Loading...
HomeMy WebLinkAboutB17-0856 039-470-015BUTTE COUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES 5 INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is Spm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax:530.538.7785 www.ButteCountv.net/dds Permit No: B17-0856 Issued: 5/8/2017 APN: 039-470-015 Address: 3795 COSBY AVE, CHICO Owner: GARNICA ROSARIO EDITH Permit Type: SOLAR ROOF -RES Description: Installation of roof mount solar 8.12 kw Flood Zone: None SRA Area: No SETBACKS for Zon*np- AG_ SRA_ PW Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Insvection Tvve IVR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Signed Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin nde inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 Shearwall/B.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 417 Manometer Test Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimming Pools Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes Setbacks 131 Blockin nde inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: rFinals - q Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL 1 *Project Final is a Certificate of Occupancy for (Residential Only) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A.1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION k 3' OFFSET FOR ROOF ACCESS IY//��� 1S MODULES VCIRCUI: \\N 1 I 2 3 MOLES O PLUMBING VENT CNIMNEY 0 METER PV INTERCONNECTION POINT, AC DISCONNECT SWITCH, 8 UTILITY METER LOCATION TIE INTO METER# 1007335034 CONDUIT 55' OF 3/4' EMT CONDUIT FROM JUNCTION BOX TO ELEC PANEL FASTENED 1.11OFF ROOF WITH ECOFASTEN INVERTER(S) USED IN THIS DESIGN IS/ARE COMPLIANT WITH CEC 201.690.12 (RAPID SHUTDOWN). SEE MANUFACTURER DATA SHEET. 1 25'=1 MODULE TYPE (29) Jinko Solar JKM28OM-80 MODULES WITH (29) En hese MICRO -INVERTERS, $N`E��O�UNTED 1 ON THE BACK OF EACH MODULE JUNCTION BOX i JUNCTION BOX ATTACHED TO ARRAY USING MSI L___ HARDWARE TO KEEP JUNCTION BOX OFF ROOF 3795 Cosby Ave, Chico CA 95928 rte. COMP SHINGLES - - - ROCK-IT COUPLING MID CLAMP N ' ' Y • • ROCK-ITCOUPLING 11 `l� r. !.�!':y, MIDCLAMP U r ROCK IT COUPLING C o a) "m o MID CLAMP -f x t •� r.t<•'+ . ,•_,c' : ''�•?: '' <<.ti,• '(^::y ROCK-TT COUPLING SHELF G j ,ray, +,�5�>� ctrl 'fir cc ul t y, 1- U ^�0 ROCK-IT ROCK-IT SLIDE SHIP LAP •` U PEDESTAL - METAL FLASHING ROCK-IT LO METAL * TIE PLATE - 5/16'%1 1/2' COUPLING SHELF - (, 5/16'x3/8' FLASHING - VIEW HEX FLANGE BOLT 300 SERIES SS. HEX FLANGE BOLT ,ISOMETRIC SIDE VIEW ISOMETRIC VIEW 5 300 SERIES SS , COMP SHINGLES - (1)SIt6'x4 1/2' SS LAG SCREW�'.. TORQUE=1312 FT-LBS. SIDE VIEW t 1-' ROCK-IT MOUNT z ROCK-IT COUPLING ASSEMBLY ` PV 2.0 NOT TO SCALE PV 2.0 NOT TO SCALE TOP VIEW ` - c N + ACHMENT - CLAMP. ATTACHMENT CANTILEVER L/3 OR LESS [(,,CLAMP PERMITTED OUPLING CLAMP SPACING COUPLING i . s �> � - L=MAX 72' (6) •^ .. .zi CLAMP RAFTER- MODULE J - - ROCK-R SLIDE MODULE i METALA -- - MODULE. _ - $ c c FLASHING EPDM BONDED WASHER r RAFTER RAFTERo U us - FORMS WATERTIGHT SEAL • - cr m _ L=LANDSCAPE CLAMP SPACING o 0 Iii • r m / APV SYSTEM MOUNTING DETAIL MODULES IN PORTRAIT/LANDSCAPE I L=doRTRAIi m 3 " PV 2.0 xor roswE PV 2.0 xor TO sc.E _ CLAMP SPACING K m COMP.SHINGLES' ' , co J J Z Z W 3'MIN AND 6MAX BETWEEN. TOP OF ROOF AND BOTTOM OF MODULE 2 112 MIN 5/16'x4 1l2' - - � ONE HOLE STEEL STRAP CONDUITa coVI SS LAG SCREW 1 - Z Z U CI — SHEET x ME: TORQUE=13m2 FT-LBS. .. -PV PV MODULE, TVP. MOUNT R sEiwix 3.0 - - - " TO FRAMING OF EXISTING ROOF TYPE, PARALLEL - CONDUIT MOUNT BRACKET 's - 7 Q WITH PLANE OF ROOF .. Ow. SECTION VIEW - SHEET ' 6' MAXIMUM - FLASHING OR TILE STRAP HUMBER: PV 2.0 s SECTION_ VIEW 6' PV ARRAY TYP. ELEVATION '--------- -----_-- � a a a 7 CONDUIT MOUNTING DETAIL m a PV 2.0 NOT To SCALE s PV 2.0 nor Tosr•,. PV 2.0 w To 5 n rte. ROOF SECTION 1 e a� NN >Na' F Qpm � Tag VUz L1 muo C U � U • � Q V F MEMBER SIZE: TRUSS 2x4 AT 24" O:C.. 4 5'1 N o� N o�t 0 g 1 J $oo 2' EAVE 22.7' I P N ZW �Wg ia INTERIOR HORIZONTAL DISTANCE 3 z Zg��w> K U W J Z C) W • U Z ? ? U O SHEET Nn E: 0J Z — LL lL • SHEET NUMBER: 4 t PV 3.0 M a m n a o v v c - Photovoltaic System _ Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER) - DC System Size (Watts) 8120 Tag It Description Wire Gauge If of Conductors/Color Conduit Type" Conduit Size m AC System Size (Watts) 6235 1 Enphase Engage Cable THWN-2 12 AWG 4(L1, L2; N, G) " N/A-Free Air N/A-Free Air Module/Inverter Count 29 1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A-Free Air N/A-Free Air °; a; to m - 2THWN-2 10 AWG 6(21.12L22N)B/R/W EMT 3/4" v " 2 THWN,2-Ground 8AWG 1(GRN) EMT 3/4" '� a m o ' - 3 THWN - 2 8 AWG- 3(iL111-2 1N) B/R/W EMT 3/4" E u° s 0 • 3 THWN-2 - Ground 18 AWG 1(GRN) JEMT 3/4" 1- z _ U a • i' D A t r 9 ry d i - • - ...- .. .. - - . , _ to 3 uz 8 o N & u) M 20A Ra pid Shutdown Point of l nterconnection, Load - - > Z W Disconnect. Square ' Side 705.12(D)(2)(3)(b), w w w ♦ 20A _ OU222RB, 240W60A, Conforms to CEC 2016 o • SA Unfused, NEMA3, or LZN n equivalent 11 Z_ Z s N - 20A Inverter: Enphase- rL M " SHEET -� Existing 240W200A Service Panel, Single NAME: Envoy-S Phase, 200A Main PVCircuit2:13 Modules / t1 F-2-1. - • ODA with Disconnect 1213 c A Parallel. s��N� ii • t - 3 5A - SHEET. PV Circuit 1:16 t 2 om ner ane -S 48A/240V 3 NUMIR Modules'/ 0 _ CONTINUOUS, PROTECTION MAX 60A BREAKER .. - Parallel ON COMBINER OUTPUT -- NEMA4 function Box with Irreversible ` vfsi abea eKnife'A/C Minimum GECsize4 ' Ground SplicetT/P) Disconnect AWG copper I• SOLAR MODULE Enphase M21560-2LLS22-IG MICR04NVERTERAT EACH MODULE, ATTACHED WITH ECOLIBRIUM SOLAR HARDWARE tib BARE CU GROUND (ATTACHED TO FIRST MODULE IN ARRAY). BALANCE OF ARRAY _ GROUNDING CONNECTIONS. MADE THROUGH ARRAY HARDWARE MIC ROI N VE RTE R'CONNECTIO N TO ENGAGE TRUNK CABLE - itsi�dLn_? _fAC Inverter Make/Model .