Loading...
HomeMy WebLinkAboutB17-1330 058-200-083DEVELOPMENT SERVICES BUTTE COUNTY f , DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) . Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 530 Permit No: B17-1330 Issued: 8/21/2017 APN: 058-200-083 Address:. 4132 DEADWOOD RD, OROVILLE Owner: SALMON DANIEL Permit Type: SOLAR GRND-RES Description: SOLAR GRND - RES (I 1.40KW) www.tsutteuounty.net/aas AREA 3 Flood Zone: None SRA Area: Yes ,RRTRACKS for 7jnnonp- AG- SRA. PW Front: 15 Centerline of Road: Rear: 0 SRA: Street:'. 0 AG: Interior 0 Total Setback from Centerline •)f Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Ins ection Type' IVR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonq Grout 120 131 ]To-olPlumbing Test Do Not Pour Concrete Until Above are Sign d Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 612 Tiedown/Soft Set System 611 Permanent Foundation System Do Not Install Floor Sheathing or Slab Until Above Signed ShearwalUB.W.P.-Interior 134 ShearwalUB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 605 Continuitv Test Do Not Install Sidin Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Roujzh Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Si ned Permit Final 802 Electrical Final 803 Mechanical •Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimmin - Pools Setbacks Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimmin - Pools Setbacks 131 ]To-olPlumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencin Alarms/Barriers 503 Pre -Plaster 507 Manufact ed Homes Setbacks 131 BlockingfUnderpining 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuitv Test 602 Ski rtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Len h z Width: Insi nia: Public Works Final 538.7681 ` Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL 1 -rrvimt r,um is a %-truncate muccupancy Tor IxesLaennaL Vinyl PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARL) MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections s 3pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 530 Permit No: B 17-2004 Issued: 9/5/2017 APN: 028-410-098 f Address: 15 MISSION OLIVE CT, BANGOR 1 ' Owner: - MALMQUIST FAMILY TRUST i Permit Type: 'REROOF RESIDENTIAL Description: tear. off and reroof with Pabco Premier Shingles :)j&1ns:) www.tsuueuounty.neuaas AREA 1 Flood Zone: None ERA Area: Yes SETBACKS for Zone ncr. AG. SRA. PW Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING I Ins ectioti Type 1VR INSP DATE Setbacks 1 131 Foundations/ Footings .. 111 Pier/Column Footings 122 Eufer Ground 1 216 Masonry Grout 1 120 1 131 Do Not Pour Concrete Until Above are Sign d Pre -Slab . 1 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 1• 319 Shear Transfer 1 136 Under Floor Plumbing 412 Under Slab Plumbing 411, i Blockin nder inin 1 Tiedown/Soft Set System Do Not Install Floor Sheathing or Slab Until Above Signed ShearwalUB.W.P.-Interior 134 ShearwalUB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 .1 . Manometer Test Do Not Install Sidin Stucco or Roofing Until Above Signed Rough Framing , 1 153 - Rough Plumbing 1 406 Rough Mechanical 316 Rough Electrical 1 208 4 -Way Rough Frartiin . 128 Gas Piping House 1' 403 Gas Test House 1 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final - 1 802 Electrical Final 1 803 Mechanical Final 1 809 Plumbing Final i 813 Fire Sprinkler Test or Final 702 1 Pools . Inspection Tyne [VR INSP DATE T -Bar Ceiling 145 Stucco Lath. 142 SwimminR Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404. Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 anufactured Homes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirting/Steps/Landings '610 Coach =nfo Manufactures Name: Date of Manufacture: Model Name/Number: - Serial Numbers: Length x Width: Insignia: Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL "Project Final is a Certificate of Occupancy for (Residential Only) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCER YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION 1 I y. Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in the following locations: 1. Outside of each separate dwelling unit sleeping area in the -immediate vicinity of the bedroom(s). 