Loading...
HomeMy WebLinkAboutB17-1160 038-080-009BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot euarantee inspections on the date requested Office: 530.538.7601 Fax:530.538.7785 www.ButteCounty.net/dds Permit No: B17-1160 Issued: 6/12/2017 ATN: 038-080-009 Address: 8789 LEMM RD, DURHAM Owner: FORTIER RICHARD & LESLIE Permit Type: ELECTRICAL Description: TESLA UNINTERUPTABLE POWER t I` AREA 5 SRA Area: No Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING . 1 Inspection Type IVR INSP DATE Setbacks 131 Foundations / Footings 1 l 1 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Signed Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin /Unde inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed ShearwalUB.W.P.-Interior 134 ShearwalUB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 417 Manometer Test Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final' 813 Fire Sprinkler Test or Final 702 Swimming Pools Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 40+4 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 50 Pre -Plaster 50 Manufactured Homes Setbacks 131 Blockin /Unde inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Under round Electric 21$ Sewer 40f1 Underground Water 417 Manometer Test 605 Continuity Test 6G Skirting/Steps/Landings 610 Coach Infe Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Public Works Final 533.7681 Fire De artment/CDF 53.8.6226 Env. Health Final 535.7281 Sewer District Final "PROJECT FINAL *Project Final is a Certificate of Oc:upancy for (Re 'dentia) Only) PERMITS BECOME NULL AND VOID I YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A I YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION } f .,,.'BUTTE COUNTY • DEPARTMENT OF DEVELOPMENT SERVICES BUILDING PERMIT - 24 HOUR INSPECTION (IVR)#:530.538.4365 ti OFFICE #: 530.538.7601 FAX#:530.538.7785 www.ButteCounty.net/dds PROJECT INFORMATION Site Address: 8789 LEMM RD Owner: Permit No: B 17-1160 , APN: 038-080-009 FORTIER RICHARD & LESLIE Permit type: -MECH ELECTRIC PLUMB 9160 AGUAS FRIAS RD Issued Date: 6/12/2017 By JMD Subtype: ELECTRICAL CHICO, CA 95928, Expiration Date: 6/12/2018 •Description:. TESLA UNINTERUPTABLE Occupancy: Zoning: Contractor , . Applicant: Square Footage: SOLARCITY CORPORATION DBA TESLA SOLARCITY - Building Garage RemdVAddn 3055 CLEARVIEW - 3055 CLEARVIEW 0 0 0 SAN MATEO, CA 94402 - SAN MATEO, CA 94402 Other Porch/Patio _ ..Total 6509635100 6509635100 0 0 • 0. LICENSED CONTRACTOR'S DECLARATION OWNER/ BUILDER DECLARATION Contractor (Name) - State Contractors License No. / Class / Expires I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for - SULARCITY 888104 / C46 / 12/31/2018 the reason(s) indicated below by the checkmark(s) I have placed next to the applicable item(s) (Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, I HEREBY AFFIRM UNDER PENALTY OF PERJURY that I am licensed under provisions of Chapter 9 improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license i permit file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' • in full force and effect. � State License ense Law (Chapter 9 (commenting with Section 7300) of Division 3 of the Business and • Professions Code) or that he or she is exempt from licensure and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of • X not more than five hundred dollars ($500).): Contractors Signature Date ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do U all of or U portions of the work, and the structure is not intended or offered for sale WORKERS'. COMPENSATION DECLARATION (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the I HEREBY AFFIRM UNDER PENALTY OF PERJURY one of the following declarations: property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the ElI have and will maintain a certificate of consent to self -insure for workers' burden of proving that it was not built or compensation, issued by the Director of Industrial Relations as provided for by Section improved for the purpose of sale.). 