� Max. Dc Volt Rating 45 Volts Max. Power at 40 C 215 Watts Nominal AC Voltage 240 Volts Max. AC Current 0.9 Amps Max. OCPD Rating 20 Amps Max. Panels/Circuit 17 15 Short Circuit Current 15 Amps Other Notes PV Module Rating @ STC 26.1 Module Make/Model 1KM280M-60B 240 Max. Power -Point Current (imp) 8.81 Am s Max. Power -Point Voltage (Vmp) 31.8 - Volts Open -Circuit Voltage (Voc) 38.6 Volts Short -Circuit Current (Isc) 9.53 Amps Max. Series Fuse (OCPD) , 15 Amps Nom. Max. Power at STC (Pmax) 280 Watts Max. System Voltage 1000 V DC (UL) Voc Temperature Coefficient -0.29 %/C AC Output Current According to NEC 690.8(0)(1) 26.1 Amps Nominal AC Voltage 240 Volts THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Rooftop conductor ampacities designed in compliance with NEC 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(a)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Loacation specific temperature obtained from ASHRAE 2013 data tables. ASHRAE2013- Highest Monthly 2% D.B. Design Temp.: 38.7 •C• Lowest Min. Mean Extreme D.B.: -3.8 •C Conductor Calculations - Wire gauge calculated from NEC code 310.15(8)(16) with ambient temperature calculations from NEC 310.15(2)(a). For "On Roof' conductors we use the 90•C column ampacity, 0.5"-3.5' off -the -roof temperature adjustment from 310.15(B)(3)(c), and raceway fill adjustments from 310.15(8)(16). For "Off Roof' conductors we use the 75'C column ampacity, or the 90•C column ampacity with the relevant ambient temperature and raceway fill adjustments, whichever is less. The rating of the conductor after adjustments MUST be greater than, or equal to, the continuous duty uprated output current. Calculation Example - Wire Rating (90•C) x -Ambient Temperature Adjustment x Conduit Fill Adjustment >= Continuous Duty Output Current ' (On Roof, Tag 2): 10 gauge wire rated for 40 A, 40 A x 0.65 x 0.8 (4 Conductors) = 20.8 A >= 18 A (Off Roof, Tag 3): 8 gauge wire rated for 50A, 50 A >= 32.62 A c > v a 'v a z o m u CIT L _Ira O C OCPD Calculations rj — o Q V Breakers sized according to continuous duty output current. PV circuit nominal current based off N r< of modules per Circuit X (1.25(NEC code 210.19(A)(1)(a) X (A Max AC current per micro -inverter) o c u Circuit #1 = 16 modules, Output Current w/ continuous duty = 18 < 20A Breaker - v+ Circuit k2 = 13 modules, Output Current w/ continuous duty = 14.63 < 20A Breaker j system output current w/ continuous duty = 32.62 < 35A (System OCPD) > m Z .. • Utility Service Provided by PGE • No battery back-ups are tied to the designed inverter(s). • Inverter(s) used in this design is/are compliant with CEC 2016 690.12 (Rapid Shutdown). See manufacturer data sheet. • Array grounding and bonding designed in compliance with CEC 2016 690.47(C)(3). • Design calculations compliant with CEC 2016. • All ampacity calculations are made in compliance with NEC 220.5(B)..49 and below is rounded down to 0, and -.50 and above are rounded up. N W - `• Inverter Grounded •S stems Per 690.5 C _ Main. Service Panel Signage i.WARNING• (Installed on the Face of the Service Meter) n s ,� a' SHOCKELECTRICAL - • ` Per 690.59, 690.56(8). & 705.10 m ' •IF A GROUND FAULT IS INDICATED, - _ Note: Roofline placard not needed unless PV disconnect is not at the - o $ c NORMALLYCONDUCTORSt Same location as the main service •• • f , ,- _. - • V �' ut 4 p ..UNGROUNDED • • • • • - I m V Combiner Boxes, l -Boxes, Disconnects, Devices, & -• • �. ' Inverters In Un -Grounded Systems Per 690.35(F) • �• • • - • . c • . • •"^ _ .. { - • (String systems) - • • • • • • - • ... i. 'WARNING• • • 1 • M. .. . ELECTRICAL SHOCK HAZARD i F yr p• PHOTOVOLTAIC SYSTEM ARE UN• • • AND MAY BE ENERGIZED •_ • 12r Conduit, Raceways, and J -Boxes (Labeled Every SO') 'J , r . ♦ - s • " i/i ; ♦ • AC Disconnect and Any Load Centers (Combiner Panel) DUAL POWER SOURCE - Per 690.17(E) & 705.12 - - r • • SOURCE IS A PHOTOVOLTAIC„ - • tPHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT i ... - - .. v ' _RATED AC • • _ - _ - m NOM. OPERATING AC VOLTAGE:- --DC Disco;nect.Per 690.17 WARNING r, ELECTRICAL SHOCK HAZARD Cn DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES WARNING ELECTRICAL SHOCK HAZARD MAY BE ENERGIZED IN THE OPEN POSITION DO NOT TOUCH TERMINALS. TERMINALS ON THE LINE AND LOAD -BOTH ENERGIZED IN THE OPEN POSITIONF 3�� .. Inverter Output Connection (Solar Breaker) at • „ •^ • • t.. �;• O L -Main Service Panel Per 705.12 -r- - .: a_• .. u . r , ..... - _r - le_.- x. ... r �^ i` -. z m WARNING - ` • ..INVERTER • • • , _fit g Z m DO NOT RELOCATE THIS tX M Rapid ShutdownPer 690.56(0) _ * ' Rapid Shutdown Disconnect Per 690.12(5) Installed On AC Disconnect r ` • - • z z g „'^, •PHOTOVOLTAIC• • - .. • • • . • • • • l _'• ,” ;' - • - ' YS SHEET WITH ' RAPID • • • . .. .._ NAME: - . r .. .. .k r • t rM f ,.. , •i - ST b t Do ♦ , a SHEET �•• - .. i . • .. ♦ _ , . • ♦ - - . - ,, , NUMBER' ' •' - `ALL STICKERS DESCRIBED HERIN SHALL.BE MADE OF WEATHERPROOF ADHESIVE, THEY SHALL BE REFLECTIVE, THEY SHALL CONTAIN NO SMALLER THAN 3/8"WHITE ARIAL FONT TEXT AND HAVE A'RED BACKGROUND UNLESS OTHERWISE DEPICTED OR DESCRIBED. ui • ' ~ i ,# " - T. - CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED WARNING: DUAL POWER SOURCE (] WARNING WARNING 1 4 9 1 Property of Vivint Solar SECOND SOURCE IS A PHOTOVOLTAIC SYSTEM ELECTRICAL SHOCK HAZARD ELECTRICAL SHOCK HAZARD ^ N - MAIN BREAKER DE-RATED TO ••• DUE TO SOLAR RATED AC OUTPUT CURRENT: •••A IF A GROUND FAULT IS INDICATED, THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE ,a, y CIRCUITS NOM. OPERATING AC VOLTAGE: ••• V NORMALLY GROUNDED CONDUCTORS UNGROUNDED AND MAY BE ENERGIZED v ¢ o Cm 2 MAX OF ***AMPS PV SOURCE ALLOWED Property of Vivint Solar MAY BE UNGROUNDED AND ENERGIZED Property of Vivint Solar a a v -- DO NOT INCREASE MAIN BREAKER RATING WARNING: PHOTOVOLTAIC POWER SOURCE Property of Vivint Solar SITE PLAN PLACARD SHOWING ADDITIONAL POWER 5 13 a 0[3 U S '^ V $ Property of Vivint Solar - _ Property of Vivint Solar P Y WARNING SOURCE AND DISCONNECT LOCATIONS. PLACARD 10 E r ^' a WARNING 3 PHOTOVOLTAIC AC DISCONNECT .INVERTER OUTPUT CONNECTION SHALL BE MOUNTED ON EXTERIOR OF ELECTRICAL ELECTRICAL SHOCK HAZARD 6 RATED AC OUTPUT CURRENT: ••• A DO NOT RELOCATE THIS OVERCURRENT DEVICE PANEL (only when necessary) DO NOT TOUCH TERMINALS. TERMINALS ON BOTH NOM. OPERATING AC VOLTAGE: •'• V Property of Vivint Solar Property of Vivint Solar THE LINE AND LOAD SIDES MAY BE ENERGIZED IN - Property of Vivint Solar PHOTOVOLTAIC POWER SOURCE DC DISCONNECT THE POSITION 11 14 PV disconnect OPEN PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID RATED MAXIMUM POWER POINT CURRENT (IMP) ­A rapid shutdown Property of Vivint Solar 7 SHUTDOWN RATED MAXIMUM POWER POINT VOLTAGE (VMP) •••V placard indicated on E.3 Property of Vivint Solar MAXIMUM SYSTEM VOLTAGE (VOC) ***V y,_ COp PHOTOVOLTAIC DC DISCONNECT SHORT CIRCUIT CURRENT(ISC) •••A Property Vivint Solar CID Property of Vivint Solar of 0 ••• - value calculated for each _ account, for specific value see the C previous warning label page 11 14 4 7 o a ROOFTOP ARRAY 8 12 6 _ 6 .6 2 4 13 IF APPLICABLE EVERY 10' AND WITHIN V OF e o ELBOWS 03 9 3 3 3 1 1 2 a 5 5 5 5 5 5 5 o'�F2� 0¢� O MICRO-INVERTER 'OHO SYSTEMS 9 OM M z DC w Z" (3 DISCONNECT `. INSIDE [OR) __ SHEET _ _ _ _ ' SOLAR INVERTERS _ _ COMBINER PANEL VISIBLE/LOCKABLE VIVINT SOLAR METER VISIBLE/LOCKABLE SUB PANEL MAIN SERVICE NAME: fto 12 (UNCTION (MAYBE ON ROOFTOP (WHEN USED) A/C