Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B17-1080 040-380-015
I BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is ?pm) Development Services cannot guarantee inspections on the date'requesied Office: 530.538.7601 Fax:530.538.7785 www.ButteCounty.net/dds Permit No: B17-1080 Issued: 5/31/2017 APN: 040-380-015 Address: 40 FAIRVIEW CIR, CHICO Owner: BALASEK KATHI ANN ETAL Permit Type: SOLAR ROOF -RES Description: ROOF MNT SOLAR (9.975 KW) AREA 5 Flood Zone: AE SRA Area: No Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline ofRoad: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING I Inspection Type IVR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Signed Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin /Unde inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 Shearwall/B.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 417 Manometer Test Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 AA' Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test •404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes Setbacks 131 Blockin /Unde inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirting/Steps/Landings 610 Coach Info Manufactures Name: Date of Manufacture: Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final r 538.7281 Sewer District Final **PROJECT FINAL 1 -rrojecc anal is a t-ernucare a occupancy for ttcesiaennai umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF iSSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS�PRIOR TO EXPIRATION l t 1 Z BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES BUILDING PERMIT 24 HOUR INSPECTION (IVR)#:530.538.4365 s • OFFICE #: 530.538.7601 FAX#:530.538.7785 www.ButteCounty.net/dds PROJECT INFORMATION Site Address: 40 FAIRVIEW CIR Owner: Permit NO: B 17-1080, APN: ' 040-380-015 BALASEK KATHI ANN ETAL Issued Date: 5/31/2017 - By DAH Permit type: MISCELLANEOUS .40 FAIRVIEW CIR Subtype: SOLAR ROOF -RES CHICO, CA 95928 Expiration Date: 5/31/2018 , Description: ROOF MNT SOLAR (9.975 KW) Occupancy: Zoning: gl Contractor Applicant: Square Footage: CHICO ELECTRIC, CHICO ELECTRIC Building Garage , Remdl/Addn 36 WEST EATON ROAD, 36 WEST EATON ROAD 0 0. 0 CHICO, CA 95973. CHICO, CA 95973 Other Porch/Patio Total 5308911933 - 5308911933 0 0 0 LICENSED CONTRACTOR'S DECLARATION OWNER/ BUILDER DECLARATION Contractor (Name) State Contractors License No. / Class / Expires . I, hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for CHICO ELECTRIC 454345 / B / 4/30/2018 the reason(s) indicated below by the checkmark(s) I have placed next to the applicable item(s) (Section • 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, , improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that or she licensed pursuant to the provisions of the Contractors' HEREBY AFFIRM UNDER PENALTY OF PERJURY that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license i - State license Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and in full force and effect. - Professions Code) or that he or she is exempt from licensure and the basis for the alleged exemption. X Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).): r Contractor's Signature Date ❑I, as owner of the property, or my employees with wages as their sole compensation, will do U all of or(-] portions of the work, and the structure is not intended or offered for sale WORKERS' COMPENSATION DECLARATION (Section 7044, Business and Professions Code: The Contractors' State License Law does not oner of property who, through employees' or personal effort, builds or improves the apply to anw Property, provided that the improvements are not intended or offered for sale. If, however, the I HEREBY AFFIRM UNDER PENALTY OF PERJURY one of the following declarations: building or improvement is sold within one year of completion, the Owner -Builder will have the have and will maintain a certificate of consent to self -insure for workers' burden of proving that it was not built or ❑I compensation, issued by the Director of Industrial Relations as provided for by Section improved for the purpose of sale.). 