3700 of the Labor Code, for the performance of the work for which this permit is issued. Policy No. _ El 1, as owner of the property, am exclusively contracting with licensed Contractors to ❑_ construct the project (Section 7044, Business and Professions Code: The Contractors' Stale t - I have and will maintain workers' compensation insurance, as required by Section 3700 of License Law does not apply to an owner of property who builds or improves thereon, and who the Labor Code, for the performance of the work for which this permit is issued. My workers' contracts for the projects with a licensed Contractor pursuant to the Contractors' State License compensation insurance carrier and policy number are: Law.). - + Carrier. ZURICH AMERICANpolicyNumbEW,"182n1R Exp.1WV2817 I am exempt from licensure under the Contractors' State License Law for the followingEl , - reason: _ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' . compensation laws of California, and agree that, if I should become subject to the workers' X - - • • compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Owners Signature Date X PERMIT: APPLICANT DECLARATION Signature Date By my signature below, I certify to each of the following: „ WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS I am L) a California licensed contractor or U the property owner` or U authorized to ` act on the property owner's behalf UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES ; AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN I have read this construction permit application and the information I have provided is ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN correct. , SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. t agree to comply with all applicable city and county ordinances and state laws relating to building construction. I authorize representatives of this city or county to enter the above -identified property CONSTRUCTION • LEN DING AGENCY DECLARATION 3for inspection purposes. California Licensed Contractor, Property Owner* or ; Authorized Agent": 'requires separate verificaticn form —requires separate 1 hereby affirm under penalty of perjury that there is a construction lending agency for the authorization form performance of the work for which this permit is issued (Section 3097, Civil Code). Lender's Name and Address - Name of Permittee [SIGN] Print Date ; Lenders Name & Address City, State Zip FEE INFORMATION j Total Fees: $128.00 Fees Paid: $128.00 Balance Due: (None) Job Value: $5,500.00 s and the manufacturer's installation instructions. Other carbon monoxide alarm and detection devices as recognized in NEPA 720 are also acceptable. Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be Installed in the following locations: 1. Outside of each separate dwelling unit sleeping area in the Immediate viciniity.of the bedroom(s). 2. On every level of a dwelling unit including basements. R315.3.1 Multiple -purpose alarms: Carron monoxide alarms combined with smoke alarms shall comply with- Section R315, all applicable standards, and requirements for listing and approval by the Office of the State l=ire Marshal, for smoke alarms. Butte County's Interpretation of 2010 CRC, Sections 314 & 315 for Smoke Alarms-& Carbon Monoxide Alarms: Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellings shall be retrofitted with smoke alarms and tie that_hm_ pffa-hed gam= or fuel -burning, Applianggg shall have carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms for Smoke and Carbon Monoxide and in most cases "I comply with the aforementioned code requirements for Carbon Monoxide Alarms. DECLARATION ORINSTALLATION UNDER THE PENALTY OF PERJURY As OwnedContractor, Itwe affirm and declare under the penalty of perjury, under the laws of the State of California, by our signatures below as Owner/Contractor, that l/we will comply prior to final Inspection with Items A & B as specified herein: A.. Both Owner/Contractor have read and clearly understand the aforementioned 2010 California Residential Code (CRC) Carbon Monoxide Alarm requirements. B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to final Inspection as per the aforementioned building code and maintaining such installation. Smoke Alarms will also be Installed prior to final inspection as per the 2010 CRC: 2k and Carbon Monoxide alarms are now installed fn the following locations: 6� -� Owner's name (print): Owner's signature: /('/Z-31% Contractor's name CSLB license: sl=el o Contractor's signature: Date: 21 Project, Address: Pennit #: Page 2of2 INSTALLATION NOTES • PARTS FOR PO PURCHASE (NOT OCCURRING IN GREAT PLAINS)' QTY MANUFACTURERS PART NUMBER AND DESCRIPTION AHJ SPECIFICS: DESIGNER NOTES: CUSTOMER EXPECTATIONS, NO EQUIPMENT TO BE INSTALLED WITHIN 3' OF THE GAS —INSTALL ENERGY GATEWAY AND NEW SUB—PANEL TO THE LEFT —POWERWALL BACKING UP THE INTERIOR SUB' PANEL AND ALL AIR—INTAKE VENTS OR METER. OF THE MAIN SERVICE PANEL UNDER THE WINDOW. ALTERNATIVE LOADS SMALLER THAN 30A IN THE MAIN. LOCATIONS ARE TO THE' RIGHT OF THE MAIN SERVICE PANEL FOR "AN ELECTRIC UTILITY, UPON REQUEST, IS REQUIRED TO MAKE THE ENERGY GATEWAY, AND DOWN THE WALL TO THE LEFT FOR AVAILABLE TO ELIGIBLE CUSTOMER GENERATORS CONTRACTS OR THE NEW SUB—PANEL. TARIFFS FOR NET ENERGY METERING ON A —INSTALL POWERWALL ON SAME WALL AS MSP FIRST—COME—FIRST—SERVED BASIS UNTIL THE TIME THAT THE —RELOCATE LOADS ACCORDING T0, THE RELOCATED BREAKER TOTAL RATED GENERATING CAPACITY USED BY ELIGIBLE CUSTOMER SCHEDULE FROM THE MAIN SERVICE PANEL TO THE NEW ' GENERATORS EXCEEDS 5% OF THE ELECTRIC UTILITY'S AGGREGATE SUB—PANEL. CUSTOMER PEAK DEMAND. EXISTING LAW AUTHORIZES A LOCAL —TIE POWERWALL INTO THE NEW SUB—PANEL USING A 30A/2P PUBLICLY OWNED ELECTRIC UTILITY TO ELECT TO INSTEAD OFFER BREAKER. CO—ENERGY METERING, WHICH USES A —FEED NEW SUB—PANEL INTO THE FIRST SET OF LUGS IN THE GENERATION—TO=GENERATION ENERGY AND TIME—OF—USE CREDIT* ENERGY GATEWAY. FORMULA, AS SPECIFIED." CA AB -327 —TIE ENERGY GATEWAY INTO THE MAIN SERVICE PANEL USING A -- 10OA/2P BREAKER. 5% OF THE ELECTRIC UTILITY'S AGGREGATE CUSTOMER PEAK —WILL NEED TO GROUP MSP CONDUCTORS AND FEED THROUGH SAFETY CONCERNS: DEMAND OR 7/1/2017 WHICHEVER COMES FIRST. CTS IN ORDER TO MONITOR WHOLE HOME LOAD, EXTRA SET OF CTS AND SPLITTERS INCLUDED ON BOM IN CASE THEY ARE NEEDED. ' r CONFIDENTIAL THE INFORMATION HEREIN CONTAINED MALL NOT BE USED FOR THE JOB NUMBER B=9597266 �� PREMISE OWNER. DESCRIPTION: RUSSELL FORTIER RUSSELL FORTIER RESIDENCE DESIGN' Cris Flores �,�,a, jzm MOUNTING SYSTEM: Unable To Calculate -Mounting Hardware BENEFIT OF ANYONE EXCEPT SMARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 8789 LEMM RD 13.5' kWh ENERGY STORAGE SYSTEM W o,�. Olar Ity ��� •' PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH DURHAM, CA 95938 MooutES 3055 aemriew Way San Mateo, CA THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION of SOLARCITY INC. PAGE NAME INSTALLATION NOTES T. (650) 6 3 8-1 02 80 (650) 638-1029 (688)—SCI—CITY (765-2489) www.8olaraHy.aam SHS' RM. DATE:- SC 1 B 7/20/2017 INVERTER SAFETY PLAN i INSTRUCTIONS: 1: USE SYMBOLS IN KEY TO MARK UP JCO SHEET. 2. SAFETY PLANS MUST BE MARKED BEFORE JOB STARTS AS PART OF THE PRE—PLAN. 3. DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE & MAKE NOTES ON THE JCO SHEET00 OD IN CASE OF EMERGENCY: s r NEAREST HOSPITAL OR OCCUPATIONALANDUSTRIAL CLINIC (E) DRNEWAYCc- NAME CL ADDRESS SAFETY COACH CONTACT INFORMATION NAME PHONE MARK UP KEY ALL EMPLOYEES ON SITE SHALL BE MADE AWARE PO PERMANENT ANCHOR OF THE SAFETY PLAN AND SIGN INDICATING THAT THEY ARE AWARE OF THE HAZARDS ON—SITE AND TO TEMPORARY ANCHOR THE PLAN FOR WORKING SAFELY. O DELINEATOR FOR WARNING LINE NAME SIGNATURE (LOW—SLOPE ROOF ONLY) O GUARD RAIL STANCHION Front Of House (LOW—SLOPE ROOF ONLY) FALL COMPETENT IL INSTALLER LADDER ELECTRICAL QUALIFIED AL AUDITOR