TRB +Associates Agency. County of Butte
RECEIVE® TRB+ Project Number. PC 17.054.107.2
2nd Plan Review
JUN 2 0� 6047 Page 1 of 4 .
Date: May 31, 2017 TRB AND ASSOCIATES
To: Elodio Salas - {
Email: Salasl478@gmail.com
(via email) -
Cc: Philo Hunt, Nancy Springer, Deborah DeBrunnef, Jordan DeBrunner, Curtis Johnson, Carrie Gomez
Email: Phunt(a)_buttecounty.net; nspringer(a).buttecounty.net; ddebrunner(a)buttecounty.net;
idebrunner(aD-buttecounty.net; cliohnson(a)_buttecountv.net; cgomezabuttecountv.net
(via email)
RE: Plan Review for: Salas Residence — New SFD
Project Address: 0 Hogan Road, Cohasset
Agency App. No.: 1317-0528
TRB+ Project No.: PC17.054.107.2
At the County of Butte's request, TRB + Associates has completed its plan review for the project
listed above. Please see the section entitled "FOREWORD" on the following page for information on
the scope of the review, instructions on how to resubmit, and contact information for your project.
L
The following documents were received for review:
Plans: (2 sets) Sheets dated 05/19/17: C, Al to A3, S1 to S5, E1, D1 to D4
Structural Calculations: (2 copies) L. Wentland, dated 03/17/17
Truss Calculations: (2 copies) E. Teodosescu, dated 05/18/17
Truss Review Letter: (2 copies) Law Engineering, dated 05/18/17
Other: (1 copy) Response, Law Engineering, L. Wentland, dated 05/03/17
(1 copy) County Permit Center Router
Plan review comments are listed on the following pages
Sincerely,
TRB + ASSOCIATES, INC.
Karin Kuffel, P.E., S.E.
Plan Review Engineer
TRB + Associates, Inc.
BUILDING SOLUTIONS - 3180 Crow Canyon Place +Suite 216 + San Ramon, CA 94583
for MUNICIPALITIES
T 925 866.2633
F 925 790.0011
Cd www.TRppius.com
Agency. County of Butte
TRB+ Project Number. PC17.054.107.2
FOREWORD
■ This plan review is only for the purpose of evaluating compliance with the provisions contained in the
2016 CBC, 2016 CPC, 2016 CMC, 2016 CEC, 2016 CRC, 2016 Green Building Standards Code,
2016 Energy Code, and County of Butte Ordinances. Please note that our review does not encompass
provisions regulated and enforced by Planning, Engineering, Public Works, Health Departments; or other
authorities outside the jurisdiction of the Building Department.
■ Please address all of the following items and return a copy of this list, along with a response sheet,
indicating the location of all required changes to the plans, specifications and/or calculations. Be as
specific as possible in your responses so that we may expedite your recheck.
■ If any changes have been made to the plan documents unrelated to those items identified in this
comment list, please list the changes on a separate sheet and include in your resubmittal documentation.
■ Please submit two (2) complete revised sets of plans and plan documents, _wet stamped and signed by
the Architect and/or Engineer of Record, to:
County of Butte
Department of Development Services
7 County Center Drive
Oroville, CA 95965
OR
TRB + Associates, Inc.
Attention: Todd Bailey
3180 Crow Canyon Place, Suite 216
San Ramon, CA 94583
The following re -check comments numbered per the original plan review list have not been fully
addressed with the re -submitted plans. Additional comments are provided to clarify the
ARCHITECTURAL COMMENTS
No further comments.
GREEN BUILDING COMMENTS
No further comments. -
Page 2 of 4
Complete review by: Karin Kuffel, P.E., S.E.
TRB+
PROJECT DATA
Occupancy Group:
R3/U -
Type of Construction:
VB
Number of Stories:
1
Conditioned Floor Area:
2950 SF
Garage:
905 SF
Fire Sprinklered:
Yes
Valuation:
$200,000
Agency. County of Butte
TRB+ Project Number. PC17.054.107.2
FOREWORD
■ This plan review is only for the purpose of evaluating compliance with the provisions contained in the
2016 CBC, 2016 CPC, 2016 CMC, 2016 CEC, 2016 CRC, 2016 Green Building Standards Code,
2016 Energy Code, and County of Butte Ordinances. Please note that our review does not encompass
provisions regulated and enforced by Planning, Engineering, Public Works, Health Departments; or other
authorities outside the jurisdiction of the Building Department.
■ Please address all of the following items and return a copy of this list, along with a response sheet,
indicating the location of all required changes to the plans, specifications and/or calculations. Be as
specific as possible in your responses so that we may expedite your recheck.
■ If any changes have been made to the plan documents unrelated to those items identified in this
comment list, please list the changes on a separate sheet and include in your resubmittal documentation.
■ Please submit two (2) complete revised sets of plans and plan documents, _wet stamped and signed by
the Architect and/or Engineer of Record, to:
County of Butte
Department of Development Services
7 County Center Drive
Oroville, CA 95965
OR
TRB + Associates, Inc.
Attention: Todd Bailey
3180 Crow Canyon Place, Suite 216
San Ramon, CA 94583
The following re -check comments numbered per the original plan review list have not been fully
addressed with the re -submitted plans. Additional comments are provided to clarify the
ARCHITECTURAL COMMENTS
No further comments.
GREEN BUILDING COMMENTS
No further comments. -
Page 2 of 4
Complete review by: Karin Kuffel, P.E., S.E.
TRB+
Agency. County of Butte
TRB+ Project Number. PCI 7.0-54.107.2
ENERGY COMMENTS
No further comments.
MECHANICAL COMMENTS
No further comments.
PLUMBING COMMENTS
No further comments.
ELECTRICAL COMMENTS
No further comments.
FLOOD ZONE COMMENTS
No further comments.
WILDFIRE EXPOSURE CONSTRUCTION REQ.
No further comments.
STRUCTURAL COMMENTS
S1. Please verify that the redundancy factor of 1.0 is applicable to this project. Per ASCE7-10
section 12.3.4.2, for Seismic Design Category D, which this projected is assigned to, the
redundancy factor should be 1.3. Please verify and revise calculations or provide
calculations which demonstrate either of the two applicable exceptions.
At the 6-6" shear wall on shear line 1, one of the HDU2 anchor bolts is still shown as
a SSTS16 on sheet S1. Please correct this to show a SSTB20 anchor per the revised
calculations.
S6. Please show how each truss will be supported that has a reaction greater than 2.5 kips. Will
a stud be directly under each of those trusses? Please clarify how each truss will be
supported and provide calculations showing the following:
a. The capacity of a double top plate when a truss is not placed directly over the stud
Please provide a calculation that shows the maximum point load capacity
of the double top plates for a concentrated load at midspan between studs.
c. The crushing capacity of the top plate when the load is perpendicular to the grain
Please provide a calculation to show the maximum load acceptable within
the crushing capacity of the top plate. Compare this value to the truss
reactions and the number of studs which occur below the supported truss
reactions.
Page 3 of 4
TRB+
Agency: County of Butte
TRB+ Project Number. PCI 7.054.107.2
V
NEW COMMENT
f. Note that trusses C14 -C16 have been designed assuming an interior bearing
wall support (at rear wall of garage with door to interior) and.the truss
reactions at this interior wall exceed the crushing capacity of a 2x6 top plate
over a single 2x6 stud. The drawings do not show any studs to be located
below these trusses at this particular wall line, or a header over the door
opening designed to carry truss reaction loads. Please address the support
conditions of these trusses on the drawings and provide calculations to
support the design.
[END]