email
It r
Cell
�o
�� 9
s .
L ense No.
S1yy7
Class
Q
Date: %
3 � ,/
;ARCHITECT/ENGINEER
Last Name
Name
Mailing Address
City
�—
Mail' n Addres
ySerpXs
4vE 50e !3�5-
City
Email
State
C�
Zi
5"97
Phone
Covered A.Cea.:
Fax
2
00
Email
Cell
Ai 4C
fco.t
CA State License No.
APPLICANT
Last Name
First Name
Mailing Address
City
State
Zip
Phone
Fax
Email
Cell
APPLICANT SIGNATURE AND DATE
Date:
3 20 t' 7
Print Name:
PERMIT NO: FORM NO
O DBP -1
BIN NO:
PROJECT LOCATION
APN
a - o-Ol
Pro erty Address
lZ S t
City Location must not be in the city limits of Chico, Gridley, Oroville or Paradise,
(LLt_
http://gismai)s.buttecounty.net/flexviewer/bcdatasearch/index.html
WORKER'S COMPENSATION
Policy Number
Carrier
If hiring other than a licensed contractor, a certificate of worker's
compensation must be shown at the time of permit issuance
Is this a Manufactured/Mobile Home (circle one) Yes / N.)
12&,,OV Z 0-p-
' LENDING. AGENCY
Name
Mailing Address
City
State
Zip
." DESCRIPTION OR SCOPE OF WORK
D
Mobile Home permits (other than installation, foundation, utilities 6 non-attached
structures) are issued by the State. Tell staff if this permit is for a Mobile Home. Click
below to see Manufactured Home Alterations and Permit Guidelines at:
rAtp://www.hcd.ca.gov/cades/mhp/HCD Phone: (9161255-2501
'V
Z
Is this a Manufactured/Mobile Home (circle one) Yes / N.)
12&,,OV Z 0-p-
JOB VALUATION:, (Enter value of labor, Including $ 1 0�
non-contiacted,.plus materials charge) !�
Square Feet Detail .
Living Area:
2
Garage:
Open Area:
Covered A.Cea.:
I_; Structure Built without permits
TOTAL SQ:
I
I
r Proposed Change of Occupancy/Use - Note previous/current use below:
I
i' FOR OFFICE USE ONLY
;Zoning: Flood Zone:(
iSRA: IYES U INO V NPDES YES 0 NO ❑
Code Ent YES L3 NO ❑ Legal Lot: YES ❑ NO ❑
'Occupancy Type Construction
P
it Tech:
Date: %
3 � ,/
"When filed, this application and all supporting material becoms s bject to the California Public Records Act. All public information
related to this application is subject to public inspection and wit posted on the County's website for electronic access.
Q l/
Revised 7.20.2015 gage I of I
Department of Development Services
Tim Snellings, Director
Pete Calarco, Assistant Director
7 County Center Drive T: 530.538.7601 Buttecounty.net/dds
Oroville, California 95965 F: 530.538.7785
NOTICE TO BUILDERS**
Before your building permit can be issued, your plans must be checked for compliance with the California
Building Codes. In addition, your plans are routed to other regulatory entities including but not limited to
Planning, Public Works, Environmental Health, and the California Department of Forestry for their clearances
and approvals. There are some things you can do to expedite your permit:
- Make sure your application is complete.
- Be responsive to requests from County departments for any additional materials or requirements.
The Building Division places its highest priorityon processing building permits as quickly as possible and each
day that passes without a complete application adds to processing time.
Every permit issued by the Building Official shall expire and become null and void if the work authorized by
such permit is not started or completed within one year from the date of issuance of such permit (per Butte
County Code Chapter 26, Article 1, Section 263.1). A permit may be renewed (for a fee) prior to expiration a
maximum of two (2) times, provided construction progress has been documented by the Building Division
during each year during scheduled inspections. No changes may be made in the original plans and specifications
for such work. In order to reinstate action on a permit after expiration, the permittee shall pay a new full permit
fee and additional plan checking and documentation may be required. Upon completion of work covered by this
permit, please contact this office for final inspection. As a reminder to you, it is illegal to occupy this building or
any portion of the building for which this permit is issued without a final inspection.