3700 of the Labor Code, for the performance of the work for which this permit is issued. Policy No. I, as owner of the property, am exclusively contracting with licensed Contractors to the project (Section 7044, Business and Professions Code: The Contractors' State ❑construct I have and will maintain workers' compensation insurance, as required by Section 3700 of License Law does not apply to an owner of property who builds or improves thereon, and who the Labor Code, for the performance of the work for which this permit is issued. My workers contracts for the projects with a licensed Contractor pursuant to the Contractors' State License compensation insurance carrier and policy number are: Law.). - Carrier. ACE AMERICAN Policy NumbfrA&i ` aR'15RSA Exp. 0IiW2018 - 1:1I am exempt from licensure under the Contractors' State License Law for the following ❑reason: I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' X compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Owner's Signature Date X - PERMIT APPLICANT DECLARATION Signature Date By my signature below, I certify to each of the following: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS I am L) a California licensed contractor or L) the property owner' or U authorized to UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES act on the property owner's behalf**. I have read this construction permit application and the information I have provided is AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN correct. ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN t agree to comply with all applicable city and county ordinances and state laws relating SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. to building construction. I authorize representatives of this city or county to enter the above -identified property for inspection purposes. California Licensed Contractor, Property Owner* or Authorized Agent**: 'requires separate verification form 'requires separate CONSTRUCTION LENDING AGENCY DECLARATION I hereby affirm under penalty of perjury that there is a construction lending agency for the authorization form + performance of the work for which this permit is issued (Section 3097, Civil Code). Lender's Name and Address , X Name of of Permittee [SIGN] Print Date Lender's Name & Address City State Zip FEE INFORMATION Total Fees: $445.00 Fees Paid: $445.00 Balance Due: (None) Job Value: $22,000.00 REC TWINPEAK 2 SERIES PREMIUM SOLAR PANELS WITH SUPERIOR PERFORMANCE REC TwinPeak Z Series solar panels feature an innovative design with high panel efficiency and power output, enabling customers to get the most out of the space used for the installation. Combined with industry-leading product quality and the reliability of a strong and established European brand, REC TwinPeak Z panels are ideal for residential and commercial rooftops r worldwide. t MORE POWER IMPROVED PERFORMANCE OUTPUT PER M' IN SHADED CONDITIONS O ENERGIZING' DOW y PID FREE 100% PID FREE Le. v... =R4 .,,,'.RE[ TWINPEAK 2. SERIES 0 • • .. ,t • 167S±2.5[65.94±0.11 y_28 [1.11 ' - 910 [35.81 382.515.051 + ❑ ... ° �` - �� �. 90 0051 + Q YEAR PRODUCT WARRANTY f. 1 45(151" Temperature coefficient of Isc WARRANTY z� Measurements in mm lin) ' ,._....38 (15] polyolefin construction ELECTRICAL DATA @ STC- NominalPower P (W 275 ' MPP „ P), ................... ' 0 1130.2 ' - '� [0.4330.8]•• 4 J .., _..............................,............................. Watt Class Sorting -(W) , ' i` t• 0/+5.0/+5 ............................................................ ....o ........................... .................. _.................................................... ..............r._.............. - 0/+5 0/+5 ._.................. .... -. 205305 -i1 [0.78 30.081 - •� '11200 [471 v �. EFFICIENCY Q YEAR PRODUCT WARRANTY f. 1 45(151" Temperature coefficient of Isc WARRANTY z� Measurements in mm lin) ' ,._....38 (15] polyolefin construction ELECTRICAL DATA @ STC- NominalPower P (W 275 ' MPP „ P), ................... Product Code*: RECxxxTP2 -280 285 290. ' 295 .., _..............................,............................. Watt Class Sorting -(W) , ' i` t• 0/+5.0/+5 ............................................................ ....o ........................... .................. _.................................................... ..............r._.............. - 0/+5 0/+5 ._.................. .... -. 0/+5 NominalPowevVoltage- VMPP(V)- ,;., 31.5 ` ..,. .-.............._,.....................,.......,.:...:................:r............................................................................... . ' 31.7' 31.9 32.1 ' 32.3 ,. . NominalPowerCurrent-IMPP(A) 1, 8.74 8:84 8.95 '9.05 9.14 Open Circuit Voltage -Voc (V) : 38.2 ............................................................................ 38.4 ' 38.6 38.8 39.0 _.....................,.....................................................,....................................................... ShortCircuitCurren t, Isc(A) 930 9.39 9.49 958•. 9.65 • , -• Panel Efficiency(%) r • 16.5 {......., 16.8 17.1 17.4 , 17.7 ................. ...................................................... .................................................... ....................................... ' Values at standard test conditionsSTC(airmassAM1.5,irradiance1000W/mzcelltemperature25°C). Atlowirradiance of200W/mz(AM 15and cell temperature 25"C)atleast 94%ofthe STC module efficiency will beachieved. - *Where xxx indicates the nominal power class (P,,,) at STC indicated above, and can be followed by the suffix BLK for black framed modules. ELECTRICAL DATA @ NOCT k- NominalPower-P (W 206 0 Product Code*: RECxxxTP2 223 210 214 218 ........ ..........._.MPP.. .r.t. •........ :................................. NominalPower Voltage-VMPP(V)` - ' 29 ....... _..................:..�......_................:: :_................................... ................................._......................... ;.................................................................. ......... ` 4 ,Nominal Power Current- 1, (A) , -707 ............................._............. ,.......,......... ............... .......,....... ............................... .......... :..... ......... 7.15 7.24 ' 7.32- 7.43 Open Circuit Voltage-Voc(V) ^ :, ' ' 35.4 _..................................... I ..................................... , •35.6 35.8 36.0 ' 36.2 ....._•.....¢.::...:........................................:............................................._................................................ ShortCircuitCurrent-Isc(A) 7.52 ., . ` 7.59 7.68 , 7.75. 