2. On every level of a dwelling unit including basements. R315.1.5 Multiple -purpose alarms: Carbon monoxide alarms combined with smoke alarms shall comply with Section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms. Butte County's Interpretation of 2013 CRC, Sections 314 & 315 for Smoke Alarms & Carbon Monoxide Alarrhs: Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellings she'll be retrofitted with smoke alarms and those that have attached garages or fuel -burning appliances shall have carbon monoxide alarms -installed. Existing smoke alarms can'be replaced with dual function alarms for Smoke and Carbon Monoxide and in most cases will comply with the aforementioned code requirements for Carbon Monoxide Alarms. DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY As Owner/Contractor, I/we affirm and declare under the penalty of perjury, under the laws of the State of California, by our signatures below as Owner/Contractor, that VAre will comply prior to final inspection with Items A & B as specified herein: A. Both Owner/Contractor have read and clearly understand the aforementioned 2010 California Residential Code (CRC) Carbon Monoxide Alarm requirements. B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to final inspection as per the aforementioned building code and maintaining such installation.. Smoke Alarms will also be installed prior to final inspection as per, the 2010 CRC. Smoke anc( Carbon monoxide alarms are now installed in the following locations: Owner's name (print): _ t4L i Owner's signature: Date: 7 1,27 COntfaCt01'3 name (pent): Connellys Professional services, nc. CSLB License: 601524 Confractor's signature'" fir:-�n�iJu. Dater Project Address: _ `s 1V1_-S&esn 6 live Permit f I . 1 t Page 2 of 2 Butte County Department of Development Services TIM SNELLINOS, bIRECTOR j PETE CALARCO, ASST UNT DIRECTOR 7 County Center Drive Oroville, CA 95965 (530) 538-7601 Telephone (530) 538-7785 Facsimile ADMINISTRATION • BUILDING' PLANNING COOL REROOF INFORMATION SHEET (/ ` , , 6- - P'roject Address: _ 5 l �'lI ��5, 6 i 1 ;, � Slope of Roof t-1$1? . # of Existing Layers_ Existing Roofing Material_ she k all that applies to NEW roof. Composition a Tile InNew hake n Wood Shingle! ❑ Built up ❑ Bitumen etal ❑ Other _ ❑ Tear off existing 13Overlay Sheathing ❑ The California. Energy Commission (CEC) has adopted new requirements for re -roofing projects. Beginning January 1, 2010 when more than 50% of the exterior surface of the roof or more than 1,000 -sq. ft of roof is replaced, whichever is less, the new roofing area must meet the roofing product "Cool Roof requirements of §152(b)1Hi, 152(b)l Hii, or 152(b)l Hiii. For robt siopi s bf gir atilt than 2A2: INSTRUCTIONS FOR COMMERCIAL PROJECTS ------------------- ----- —_ • Commercial roofs on decks with a slope of 2:12 or less must meet the 2008 Building Energy Efficiency Standards by being a certified Cool Roof. A copy of the standards. Aned by the applicant must acro — this application • Overlays that exceed 100 pounds per square must be accompanied by calculations performed by a California licensed Civil or Structural Engineer. All overlays must be approved by the Building Official and other requirements listed within Appendix Chapter 15, California Building Code. • A specification from the roofing manufacturer rust aecomparn This application The specification should list the fire doss of the material, a description of the malenats or liayers thM must fie in`sletled, llie Cool Roof ceiliflcation (if iequiie8 because of the slope bf the root), and ihWiIlefibh requirements. , ■ Packaging materials w/CRRC labels must be left on the job site to demonstrate compliance with the specification for he cool roof rating if applicable. I agree that the informatlon pr/ovideed'oon is documentipccura ,and True. ,a Applicants Signature: <�-�1 z._ _..c==-= 2/+L�� - -- Date Rooflng products with a density of less than 5lbs/sq.ft. (i.e. Asphalt shingles) shall have a minimum 3 -year aged solar Roofing products with a density of Slbslsq.ft. or more (i.e. Concrete, day tiles or slate) sliall have a minimum 3 -year reflectance of 0.20 and a minimum thermal emittance of 0.75, or a Solar Reflectance index (SRI) of 16. . aged solar reflectance of 0.15 and a minimum thermal or check alternate (alt) 0 emittanoe of 0.75, or a SRI of 1). or -check alternate (alt) Note: Manufacturers specification for Cocl Roof compliance when required shall be provided for inspector. Packaging materials w/CRRC labels must be left on the job site to demonstrate compliance