HomeMy WebLinkAboutB17-1334 000-000-000VINCI -& ASSOCIATES
61rucfura/ Cnpi leers
June 26, 2017
..,Advance Power Redding
Subject: Review of minimum footing requirements
' Project (12) Module Photovoltaic Groundmount Installation (1 Array)..
Martin Petkov
.....
' 256 Yankee Vista Drive, Concow, CA 95965®®®� ON
V&A Project No. 12=3457
The purpose of this report is to provide a site specific analysis of the minimum footing
requirements for the photovoltaic array.groundtrac installation at 256 Yankee Vista Drive
in Concow, CA 95965.
Based upon our review of the 1. Photovoltaic Array,. installed 4 modules high and 3
modules wide. The PV Array shall have *a transverse spacing of approximately 8.00 feet
on center and a' longitudinal spacing of 8.00 feet maximum. Based upon a wind speed
of 100 mph, Exposure C, it was determined that the minimum required footing depth is.
' 26 inches minimum below grade for a 18 inch diameter pier footing. The footing sizes are
based upon the worst case loading due to horizontal and vertical wind loading.
In ;addition to our analysis of the foundation, we have reviewed the professional solar -
rails and pipes for the added load due to the 20 psf snow load applicable at the site.
' Based upon our analysis, it is recommended that Professional Solar Products.3" deep_
XD rails be utilized supported by 1.5" galv schedule 40 pipe horizontal with supports at...
8'-0" o.c.. Vertical pipes can be 1.5" galv schedule 40.
Refer to attached calculations and details for additional information.
' Our professional services have been performed using the degree of care and skill ordinarily
exercised under similar circumstances by reputable engineers practicing in this locality. No
' other warranty, expressed or implied, is made as to the professional options included in this
report.. We hope p;r/ri(egarding
es you with the information you need at this time. Please tall us
if you have u t this report.
FE�S�c�,�
Sincerely �9SR1cN�°`y Fy
.VINCI OCIATE$ ' c3 ' � z No. S4411
OwG. Exp. 12/31/17
J s inci, S.E. 9rF OFCA
. L' rise No. S-4411
175 E. wiLBUR ROAD, STE. 103 THOUSAND OAKS, CA 91360
' _ p 805.496-2100 f 805.496-2442 a vinci incise.com
DATE: 6/26/2017 VINCI & ASSOCIATES
SHEET: Al
PROJECT: Martin Petkov i 61rucfural Engineers
JOB No.: 12-3457
256 Yankee Vista Drive 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360
ENGR.: JRV,
Concow, CA 95965 p805.496.2100 • f805.496.2442 • esolar@VinciSE.com
CLIENT: Advance Power Redding
DESIGN DATA:
WIND DESIGN CRITERIA: '
BASIC WIND SPEED =
100
mph
(ASCE 7-10: Risk Category 1 per Table 1.5-1 &
Figure
26.5-1C)
WIND EXPOSURE =
C
GROUND SNOW LOAD —
20
psf
SOLAR MODULE ARRAY DATA
' Sloped Dimension of Array =
164
in
Angle of Array =
15
.degrees
Slope of Array: _
3.11
:12,
No. of Modules in Transverse Direction =
4
No. of Modules in Longitudinal Direction =
3.
'
Total No. of Modules in Project =
12
Transverse Post Spacing =
8
Pl-
ft '
ILongitudinal
Post Spacing =
8:00
ft
Number of supports - Transverse Direction =
2
'
Diameter of Pier Footing =
18
in . .
Number of Arrays =
1
Array Uniform Load =
2.8
psf
SOIL DESIGN CRITERIA (Based upon Chapter-18 of CBC)
Allowable Soil Bearing Pressure =
1500
psf
IAllowable
Soil Lateral Bearing =
200
pcf (CBC 1806.3.4) +
Allowable Shaft Skin Friction / Cohesion =
i
130
pcf
,y •.