7.85 ........................................................................................................................::............................................................I.................. Nominal operating cell temperature NOCT (800 W/m=, AM 15, windspeed I m/s, ambient temperature 20°C). ,% *Where Y= indicates the nominal powe class (P� at STC indicated above, and can be followed by the suffix BLK for black frimed modules. CERTIFICATIONS UVEl0 �� a year produlinear owero ty 25 year linear poweroutputwarranty C us (max. degression in performance of 0.7% p.a. from 97% LIL1703, Fire classification Type 2:IEC 61215,IEC 6173Q, after the first year) IEC 61701 (Salt Mist- severity level 6), IEC 62804(PID Free), IEC 62716 (Ammonia Resistance), ISO 11925-2 (Ignitability Class 1). See warranty conditions for further details. LINI8457/9174 (Class A), ISO 9001:2015,15014001, OH5AS 18001 �. EFFICIENCY Q YEAR PRODUCT WARRANTY 25 YEAR LINEAR POWER OUTPUT Temperature coefficient of Isc WARRANTY z� US IMPORT DUTY FREE Nominal operating cell temperature(NOCT) 44.6"C(±2°C) Temperature coefficient ofPMPP -0.39%/'C Temperature coefficient of Vac -0.31 %/'C Temperature coefficient of Isc 0.045 %/'C Cell type: 120 REC HC multicrystalline 6 strings of 20 cells Glass: 0.13"(3.2 mm) solar glass with anti -reflective surface treatment Backsheet: Highly resistant polyester polyolefin construction Frame: Anodized aluminum* *(available in silver or black) Junction box: IP67 rated, 3 -part with bypass diodes 12 AWG (4 mm2) PVwire, 35"+47"(0.9m+1.2m) Connectors: Multi-ContactMC4 PV-KBT4/PV-KST4 12 AWG (4 mm2) Founded in Norway in 1996, REC is a leading vertically integrated solar energy company. Through integrated manufacturing from silicon t to wafers, cells, high-quality panels andextendingtosolarsolutions;RECprovidestheworldwithareliablesourceofcleanenergy.REC's ,:' ®` RCC ' renowned product quality is supported by the lowest warranty claims rate in the industry. REC is a Bluestar Elkem company with , headquarters in Norway and operational headquarters in Singapore. REC employs more than 2,000 people worldwide, producing 1.4 GW of solar panels annually. www.recgroup.com 1!, ` ... r it • + ! - Engage Cable System and Accessories Enph.a'se°Engage Cable`_ 7 _ ,.+ • ` + t - - .. a yf. The Engager"" Cable is a continuous length of 12AWG cable with pre-installed connectors for Enphase Microinverters. The cable is handled like standard outdoor-rated electeical wire, allowing it ' to.-,be cut, spliced and extended as needed. ` The Engage Accessories complement the Engage Cable and give it the ability to adapt to any. - ; installation. FAST •+ J FLEXIBLE SAFE - Quick installation A_ ,- Simple design r - No. high vol-.age DC �. - Large branch capacity_' s• '` ; No additional cables - Reduced fir✓ risk w M l enphase IeJ_ E N•,E RG +'. c us Enphase® Engage Cable System // DATA CABLE TYPES / ORDERING OPTIONS 'Voltage Connector Spacing PV Module Orientation Model Number #Connectors' Weight" 240 VAC, 4 conductors 1.025 meter (40") Portrait ' ET10-240-40 •40 • 40 lbs 240 VAC, 4 conductors 1.7 meter (67") Landscape ET17-240-40 40 ' 45 lbs 208 VAC, 5 conductors' 1.025 meter (40") Portrait ET10-208-30 30 30 lbs 208 VAC,5 conductors 1.7 meter (67") Landscape ET17-208-30 . 30 35 lbs additional lengths available through Enphase authorized distributors. "weights are approximate CABLE SPECIFICATIONS - + Description Rating -Cable temperature rating 90°C (194°F) wet/dry ' Cable insulator rating THWN-2 ' ' UV exposure rating UL 746 C, F1 Conductor size - • 12AWG b" Compliance `" IEC 60529 IP67, CAN/CSA 22.2 No. 21, 182.3, UL 486A/B, 514C,.6703, and 9703 Cable rating TC-ER r , Cable Diameter. 1.25 cm (0.49") • Minimum bend radius. 12 cm (4:75") ENGAGE ACCESSORIES + + Branch Terminator Disconnect Tool One terminator needed per branch Plan to use at least one per circuit installation { ET-TERM-10 (sold in packs of 10) ET-DISC-35 (sold in packs of 5) i Watertight Sealing Cap Cable Clip,® One needed to cover each unused Many needed to fasten cabling connector on the cabling to the racking or to secure'looped ET-SEAL-10 (sold in packs of 10) 01 cabling , ET-CLIP-100 sold in packs of 100 s Engage Coupler " > Used for splicing two power cables within an array ET-SPLK-05 (sold in packs of 5) To learn more about__Enphase Micro_inverter technology, del enphase visit enphase.com,= E N E R G Y•. © 2013 Enphase Energy. All rights reserved: All trademarks or brands in this document are registered by their respective owner. + ; i` r .