with the specification for the cool roof rating if applicable. ALTERNATE (ALT)Aitematives to §152(b)1HI and §1152(b)Hli, Stee"lope roof (pitch > 2:12) Alternatives to the Cool Roof requirement may be one of the following: aft o Building with at least R-30 ceiling insulation (approximately 11" (or more) thick if blown in) alt n If in climate Zone 11 •, R-3 or gr=ater roof deck insulation above vented attic. aft ❑ Existing ducts insulated with R-6 and H.E.R.S. dud tested to verify duds are sealed Building has no HVAG ducts in theet6c all (evaporative cooling duct exempt) alt o Buildifig with a miant b&iie-r iii atflc in'dufio tfie iequi'reiriants aft a Ihsul'atioii oval roof deck bi at lea: t % inch ail -'space is ofJ151(f)2; added to the roof deck over an atic Other Exceptions • Roofing area covered by building integrated; photovoltaic panels and solar thermal panels are exempt from the below Cool Roof criteria. ■ Roof constructions that have thermal mass over the roof membrane with at least 25 Ib/ft2 Is exempt from the below Cool Roof criteria. • Butte. County areas within Climate Zone 99 per T 24, Part 6. 2008 California Energy code: Bangor, eery creek Biggs, 4bonto,,110 Powerhouse, Cherokee, Chico, Cohasset, Dayton, De Sable, Durham, East Biggs, Forest Ranch, Gridley, Horcul, Lake Oroville, Lake Wyandotte, Las Plumes, Magalia, Nelson, Nord, Oroville, Oroville East, Palermo, Paradise, Pentz, Richardson Springs, Richvale, south Oroville, Thermalito, Thermallto Afterbay, Thermalito Foreba , Tiger Creek Powerhouse and Wyandotte., CLIMATE ZONE 16 (ONLY) Cool roof requirements apply ONLY when Roofing products with a density of 5lbslsq.ft. or nore (i.e. Concrete, clay tiles or slate) shall have a minimum 3 -year aged solar reflectance of 0.15 and a minimum thermal emittance of 0.75, or a SRI of 10. or check alternate .(aft) as applicable. INSTRUCTIONS FOR COMMERCIAL PROJECTS ------------------- ----- —_ • Commercial roofs on decks with a slope of 2:12 or less must meet the 2008 Building Energy Efficiency Standards by being a certified Cool Roof. A copy of the standards. Aned by the applicant must acro — this application • Overlays that exceed 100 pounds per square must be accompanied by calculations performed by a California licensed Civil or Structural Engineer. All overlays must be approved by the Building Official and other requirements listed within Appendix Chapter 15, California Building Code. • A specification from the roofing manufacturer rust aecomparn This application The specification should list the fire doss of the material, a description of the malenats or liayers thM must fie in`sletled, llie Cool Roof ceiliflcation (if iequiie8 because of the slope bf the root), and ihWiIlefibh requirements. , ■ Packaging materials w/CRRC labels must be left on the job site to demonstrate compliance with the specification for he cool roof rating if applicable. I agree that the informatlon pr/ovideed'oon is documentipccura ,and True. ,a Applicants Signature: <�-�1 z._ _..c==-= 2/+L�� - -- Date 1 - BUTTE COUNTY i DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections :s 3pm). Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 530 Permit No: B17'1488 Issued: 7/24/2017 1 APN: 031-212-014 1 Address: 1923 6TH ST, OROVILLE Owner: BROWN MARK C & CORINNA M FAMIL Permit Type: SOLAR ROOF -RES Description: Install 6.56kw roof mount to existing meter AREA 1 ass. i ia� www.tsutteuounty.net/aus Flood Zone: None SRA Area: No Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline :)f Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING 1 Inspection Type IVR, INSINSP DATE Setbacks 1 131 Foundations / Footings I I F Pier/Column Footings 122 Eufer Ground 1 216 Masonry Grout 1 120 i Pool Plumbing Test Do Not Pour Concrete Until'Above are Sign d Pre -Slab 1 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 1 319 Shear Transfer 1 136 Under Floor Plumbing 412 Under Slab Plumbing 411 1 Tiedown/Soft Set System 1 Permanent Foundation System Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.,Interior 134 Shearwall/B.W.P.-'Exterior 135 Roof Nail/Drag Trusses 129 1 Continuity Test Do Not Install Sidin Stucco or Roofing Until Above Signed Rough Framing 1 153 Rough Plumbing 1. 