LADDER • B❑ JUNCTION/COMBINER BOX STUBOUT SKYLIGHT • 0NO LADDER ACCESS (STEEP GRADE OR - GROUND LEVEL OBSTRUCTIONS) +®RESTRICTED AREA (SOLARCITY .EMPLOYEES ONLY) s CONDUIT ®a GAS SHUTOFF, 20 WATER SHUTOFF ESS Lc RELAY DATE: TIME: 0 z0 SERVICE DROP POWER LINES SELECT ELECTRICAL TIE IN METHOD MAIN / SUB BREAKER/TAP ,CONFIDENTIAL —THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE JOB NUMBER B-9597266 00 PREMISE OWNER: RUSSELL FORTIER DESCRIPTION: RUSSELL FORTIER RESIDENCE DESIGN: Cris Flores MOUNTING SYSTEll: Unable To Calculate Mounting Hardware BENEFIT OF ANYONE EXCEPT SOIARgTY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 8789 LEMM RD 13.5 kWh ENERGY STORAGE SYSTEM -.., a ,So1'rCity. PART TO OTHERS OUTSIDE THE RECIPIENT'S DURHAM, CA 95938 MODULES: 3055 CIearview Way San Mateo, CA ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE _ SHEET: REV. DATE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. PAGE NAME - ` SAFETY PLAN SC 2 B 7/20/2017 L(650) 638-10Y4402 638-1029 (BBB)—sm—aTY (765-2489) ....eala aRl:a«n INVERTER ,• JOB HAZARD ANALYSIS Ladder Access • Ladder must be inspected before use and must be non-conductive (fiberglass). • ladder must be secured at a 4 to 1 angle (75 degrees). • Ladder must rise 36" (4 rungs) above landing or with walk through devices when available. Fall Protection • Site specific fall plan is required prior to starting work. • Competent Person is required. • First Person on the roof must install their anchor and connect before loading the roof or installing any other anchors. • Fall RESCUE procedure must be included as part of the Fall Protection Plan. Electrical Safety • Electrical Qualified Person is required onsite during electrical work. • Al E -PPE is required onsite regardless of work performed. • All Electrical work will be performed de -energized unless prior approval has been granted. • Service drops and overhead electrical hazards will be identified and covered if necessary. • Powerk3laster and all Supply Side Connections shall be installed by an Electrical Qualified Person. Public Protection • Employees are required to ensure the safety of the Home Owner and the General Public at all times. • The Home Owner and the General Public shall be prevented from entering the work zone through the use of barriers. • The Home Owner, the General Public and their property shall be protected from falling objects. • Pets (including dogs) shall be avoided by the crew and secured by their owners when work is being performed at the home. • The Homeowner is not allowed to leave pets, family members or others in the charge or pre of SolarCity Employees, Contractors or Temporary Workers. Training • All employees onsite shall be made aware of the JHA and their signature indicates awareness of site conditions and the plan development to eliminate the hazards identified onsibe. • A Competent Person is required onsibe when Fall Protection is in use. • A Qualified Electrical person is required onsite when any electrical work is performed. • Al employees onsite are required to have completed field safety training prior to performing work, as well as any relevant technical training for the work that will be done. Airborne Contaminants: • Asbestos -containing (Transite) piping (ACIP) - do not disturb (move, drill, at, fracture, etc). • Asbestos -containing exterior building siding (ACS) - only Asbestos Class III trained personnel can drill or curt into ACS material, and only for purposes of mounting BOS equipment; a completed Asbestos Work Permit is required onsite at all times when working with ACS. • Asbestos -containing (Vermiculite) insulation (ACI) - do not disturb; no attic or c awlspace access is allowed. • Asbestos -containing duct wrapping (ACWIt) - do not disturb; if the material is brittle or crumbling (Could become airborne), work is not allowable within an attic, c awlspace, or other similar area. CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. Heat