� '•`, \ , � '' .a�1 �.�+,•, •' tom'` • r .. •�� *. Y 'r i • ` .4 • Enphase® Microinverters .� Ehp'hase° td]-enphase E N E R G Y f f +,. The Enphase®;Microinverter System improves energy harvest, increases 'reliability, and dramatically simplifies design, installation, and management of solar power systems. The Enphase System includes the microinverter, the Envoy® Communications Gateway,"' and .; + Enlighten® Enphase's monitoring and analysis software. ~' t -P'ROD'UCTIVE-." ' SMART Maximum energy production •, l F, -.Quick and simple design, installE.tion, = Resilient to dust, debris and shading and management -Performance monitoring 24/7 monitoring and analysis - t �. � , •: .' SAFE- -. == System availability greater than 99.8% Low -voltage DC No single point of system failure g p y L -Reduced fire risk • �.� enphase® S�® E 'N E R G',Y .1 4ti C us l,t Enphase® M215 Microinverter // DATA ` INPUT DATA (DC) M215-60-2LL-S22/S23 and M215-60-2LL-S22-NA/S23-NA (Ontario) Recommended input power (STC)190 - 270 W. s .. Maximum input DC voltage 45 V' i , Peak power tracking voltage 22-36V - Operating range 16-36V } f Min./Max: start voltage 22 V' / 45. V _ Max. DC short circuit current, •15 A V Max. input current 10.5.A t OUTPUT:,DATA (AC) , @208 VAC @240 VAC } ' Rated (continuous) output power 215 VV 215 W t Nominal output current • 1.0 A (Arms at nominal duration) 0.9 A (Arms at nominal duration) r Nominal voltage/range. 208 / 183-229 V 240-/ 211=264 V ' Extended voltage/range , 179-232 V 206-26E V f .4 4 �« Nominal frequency/range 60.0 /59.3-60.5 Hz .., • 60.0 / 59.3-60.5 Hz, . _ _ - Extended frequency range 57-60.5 Hz 57-60.5 Hz ` Power factor >0.95 >0.95 • f Maximum units per 20 A branch circuit 25 (three phase) ' 17 (singile phase) ' ' Maximum'output fault currenf 1.05'Arms, over 3 cycles; 1.04 Arms over 5 cycles • '_ EFFICIENCY CEC,weighted efficiency 96.0% Peak inverter efficiency - 96.3% ' Static MPPT efficiency (weighted,, reference EN50530) 99.6%- ' '• t Dynamic MPPT efficiency (fast irradiatiori changes, reference EN50530) 99.3% Night time power consumption 46 mVV- A MECHANICAL DATA r ' s ' Ambient temperature range -40°C to + 65°C Operating temperature range (internal) ' -40°C to + 85°C - Dimensions (WxHxD) 17.3 cm x 16.4 cm x 2.5 cm (6.8" x 6.45" x 1.0"') without mounting bracket Weight :. `' '. 1.6 kg (3.5 lbs) Cooling . Natural convection - No fans - 'Enclosure environmental rating Outdoor - NEMA 6 #. f ' FEATURES ,�• f .t F . . Y Compatibility - . -: t Pairs with most 60 -cell PV modules L ' ' ' c ' . Communication • 'Power line M ononng _ ree lifetime monitoring via Enlighten software , Compliance . UL1741/IEEE1547, FCC Part 15 Class B e, CAN/CSA-C22.2 NO. 0-M91,.0..4-04,.and 107.1-01 To learn more about,Eriphase Microinverter technology, ' • ' visit enphase.com;; fie] Opp ase { © 2013 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. • ` . ' , • • F ' . �:, { :,: , - ,- � - •solar system r ' • .. ` . ' r 1 F •� may_ yu;r;,:*'°n�s'.n. CROSSRAIL MAIN COMPONENTS CROSSRAIL ACCESORIES • Belau are the parts to assemble the Everest CrozRa 1 Wein . CrossRall 4.8 ' ' 4 • C -Rd I Material Aluminium j Enphase ;1S Mounting Kit Material. Aluminium 'Length 161 42- ' L Foot w/ T -Bolt and Flange Nut (CR 48) tL FootMaterial: Aluminum - 4,tt, - - - 'End Cap for CrocsRail 48 Material: gWsz fibre rinforced polyamidHardware Material: Stainles Steel T Bolt 28/15'M 10 1 + i. Hex Flange'NuL Serrated M10 a t Rail Connector Set CrossRail 48 Omega Wire Management Clip { , Material Aluminium Splirn • - .