EXPIRATION OF PERMIT APPLICATION AND REFUND POLICY**
Application for which a permit has not been issued will expire one year after date of application.
Refunds may only be made upon written request by the person who originally paid the fees. Refunds for permit
applications, if the permit has not issued, but not after 180 days from the date of fee payment. Fees paid at
the time of application are for Plan Check and administration. The Plan Check portion of fees is refundable only
if the permit is cancelled or withdrawn before any plan checking is done. Building Division costs will be
deducted prior to authorizing a refund and a charge to process the refund application will be assessed. The
current refund processing fee is $127.00. Refunds on permits (issued) may be requested prior to the expiration
of the permit, provided no work has been done pursuant to the pen -nit. An Inspection may be required (and
deducted from any refund amount) to detennine no work was done.
Fee/refund information can be read on-line at http://municipalcodes.lexisnexis.com/codes/butteco/
"When filed, this application and all supporting material becomes subject to the California Public Records Act. All public
information related to this application is subject to public inspection and will be posted on the County's website for electronic
access.
Permit Number: B17-0472 Date: 3/20/2017
Parcel Number: 029-240-019
Location: 1245 RICHVALE HWY, RICHVALE Phone:
Owner Name: LUNDBERG ELDON & RUTH
FAMILY T
Description: REMODEL RES - ADD BATHROOM
AND CHANGE SUNROOM TO SCREENROOM
Signature of Applicant: Date: 3/20/2017
t' BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Regan & Rachel Lundberg
1245 Richvale Highway
Oroville, CA 95965 ,
Project Designer:
Gary Hawkins Architect
3045 Ceres Avenue, Suite 135, -
Chico, California 95973
(530) 892-2700. ,
Report Prepared by:
Donna Wallace
Donna Wallace
399 E. 9th Avenue
Chico, CA 95926
t 530-893-4982
PERMIT # �/� v VZZ
BUTTE COUNTY DEVELOPMENT SERVICES
REVIEWED FOR
CODE )COMPLIANCE
DATE Z i 7 BY�
Job Number:
16-063
B17-0-472 72 02)- :ail -0.1v ,v �Date:
�ii7
I:r>:i D1{1: 17s 2/14/2017
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards.
This program developed by EnergySoft Software — www.energysoft.com.
4
t' BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Regan & Rachel Lundberg
1245 Richvale Highway
Oroville, CA 95965 ,
Project Designer:
Gary Hawkins Architect
3045 Ceres Avenue, Suite 135, -
Chico, California 95973
(530) 892-2700. ,
Report Prepared by:
Donna Wallace
Donna Wallace
399 E. 9th Avenue
Chico, CA 95926
t 530-893-4982
PERMIT # �/� v VZZ
BUTTE COUNTY DEVELOPMENT SERVICES
REVIEWED FOR
CODE )COMPLIANCE
DATE Z i 7 BY�
Job Number:
16-063
B17-0-472 72 02)- :ail -0.1v ,v �Date:
�ii7
I:r>:i D1{1: 17s 2/14/2017
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards.
This program developed by EnergySoft Software — www.energysoft.com.
STATE OF CALIFORNIA
Prescriptive Residential Alterations That Do Not Require HERS Field Verification
CEC-CFI R -ALT -05-E (Revised 04/16) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CFIR-ALT-05-E
Prescriptive Residential Alterations That Do Not Require HERS Field Verification Page 1 of 3
Project Name' Regan & Rachel Lundberg Date Prepared: 02/14/2017 -
This compliance document is only applicable to
with a HERS Provider Data Registry.
not require HERS verification
HERS verification is required, a CFIR-ALT-01 shall first be registered
Alterations to Space Conditioning Systems that are exempt from HERS verification requirements may use the CFIR-ALT-05 and CF2R- ALT -05 Compliance Documents. Possible exemptions from duct
leakage testing include: less than 40 ft of ducts were added or replaced; or the existing duct system was insulated with asbestos, or the existing duct system was previously tested and passed by a
HERS Rater. If space conditioning systems are altered and are not exempt from HERS verification, then a CFIR-ALT-02 must be completed and registered with a HERS Provider Data Registry.