J
r
PROJECT: Marfln Petkdv PAGE :
CLIENT:.256 Yankee Vista DnvelConcow�CA 95965'Z4 b DESIGN BY :
JOB NO.: 15 457 �' DATE 06126717- REVIEW BY
AA*
Wlnd'Analysfs'fCrApen`Struc_ tuF�e ($olar Panels)Ba�sed on�ASCEY7x2010 :/.' 20.16 CBC .
INPUT DATA: "
Exposure category (B, C or D) = C w
Importance factor, 1.0 only, (Table 1.5-2) 1w = 1.00
Basic wind speed (ASCE 7-1026.5.1) V _ �. j1,00 mph - 0
Topographic factor (26.8 & Table 26.8-1) Kn _ ,.„nr,1 0 Flat
slope
Height
-
Height of mean roof h= 6 ft s y 2
Roof slope 12 7
Roof length L = X10, ft
Roof horizontal projected width B = 10 ' ft
Effective area of component / cladding a A =` 10 ftZ 8, ofOJeC,0dI
DESIGN SUMMARY "
1. Main Wind -Force Resisting System
Max horizontal force / base shear from roof = + 0.58 kips +. .
+ :; is .06 kips (eave & columns increasing)
E 0.64 kips
Max vertical download force = 2.25 kips + C.
Max vertical uplift force = 2.11 kips f ''
k,.
Max moment at centroid of base from roof = ' 6.34 ft -kips
+ .-..'•0.63 ft -kips (eave & columns increasing) 4
E 6.98 ft -kips
2. Component and Cladding Elements
Max inward pressure 'L = 56 psf
Max net outward pressure = 66 psf r
ANALYSIS -
Velocity pressure F
qn = 0.00256 KIN Ke Kd VZ = 18.50 psf
where: 4n =velocitY Pressure at mean roof height, h. (E4 28.3-1 page 298 Eq. 30.3-1 page 316)
Kn = velocity pressure exposure coefficient evaluated at height, h, Crab. 28.3-1, pg 299) = 0.85
Kd = wind directionality factor. (fab. 26.6-1, for building, page 250) = 0.85
h = height of mean roof l = 6.00 It '
Main Wind -Force Resisting System (Sec. 27.4.3)
p=gnGCN
F=pAf _
where: G= gust effect factor. (Sec. 26.9) = 0.85.
0 = roof angle ,, = 14.51 � degree
< 45 deg. [Satisfactory]
A, = roof actual area. = 51.6 ft 2, windward
= 51.6 ftZ, leeward -
CN = net force coefficients. (Fig. 27.4-4, page 267)
Check Fig. 27.4-4 limitation h / B = 0.60 within [0.25 , 1.0] [Satisfactory]
0
WIND TO BOTTOM, 7 = 0°
- WIND TO TOP, 7 = 180°
CLEAR FLOW OBSTRUCTED 'CLEAR FLOW OBSTRUCTED
CASE CNw CNS CW CNS CNw CNS CNw CNS
14.51
A
-0.88
-1.28
-1.09.
-1.50
1.27
1.59
0.36
-1.11
5 -13.84 -20.13 -17.19 -23.58 20.03 25.05 5.67
-17.40
F ki s ' -0.71 -1.04 -0.89 -1.22 1.03 1.29 0.29
-0.90
B -1.87 0.00 -2.07 -0.61 1.79 0.58 1.17
-0.30
s -29.36 0.00 -32.61 -9.64 28.09 9.13 18.46
-4.72
F kis -1.52 0.00 -1.68 -0.50 1 1.45 1 0.47 1 0.95 1
-0.24
r.