DISCONNECT (WHERE REQUIRED) A/C DISCONNECT WHEN REQUIRED) DISCONNECT PANEL 5 REQUIRED) STRING-INVERTER BOX INTEGRATED WITH (WHERE 101O ` a m ARRAY) TYPICAL SOLAR GENERATION INSTALLATION INSIDE PANEL m A SYSTEMS (NOT ALL DEVICES ARE REQUIRED IN EVERY JURISDICTION) 3 d SHEET NUMBER: ALL STICKERS DESCRIBED HERIN SHALL BE MADE OF WEATHERPROOF THESE PLACARDS SHALL BE PLACED ON ALL INTERIOR AND EXTERIOR DIRECT-CURRENT (DC) CONDUIT, ENCLOSURES, RACE-WAYS, CABLE ADHESIVE, THEY SHALL BE REFLECTIVE, THEY SHALL CONTAIN NO ASSEMBLIES, JUNCTION BOXES COMBINER BOXES, AND DISCONNECTS TO ALERT THE FIRE SERVICE TO AVOID CUTTING THEM. MARKINGS SMALLER THAN 3/8" WHITE ARIAL FONT TEXT, AND HAVE A RED SHALL BE PLACED ON ALL DC CONDUIT EVERY 10 FT (3048 MM), WITHIN 1 FT (305MM) OF TURNS OR BENDS AND WITHIN 1 FT (305 MM), ABOVE BACKGROUND, UNLESS OTHERWISE DEPICTED OR DESCRIBED. AND BELOW PENETRATIONS OF ROFF/CEILING ASSEMBLIES, WALLS OR BARRIERS ui ° _5061T i` www.jinkosolar.com PY Jin -0 Eagle MONOCRYSTALLINE 1500V Availril)jr , ' .1. MODULE Preliminary Version KEY FEATURES . High Efficiency , H+ni, modoe efriciency LIP :0 1`.72aa •.villi Passivrlted Emr-ler Rear Contact .. iPERC;.Ler-:hnnlugy High Voltage _ 1000V standard' 1 SOOV opaon lovers B0S costs and yields bPt er I.COE I Innovative Solar Cells , Four,busbar relI ierhnology;mprnvcs mocittie effirienry ' PID -Free ' Wolid's 1st PIU -Free module at 8'6C'65;,RH Low -Light Performance Advanced (glass and solar call surface texturing allow for excellent performance in low -light environ,u:!nI% ' -1 _447 I Strength and Durability i•00 Pe Wilhstands snow (5400pa) arid wnd (2400Pa) loads, salt mist and omn+onla • LINEAR PERFORMANCE WARRANTY 10 Year Product Warranty, y 25 Year Linear Power Warranty . _ C �� us 1 CE, • t v .loox linear performance warranty E. q) ; ^rrrfiflpr�8r `, Standard performance warranty osx vaiuefrofiJinbLISTEDqov, Solar-, fin ear Wa�omfy - •. - 12 zs years • Cunont-VoNaye3 Po,var•Vokge , Temp—tura Dcpondeuco ' � ,' Iii. •�I I IIII i , ;�'� - I -' Curves 129aW("• or lxc.VncJ'max - - � � - 1 II 0 i ' • • 11i 111, IillI I I 1fl I I I '. 1 ILI111�11,11.J III h 111 • � � ' r V.N:.xi: ; •.r, :'r1i Iaupnrnu.NC. x . ;Mechanical Charactsistics Cell Type Mono -crystalline PERC 156.156mm (6 inch) • * ,' �•�.-,x t r � ° No,of cells ' " I. 1 , •, ) Dimensions - 1650xSD2x40mm ((.1,7x39,06x'1,57 inch) - ' Weight '�. '0 ' 19.0 kg (41.9 lbs,) • + • 3.2mn, High Transmission. Low Iron, Front Glass , wR Coating Tempered Glass Packaging Configurations Frame ''.Anodized .AkunndumAlloy 4 t. • a,. -orrrp r� r 1 Junction Box 1 I?G7 Rated 2Spcs/ box, SOpcs/pallet. 700 pcs/40'HQ Container Output Cailtes I MWG, Length: 10001rim (_R'.7 inch) Fire Type - A ` Type I SPECIFICATIONS . Module Type JKM270M-608- JKM275M-608 S, JKM280M-ri06 JEM285M-608 . JKM290M-600 :1 . - s STC NOCT • STC NOCT STC NOCT-.TC NOCT STC NOCT 4 Maximum Power(Plnax) ' 2701Np 201Wp 275Wp 205Wp 28OWp 209VVp 265Wp 212Wp. 29011Vp 21GWp. .. • , Maximum Power Voltage (VMP) 31,4V ' 29.3V 31.6V 29.6V 31,8V 29.7V Z2,0V 29.9V 32:2V 3D.2V ' Maximum Power Curren t(imp), 8,60.4 6,85A 8.70A 6193A 8.81A °7.01A F -90A 7.12A 9.02A 7.21A - - Open -circuit Voltage (Voc) • t 38AV -'35.6V 38.5V 36.OV r 38,6V 36.2V 3.7V 36AV 38.8V 36.6V , Short-circuit Current (Isc) - - • 9.28A 7,45A - 9.40A 7,54A • 9,53A 7.62A S65A 7.72A. 0.78A 7.81A ' ! • Module Efficiency STC (o) 16.50% 1GAG°e 17.11% ` f' 17.41% 17.72% _ Operating Ternperaturo('Ci (' . n LAD -C -+85°C 1u _ Maximum system voltage ' r;-I000V0C(IJL) ' Maximum series fuse )ating- 4 ' 15A Power tolerance 0--3% .. Temoemu.ne coefficients of Pin axIF >r -0.30'1;1"C ' Temperature coefficients of Voc r ♦ . --0.29'yd°C 41 r - )' Temperature coefficients of Isc a 0.05".%{"C ° Nominal operating tell temperature (NOCT) .� T ' 45i2°C' '• G - , STC: Irradiance 1000W/mz .r.:. 't?Cell Temperature 2S°C 11 , 41111111- AN 1.5 - _ AI. NOCT: 41"Irradiance 800W/mz ^"Wind Speed 1m/s.. , `Al Ambient Telnp%rature 20°C i AM= 1.5 r i i S " Power measurement tolerance: t 3;0 h " CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODIUCT. ct ,Iinkc Solar Co.. Ltd: All rights reserved spe.cllicationr, included In this datasheet are sub•=_ct to change without notice. M US-MKT•290M-606_v1.0_rev2016 + �� f • � r t j� Etl{ t1.>>r Nil tCr ,in•rcir'tp , Enphase IQ 6 and IQ 6+ Microinverters .U` To learn more about Enphase offerings, visit enphase.com Designed for higher powered modules, the smart grid - ready Enphase IQ 6 Micro'" and Enphase IQ 6+ Micro" are built on the sixth -generation platform and achieve the highest efficiency for module -level power electronics and reduced cost per watt. Part of the Enphase IQ System, the IQ 6 and IQ 6+ Micro integrate seamlessly with the Enphase IQ Envoy` Enphase IQ Battery'", and the Enphase Enlighten'" monitoring and analysis software. The IQ 6 and IQ 6+ Micro are very reliable as they have fewer parts and undergo over 1 million hours of testing. Enphase. provides an industry-leading warranty of up to .25 years. Easy to Install Lightweight Simple cable management Built-in rapid shutdown (NEC 2014) Productive Optimized for high powered modules Supports 60 and 72 -cell modules Maximizes energy production Smart Grid Ready Complies with fixed power factor, voltage and frequency ride -through requirements Remotely updates to respond.to changing grid requirements Configurable for varying grid profiles ENPHASE. Enphase IQ 6 and IQ 6+ Microinverters INPUT DATA (DC) IQ6-60-2-US AND I06 -60 -5 -US I06PLUS-72-2-US AND I06PLUS-72-5-US Commonly used module pairings' 195 W - 330 W r 235 W - 400 W + Module civnpatibility 60 -cell PV rriudules only 6U -cell and /2 -cell IJV modules Maxunum input UC voltage 48 V 62V Peek power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 62 V Min/Max start voltage 22 V / 48 V 22V/62V Max DC short circuit current (module Isc) 15 A 15A Overvoltage class DC port II II DC port hankfend under singlefnirlt 0 A n A PV array configuration 'I x I ungrounded array; No additional UC side protection required; AC port backfeed under single fault AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) I06 -60 -2 -US AND IQ6-60-5-US IQ6PLUS-72.2-US AND IQ6PLUS-72-5-US Ponk output pnwnr 740 VA 29n VA Maximum continuous output power 230 VA 280 VA Nominal voltage/range' 240 V / 211-264 V 208 V (10) i 183=329 V 240 V / 211-264 V 208 V (I (D) 1183-229 V Nominal output current 0.9E A I 'Il A '1 17 A 1'35 A Nominal frequency 61) Hz 60 Hz Fxtended Irerluenry ra.nrle A7 - Gil N? 47 - 6A H7 Power factor at rated power 1.0 1,0 Maximum units per 20 A branch circuit 16 (240 VAC) 13 (240 VAC) '14 (siuyle-phdSe 208 VAC) 11 (sinyle-please 7.08 VAC) Overvoltage class AC port III III AC port backfeed under single fault 0 0 A Power factor (adjustable) 0.7 leading .. 