Alterations that utilize close Cell Spray Polyurethane Foam (ccSPF) with a density of 1.5 to less than 2.5 pounds per cubic foot having an R -value other than 5.8 per inch, or Open Cell Spray
Polyurethane Foam (ocSPF) with a density of 0.4 to less than 1.5 pounds per cubic foot having an R -value of 3.6 per inch, shall complete and register a CFIR-ALT-01 with a HERS Provider Data
Registry.
If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction for which they are
responsible. Alternatively, the person with chief responsibilityfor construction shall prepare and sign this certificate for the entire construction. All applicable Mandatory Measures shall be met.
Temporary labels shall not be removed before verification by the building inspector.
A. General Information
01
Project Name:
Regan & Rachel Lundberg
02
Date Prepared:
02/14/2017
03
Project Location:
1245 Richvale Highway
04
Building Front Orientation (deg or cardinal):
South
05
CA City:
Oroville
06
Number of Altered Dwelling Units:
1
07
Zip Code:
95965
08
Fuel Type:
Natural Gas
09
Climate Zone:
11
10
Total Conditioned Floor Area (ft):
2423
11
Building Type:
Single Family
12
Slab Area (ft)
0
13
Project Scope (Select all that apply):
❑ B. Insulation ❑✓ D. & E. Fenestration/Glazing -ADD
❑ C. Roof Replacement ❑ D. & F. Fenestration/Glazing - REPLACE
❑ G. Space Conditioning System (Heating, Cooling, Duct system)
❑ H. Water Heating System
CA Building Energy Efficiency Standards - 2016 Residential Compliance April 2016
STATE OF CALIFORNIA
Prescriptive Residential Alterations That Do Not Require HERS Field Verification
T�lr
CEC-CFIR-ALT-05-E (Revised 04/16) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ALT-05-E
Prescriptive Residential Alterations That Do Not Require HERS Field Verification Page 2 of 3
Project Name: Regan & Rachel Lundberg Date Prepared: 02/14/2017
E. Fenestration Proposed Areas and Efficiencies - Add (Section 150.2(b)1A)
01
02
03
04
05
06
07
08
09
10
11
12
13
14
Tag/ID
Fenestration
Type
Frame Type
Dynamic Glazing
Orientation
IN, S, W, E, or
Roof)
Number
of Panes
Proposed
Fenestration
Area (ft2)
Proposed
West Facing
Fenestration
Area (ft2)
Proposed
U -factor
Source
Proposed
SHGC
Source
Exterior
Shading Device
Combined
SHGC from
CFIR-ENV-03
6060
Non-metal
no
South
2
36
0.32
NFRC
0.25
NFRC
6068 French Dr
Non-metal
no
South
2
40
0.32
NFRC
0.25
NFRC
6060
Non-metal
no
South
2
36
0.32
NFRC
0.25
NFRC
2030
Non-metal
no
South
2
6
0.32
NFRC
0.25
NFRC
6040
Non-metal
no
South
2
24
0.32
NFRC
0.25
NFRC
Add Row
Delete Row
15
Total Existing + Proposed Fenestration Area = 286.9 Sf Existing + 142 sf Proposed =
428.9
16
Maximum Allowed Fenestration Area = 2423 sf x 0.20 =
484.6
17
Compliance Statement
Existing + Proposed Fenestration Area:5 Maximum Allowed Fenestration Area
® Yes % No
18
Total Existing + Proposed West -Facing Fenestration Area
30
19
Maximum Allowed West -Facing Fenestration Area
121.2
20
Compliance Statement
Existing + Proposed West -Facing Fenestration Area 5 Maximum Allowed West -Facing Fenestration Area
if Yes r, No
21
Proposed Fenestration U -factor (Windows)
0.32
22
Required Fenestration U -factor (Windows)
0.32
23
Compliance Statement
Proposed Fenestration U -factor 5 Required Fenestration U -factor
® Yes r No
24
1 Proposed Fenestration SHGC (Windows)
0.25
25
Required Fenestration SHGC (Windows)