Related Illness Prevention • Employees shall have access to potable drinking water that is fresh, pure, and suitably cool. The water shall be located as dose as practicable to the areas where employees are working. Water shall be Irradiance read supplied in sufficient quantity at the beginning of the work shift to same time as t provide one quart per employee per hour for drinking for the entire INVERTER #1: shift Employees may begin the shift with smaller quantities of water if they have effective opportunity for replenishment during the shift SERIAL NUM: needed to allow employees to drink one quart or more per hour. The STRING: frequent drinking of water shall be encouraged. Voc • Shade shall be present when the temperature exceeds 80 degrees Fahrenheit. When the outdoor temperature in the work area exceeds Ir4P 80 degrees Fahrenheit, employees shall have and maintain one or IRRADIANCE more areas with shade at all times. Power (W) PAc: • New employees must be acclimatized. New employees are identified INVERTER #2: by a fluorescent band attached to their fall protection harness and a SERIAL NUM: sticker attached to their hard hat New employees will be monitored STRING: by their Crew Leader (side supervisor) for the first two (2) weeks of employment or longer when necessary. Voc • Employees will be allowed and encouraged to take a cool -down rest •MP in the shade any time they feel the need to do so to protect them IRRADIANCE from overheating. Supervisors are REQUIRED to allow employees an Power (W) PAa break period they need during high heat conditions. INVERTER #3: • Cool Vests are encouraged for all employees at all times during periods of high heat. SERIAL NUM: • Identify the location of the closest Occupational/Industrial Clinic or STRING: Hospital in case a crew member becomes ill. Voc What is the specific plan to provide and replenish sufficient water for all Imp employees onsite? IRRADIANCE This is a worksheet for on-site use as needed. All information must be transferred/uploaded through the digital app for all jobs (including the 2 cell phone pics). How W11 you replenish water, When W11 you feple *h water. Who wit/rr9p/ef8h water.• — Raehrvim anhirim • Employees shall have access to restroom facilities with hand -washing stations. Use of onsite restroom is at the clients discretion (location is noted below). If client does not give permission, location of suitable restroom facilities with hand -washing stations at an offsite will be provided. The onsite supervisor will identify location and make arrangements to ensure all employees have access at any point Restroom facilities will be (cirde one): Onsibe - Offsite If offsite, note location: _ Incident Reporting Procedure ✓ Contact your 5 teSbpeivA yr • Phone: ✓ Contact the your Manager • Name: Phone: ✓ Contac the InddentHotline • (650) 963-5678 - follow the voice prompts and provide us with: Yourful/name, phone number, of re /oration, briefdeZ7pton of whathappened and when. /F - KWITG WPDF- PROTECTION: PROTECTION: JOBNUMBM JB -9597266 00 MOUNTING SYSTEM. Unable To Calculate Mounting Hardware MODULES INVERTER: RUSSELL FORTIER 8789 LEMM RD DURHAM, CA 95938 Power (W) PAc: ing must be taken in the plane of array and at the he I mp and P Ac measurements. 1 1 2 1 3 4 1 1 2 2 3 3 4 n JOB PHOTOS 0 Finished array photo (pullback)? Take these photos 0 String Diagram / Safety Plan? with your phone. 0 All inverter or meter labels. 0 Worker in electrical PPE testing the system or completing tie-in. ❑ All ladders set up. 0 System used to raise modules to roof. 0 Fall arrester or restraint with employees while in use. A hazard encountered that isn't noted in the SolarWorks case ❑ notes or mentioned in the project preplan. ❑ Unflashed, installed anchor. 0 Flashed anchor. 0 In process penetration. 0 Combo / J box location / Wiring. 0 Array wire management / grounding. 0 Rafter upgrades. 0 All electrical equipment wiring / grounding. 