DATE: 6/26/2017
VIN 'C I &
ASSOCIATES SHEET: 'A3
PROJECT: Martin Petkov
cSlruclu nal Cingmeers
JOB NO.: 09-3457
256 Yankee Vista Drive
175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS,
CA 91360 _ ENGR.: JRV
COncow, CA 95965
p 805.496.2100 • f 605.496.2442 • e vinci@VinciSE.com
CLIENT: Advance Power Redding
_
' FOOTING DESIGN -
PV Sloped Dimension:
164 in
4 f>TYPICALARRAY`�_
PV Array Angle:
15 -degrees
Post Spacing:
8.00 ft
'
No. of Supports:
2
Footing Diameter (d):
18 in
MAXIMUM VERTICAL FORCE: 2.25 k
/ (10.0 x 10.0) =
22.54 psf x 0.6'= 13.52 psf
MAXIMUM UPLIFT FORCE: 2.11 k
/ (10.0 x 10.0 ) =
21.12 psf x 0.6 = 12.67 psf
ASD Factor
GROUNDTRAC SYSTEM CAST INTO EARTH
Maximum Vertical Load: (Worst Case: DL + 0.75 Wind
+ 0.75 Snow)
P = 0.75 13.52 psf +
2.8 psf DL +
-
20 psf snow x 0.75 27.94 psf
P = 27.94 psf x ( 158 "
/12"/ft) x( 96.0 "
/12"/ft) = 2951
lbs for 2 Supports
' P = 1475 lbs/footing
Try 18" diameter footing
Soil Bearing= 1475
/ (p x 0.75) =
835.4 psf <<
1995 psf
1500 psf x 1.33 (CBC Table 1806.2)
Maximum Uplift Load:
Therefore O.K.
P = 12.67 psf ( 2.8
psf DL x .6) =
10.99 psf
P = 10.99 psf x ( 158 "
/12"/ft) x ( 96.0 "
/12"/ft) = 1161
lbs for 2 Supports -
'
P = 580 lbs/footing
Try 18" diameter x 26 "
footing
Allowable uplift =
Concrete DL + Soil Cohesion ( 130 psf x 1.33
) per CBC Table 1806.2
'
[ (7I: x (d/2)2) x 150 pcf x 2.2 ft ] +
[ (71 x d) x' 2.15 ft
x 172.9 psf] = 2320 lbs
Design Ratio =
( 2,320 lbs / 580 lbs)
_ 4.0
Therefore O.K.
R
1
1
'
_
DATE: 6/26/2017 VINCI $ ASSOCIATES SHEET: A4
PROJECT: Martin Petkov 61ruclura/ &ylneers JOB No.: 09-3457
256 Yankee Vista Drive 175 E. WILBUR ROAD, STE 103 - THOUSAND OAKS, CA 91360 ENGR.: JRV
Concow, CA 95965 p805.496.2100 - f805.496.2442 - evinci@VinciSE.com '
CLIENT: Advance Power Redding
DESIGN OF PIER FOOTING & POST CHECK,.kWIN:D=
Post Spacing: 8.00 ft
Number of Columns: 2
Horizontal Load: 9.6 psf
Exposed wind surface 3 ft
-DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA:
(CBC Section 1807.3.2.1)
P
d = (AQ) (1 + ( 1 + (4.36h/A) )^.5)) A = (2.34 • P) / (S1 - b)
III
h
Id
GOVERNS >>>
DESIGN COLUMN
P = 96 lbs = 9.6 psf x 8.0 ft x 3 ft / 2 columns
h = 6 ft (Average Height)
S1 = 266 psf/ft x (d/3) (includes 1.33 increase for wind)
b = 18 in (diameter or diagonal of square)
Try d =
(ft)
S1 @ (1/3)d
(psf)
A
Calc d
(ft)
1.15
153
0.979
3.07
1.4
186
0.804
2.73
1.65
219
0.682
2.48
1.9
253
0.593
2.29
2.1.5',
ME"EMIEZ
2.4
319
0.469
2.00
M., = Ph = 576 ft -lbs
S., = M., / Fb = 0.30 in Fb = 0.66 x 35,000 psi
ASTM A53, Gr B
»»> USE: 1-1/2" Schedule 40 Pipe S = 0.33 in
with 18 inch diameter x 26 inch MIN. deep concrete footing.