0.25
26
Compliance Statement
Proposed Fenestration SHGC <_ Required Fenestration SHGC
® Yes ri No
27
Proposed Fenestration U -factor (Skylights)
n/a
28
Required Fenestration U -factor (Skylights)
29
lCompliance Statement
Proposed Fenestration U -factor <_ Required Fenestration LI -factor
r Yes No
30
Proposed Fenestration SHGC (Skylights)
31
Required Fenestration SHGC (Skylights)
32
Compliance Statement
Proposed Fenestration SHGC <_ Required Fenestration SHGC
r Yes P No
CA Building Energy Efficiency Standards - 2016 Residential Compliance April 2016
STATE OF CALIFORNIA
Prescriptive Residential Alterations That Do Not Require HERS Field Verification
�71---
CEC-CF1 R-AL(Revised 04/16) CALIFORNIA ENERGY COMMISSION��■
CERTIFICATE OF COMPLIANCE CF1R-ALT-05-E
Prescriptive Residential Alterations That Do Not Require HERS Field Verification Page 3 of 3
Project Name: Regan & Rachel Lundberg Date Prepared: 02/14/2017
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
Donna Wallace
0 n A-.4—
Company:
Signature Date:
02/14/2017
Address:
CEA/ HERS Certification Identification (if applicable):
399 E. 9th Avenue
City/State/Zip:
Chico, CA 95926
Phone:
530-893-4982
RESPONSIBLE PERSON'S DECLARATION STATEMENT
certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible.under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency
for all applicable inspections. I understand that a registered copy of this Certificate of Compliance is required to be included with the docum ntation the builder provides to the building
owner at occupancy.
Responsible Designer Name:
Responsible Designer Signature: ,
Gary Hawkins
Company:
Gary Hawkins Architect
Date Signed:
lip't,
Address:
3045 Ceres Avenue, Suite 135
License:
City/State/Zip:
Phone:
Chico, CA 95973
530-892-2700
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300.
CA Building Energy Efficiency Standards - 2016 Residential Compliance April 2016
2016 Low -Rise Residential Mandatory Measures Summary
NOTE: Low-rise residential buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach
used. Review the respective section for more information. 'Exceptions may apply.
(OHninal OR/20161
Building Envelope Measures:
§ 110.6(a)l :
Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfmlft2 or less when tested per
NFRC-400 or ASTM E283 or AAMA/WDMA/CSA 101/I.S.2/A440-2011 ' ,
§ 110.6(a)5:
Labeling. Fenestration products must have a label meeting the requirements of § 10-111(a).
§ 110.6(b):
Field fabricated exterior doors and fenestration products must use LI -factors and solar heat gain coefficient (SHGC) values from TABLES
110.6-A and 110.6-B for compliance and must be caulked and/or weatherstri ed.'
§ 110.7:
Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked,
asketed, or weather stripped.
§ 110.8(a):
Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material.
§ 110.8(g):
Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of § 110.8(g). ".
§ 110.8(1):
Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing
material must meet the requirements of § 110.8(i) when the installation of a cool roof is specified on the CF1 R.
§ 110.80):
Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs.
-•
Ceiling and Rafter Roof Insulation. Minimum R-22 insulation in wood -frame ceiling; or the weighted average LI -factor must not exceed 0.043.