0.7 lagging "' 0.7 leading... 0.7 lagging EFFICIENCY @240 V @208 V (10) 0240 V (x208 V (10) CEC weighted efficiency 97.0 % 96.51/. 97.0% 96.5 ro MECHANICAL DATA Ambient temperature range -40°C to +65°C Relative humidity range 4% to 100` (condensing) Connector type MC4 or Amphenol H4 UTX Dimensions (WxHxD) 219 mm x 191 mm x 37.9 mm (without bracket) Weight 1.5 kg (3.3 lbs) i Cooling Natural convection. - No fans Approved for wet locations Yes Pollution degree PD3 Environmental category / UV exposure rating Outdoor - NEMA 250, type 6 (IP67) FEATURES Communication Power line Monitoring Enlighten Manager and MyEnlighten monitoring options Compatible with Enphase IQ Envoy Compliance UL 62109-1, UL17A1/IEEE1547, FCC Part 15 Class B,. ICES -0003 Class B. CANiCSA-022.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC -2017 section 69012 and C221-201-5 Rule 64-218 Rapid Shutdown of PV Systems; for AC and DC conductors, when installed according manufacturer's instructions. 1. Nc enforced DCiA.0 ratio, See the compatibility calculator at enhIz ase cryo/en-ups/support/module-compatibility. 2. Nominal voltage range can be extended beyond roininal if required by the utility. To learn more about Enphase offerings, visit enphase.com Ylt r C,,.--1 as- Lne. _y All irn[s -rise:vef: ill r;,aerna '<, r. bf nors user' ,rn:.'ie Ix oUe :;; .a 3r(nase L- rergy. Inc E N P H A S E - v .:,.;T � �� •--�-/f/-. ��- ,-, —�- . � � _ -- � � _ _ _ - _ cam'- �" ^y/ • D _401Ecoasten S6lar8 Committed to the connection ,; h Contents Pg. 1.................................................. ................................................................... Assets of Design Features - System. Components Pg. 2 ...................... _: _.. ............., . ,...... ....,...,.........- ...... Rock -It 2.0 Mount Assembly Rock -It 2.0 Coupling Assembly Pg. 3 ............................................ _.......... ................. .....-...... ....:....• Rock -It 2.0 Hybrid Mount Assembly Rock -It Clip SS Assembly , pPg. 4...._..................................................................................................................................... Array Layout w i GreenFasten Flashing Install - Pg. 5.............. ...... .... ..................... ........... .............. .... ..,.........,........................ . Rock -It System 2.0 Install Pg. 6 .................... ............. ....... .................. .............. .......... ................................ ......... ... Ground Lug Install Rock -It Clip SS Install Pg. 7 -11..................................................................................................:............. Standoff Spacing Tables Snow Load 0-20 psf Snow Load 21-30 psf Snow Load 31-40-psf Snow Load 41-50 psf Snow Load 51-60 psf Pg. 12 ............................................ ....... ......... ........................... ................... ................ Grounding Information Bonding Assembly and Bonding Path Pg. 13 ........................................... t _..................................................... ,.. Thermal Expansion and Bonding Bracket Spacing ` Staggered Layout Cantilever Pg. 14.........•........................:........_......................:................................... Evaluated, Compatible Modules System Specifications . www.ecofastensolar.com info@ecofastensolar.com877-859- ' Rock -IT SYSTem 2.0 Designed with the installer in mind. EcoFasten Solar specializes in solar roof attachments that are fast and easy to install, straightforward, secure and cost-effective. EcoFasten offers a wide variety of standard products as well as custom solutions, for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow guard and solar industries for two decades. FeaTures • Fastest, easiest to level system on the market • Conforms to UL 2703 First Edition Class A Fire Rating with Type 1 modules • Integrated electrical bonding • SIMPLE- only 4 components • North-South adjustability • Only one tool required. (1 /2" deep well socket) • Vertical adjustment of 3"-4" SYSTem comPOnenTS* - reouireo ROCK -IT SLIDe ROCK -IT 2.0 ROCK -IT 2.0 COUPUnG 4" For comp SHInGLe MounT & LoaD BeannG FOOT 8„ For TILe sysTem comPonenTS* - oPTIonaL ROCK -IT 2.0 HY Bf nD MOunT (ReFer To PG. s) ROCK -IT CLIP SS (ReFer To PG. 6) ROCK -IT 2.0 Array sKir-T �a EcoFasten Solar- EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 8,153,700 8,181,398 8,166,713 8,146,299 8,209,914 8,245,454 8,272,174 8,225,557 9,010,038 . 9,134,040 9,175,478 9,212,833 *Components for use with 32mm modules are available as special order. Components for use with 32mm modules are labeled as such on packaging. Side profile of Mid -Clamps on Rock -It 2.0 Mount and Rock -It 2.0 Couplings is slightly different for use with 32mm modules. Please refer to evaluated, compatible modules on page 14. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 1 fig. AJ, (32mm) t www.ecofastensolar.com ROCK -IT 2.0 MounT ASSeI"1'1BLY NOTe: ITems 1-7 SHIP assemBLeD Tem 6 Pre-ToroueD 1 5/16"-18 Hex Flange Bolt (or Hex w/star washer) 300 Series SS 2 Rock -It Mid -Clamp 6000 Series AL (fig. A: Mid -Clamp for use with 32mm modules) 3 Conical Spring 300 Series SS 4 Rock -It Shelf 2.0 6000 Series AL S Flange Level Nut 300 Series SS 6 Rock -It Pedestal 6000 Series AL 7 Rock -It -Tie Plate 6000 Series AL 8 Rock -It -Slide -Tile 2.0 6000 Series AL (sold separately) 9 Rock -It -Slide -Comp 2.0 6000 Series AL (sold separately) ITems 8-9 are accePTaBLe BracKeTS For use WITH THe ROCK -IT 2.0 (SOLD separaTeLY) ROCK -IT 2:0 COUPLING aSSeMBLY NOTe: ITems 1-4 SHIP assemBLeD 1 5/16'-18 x :1.25" or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MidClamp 6000 Series AL (fig. A: Mid Clamp for use with 32mm modules) 3 Conical Spring 300 Series SS L 4 Rock -It -Coupling -Shelf -2.0 6000 Series AL I�5 Load Bearing Foot fi- J (32mm) . S. info@ecofastensolar.com 877-859-3947 - 2 ROCK -IT 2.0 HYBRID MounT ASSeMBLY NOTe: ITems 1-10 SHIP assemBLeD 1 1 5/16"-18 x 1.25"or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MidClamp 6000 Series AL (dig. A: Mid -Clomp for use with 32mm modules) I —'L 3 'Rock -It -Coupling -Shelf -2.0 6000 Series AL 4 Crushable Spacer- Cardboard or Similar ' S Flange Level Nut 300 Series SS 6 Rock -it Pedestal 6000 Series AL t4l 7 3/8" ID Star Washer 300 Series SS 8 3/8"-16 x 3" HexTap.Bolt 300 Series SS 9 5/16"-18 x 3/8" Hex Serrated Flange Bolt 300 Series SS 10 Rock -It Tie -Plate T 6000 Series AL ---- -1. _J 7) S J fig. A (32mm) I � I ROCK -IT CLIP SS ASSeMBLY NOTe: ITems 1-3 SHIP assemBLeD 1 Stainless Steel Carriage Bolt -.313-18X.75 2 Rock -It Clip SS 3 Stainless Steel Flange nut.313-18 CZi a �� www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 u ArraY La J- OUT Find the required structural attachment points. Mark these using a vertical (N -S) chalk line on the center of the rafters. Spacing may vary depending upon project specific structural requirements; Le. high snow and wind load areas may require lesser bracket spacing in the E -W axis vs. the maximum spacing. Max spacing is 48"for portrait orientation and 72"for landscape orientation. Consult project layout diagram for project specific bracket spacing on the roof. Install Rock -It Mounts to predetermined mount spacing. • The array skirt sections are the width of a typical 60 cell module — use the array skirt as <3 guide to lay out module placement. Note: The distance between the rows of mounts is calculated by the module dimension N -S plus 1 3/8" (35mm). Lag screw should be installed as close to center of exposed shingle as possible. The minimum distance between the lag screw and the edge of the shingle is 1/2" GreenFasTen FLaSHinG insTaLL position for each GreenFasten Flashing, vertical lines to mark the installation 2 Drill a pilot hole (1/4" diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3 Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole. Insert the lag bolt through the EPDM bonded washer, the Rock -it slide, the gasketed hole in the flashing and into the rafter. Torque: The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque Is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. 'The Engineer of Record shall check capacity of rafter to support lag screw loading. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 v ROCK -IT SYSTeM 2.0 inSTaLL ti�a� 1 Install EcoFasten Solar Flashing with Rock -It Mounts Follow EcoFasten Solar Install inshuetio os for flashing and bracket install (GreenFasten shown above) Optimum vertical distance between lagboits is l 3/8'plus module dimension Set mounts on eave most row so that the Rock -it Pedestal is on the South end of Rock -It Slide Set mounts on all upper rows so that tate Rock -It Pedestal is on the North end of Rock -it Slide 2 Install Array Skirt on Eave Mounts Loosen Hex Flange Bolt in Rock -it Mild -Clamp Slide Array Skirt Into front channel on Rock -It Shelf Tighten Hex Flange Bolt to engage tt.e Array Skirt 3.5 Install Rock -It Couplings Snap Load Bearing Foot Into the botnm of every Rock -it Coupling prior to mounting on the roof (Each Load Bearing Foot is set to sam* height as the Rock -It Mounts - adjust accordingly) On eave row only, slide Rock -It Skirt into front channel on Rock -It Coupling On eave row only, tighten the west most Array Skirt bolt on Coupling first to 1 SO In4bs., followed by tightening the east bolt, drawing the Array Skirt sections together Upon final levelling of entire array (se._ step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface NOTE: If a coupling lands on a rafter, the Hybrid Mount' should be used in place of the Rock -It Coupling (refer to image 3a) 6 'Hybrid Mount can be made in the field by assembling a coupling to amount pedestal, or by purchasing separately Align a { nd Straighten First Row of tha Rock -it System with Array Skirt Use North-South adjustment of the Rock -It Phdesta) to straighten array skirt Torque screw on side of Rock -It Pedestal tc 150 in -lbs to secure it to the Rock -It Slide Adjust Flange Level Nut to level the systen- (optional - can be leveled during or after installation) 7.1 O Install 1St ROW of PV Modules Stide upslope Rock -It Mounts down to engage top of first module Install Rock -It Couplings on the upslope side of 1st row of panels Torque istand 2nd row of Mid -Camps on Fockat Mounts and Rock -It Couplings to 1501n -lbs. (Torque to 1301Mbs. when Installing with 32mm modules) Install balance of PV modules, ensuring thaethe RockAt pedestals are In the appropriate position, then torque Mid -Clamps to secure modules 11 Level the Rock -It System • When assembly is complete, level the en -ire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value) www.ecofasterisolar.com ' infolpecofastensolar.com 877-859-3947 s GrounDinG LUG insTaLL RE 1 ROCK -IT inSTaLL s ;,�. rr•,;:.;:�Ir At;:�ntnvj I:ucalipny I Locate all parts , -Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting • the micro-inverter/power optimizer. See fig. A for acceptable mounting locations. ' 2 Install the Rock -It Clip SS ' •Slide the Rock -ft Clip SS onto the lip of the module frame. ' •Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS. ' •:Tighten ;rpm lun::snr. ({pr the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the Rock -It Clip SS. • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against • , the Clip flange to avoid rotation during tightening. www.ecofastensolar.com ,info@ecofastensolar.com 877-859-3947 i . titir,L 6 t i 'S i ii ,� . ,� �� b ,� �� u i 'S i 4; Snow Load 0-20 plif Z71 Mod_ ulesim Landscape Wind Speed Exposure Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch 4.12:12 ASCE 7-05 ASCE 7-10 ,i Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 --3-3t"' • B 159 93, 11 59 - 32 24 61 50 50 A20 52- 42 42 30 U 85 mph 110 mph, C f 114 67 42 C 88 88.1, 4 91'� D 50 56, 1:.� 35. 4 ',-'7 0 74 C '50 • B 146 54 3 43 10 90 mph 115 mph C 104 .85 61 38 98 80 80 6 40 -.23 88 51 32 83 68 68 12 432 26 26 . 'B 123 72-- `45 95*- 1`-95 ;35 100 mph 125 mphj� C 88 51 -, )1 32 68 68, 83 - D 74, .,43.1 "27 70, _57 57 !�B -57 36 93 76 7C, 110 mph 140 mph C 70 41 26 66 54 54 59 *34 22 56 46 46.'' 85 50 'M-- r -8i --66-7 —,66% 7 120 mph 150 mph 161, 22 -47 ��f47 , -'D '61 '51 -301 19 49 1 a40 -', 40 .--, Notes: k Spacing Governed by Snow Load 11,) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff. however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by Erol'asten Solar is 72 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for 6g pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 0-20 psf Notes:, Spacing Governed by Snow Load 1.) Values in above7table represent the maximum allowable spacing in inches for pullout forces only on 6coFasten Solar standoff 2.) Maximum allowed spacing approved by Ecol'asten Solar is 48" 3.) Maximum a]16we-d standoff capcity'= 547# (per testing results). 