�. Material: payamidbWck r Harwa a Stainless Steel a, •r,,, l _,la J ,,, . 1 J ' Module End Clamp Set ' r Burndy WEEB 4ug 8.0 • ' Material: aluminium • R - .. Material: Aluminium Clamp y,, •' - 1 . • Hardware' Stainless Steel WEER _ug 8y. 0 Hardvare Only •+- • �• - XBurndy t, Material: Stainlessee Module Middle Clamp Set r F.,%ching BurngwEEB Lug a.0 to CrossRad 48 TBoh 28115 M20 4 • i Hex Flange NeL Serrated 20 , r - • Material Aluminium � - y J ' HardwareStainless Steel ` - ' ;•. - Burndy KMC WEEB Clip + • a • Dark Module End Clamp Set - • ,. „d�� V ►1� Material: Stainles Steel use with EverestMid Clamps to Bond Modules to the CrossRaa 48 - - " Material: aluminium, • ��+ •- ' 1 + ., r ' .. • . Dark Module Middle Clamp Set Material. aluminium : , ' • • . Frs ` EVEREST SOLAR SYSTEMS f CROSSRAIL PITCHED ROOF SOLUTION ASSEMBLY: STEP BY STEP ® ROOF ATTACHMENT /FLASHING The Zcntractor shall venfy that the mounting inst- ructions of the module manufacturer are followed! ♦, ATTACH MODULES WITH END CLAMPS Install the appropriate roof attachments and flas- hings according to the manufactures installation ins- tructions (e.g. Quickmount PV Composition mount). Ensure the waterproofness the roof observing all _ ` ` ,,� Everest Solar supplies End 'Clamps preassembled with the universal MK2 Slot Nut for fast, easy ins- , tallatior- To attch the End Clamps to the CrossRail, - insert tke MK2 Slot Nut into the CrossRail 48 by' - , applicable laws, regulations, ordinances and codes. _ J @• ��, pulling rip on the plastic tab then rotating clockwise , Ensure that the structiral roof attachments points are in the right position according to your structural 1 \ / _ by 90 degrees. :calculations for the CrossRail system. V' '` ., Never mount end clamps directly on the rail joint or , , end of ate rail! There must be at least 1" (20 mm) Materials required. appropriate roof attachments and flashings from end damp to the end of the rail.. - - ' Attach modules and position the clamps on the mo- ' dule according to the manufacturer's instructions. ® L -FOOT TO ROOF ATTACHMENT s as The Zcntractor shall venfy that the mounting inst- ructions of the module manufacturer are followed! ♦, insert the MK2 Slot Nut into the CrossRail 48 by ` ® Place the L -Foot on top of the roof attachment with - Module End Clamp Tightening Torque; 10.3 Ibf-ft ® the long leg of the foot facing the roof ridge. Tighten -.. - (14 Nm). Due to thermal expansion, we recommend a ther- the hardware (e.g. bolt and nut) according to the manufacturer's instructions through hole on the ' Materiels required: End Clamp Set r ' bottom flange of the L -Foot. , , Materials required: Everest L -Foot, attachment ATTACH MODULES WITH MIDDLE ' hardware by 3rd parry roof attachment supplier. ® CLAMPS +' Everes Solar su lies Mid Clam bl d PP p pre sem e ® with tseuniversal MK2 Slot Nut for fast, easy ins- tallation. To attch the Mid Clamps to the CrossRail, ' •t t1h® ATTACH CROSSRAIL 48 TO THE L -FOOT top of the CrossRail 48 is located above the top of the L -Foot. Verify that the groove mark on the end insert the MK2 Slot Nut into the CrossRail 48 by r - - ® pulling up on the plastic tab then rotating clockwise •� ® OPTIONAL: END CAP ASSEMBLY by 90 degrees. 