Minimum R-19 or weighted average U -factor of 0.054 or less in a rafter roof alteration. Attic'access doors must have permanently attached
§ 150.0(a): insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in
direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in § 110.7, including but not limited
to placing insulation either above or below the roof deck or on top of a drywall ceiling.*
§ 150.0(b):
Loose -fill Insulation. Loose fill insulation must meet the manufacturers required density for the labeled R -value.
Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or U -factor of 0.074 or
§ 150.0(c):
less). Opaque non -framed assemblies must have an overall assembly Ll -factor not exceeding 0.102, -equivalent to an installed value of R-13 in a
'
wood framed assembly.'
§ 150.0(d):
Raised -floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum U -factor.'
§ 150.0(f): ,
Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without
facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 perm/inch; be protected from physical damage and UV light
'
deterioration; and, when installed as part of a heated slab floor, meet the requirements of § 110.8(g).
§ 150.0(8)1:
Vapor Retarder. In Climate Zones 1-16, the earth floor of unvented crawl space must be covered with a Class I or Class II vapor retarder. This
requirement also applies to controlled ventilation crawls ace for buildings complying• with the exception to § 150.0(d).
§ 150.0(8)2:
Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class II vapor retarder must be installed on the conditioned space side of all
insulation in all exterior walls vented attics, and unvented attics with air -permeable insulation.
150.0
§ (q)'
Fenestration Products. Fenestration, including skylights, -separating conditioned space from unconditioned space or outdoors must have a
maximum LI -factor of 0.58; or the weighted average U -factor of all fenestration must not exceed 0.58'
Fireplaces, Decorative Gas Appliances, and Gas Log Measures:
§ 150.0(e)1A:
Closable Doors. Masonry or factory -built fireplaces must have a closable metal or glass door covering the entire opening of the firebox.
§ 150.0(e)1 B:
Combustion Intake. Masonry or factory -built fireplaces must have a combustion outside air intake, which is at least six square inches in area
and is equipped with a readily accessible, operable, and tight -fitting damper or combustion -air control device.' -
§ 150.0(e)l C:
Flue Damper. Masonry. or factory -built fireplaces must have a flue damper with a readily accessible control.'
§ 150.0(e)2:
Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of
the building, are prohibited.
Space Conditioning, Water Heating, and Plumbing System Measures:
§ 110.0-§ 110.3:
Certification. Heating, ventilation and air conditioning (HVAC) equipment, water heaters, showerheads, faucets, and all other regulated
appliances must be certified by the manufacturer to the Energy Commission.'
§ 110.2(a):
HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.'
Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters
§ 110.2(b):
must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the
cut -on temperature for compression heating is higher than the cut -on temperature for supplementary heating, and the cut-off temperature for
compression heating is higher than the cut-off temperature for supplementary heating.
§ 110.2(c): `
Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a
setback thermostat.'
Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must
§ 110.3(c)5:
meet the air release valve, backflow_ prevention; pump priming, pump isolation valve, and recirculation loop connection requirements of §
110.3(c)5.
§ 110.3(c)7:
Isolation Valves. Instantaneous water heaters with an input rating greater than 6.8 kBTU/hr (2 kW) must have isolation valves with hose bibbs
or other fittings on both cold water and hot water lines of water heating systems to allow for water tank flushing when the valves are closed.
§110 . .5:
Pilot Lights. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces; household cooking appliances (appli-
ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt); and pool ands a heaters.'
Building Cooling and Heating Loads. Heating and/or cooling loads are calculated in accordance with ASHRAE Handbook, Equipment
§ 150.0(h)l:
Volume, Applications Volume, and Fundamentals Volume; SMACNA Residential Comfort System Installation Standards Manual; or ACCA
Manual J using design conditions specified in § 150.0(h)2.
In
2016 Low =Rise Residential Mandatory Measures Summary
§ 150.0(h)3A:
Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any
'
dryer vent.
§ 150.0(h)313:
Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by
manufacturer's instructions.
§ 150.00)1:
Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, must have
R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank.