0 All electrical equipment locations / working clearance. All conduit, including stubout. Explain if any photos are missing: JOB INFO Did you walk customer through system operation? Y / N What and where is the grounding means? Y / N Does customer have the gateway connected? Y / N Is grounding mechanism accessible for inspection? Y / N Was placard installed? Y / N Which ladders are required for roof access? Are there internal conduit runs? Are there locked gates that need to be accessed? Did we tie into an existing subpanel? Does as -built match approved drawings? 12 24 36 DESCRIPnON: RUSSELL FORTIER RESIDENCE 13.5 kWh ENERGY STORAGE SYSTEM PAGE NAME JCO SH Y/N Y/N Y/N Y / N Are there punch list items remaining? Cris Flores SHEET: REM: DATE- SC ATE SC 3 B 7/20/2017 Y/N 'f;SolarCity 3055 ClearAew Way San Mateo, CA T.(650) 638-1028 �F (650) 638-1029 (668) -SOL -CITY (765-2489) www.sdaraityown CONSTRUCTION PLAN co co to (E) DRIVEWAY 3 3 a LEGEND Q (E) UTILITY METER & WARNING LABEL Inv INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS AUTOMATIC RELAY FAC I AC DISCONNECT & WARNING LABELS ENERGY STORAGE SYSTEM FOR STAND .ALONE OPERATION QD DISTRIBUTION PANEL & LABELS r Q LOAD CENTER & WARNING LABELS - O DEDICATED PV SYSTEM METER Rso - RAPID SHUTDOWN Q STANDOFF LOCATIONS Q R®O t ESS CONDUIT RUN ON EXTERIOR --- CONDUIT RUN ON INTERIOR — GATE/FENCE Q HEAT PRODUCING VENTS ARE RED I, 'I L -"J INTERIOR EQUIPMENT IS DASHED CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE JOB NUMBER JB -9597266 O O PREMISE O"� RUSSELL FORTIER DESCRIPTION: RUSSELL FORTIER RESIDENCE DESIGN: Cris Flores ■ BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN MOUNTING srsTEM: Unable To Calculate Mounting Hardware 8789 LEMM RD 13.5 kWh ENERGY STORAGE SYSTEM W'" �Olar.�I�� ��� • PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES DURHAM, CA 95938 THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME DATE 3055 CleaMew Way San Mateo, CA 94402 SHEET: REM- INVERTER PERMISSION OF SOLARCITY INC. CONSTRUCTION PLAN SC 4 B 7/20/2017 (888) -SOL -CITY (765-2489)�www..darmiitycom GROUND SPECS MAIN PANEL SPECS GENERAL NOTES LICENSE (N) GROUND ROD AT PANEL Panel Number NoLabel CA # 888104 Meter Number: 1007768219 C-10 200A CENTER—FED MAIN SERVICE PANEL �E E; 20OA/2P MAIN CIRCUIT BREAKER AUTOMATIC RELAY 0 (N) 200A BRYANT 200A/2P LOAD CENTER ZY RELOC. (E) LOADS LOADS TO EXISTING .. LOADS 10OA/2P N JA -- — G --- — N G -- .. I POAV - Ll - - N ; N X ENERGY STORAGE I I SYSTEM EGGGEC L — — — — — — _ EGC Z Z • --- GEC TO 120/240V SINGLE PHASE I UTILITY SERVICE I I I _ Voc* = MAX VOC AT MIN TEMP OI (1 )SIEMENS 0 Q210 Breaker 100A %2P, 2 Spaces X (0Tesla kf 1108567 -OO -C -ST AC POWERWALL 5.8kVA; Home Energy Storage,13.5KWH - Rev C, Stackable, PWL RELOCATED LOADS BOM — (1) CUTLER-HAMM BR290 Relocated Loads Breaker 90A P. 2Spaces 1 Tesla 1118431-00-E Z O BA UP GATEWAY, for ACPW2.0, ASY, NA with 3G, PW20 (1)BRYANT BR204OL20OR Load Center, 200A, 120/24OV, NEMA 3R Y AC — (1)AWc l�, TH -2, Black WFRL —(I)AWG 3, THWN-2, Red WFRL _(1)CUTLER-HAMMER III BR230 Powerwall Breaker Breaker, 3OA2P, 2 Spaces . —(1)AWG #3 THWN-2, White WFRL —(1)Gutter Bar Metal; 4 x4'x3' , Box w/ cover, Nema 3R —(3)Bumdy f BIBD2/0-2. Double sided entry, 2 Port, 14-2/0 AWG - —(5)CuUer-Hammer ® BRCAF115 Relocated Load Circuit Breaker, Combination Arc Fault, 15A/IP; Type BR, Plug-on -(5)AWG ®14, THWN-2, Black WFRL —(5)AWG #14, THWN-2, White WFRL _ 1 AWG #3, THWt-2, Black ' O (1) AWG q3, THWN-2, Red 1. AWG $10, THWN-2, Black ® (1) AWG #10, THWN-2, Red (I )AWG #3, THWN-2, White NEUTRAL (1)AWG $10, THWN-2, White NEUTRAL ­(I)Conduit Kit; 1-1/4' EMT Relocated Loads Conduit = (I )AWG #8, THWN-2, Green EGC— (1)CO_NIUIT,K T (1)AWG #10, THWN72, EGC (1)Condu1.t.KR; 3/4 EMT 1 x 10 EMT Conduit ......... •Green. .....