DATE: 6/26/2017 VINCI $ ASSOCIATES SHEET: 131
' PROJEC' O cSfruc/ural 6nyrneers JOB NO.: 12-3457
0 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.: JRV
0 p805.496.2100 • f805.496.2442 • evinci@VinciSE.com
CHECK RAIL TO SPAN SUPPORTING DEAD LOAD + SNOW LOAD
'SPAN, 1� LOADING TYPE: Uniform SPAN: 8.00 ft
UNIFORM LOAD: PV = 2.77 ft x 2.8 psf. = 7.756
' Snow = 2.77 ft x 20 psf = 55.4 .
Wind = 0 ft x 15.14 psf = 0
0
w 63.156 #/ft R1 = 253 lbs
R2 = 253 lbs
Aluminum
S = w 1` = 0.23 in'
' 8 Fb
A = 1.5 w (1-2d) = 0.02 inZ r •-
2 Fv
»» USE: 3" Prosolar Rail ( Alt: - )
(S = 0.63 in3, A= 0.696 inz,
•
1
1ro
1
1
1
1,
1
1
0.750" 0.750-
1.500"
01
FTI I SECTION PROPERTIES saos
Ixx
0,830 in 4
lyy
0,283in 4
Sxx(max)
0.630 in 3
Syy(max)
0.378 in 3
Sxx(min)
0.484 in 3
Syy(min)
0.377 in 3
rxx
1,092 In
ryy
0,638 in
Area.
Perlm,
0.696 in 2 Weight
15.873 'in Wall Thk,
0.810 lbs/ft
0,000
in '
I
DATE: 6/26/2017 VINCI & ASSOCIATES SHEET: B2
PROJEC' 0 cSfrucfurai Cnyineers JOB NO.: X09-3457
0 175 E. WILBUR ROAD, STE 103 . THOUSAND OAKS, CA 91360 ENGR.: JRA/
0 p805.496.2100 . f805.496.2442 -'evinci@VinciSE.com
CHECK RAIL TO SPAN SUPPORTING.DEAD LOAD + WIND
SPAN LOADING TYPE: Uniform SPAN: 8.00 ft
UNIFORM LOAD: PV = 1.75 ft x 2.8 psf = 4.9
Snow = 0 ft x 20 psf = 0
Wind = 1.75 ft x 15.14 psf = 26.4993
0
0
w 31.3993 #/ft R1 = 126 lbs
R2 = 126. lbs
Aluminum
S = w 1' = 0.11 in'
8 Fb
A = 1.5 w (1-2d) = 0.01 in
2 Fv
»» USE: 3" Prosolar Rail ( Alt: - )
(S = 0.63 -in3 A= .0.696 inz,
O
to
O
ic
0.750" 0.750-
1.500"
SECTION PROPERTIES F6005
box
Sxx(max)
Sxx(min)
0.830 'In 4
0.630 In 3
0.484 in 3
lyy
Syy(max)
Syy(min)
0,283 in 4'
0.378 in 3
0.377 in 3
rxx
1,092 In
ryy
0,638 in
Area
Perim;
0.696 in 2 Weight
15,873 In Wall Thk,
0.810 16S/ft
0,000 in
DATE: 6/26/2017 V I N C 1 Ss A S S O C UA T E S SHEET: 133
1 PROJEC' 0 cSlruclurai (inyineers JOB NO.: '09-3457
0 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.: JRV
.0 p805.496.2100 • f805.496.2442 • evinci@VinciSE.com
CHECK RAIL TO SPAN SUPPORTING DEAD LOAD + 0.75 SNOW + 0.75 WIND
' SPAN 1� LOADING TYPE: Uniform SPAN: 8.00 ft
UNIFORM LOAD: PV = 2.55 ft x 2.8 psf = 7.14 ;
' Snow = 2.55 ft x 15 psf = 38.25. \
Wind = 2.55 ft x 11.36 psf = 28.9599
= 0
0
w = 74.3499 #/ft R1 = 297 lbs
R2 = 297 lbs
Aluminum
S = w 1` = 0.20 in' s
' 8 Fb
A = 1.5 w (1-2d) = 0.03 inZ
2 Fv
' »» USE: 3" Prosolar Rail ( Alt:-) -
(S = 0.63 in3, A= 0.696 int, -
Y
0
ba
0,830 in 4
lyy
0.283 in 4
M
0,630 in 3
Syy(max)
0.378 in 3
S)oc(min)
O
Syy(min)
0.377 in 3
rxx
1,092 In
M
0,638 in
Area
Perlm,
X X
0.810 lbs/ft
0,000 in
'
Y
M
1
' 0.750" 0.750"
1.500"
r'
0 I SECTION PROPERTIES . sari
ba
0,830 in 4
lyy
0.283 in 4
Sxx(max)
0,630 in 3
Syy(max)
0.378 in 3
S)oc(min)
0,484 in 3
Syy(min)
0.377 in 3
rxx
1,092 In
ryy
0,638 in
Area
Perlm,
0.696 in 2 Weight
15,873 in Wall Thk,
0.810 lbs/ft
0,000 in
DATE: 6/26/2017 V I N C' 1 • & ASSOCIATES
SHEET:
B4.