Water piping and cooling system line insulation. For domestic hot water system piping, whether buried or unburied, all of the following must
be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and cold water pipes from the storage tank; all piping with a
§ 150.00)2A:
nominal diameter of 3/4 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter;
piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water. pipes from the heating source to
kitchen fixtures' '
§ 150.00)28:
Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof
and non -crushable casing or sleeve'
§ 150.00)2C:
Water piping and cooling system line insulation. Pipe for cooling system lines must be insulated as specified in § 150.00)2A. Distribution
piping for steam and h dronic heating systems or hot waters stems must meet the requirements in TABLE 120.3-A.' V
§ 150.00)3:
Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by
§ 150.00)3A:
aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can
cause degradation of the material.
§ 150.00)38:
Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a
.
Class I or Class II vapor retarder.
Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a
§ 150.0(n)1:
120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside
termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the
water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr.
§ 150.0(n)2:
Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of § 110.3(c)5.
§ 150.0(n)3:
Solar Water -heating Systems. Solar water -heating systems and collectors must be certified and rated by the Solar Rating and Certification
Corporation SRCC or by a listing agency that is approved by the Executive Director.
Ducts and Fans Measures:
§ 110.8(d)3:
Ducts. Insulation installed on an existing space -conditioning duct must comply with § 604.0 of the California Mechanical Code (CMC). If a
contractor installs the insulation, the contractor must certify to the customer, in writing, that the insulation meets this requirement.
CMC Compliance. All air -distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC
§§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions
.
of supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or
a minimum installed level of R-4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing
§ 150.0(m)l:
(RA3.1.4.3.8). Connections 'of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with
mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181 B or aerosol sealant that
meets the requirements of UL 723. If mastic or tape is used to seal openings greater than % inch, the combination of mastic and either mesh or
tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed
_
sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain
ducts. Ducts installed in cavities and support platforms must not be compressed to cause reductions in the cross-sectional area of the ducts:'
Factory -Fabricated Duct Systems. Factory -fabricated duct systems must comply with applicable requirements for duct construction,
§ 150.0(m)2: _
connections, and closures; joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct
tapes unless such tape is used in combination with mastic and draw bands. -
§ 150.0(m)3:
Field -Fabricated Duct Systems. Field -fabricated duct systems must comply with applicable requirements for: pressure -sensitive tapes,
mastics, sealants and other requirements specified for duct construction.
§ 150.0(m)7:
Backdraft Dampers. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or
' - .
automatic dampers.
§ 150.0(m)8:
Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible,
manually operated dampers in all openings to the outside, except combustion inlet and outlet air openings and elevator shaft vents.
Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and
§ 150.0(m)g:
wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or
plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from
solar radiation. _
§ 150.0(m)10:
Porous Inner Core Flex Duct. Porous inner core flex duct must have a non -porous layer between the inner core and outer vapor barrier.
Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an
§ 150.0(m)l1:
occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through_ field verification and diagnostic testing, in
accordance with § 150.0 m 11 and Reference Residential Appendix RA3.
Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal
§.150.0(m)12:
conditioning component, except evaporative coolers, must be provided with air filter devices that meet the design, installation, efficiency,
-pressure
drop, and labeling requirements of § 150.0 m 12.
S ,
2016 Low -Rise Residential Mandatory Measures Summary
Duct System Sizing and Air Filter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable
,
space must have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the
§ 150.0(m)13
supply plenum. The space conditioning system must also demonstrate airflow z 350 CFM per ton of nominal cooling capacity through the return
grilles, and an air -handling unit fan efficacy <_ 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with
Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central
forced airs stems.' '
Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor
§150.0(0):
continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of
providing whole -building ventilation. '
§ 150.0(o)1A:
Field Verification and Diagnostic Testing. Whole -building ventilation airflow must be confirmed through Feld verification and diagnostic
testing, in accordance with Reference Residential Appendix RA3.7.