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of TO" 6.) Based on Risk Category 11 (ASOE 7-10) structures less than 30 feet in height .7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolarcoirn in'fo@kofastensolarxom 877-859-3947 7 Wind Speed Exposure Category 2:12 -d Roof Pitch 4 6:12 7:12 0 Roof Pitch< 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1* Zone 2 Zone 3 ---I G. -Y . B: — 91r+53.... --3-3t"' • 85 mph 110 mph CJ65 55 32 24 61 50 50 A20 52- 42 42 30 U B -83 49- 90 mph 115 mph C 59 35 22 56 46 46 D 50 29 18 47 38 38 100 mph 125 C '50 • --41--" 29: 2-6 18 47 39 39 D42 .15 � —40 32 32 B 56 "33 20 53 43 43 110 mph .140 mph 6 40 -.23 - 14 .38 31.31 D.- 34 Tom-, - -to .49 19 28r 12 432 26 26 6— -- --Tf— —37� 118�� r, 46""r 120 mph #150 mph 1, -C ;35 2 6 12 33 27 2719— 9. D 1; 297 -17 10 28,,, - , 22'!' 22 —14., Notes:, Spacing Governed by Snow Load 1.) Values in above7table represent the maximum allowable spacing in inches for pullout forces only on 6coFasten Solar standoff 2.) Maximum allowed spacing approved by Ecol'asten Solar is 48" 3.) Maximum a]16we-d standoff capcity'= 547# (per testing results). 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of TO" 6.) Based on Risk Category 11 (ASOE 7-10) structures less than 30 feet in height .7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolarcoirn in'fo@kofastensolarxom 877-859-3947 7 1. Notes:, Spacing Governed by Snow Load 1.) Values in above7table represent the maximum allowable spacing in inches for pullout forces only on 6coFasten Solar standoff 2.) Maximum allowed spacing approved by Ecol'asten Solar is 48" 3.) Maximum a]16we-d standoff capcity'= 547# (per testing results). 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of TO" 6.) Based on Risk Category 11 (ASOE 7-10) structures less than 30 feet in height .7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolarcoirn in'fo@kofastensolarxom 877-859-3947 7 s Snow Load 21-30 psf ' Modules`tn Land ap-e�, Wind Speed Exposure: Category 2:12 < Roof Pitch < 6:12 ..4 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3. Zone 1 Zone 2 Zone 3 i 85 mph t .110 mph'. B " C 1,1f1, ` , 93 59 .67 42 - 68 ;y. '88 88 •` X1381 t38r i 88' 11 r. 96 - - D a' B .. 56 35 85 54 '#8. 68 Iasi 0• 90 mph 115 mph ` C r: 104 61 38 88 +68; 68 D 88 51 32 las -68 68, 88 . 8& 88. 88 ,. w 74 100 mph • 125 mph ' C D 51 32 43 ` 27 , ,t38 % _ .b8 +' 88' h 57-°"'r: k 57: B 98 57 36 110 mph 140 mph C 70 • 41 26 66 54 54 D 59, 34 22 -56 46 46 '�85 ` 50 31, t ` . 66 ._ 66 B8 120 mph 150 mph,' j'' C - :' '`.61 'r X36 • 22 `58 ` 47 ; y47 D. 51 i 301.... 19 _ 49 .... 40. 40 s Is Notes: ©Spacing Governed by Snow load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff. ' however the designer must round down to meet appropriate rafter spacing r' 2.) Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4,) Includes additional factor of safety of 1.5 for lag pullout capacity' 5.) Values based on a maximum module width of 40" 6.) Based an Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table y Snow Load 21-30 psf Wind Speed Exposure 2:12 < Roof Pitch < 6:12 1 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Cate o Zone 1 Zone 2 Zone 3 Zone 1, Zone 2 1 Zone 3 85 mPh 1.110,m phI C " 65 38 1 24.1i ' At !39 4y55 32::20 7 4149 30 41 90 mph 115 mph C 59 35 22` D 50 29 ,18 8 38+-13 '-r-4'1or726�.n-125 mph -C ' r � • - Snow Load 31-40 psf ; Moduies n :iin Wind Speed Exposure, 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 : Zone 2 Zone 3- Zone 1 - Zone 2 -Zone 3 85 mph 110m B ` C 83 $3 L_&_3 67 -..-59 .�..,; -51 42 t 51 ° ;5�1 ': '$1 51, f$1, n 20 31' 30 .31 22 311 18-.F 18L31 .t t_.: l5-.�.'1' 20 •,14"D34 ' 12'26' 1227 __10ti D B 83 .83 56 35 S1 54' rfi1. 51, 5! 5 ! `5f 83 61 90 mph 115 mph. C `• '83 38 51 ,$T 51 + 2634.+.+r-2.120mph D 1 B - a i ,83 83 c 51 T2- - 32 1• 51 45 51 51 , , S1, 5U 51- ', 100 mpfi -125 mph C-= • w 83" + 51 32 74- 43, .. 27 b1,1 SI t $1 110 mph 140 mph > B ` i C ' .i 57' 41 361 26 fit 5 83 70 - 46 46 . ! - r 120 mph 150 mph .,. D - 'nf B• ` C ' t, ' . D .. 59 34 50 - • 36 30'& J. 22 ''51 '31 51t 22 .19 -' '49 8 61 ;' 1 51 1 -47 40 47 40 Notes: . _ . . . ®Spacing Governed Dy Snow Load V ,� _ 1.) Values in above table represent the maxlmum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing , ^ 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" , 3.) Maximum allowed standoff capoity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum nDdule width of 40" 6.) Based on Risk Category II (ASC E 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow L'oad,31-40 psf + Wind.S eed. ' Exposure Cateigory 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 85 mph.. ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 �..-•.`�`"`.r•. 110 mph ! ° . B k ' C G 50 so n 20 31' 30 .31 22 311 18-.F 18L31 .t t_.: l5-.�.'1' 20 •,14"D34 ' 12'26' 1227 __10ti 31 31 oil3t 31 31 3t xT 3t 31 31 31 32 Notes: . _ . . . ®Spacing Governed Dy Snow Load V ,� _ 1.) Values in above table represent the maxlmum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing , ^ 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" , 3.) Maximum allowed standoff capoity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum nDdule width of 40" 6.) Based on Risk Category II (ASC E 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow L'oad,31-40 psf + 1 Notes: .• ! 1 Spacing Governed by Snow Load ti , A.) Values in above table represent the rraximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoffr • it 2.) Maximum allowed spacing approved By EcoFasten Solaris 48" 3.) Maximum allowed standoff capcily = 547# (per testing results) y 4.) Includes additional factor of safety of 15 for lag pullout capacity, .5.) Values based on a maximum module 13ngth of 70" 6.) Based on Risk Category II (ASCE 7-1q structures less than 30 feet in height + 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastens6lar.com info@ecofastensolar.com 877-859-3947. 9 ; Wind.S eed. ' Exposure Cateigory 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 85 mph.. ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 �..-•.`�`"`.r•. 110 mph ! ° . B k ' C G 50 so 20 31' 30 .31 22 311 18-.F 18L31 .t t_.: l5-.�.'1' 20 •,14"D34 ' 12'26' 1227 __10ti 31 31 oil3t 31 31 3t xT 3t 31 31 31 32 ti 90 mph '115 mph s 13 G50 D 49 . 35 29• 29 33 23 -' 19 100 mph.'71i5ph yy C'' D ; 42 110 mph 140 mph ' B ; C1 " 40 2634.+.+r-2.120mph 150 mph' 'I C35 D.�'.,, " 13 L_ 29 _--- 20•,1. '_17_. _. 22—_ 27 _� 22 1 Notes: .• ! 1 Spacing Governed by Snow Load ti , A.) Values in above table represent the rraximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoffr • it 2.) Maximum allowed spacing approved By EcoFasten Solaris 48" 3.) Maximum allowed standoff capcily = 547# (per testing results) y 4.) Includes additional factor of safety of 15 for lag pullout capacity, .5.) Values based on a maximum module 13ngth of 70" 6.) Based on Risk Category II (ASCE 7-1q structures less than 30 feet in height + 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastens6lar.com info@ecofastensolar.com 877-859-3947. 