1 Due to thermal expansion, we recommend a ther- Place the CrossRail on the high side of the L-Foot - ' -• facing the roof ridge. Insert the T -Bolt through the L -Foot slot and into the lateral channel of the , ` 'Attacl modules and position the clamps on the mo - dule according to the manufacturer's instructions. of the rail. CrossRail 48. Turn the T -Bolt clockwise making sure - The Contractor shall verify that the mounting inst- that the groove mark on the end of the T -bolt is ;fid® ructicts of the module manufacturer are followed! �. verticle. Put the appropriate self-locking Hex Flange - ' ' Nut onto the T -Bolt, adjust the height of the rail - Modde Mid Clamp Tightening Torque; 10.3 lbf-ft a and tighten the nut with a torque wrench using a - (14 Nln). , ~ �------� �� — torque 25.81bf-ft (35Nm) for M10. Ensurethat the � r Mate -gals required: Middle Clamp Set • top of the CrossRail 48 is located above the top of the L -Foot. Verify that the groove mark on the end r - - - • ` -.. of the T -Bolt is verticle, otherwise disassemble and repeat this step. •� ® OPTIONAL: END CAP ASSEMBLY ` • ''• Due to thermal expansion, we recommend a ther- - Push the ms of the CrossRal 48 end cap ♦ Into end -• mal break after (20 m), but no further than (24.4 m). The minimum separation between the two rails , of the rail. •.t-. g is 1:25" " to 2 (3-5 cm). _ _ ® Materials required: CrossRail End Cap. r Materials required: CrossRail 48, T -Bolt M10, self- locking nut M 1 �. I - ' ' r • ACCESSORY ASSEMBLY a r ' f ' ~ �------� �� — N IL RACONNECTOR ASSEMBLY � � r . ENPhASE 215 MOUNTING KIT • ' ' " Align the two rail ends next to each other (Rail Joint). Slide the Rail Connector on to the rails from Eveest Solar supplies the preassembled hardware ' below aligning the middle of the Rail Connector ,1. y, to --tach the Enphase 215 with the universal MK2', Slot Nut for fast, easy installation. To attch the en- -•t � near the Rail Joint. Connect the Rail Connector :� - - phase mounting kit to the CrossRail, insert the MK2 ' O to each rail using 2 T -bolts, 4 T -Bolts total, and 4i self-locking nuts. The rail joint may not be in the _ �A' '!� =`��'- Slol Nut into the CrossRail 48 by pulling up on the ♦ ` - � range of the L -Foot or roof attachment. Tightening pla3ic tab then rotating clockwise by 90 degrees. - • " torque: 25.816f -ft (35Nm) for M70 hardware. Ma.erials required: Enphase Mounting Kit .. - Materials required: Rail Connector Set (includes Opional: Bumcly KMC WEEB Clip y _ + - hardware) - - - OMEGA WIRE MANAGEMENT CLIP - - !' F` • Insall the Omega Wire management -clip to the ' i • - --tR - CressRall 48 by pinchingthe end of the clip and inserting the ends into the side c -channel slot of , the CrossRail 48. , - ' 4—Xiill nichishes M l US310213 Ana.timams+re lo,Nuba rupc:asa*,. $pmf .rtion I: h-- ' ' The CrossRail System is simple and fast Everest Solar Systems, LLC m.hw. mtce.--tris opu prod c¢ Wbe wbe roEcaesi Sds SyIIem tH mend cn.4tmns, IM�uq Ino ou0arve YMtM wanany N l t, E therein. i bruce.nwMS NesgotedviS, to install. Please contact us for further- 3809 Ocean Ranch Blvd. wtia. stlmp:pn ♦ assistance: c- { Suite 111 ` y SERVICE -HOTLINE +1 '760.301.5300 Oceanside, CA 92056 Tel, +1.760.301.5300 E „ -` info@everest-solarsystems.com www.everest-solarsystems.com 1' ®�d.l RON RI DGE,. ' . FlashFoot2 The Strongest Attachment in Solar --_-- IronRidge FlashFoot2 raises the bar in solar roof protection. The unique water seal design is'both elevated and encapsulated, delivering redundant layers " of protection against water intrusion. In addition, the ' twist -on Cap perfectly aligns the rail attachment with the - lag bolt to maximize -mechanical strength. Twist -On Cap •.FlashFoot2's unique Cap design encapsulates the lag bolt and locks into place with a simple Three -Tier Water Seal ` twist. The Cap helps FlashFo6t2 deliver a Flash Foot2'sseal architecture utilizes three ` superior structural strength, by aligning "^—� . layers of protction.