Pool and Spa Systems and Equipment Measures:
Certification by Manufacturers. Any pool or spa heating system or equipment must be certified to have all of the following: a thermal efficiency
§ 110.4(a):
that complies with the Appliance Efficiency Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater
without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric
resistance heating.* '
§ 110.4(b)1:
Piping. Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the heater, or dedicated
suction and return lines, or built-in or built-up connections to allow for future solar heating.
§ 110.4(b)2:
Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover. '
§ 110.4(b)3:
Directional inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that
will allow all pumps to be set or programmed to run only during off-peak electric demand periods.
§ 110.5:
Pilot Light. Natural gas pool and spa heaters must not have a continuously burning pilot light. '
150.0 (p)'
Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow
rate, piping, filters, and valves.'
Lighting Measures:
§ 110.9:
Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements
of § 110.9'
§ 110.9(e):
JAB High Efficacy Light Sources. To qualify as a JAB high efficacy light source for compliance with § 150.0(k), a residential light source must
be certified to the Energy Commission according to Reference Joint Appendix JAB. .
§ 150.0(k)1A:
Luminaire Efficacy. All installed luminaires must be high efficacy in accordance with TABLE 150.0-A.
Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or
§ 150.0(k)1 B:
other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or
fan speed control.
Recessed Downlight Luminaires in Ceilings. Luminaires recessed into ceilings must meet all of the requirements for: insulation contact (IC)
§ .150.0(k)1 C:
labeling; air leakage; sealing; maintenance; and socket and light source as described in § 150.0(k)1C. A JA8-2016-E light source rated for
elevated temperature must be installed by final inspection in all recessed downli ht luminaires in ceilings.
§ 150.0(k)1 D:
Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must_ be electronic and must have an output frequency no less than
20 kHz.
Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no
§ 150.0(k)1 E:
more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled
by vacancy sensors.
§ 150.0(k)1 F:
Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods)
must meet the applicable requirements of § 150.0(k).*
r
Screw based luminaires. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply
§ 150.0(k)1G:
with Reference Joint Appendix JAB. Installed lamps must be marked with "JA8-2016° or'JA8-2016-E' as specified in Reference Joint Appendix
JAB.*
§ 150.0(k)1 H:.
Enclosed Luminaires. Light sources installed in enclosed luminaires must be JAB compliant and must be marked with "JA8-2016-E.°
§ 150.0(k)2A:
Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A.,,
§ 150.0(k)2B:
Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.'
§ 150.0(k)2C:
Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually
switched ON and OFF.
§ 150.0(k)2D:
Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions.
§ 150.0(k)2E:
Interior Switches and Controls. No control must bypass a dimmer or vacancy sensor function if the control is installed to comply with
150.0(k).
§ 150.0(k)2F:
Interior Switches and Controls. Lighting controls must comply with the applicable requirements of § 110.9.
Interior Switches and Controls. An energy management control system (FMCS) may be used to comply with dimmer requirements if it:
§ 150.0(k)2G: '
functions as a dimmer according to § 110.9; meets the Installation Certificate requirements of § 130.4; meets the EMCS requirements of §
.130.5(f); and meets all other requirements in § 150.0(k)2.
Anterior Switches and Controls. An EMCS may be used to comply with vacancy sensor requirements in § 150.0(k) if it meets all of the
§ 150.0(k)2H:
following: it functions as a vacancy sensor according to § 110.9; the Installation Certificate requirements of § 130.4; the EMCS requirements of §
130.5 ; and all other requirements in § 150.0(k)2.
§ 150.0(k)21:
Interior Switches and Controls. A multiscene programmable controller may be used to comply with dimmer requirements in § 150.0(k) if it
provides the functionality of a dimmer according to § 110.9; and complies with all other applicable requirements in § 150.0(k)2.
• X2016 Low -Rise Residential Mandatory Measures Summary
§ 150.0(k)2J:
Interior Switches and Controls. In bathrooms, garages,' laundry rooms, and utility rooms, at least one luminaire in each of these spaces must
be controlled by a vacancy sensor.