- ......... CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED MALL NOT BE USED FOR THE JOB NUMBERPREMISE JB -9597266 00 OWNER: RUSSELL FORTIER``a, DESMPTION: - DESIGN: BENEFIT OF ANYONE EXCEPT SOLARCITY INC., 8789 LEMM RD RUSSELL FORTIER RESIDENCE Cris Flores ' ;SolarCity MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Unable To Calculate Mounting Hardware 13.5 kWh ENERGY STORAGE SYSTEM PARTDN TIPIENrS ANI DURHAM, CA 95938 MODULES: ORGANIZATION, EXCEPT IERS OR CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE . SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME 3055 Clearview Way San Mateo, CA 94402 SHEET. REV:' DATE . INVERTER PERMISSION of SOLARCITY INC. THREE LINE DIAGRAM SC 5 B 7/20/2017 (868) SOOLL CITY('765-2489) wwww..�arccitycom LICENSE CA # 888104 C-10 COMMUNICATION WIRING DIAGRAM 200A CENTER—FED MAIN SERVICE PANEL ` �E E; 20OA/2P MAIN CIRCUIT BREAKER AUTOMATIC (N) 200A BRYANT RELAY LOAD CENTER .. Z Y n TO r — — — — - EXISTING i _ ylITTJA LOADS _ L — — — —� X ENERGY STORAGE SYSTEM TO 120/240V SINGLE PHASE UTILITY SERVICE ` COMM WIRE LEGEND r ® METER IM METER CTs — — — — — — METER CT WIRE POWERWALL COMMUNICATION WIRE Z (1)PW20DC Battery Communi lon Cable /fj Multicondudor SSTR; 250 Rdls '—(1)Teslaj 1112477—OG—A jy 2 C11 s CURRENT )(FMR's, NEURIO ENERGY GATEWAY for ACPW20, ASY, PW2.0 — (2)TESLA 1129625—OD—A CT Y— litter, Harness; for ACPW Installation, PW20 r , CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE JOB NUMBER J B-9 59 7 2 6 6 O O PIAOSE 01NOR: RUSSELL FORTIER DESCRIPTION: RUSSELL FORTIER RESIDENCE DESIGtk Cris Flores `\` �.��a, • ..�Oh MOUNTING SYSTEM: Unable To Calculate Mounting Hardware ' _ BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN $789 LEMM RD 13.5 kWh ENERGY STORAGE SYSTEM ',01�. rC'ty PART TO OTHERS OUTSIDE THE RECIPIENT'S DURHAM, CA 95938 MooULES ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE 3055 Clearview Way San Mateo, CA SC 6 6 DATE.7/20/2017 2O 2017 / / SOLARg1Y EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. PAGE NAPE COMMUNICATION -WIRE DETAIL 38 110ty.cam (888) (BUL,CI38 10282R(650) 638-1029 INVERTER r ,�' t; '• r - �,' e_ ' PROPOSED ENERGY = {".. '� SECONDARY A PROPOSED` .. _ GATEWAY AND NEW '. `.. ENERGY POWERWALL, y.+ . SUB PANEL. LOCATION' y? GATEWAY`. Y - a=' = ' y =' ;{ ,.: > , h LOCATION " - ;H . , LOCATION j + l , a , • • J •. + .. • `t !, .,' F �t� �� .�-• • ',:. � 1 +tea' �.� i � -�� .f - SJR=•t.1 ���•�!� 6 �.�r•'a `. .. - �_��.„,,,+•�"rn"�,,,,.,w.�^"".,'.-rt , -+' !• ; , Ste'«' �_$.; , - _ -wM"r._ ^�«�•..w"'-` _ j for.. _ li 1j Y • Relocated Breaker Schedule ' Breaker Size Location Slot it Label ' 90Al213 11 // 12 Sub -Panel 16A 15 Upper- Unlabeled 15A 15 Lower Unlabeled 15A AFCI 16 Unlabeled' 15A 17 Upper Unlabeled I: o": b. 1 15A 17 Lower Unlabeled1« ?' = - LOADS ENCLOSED IN RED TO BE RELOCATED TO THE NEW SUB—PANEL • {,, g is i t a •. :. ,� �• . • ♦ - � a - - t .• -_ C ... -- t�, .. .. �. "may;, ,.`,.�' ✓ •'N , ... - � - •-•- .� , .• • ... t.t , ,� '.i..\ *, . .. � _ - .T � r ... • s � - � r ♦ - t • '✓ �. t.. /, -z ' P,- >. + -. X t~ _ s' SECONDARY - . • - . - ` . NEW SUB—PANEL ,' •r , • y.? LOCATION r A - ' ` ; • _ } l •t �- 1 '.l •..., , !. . .. • . ' < y r . •• .• • Y �, .. F , .. a L. Y, . - i ,,. t 5 i �- , a ' CONFIDENTIAL —THE INFORMATION HEREIN JOB NUMBER JB -9597266 v B-9 5 9 • O O PREMISE OTA R ' DESCRIPTION: ' DESIGN ° + CONTAINED SHALL NOT BE USED FOR THE RUSSELL FORTIER RUSSELL FORTIER RESIDENCE, Cris Flores =�••!s . ; MouanrlG SYSTEM: Unable To Calculate Hardware • BENEFIT of ANYONE ExaPr soLARaTr INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN . 8789 LEMM RD 13.5 kWh ENERGY STORAGE SYSTEM- � 01arCit h� - -, • PART TO 01HERS OUTSIDE THE RECIPIENTS DURHAM; 'CA "9593.8 MODULES ORGANIZATION, EYCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE Y +• 3055 aemAew Way San Mateo. CA SHEET. REV: DATE �' '7 ' SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN' �� PAGE NAPE L(650) 638-102(650) 638-1029 } INVERTER _ PERMISSION OF SOLARCITY INC f RELOCATED BREAKER SCHEDULE SC' B. 7/20/2017" (BBB)-sm-aw (765-249) www.edarcRymn �� it - • .• .. . • - } - . .