•An elevated platform r ' the rail and la bolt in.,,a concentric '^ ', 9 � diverts water away, while a stack of rugged -, load path. " :, - components wises the seal an entire inch h The seal is then fully-encapuslated by the Cap. FlashFoot2 is the first solar attachment to pass the TAS -100 Wind -Driven Rain Test., Single Socket Size (I A custom -design lag bolt allows ! you to install FlashFoot2 with the same 7/16" socket size.` used on other Flush Mount '• System components. a � Water -Shedding Design , ' a - An elevated platform diverts water " ;' away from the water seal. Installation Features 4 A ; Alignment Markers Quickly align the flashing with,chalk lines to find pilot holes. k B Rounded Corners x + Makes it easier to handle and insert under the roof shingles. {: Oi Reinforcement Ribs •- A— — — — — — — — — — ' Help to stiffen the flashing and prevent any bending or `. crinkling during, installation. rte• _' .. 4�.,' yti.:.vi` - .. - l , ' Benefits of Concentric Loading lzoo, 1000 i' ,.Traditional solar -attachments have'a. horizontal offset between the.rail and lag soo bolt, which introduces leverage'on�the lag a 600 bolt and decreases uplift capacity. ' 400 ,. FlashFoot2 is the'only product to align the zoo rail and lag bolt._This concentric loadings SII •' • design results in a stronger attachment for o - 1 2, =a _ the system.', -Rail-to-Lag Offset (in) ' . • - Testing & Certification • Structural Certification Desidned and Certified for Compliance with the International Building Code & ASCE/SEI-7. Water Seal Ratings " Water Sealing Tested to UL 441 Section 27 "Rain Test" and TAS ,100-95 "Wind Driven; Rain Test" by Intertek'. Ratings applicable'for composition shingle roofs having slopes between 2.12 and 12:12. U L'" 2703... Conforms to UL 2703 Mechanical and Bonding Requirements. See Flush Mount Install Manual for full ratings SOLAR ARRAY INSTALLATION Cromwell, Randy 40 Fairview Cr Chico, Ca 95928 System Size: (9.975) kW DC System Type: 120/240V Single Phase (New) 1-1/4" Flex Conduit w/ (3) #2 THWN-2 Cu. Str. & (1) #4 THWN-2 Cu. Str. Ground Wire (New) 200 Amp Sub 0 Panel in 400 Amp Garage Residential 20A 2P - Meter (New) Main Panel solar circuit 20A 2P— with (New) Distribution Solar circuit 20A 2P— (New) 125 Amp (New) solar circuit 2P Breaker (New) Junction Box/Combiner (On Roof) (New) 3/4"-EMT/FMC conduit w/ (6) #10 THWN-2 Cu. Str. & (1) #10 THWN-2 Cu. Str. ground wire TOTAL SYSTEM INCLUDES: Inverter: 35 Enphase M215-60-2LL-S22-IG Solar Panels: 35 REC285PE BLK Arrays:8 (New) Solar Panels: 1 string of 15 REC: REC285PE BLK & Enphase M215-60-2LL-S22-IG Micro - inverter (New) Solar Panels: 1 string of 15 REC: REC285PE BLK & Enphase M215-60-2LL-S22- IG Micro -inverter (New) Solar Panels: 1 string of 5 REC: REC285PE BLK & Enphase M215-60-2LL-S22-IG. Micro -inverter (New) Enphase Engage trunk -cable (4 wire, #12 THWN-2) from attic j -box to each circuit of panels on roof. EMCM LCONT MrNG-SOLA+RENERq,&SEyR�V�I.CE -91 DATE: 5/30/17 Address: � ff.1 0"5 l J qrq DRAWN .' CW 4o Fairview Cir. SHEET: ��+y�J)� - q CHECKED:. MP Chico, CA 95928 °w li PROJECT:. • - - '. - Fa x (5 0 89 -1 3 SCALE: As Noted !!:8t , • M6) -,. .,.,.... _ . Randy, Cromwell. Plot 1 U ►i yrr APN: 040-380-015-000 ✓ - 36 Forton Road Chico; CA 95973 r doccel c.com 1_ 1 7 M 0 •. .fes by �-• •.,a .` f , a .;•- ' ���' !• `�.. �': EMCM LCONT MrNG-SOLA+RENERq,&SEyR�V�I.CE -91 DATE: 5/30/17 Address: � ff.1 0"5 l J qrq DRAWN .' CW 4o Fairview Cir. SHEET: ��+y�J)� - q CHECKED:. MP Chico, CA 95928 °w li PROJECT:. • - - '. - Fa x (5 0 89 -1 3 SCALE: As Noted !!:8t , • M6) -,. .,.,.... _ . Randy, Cromwell. Plot 1 U ►i yrr APN: 040-380-015-000 ✓ - 36 Forton Road Chico; CA 95973 r doccel c.com 1_ 1 7 M 0