PROJEC' 0 cslruclura/ 6nrfineers
JOB NO.:
09-3457
0 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360
ENGR.:
JRV
0 p805.496.2100 • f805.496.2442 • evinci@VinciSE.com
CHECK PIPE TO SPAN SUPPORTING DEAD LOAD + SNOW LOAD
SPAN
LOADING TYPE: Uniform SPAN:
8.00 ft
UNIFORM LOAD: PV = 5.50 ft x 2.8 psf = 15.4
Snow = 5.50 ft x 20 psf = 110
Wind = 0.00 ft x 15.14 psf = 0
= 0
= 0
w = 125.4 #/ft R1 =
502
lbs
R2 =
502
lbs
STEEL
S = w V = 0.24 in'
12 Fb
A = 1.5 w (1-2d) = 0.05 int
2 Fv
»» USE: 1.5" Sched 40 Galy Pipe ( Alt: - )
(S'= 0.326 in', A = 0.799 int
I
u
1
DATE: 6/26/2017 V I N C I $'ASSOCIATES
SHEET:
-135
' PROJEC" 0 c3irucfural 6n9ineers
JOB NO.:
X09-3457
0 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS; CA 91360
ENGR.:
JRV
0 p805.496.2100 • f805.496.2442 • evinci@VinciSE.com
-
CHECK PIPE TO SPAN SUPPORTING DEAD LOAD + WIND
' SPAN �2 LOADING TYPE: Uniform SPAN:
8.00 It
_
UNIFORM LOAD: PV = 5.50 It x 2.8 PSI = 15.4
'Snow= 0.00 It x 20 PSI = 0
Wind = 5.50 It x 15.14 Psf = 83.2834
0
1 = 0
,
w = 98.6834 #/ft R1 =
395
lbs
' R2 =
395
lbs,
STEEL
S = w V — 0.19 in'
' 12 Fb .
—^
A = 1.5 w (1-2d) — 0.04 int
2 Fv
' »» USE: 1.5" Sched 40 Galy Pipe ( Alt: - )
(S = 0.326 in', A = 0.799 inz,
1
DATE: 6/26/2017 V I N C I Ss ASSOCIATES
PROJEC' 0 cSlruchwai &pneers
0 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360
0 p805.496.2100 • f805.496.2442 • evinci@VinciSE.com
SHEET:
JOB NO.:
ENGR.:
Bs'
'09-3457
JRV
CHECK PIPE TO SPAN SUPPORTING DEAD LOAD + 0.75 Snow + 0.75 WIND
SPAN LOADING TYPE: Uniform SPAN:
.8.00 ft
UNIFORM LOAD: PV = 5.50 ft x 2.8 psf = 15.4
Snow = 5.50 ft x 15 psf = 82.5 i
Wind = 5.50 ft x 11.36 psf = 62.4626
= 0
= 0
w = 160.363 #/ft R1 =
641
lbs
R2 =
641
lbs
STEEL
S = w 1` = 0.31 in'
12 Fb
A = 1.5 w (1-2d) = 0.07 int
2 Fv
»» USE: 1.5" Sched 40 Galv Pipe ( Alt: - )
_
(S = 0.326 in', A = 0.799 inz,