+ ` . Label Location: Backup load Center- (BLC) Per Code: NEC 408.4 , "a bel Location: Back up load Center (BLC) Per Code: NEC 220 _Label Location: Main Panel Per Code: NEC 3.12.8(3) Real Power,'max continuous. ' , 5 -kW (charge and discharge) ~ �, • �' �' , , to . � -• ,a'• ' +• ' ; .. L. .., ., -• �� 7 kW (discharge only) F � ,k �, ' 5.8 kVA (charge and discharge) , . i f Vi,.x• �� _ Y � f r -a �I' sf'�' •''!`••r. `.. , •} - `�:• �' ' r • � • +t � Maximum Output Fault Current Operating Humidity,(RH) 32 A° Overcurrent Protection Device,, , • 1 30'A _ , Imbalance for Split -Phase Loads = i "i'100% • it ° : Power Factor'Output Range b. ` +/-1.0 adjustable `r y Power Factor -Range (full -rated power) "` _ 4-,0.85 -'t r r , r `up to 95% RH, non -condensing 4 50V v ¢ , Round Trip Efficiency 1,2 ^ = UL 1642, UL 1741, UL 1973— 90% P 0 W E R• W,A L L* UL 9540, UN 38.3 Environment .A r Ind oor.and outdoor rated - Grid CoAnection Worldwide Compatibility . 4 47 • Tesla Powerwali is a fully -integrated AC battery system for. NEMA 3R, ' Emissions , ` FCC Part 15 Class B, ICES 003' ` residential;or light commercial use. •Its rechargeable lithium -ion - , ' battery pack provides energy Storage for solar self -consumption,.' Ingress Rating •'.7 �IP67 (Battery & Power Electronics) Environmental'.. RoHS Directive 2011/65/EU - IP56 (Wiring Compartment)' „ load shifting, and backup. ' Powerwall's electricafint6rface provides a simple connectionto , r Yes 'Any home or, building: Its revolutionary compact design achieves Pollution Degree Rating , ' PD3 market -leading energy density and is easy to* install, enabling ;` •*. <'40 dBA'at 30°C (86°F) ' _ • owners`to quickly realize the benefits of reliable, clean power., - ower: • T= 5 L n y y» TESLA.COM/ENERGY . 'PERFORMANCE SPECIFICATIONS �j. 'PERFORMANCE, MECHANICAL- SPECIFICATIONS ` AC Voltage (Nominal 120/240 V } , - Dimensions +: 1.150 mm x 755'mm x 155 mm - (45.3 in x 29:7 in'x 6.1 in) c Feed -In Type', Phase ; a .Split . `. .�. Weight r 125 kg (276-Ibs). Y Grid Frequency . ti _ , . y i 60 Hi . ... `z Mounting options fl Floor or wall mount Total Energy'• - 14 kWh x x ., _ 1 'Usable Energy' r a '_ 13.5 kWh y ' •,�, ��', ,, 755 mm + Y. 155 mm•. 1," {: t 19Q 7 inl ' /R I,iAl Real Power,'max continuous. ' , 5 -kW (charge and discharge) ~ �, _ , 10 years Real Power, peak (10 s) ENVIRONMENTAL SPECI+FI,CATIONS • 7 kW (discharge only) F Apparent Power, maz continuous' 5.8 kVA (charge and discharge) , Apparent Power, peak (10s) ' 4 7.2 kVA (discharge only) Maximum Supply Fault Current 10 kA ` Maximum Output Fault Current Operating Humidity,(RH) 32 A° Overcurrent Protection Device,, , • 1 30'A _ , Imbalance for Split -Phase Loads = i "i'100% • it ° : Power Factor'Output Range b. ` +/-1.0 adjustable `r y Power Factor -Range (full -rated power) "` _ 4-,0.85 -'t Internal Battery DC Voltage` `up to 95% RH, non -condensing 4 50V _ ¢ , Round Trip Efficiency 1,2 ^ = UL 1642, UL 1741, UL 1973— 90% Warranty , 10 years ENVIRONMENTAL SPECI+FI,CATIONS • 'Values provided for 25°C (770F), 3.3 kW charge/discharge power., .' 2AC to•battery to AC, at.beginning of life., • Operating Temperature -20'C to 50°C (-4°F to 122°F)` iR Operating Humidity,(RH) Up to.100%, condensing ;• - , • it ° : Storage Conditions , -20°C to 300C. (-4°F to 86°F) -COMPLIANCE INFORMATION `up to 95% RH, non -condensing 4 _ - State of Energy (SoE): 25% initial Certifications ^ = UL 1642, UL 1741, UL 1973— Maximum Elevation' 3000 m (9843 ft) . ,, UL 9540, UN 38.3 Environment .A r Ind oor.and outdoor rated - Grid CoAnection Worldwide Compatibility . • Enclosure Type NEMA 3R, ' Emissions , ` FCC Part 15 Class B, ICES 003' ' Ingress Rating •'.7 �IP67 (Battery & Power Electronics) Environmental'.. RoHS Directive 2011/65/EU - IP56 (Wiring Compartment)' Seismic AC156, IEEE 693-2005 (high) • '+ .Wet Location Rating ' r Yes Pollution Degree Rating , ' PD3 Noise Level @ 1 m <'40 dBA'at 30°C (86°F) 5 • T= 5 L n y y» TESLA.COM/ENERGY .