§ 150.0(k)2K:
Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with
Reference Joint Appendix JAB, except luminaires in closets less than 70 square feet and luminaires in hallways.*
§ 150.0(k)2L:
Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems.
Residential Outdoor Lighting. For single family residential buildings, outdoor lighting permanently mounted to a residential building, or to other
§ 150.0(k)3A:
buildings on the same lot, must meet the requirement in item § 150.0(k)3Ai (ON and OFF switch) and the requirements in either item
•
§ 150.0(k)3Aii (photocell and motion sensor) or item § 150.0(k)3Aiii (photo control and automatic time switch control, astronomical time clock, or
EMCS.
Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies,
§ 150.0(k)3B:.
and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with
either § 150.0(k)3A or with the applicable requirements in 110.9, 130.0, 130.2, 130.4, 140.7 and 141.0.
§ 150.0(k)3C:
Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by -
150.0(k)3B or § 150.0(k)3D must comply with the applicable requirements in §§ 110.9 130.0, 130.2, 130.4, 140.7 and 141.0." +
§ 150.0(k)3D:
Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more
vehicles per site must comply with the applicable requirements in §§ 110.9, 130.0, 130.2, 130.4, 140.7, and 141.0.
§ 150.0(k)4:
Internally illuminated address signs. Internally illuminated address signs must comply with § 140.8; or must consume no more than 5 watts of
ower as determined accordingto 130.0(c). I • .
§ 150.0(k)5:
Residential Garages for Eight or More Vehicles. Lighting for residential parking garages for eight or more vehicles must comply with the
applicable requirements for nonresidential garages in §§ 110.9, 130.0,130.1, 130.4, 140.6, and 141.0.
Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior
§ 150.0(k)6A:
common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that
building must be high efficacy luminaires and controlled by an occupant sensor.
Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior
common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must:
§ 150.0(k)6B:
I. Comply with the applicable requirements in §§ 110.9, 130.0, 130.1, 140.6 and 141.0; and
ii. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least
50 percent. The occupant sensors must be capable of turning the light fully on and off from all designed paths of ingress and egress.
Solar Ready Buildings:
Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the
§ 110.10(a)1:
application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the
requirements of § 110.1 0 b through § 110.10 a ..
§ 110.10(a)2:
Low-rise Multi -family Buildings. Low-rise multi -family buildings must comply with the requirements of § 110.10(b) through § 110.10(d).
Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke
ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local
jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet
each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas
§ 110.10(b)1:
greater than 10,000 square feet.
For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250
square feet. For low-rise multi -family buildings the solar zone must be located on the roof or overhang of the building, or on the roof or overhang
of another structure located within 250 feet of the building, or on covered parking installed with the building project, and have a total area no less
than 15 percent of the total roof area of the building excluding any sk li ht•area.'
§ 110.10(b)2:
Orientation. All sections of the solar zone located on steep -sloped roofs must be oriented between 110 degrees and 270 degrees of true north.
§ 110.10(b)3A:
Shading. The solar zone must not contain any obstructions, including put not limited to: vents, chimneys, architectural features, and roof
mounted equipment.*- I
ui ment.•-
Shading.-
Shading: Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the
§ 110.10(b)3B:
distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of
the nearest point of the solar zone measured in the vertical lane.'
§ 110.10(b)4: �.
Structural Design Loads on Construction Documents. For areas of the roof designated as solar zone, the structural design loads for roof
dead load and roof live load must be clearly indicated on the construction documents.
Interconnection Pathways. The construction documents must indicate: a location for inverters and metering equipment and a pathway for
§ 110.10(c):
routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of
interconnection will be the main service ane) • and a pathway for routing of plumbing from the solar zone to the water -heating system.
§ 110.10(d):
Documentation. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through
110.10(c) must be provided to the occupant.
§ 110.10(e)1:
Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps.
Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit
§ 110.10(e)2:
breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or
main circuit location; and permanently marked as 'For Future Solar Electric". '
•