9 ; ` All Snow Load 41-50 psf ' F r: 7. TMlsein L dnsa a Wind Speed - Exposure Cate o 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7=05 ASCE 7-10 Zone 1 Zone 2- . .Zone 3 Zone 1 Zone 2 . .Zone 3 85 mph, 110 mph C 66 H6 42 51 5'r, 5J' b1 x _ D BH 56 '� 35 B, 66 54 51 S 8i3 b1 61. 90 mphr 115 mph C 66 38, 61' 61' �• 51 D Bti T B6 w 66 , 51 32 " 45 r51 a 59 ff1 6 51 43 100 mph ' 125 mph C � • 0I 86' 86, 32 27 51 P51 5;t II1 - rB 6g, S ..57 36 ,51 i 51 51 110 mph 140 mph , C < D 6 41 26 22 L'J 5•t' ., 59,.34 46 46 ., .-�• . 120 mph 150 mph a , .. C 36. -22 (51 61 -47` F- 47 - ' D . 51 310, 19 Notes: - , Spacing Governed by Snow Load . 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing _ r , 2.) Maximum allowed spacing approved by EcoFasten Solar Is 72" s ♦ , 3.) Maximum allowed standoff capcily = 547# (per testing results) , 4.) Includes additional factor of safety of 1.5 for lag pulloul capacity 5.) Values based on a maximum module width of 40' _ 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table { Snow Load 41-50 psf. r . r 100 mph ' 04 125mph . '' ' C -.'f v' D ' f Notes: ti ' ©Spacing Governed by Snow Load ; - 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed slandofl capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity ! 5.) Values based on a maximum module length of 70' , 6.) Based on Risk Category II (ASCE 7.10) structures less than 30 feet in height 7.) All adjustment factors ere set to 1. No site specific engineering is included in this table www.eco.fastensolar.com F info@ecofastensolaccom = 877-85943947 to ' +• a - Notes: ti ' ©Spacing Governed by Snow Load ; - 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed slandofl capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity ! 5.) Values based on a maximum module length of 70' , 6.) Based on Risk Category II (ASCE 7.10) structures less than 30 feet in height 7.) All adjustment factors ere set to 1. No site specific engineering is included in this table www.eco.fastensolar.com F info@ecofastensolaccom = 877-85943947 to ' +• a - n Snow Load 51-60 psf t ' "+�•t .: r-• ,:r'a�, � ---cs = - .�. �_ �-" : .,-- --•rte•--^tt„ �"- . Modg1es in Landscape Wind Speed ASCE 7-05 ASCE 7-10 Wind Speed Exposure 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 -- Category' 'Zone 1 - Zone 2 Zone 3 . Zone 1 k Zone 2 Zone 3 %. ,, B d' - 55 S5" 55>. - 34• r 34' 34 42'134 85 mph 110 mph ` .0 J1i6 +55 j C '343�1 -22' .21f 1f,' 21 56 . 35,x. '3.i '34 .34,y Z 71 21 ` B X55, fib 54 34 ;34 39' 90 mph 115 mph C S5 ► 38 .. 8d 34 •$4 C - - D 155 51 • 32 34 i34 3r4: 33- 33 ° . `.. B ,•; 55 8 45 .34 iia 34,. 51 100 mph ; 125 mph C • Y ,55' r 32 { 34 34 $4', ' i ' D • BS6 65 43 27 34 34 b 36 34i 34'{ 110 mph . 140 mph , C '66 41 26 34 34 34 D - r$5' �'� 34 22 34 F3q, •.3K V150 B 50 • .• 131, 34 .34 <34 120 mph • mph ' C ( * .,36 • 22 34 ,34 Sd; 51 is s D r 30 19 34 _ 34 t •.3i4 .. Notes: - ®Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing In inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" ' a 4 -3.) Maximum allowed standoff capcity = 547# (per testing results) 4. Includes addltlonal factor of safety of 1.5 for lag pullout ca aclt 5.) Values based on a maximum module width of 40''.' 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site speck engineering is included in this table44 - f • - ' - v Snow Load 51.-60 psf fid. e5 Iii o _ a ) Wind Speed ASCE 7-05 ASCE 7-10 Exposure ' Category 2:12 < Roof Pitch < 6:12. 7:12 < Roof Pitch < 12:12 Zone 1 Zone 2 Zone 3 Zone 1 c • 85 mph 110 mph B33 • y C , �u, 33 .. Notes: - ®Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing In inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" ' a 4 -3.) Maximum allowed standoff capcity = 547# (per testing results) 4. Includes addltlonal factor of safety of 1.5 for lag pullout ca aclt 5.) Values based on a maximum module width of 40''.' 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site speck engineering is included in this table44 - f • - ' - v Snow Load 51.-60 psf fid. e5 Iii o _ a ) Wind Speed ASCE 7-05 ASCE 7-10 Exposure ' Category 2:12 < Roof Pitch < 6:12. 7:12 < Roof Pitch < 12:12 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 110 mph B33 • y C , �u, 33 24 21, 7-21- 2t 21 ' 3s'. 32`207 Ti 30- 21 21 27 21 .... _.,+..,,. �,.D B 90 mph. 115 mph C 33 -22' .21f 1f,' 21 D . ' X33 29 18 ' 217 Y61T_ ti Z 71 21 phJr,125�mpti ,100 C.- 33' 29' 18 4i, 26 15r 20 r21 211 21 2t 21 B 110 mph' 140 mph " C - 33' `, 23 14 p1* 2a' 2I• D 33- 33 ° 19 12 i2f ''. "/ l8_'w0" 21 20 12 • '23 17' r ..10 X21 21, - 2+R $1 21 21 21 120 mph 150 mph ' ' C D _., 29 w Notes" QSpacing Governed by Snow Load - 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only'on EcoFasten Solar standoff' 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 5471$ (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity t , 5.) Values based on a maximum module length of 70 ' 6.) Based on Risk Category II (A3CE 7-10) structures less than 30 feet in height 7.).AII adjustment factors are set to 1. No site specific engineering Is Included in this table www.ecofastensolar.com `info@ecofastensolar.com - -.. '' ii 877-859-3947 n 1 i i GrounoinG inFormaTion The rail -free Rock -It System maybe used to mount and ground PV modules that comply with UL 1703, only when that specific module has been evaluated for mounting and grounding, in compliance with the included installation instructions. Note: Grounding lug must be visible to inspectors from the entire perimeter of the PV array. Multiple Use Grounding Pins Grounding pins within the Mid -Clamp are multiple use bonding/grounding devices. Modules will need to be adjusted if the Mid -Clamps are loosened to ensure there is "new" metal to pierce into upon retightening, Grounding Method Rock -It 2.0 Mount bonds N -S rows of modules Rock -It 2.0 Coupling bonds E -W rows of modules Array Skirt 2.0 bonds E -W along the entire array when installed One Bumcly CL50-1TN ground lug is required per PV array, limited to 300 modules placed in either portrait or landscape orientation. BonDInG ASsemBLy anD BOnDInG PATH Bond Path ® Grounding Lug ' �- cot�clorfl -]Ing Integrated Bonding 5exragg m earm gronne r. ROCk-It Coupling ■ Rock It Moura Rock -It Array Skirt i' Band Peth Bond Path - - - Grounding Lug ®Grounding Lug EeuipRn nductot Grounding m or (EI;CF generally to mm E9 "pmmtGrounding pound Conductor (Gro • Rock -It Coupling g—Ily to cath cwrd a Rock-I[.Coupiinp, ' - • ROCK-RMount " - — Rock -It Array Skirt - • Rock -It Mount . Rock -k Array Skirt www.ecofastensolar.corri info@ecofastensolar.co.m 877--859-3947 12 THermaL EXPanslon ante BonDinG A thermal expansion gap is required per each continuous 40' length of modules. r' Omit a coupling and leave a 2" gap in the array skirt and also between the modules at that point. , Bond Path ® Grounding lug Equipment Grounding ti CO ndlRTdr([GC)• - ground m Rock -it Coupling • Rock -It Mount Rock -It Array Skirt BracKeT sPacinG ` Portrait Orientation " Landscape Orientation 32mm, 35mm & 40mm Modules: Max east/west bracket spacing is 72" OC. Maximum east/west bracket spacing is 48"OC.' 32mm Modules: Max east%west bracket spacing is 48"OC. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser spacing E -W than the maximum. sTaGGereD LayoUT . ,- canTlLever am oFFseT Staggered Mounting Points- '� iy �. j.. •art n YI.1 i. ,,ii��} ].t�.. : i •r LL ! i r � . !Offset' .a,.�.� i Rock It Mount ®Rock It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing. The array layout instructions in this installation manual offer a. general overview of layout. Periodically, due to a variety of Offset: Offset from all rouf edges depends un wind speed, snow factors (roof obstacles, shading, etc.) other tayouts are required. ! loads, local fire and building codes per location nfw.ecofastensolar.com info@ecofastensolar.com 877-859-3947 13 ROCK -IT SYSTeM 2.0 EvaLUaTeD, COmpaTIBLe MODULes Module Manufacturer Model Type (X used to indicate varlable test) Module Dimensions (mm) Module Dimensions (In) Trina Solar TSM-XXX-PX05.08 1640 x 992 x 40 64.57 x 39.06 x 1.57 Canadian Solar CS6P-XXXM 1638 x 982 x40 64.50 x 36.70 x 1.57 Canadian Solar CS6P-XXXP 1638 x 982 x 40 64.50 x 38.70 x 1.57 Jinko Solar JKMXXXP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXPP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXMM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Yingli Solar YL2XXP-29b 1650 x 990 x 40 65.00 x 38.98 x 1.57 LG Electronics LG300MC-63 1640 x 1000 x 35 64.57 z 39.37 x 1.38 LG Electronics LG300N1 K -G4 1640 x 1000 x 40 64.57 x 39.37 x 1.57 Axitec Solar AC-XXXM/156-60S 1640 x 992 x 40 , 64.57 x 39.06 x 1.57 RECOM RCM-XXX-6MB 1640 x 992 x 35 64.60 x 39.00 x 1.38 Silfab SLA 2XXP 1650 x 990 x 38 64.96 x 38.98 x 1.50 Solaria PowerXT XXXR-BX 1621 x 1055 x 40 63.82 x 41.57 x 1.57 Hanwha Q Cells Q.PRO G4 2XX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q. PRO BFR G4 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO 8FR G4,1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR G4.3 XXX` 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PEAK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells I Q.PEAK BLK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells -r B.LINE PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells I B.LINE PRO BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 'Hanwha 32mm modules to be used with speclal order Rockat System components. Call for details Fastest, easiest to level system on the market SIMPLE- only 4 components • Conforms to UL 2703 First Edition North-South adjustability • Class A Fire rating with Type 1 modules Only one tool required (1/2"deep well socket) Integrated electrical bonding Max No. of Panels 300 Modules per ground lug Materials 300 Series Stainless Steel 6000 Series Aluminum Max System voltage 1000VDC Coating Black Andodization/Mill Finish Class A Fire Rating With UL1703 Type 1 Rated Modules Lug Specifications Burndy CL50-lTN Ground Lug (UL Listing #KDER E9999) Leveling Range 3-4" Ground Wire Per above Lug spec. 14 AWG 4 AWG Copper Ground Wire Rock -It Slide -Comp 2.0 Range Rock -It Slide -Tile 2.0 Range 3" 7" Max Module Size 64.9611650mm) x 39.05"(992mm) x 2"(50mm) Mirk/Max Roof Slope 1/2:12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing (35mm/40mm) Max Anchor Spacing (32mm) 72" 48" Rock -,It Mount Load Rating 547lbs with Single 5/16" Lag 3.0 Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box QTY 12 units Module Cantilever Maximum cantilever is 1/3 bracket spacing Rock -It Slide Box QTY 50 units Coupling Box QTY 12 units Warranty 20 Year Material and Workmanship System making (placedonside 21 underside Codes: National Electric Code, ANSI/NFPA 70, NEC 250, NEC 690, IRC, IBC ofAomi.4ountlndcoupling) Standards: UL 2703 First Edition, UL 1703 IV EcoFastenSolar- ROCK-1'I SYS FEM MF OME1120=00-MY CONFORMSTO UL 2703 04 EcoFasten Solar www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 Carbon.nionoxide alarms required by Sections R315.1 and R315.2 shall be installed in the following locations: 1. Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s). 2. On every level of a dwelling unit including basements. R315.1.5 Multiple -purpose alarms: Carbon monoxide alarms combined with smoke alarms shall comply with Section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms. Butte! County's Interpretation of 2013 CRC, Sections 314 & 315 for Smoke Alarms & Carbon Monoxide Alarms: Where alterations, repairs or additions exceeding.$ 1,000 in valuation, existing dwellings shall be retrofitted with smoke alarms and those that have attached garages or fuel-burnink"appliances.shall have carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms for Smoke and Carbon Monoxide and in most cases will comply with the aforementioned code requirements for Carbon Monoxide Alarms. DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY As Owner/Contractor, Uwe affirm and declare under time penalty of perjury, under the laws of the State of California, by.our signatures below as Owner/Contractor, that Iiwe will comply prior to final inspection with Items A & B as specified herein: A. Both. Owner/Contractor have read and clearly understand.the aforementioned 2010 California Residential Code (CRC) Carbon Monoxide Alarm requirements. B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to final inspection as per the aforementioned building code and maintaining such installation. Smoke Alarms will also be installed prior to finalinspection as per the 2010. CRC. Smoke and Carbon. Monoxide alarms are.now installed in the following locations: tiL7'i .yam' L 'G It 51�z i' lC� 'A fCf= 6A�1 6.V,e=m Lti11e-i IMZLt< Vb l6 ta�. t1.1 K..tT' I -6:i. I Al JEa-61A 51-a_tP1NL<A .0.�6LAa ANO Ol►TS k oe-. A.C.6N - L'S• i A" ic, , 5 lsl' w'D uAlIC� >�SEWIEE�t'C'9 pntn �A��'A. g l►� • /s-t-(ZC S Owner's name (print)g,-,W, Q_1.6 afl entr Owner's signatre: Contractor's name (print): , c �� CSLB license: ct`i3ZSly Contractor's signature: Date:, 64 l Project Address: �ws�, J.e..Ico "Kermit#:.3���0856 Page 2 of 2