406 Rough Mechanical 316 Rough Electrical 1 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 1 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Insvection Tyne IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Plumbing Final 1 : 813 Fire Sprinkler Test or Final 702 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Home Setbacks - 131 BlockingfUnderpining 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Under round Electric 218 Sewer 407 Under round Water 417 Manometer Test 605 Continuity Test 602 Ski rting/Steps/Land ins 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: 77=Finals�..- _ __ n T r� 1 Permit Final . 1 802 Electrical Final. 1 803 Mechanical Final 809 Plumbing Final 1 : 813 Fire Sprinkler Test or Final 702 1 Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281' Sewer District Final "PROJECT FINAL *Project Final is a Certificate of Occupancy for esldential Only) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION Carbon morfaxide'alarrn-s`req(iird_d b Sections R315'.1 and R315.2 shall be ihsta (led -in �the � y fbllowing locations: 1. "Outside of each 'separate dwelling unit sleeping area in the, irtimedia,fe. Adhity of the bedroom(s). 2. On every level of adwelling welling unit including basements. R315.1.5 Multiple -purpose alarms: Carbon monoxide alarms combined with h smoke alarms .shall comply with Section R315, all applicable standards, and requirement.sfor listing and -approval by the Office of the State Fire Marshal, for smoke alarms. 'Butte County's Interpretation of 2013 CSC, Sections 314 & 315 for Smoke Alarms & Carbon Monoxide Alarms: Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellings shall be retrofitted with smoke alarms and those that have attached garages or'fuel-burning appliagges shall have, carbon monoxide alarms installed. Existing smoke alarms can be. replaced with dual fuhc:ion a - larnis -for. ,Smoke and Carbon Monoxide and in most cases will comply with the aforerridntiode'd.01'e req'uirein­erits for Carbon Monoxide Alarms. DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY As. Owher/Contracior, Uwe affirm and declare under the penalty of perjury, under -the laws of the State of California, by our signatures below as OwnerlContractor, th4.11we will comply pr-ior to final inspection with Items A & B as specified .herei . n: A. Both Owner/Contractor have read and clearly understand the aforemeniicned 2010 California Residential Code (CRC) Carbon Monoxide Alarm requirements, B. Both Owher/Cohtractor are responsible for installing Ca(rbon, Monoxide Alarms prior to final inspection as per the. aforementioned building code and maintaining such installation. Smoke Alarms will also be installed prior to final inspection as per the 2010 CRC.. Str)ok6 and Carbon Monoiide alarms a59 now installed in thefol-lowing locations.; Cwner'!§ name (print): Owner's signature:Date: 6 L9 Contractor's name (print): &�elSLB License: -1-, Contra ctor's signature: Project Address:11f2_3 5-A'&,qViAX49_527a5 Permit #J'111- 8 Page 2 of 2 Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530) 538-7601 Fax (530) 5384785 w Aw.bunecounr:.net•dd:, Declaration ®f Installation for Smoke Alarms and Carbon Monoxide Alarms FORM NO The newly adopted 2013 California Residential Code requires the installation of Carbon Monoxide Detectors in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. The policy for Carbon Monoxide Alarms in Butte County states: "Any permit obtained in which the value of work exceeds $1000 associated with a Residential. Group R Dwelling Unit or Sleeping Unit shall conform to the following 2013 California Residential Code requirements for Smoke and Carbon Monoxide Alarms (Section R314 &. R315)." 2013 California Residential Code requirements for Carbon Monoxide Alarms: R315.1 New construction: An approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. . R315.1.2 Power supply: For new construction required carbon.monoxide alarms shall receive their primary power from the building wiring where such wiring is served from a commercial source and shall be equipped with a battery back-up. Alarm wiring shall be directly connected to the permanent building wiring without a disconnecting switch other than as required for over - current protection. E.reeptions: 1. In dwelling emits where there is no commercial power supply the -carbon monoxide alarm maybe solely battery operated. 2. In existing dwelling units a carbon monoxide alarm is .permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. 8315.1.3 Interconnection. Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or within a sleeping unit the alarm shall be interconnected in a. manner that activation of one alarm shall activate all of the alarms in the individual unit. Exception: ' 1. Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes there is no access by means of attic, basement or crawl_ space, and no previous melhod for interconnection existed. R315.2 Where required in existing dwellings: Where a permit is required for alterations, repairs or additions exceeding one thousand dollars ($1,000), existing dwellings or sleeping units that have attached garages or fuel -burning appliances shall be provided with a carbon monoxide alarm in accordance with Section R315.1. Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for which the permit was obtained. R315.2.6 Alarm requirements: No person shall install, market, distribute, offer for sale or sell any carbon monoxide device in the State of California unless the device and instructions have been approved and listed by the State Fire Marshal.. Pagel of 2 ASa UILT go PROJECT OWNER: (� l SCOPE: PAGE # CONTENT BROWN, MARK & CORINNA►l. o `� INSTALL PHOTOVOLTAIC SOLAR SYSTEM ON A TRUSS PV -1.0 SCOPE 1923 6TH ST ROOF, MOUNTED IN ACCORDANCE WITH ALL PV -2.0 SITE PLAN OROVILLE, CA 95965 ► APPLICABLE BUILDING CODES SPECIFICALLY PV -3.0 ARRAY LAYOUT APN:031-21_2-014 PH#:530.533.4928 _REF.ERENCING.THE 2016 CALIFORNIA ELECTRICAL - PV-4:0—ELECTRICAL'DIAGRAM�` EMAIL:markcbrown@yahoo.com CODE/ 2014 NEC USING THE FOLLOWING SPECIFIC PV -4.1 LABEL DIAGRAM EQUIPMENT: - PV -5.0 GENERAL NOTES CONTRACTOR: 1. MODULES: SUNPOWER ATTACHMENT MODULE SPECS (19) SPR -X21 -345 -C -AC INVERTER SPECS - ALTERNATIVE ENERGY SYSTEMS INC. 6.56kW SYSTEM RACKING SPECS 13620 HIGHWAY 99 347 SQFT COVERED u WIRE CALCS CHICO, CA 95973 11,41? CSLB: 853351 C-10, C-46 2. INVERTER(S): SUNPOWER: (19) MODULE INTEGRATED 320W EACH BUILDING JURISDICTION: SITE MAP BUTTE COUNTY - , �- � •.- � ., �-,� Its j � 1' ° � - DEPT. OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE OROVILLE, CA 95965 l 4 ;� 6 r , ;•r f f OFFICE#: (530) 538-7601 FAX#: (530) 538-2140 r , i F t i s i I MON-FRI 8AM-3PM I *, • ,. ',�., ��- INSPECTION LINE: (530) 538-4365.J_ t r REQUESTS PHONED IN BY 2PM WILL BE INSPECTED THE NEXT BUSINESS DAY L m A ° s BROWN, MARK & CORINNA 13620 HWY 99 A g l;nP t1 i' . llre o C n D p o o 1923 6TH ST CHICO, CA 95973 N ° _ ;, OROVILLE, CA 95965 CJJ PHONE#: (530) 345 6980 z m m ° 1 APN:031-212-014 PH#:530.533.4928 Alternative Energy Systems Inc. FAX#: (530) 892-2360 a design@solarenergyforlife.com A&BUILT ' (N) -MONITORING n ' MODEM AND ROUTER LOCATION ! 3 �,, �i MSW' ! f� r♦ (E) RESIDENCE COM OSI IONR,OOF W/WOOD TRUSSESM kTT ' (E) MAIN SERVICE PANEL (N) AC S BUT{I PANEL ti SITE PLAN m A S BROWN, MARK & CORINNA 13620 HWY 99 A m z g 3 1923 6TH ST CHICO, CA 95973 5 N n 8 p o � PHONE#: (530) 345-6980 z ;, r OROVILLE, CA 95965 �lJ Z Q o z o FAX#: (530) 892-2360 m p APN:031-212-014 PH#:530.533.4928 Alternative Energy Systems Inc. design@solarenergyforlife.com AC -2 " AC -1 - (1) 3/4" EMT./ SERVICE VOLTAGE 0 ROOF w/ (TRANSITION CABLE(5) (3) #B THWN-2 CU. & 120 - - 2= 0 - (1) #10 THWN-2 CU. GRD. 120V=N-L2-L3=NAV WIRE RUN: 5' AC -1 WIRE RUN: 30' NAV=N-L3-LI=NAV IMP: 20A (2) #10-2 WIRE NM CABLE CU. IMAX: 32A WIRE RUN: 30' " 'IMAX: 20A OMETER F- A *UL IS t BUILI A' DRAWINN' L-------9 200A 1P 240V (9) PV MODULES/INVERTERS SUNPOWER:SPR-X21-345-C-AC 1.33A/ 1 P/240V I 20A IP 240V 20A V 1P (10) PV MODULES/INVERTERS I -BOX 240V -TO -AU SUN POWER: SPR -X21 -345 -C -AC 1P 11 1.33A/1P/240V '21 11 240V _ (N)AC DISTRIBUTION PANEL 125A/ 1P/ 240V AC -MONITORING (1) #14.2 NM CABLE CU. & _ WIRE RUN: 50' CAT -5 SUNPOWER MONITORING — — —b— I ROUTER ELECTRICAL DIAGRAM m p m BROWN, MARK & CORINNA 13620 HWY 99 o ^ F. a< y o „ D c Z o o p 1923 6TH ST r_„A,�,y For!-Jir CHICO, CA 95973 PHONE#: (530) 345-6980 I < o z 3 g c A OROVILLE, CA 95965 z m p o APN:031-212 014 PH#:530.533.4928 Alternative Energy Systems Inc. FAM (530 892-2360 ) design@solarenergyforlife.com a } PV ARRAY t L' -4 y • Y • ( •_ ia""."'••"'_--- y .r- ..'•� < • ¢. '' + '} -� — '• ?..DISCONNECT - MAIN SUB PANEL 'e. i" METER i + r + + + • •,WLS X15 ' AMPS PHASE ' • • ` : y VOLTS + FLOWINGWARNING UTILITY INTERACTIVE POWER • , • ..KW SOLARGENERATOR . a AC OPERATING VOLTAGE: WARNING • » • • •EQUIPPED WITH "RAPID SHUTDOWN PER NEC 690.54 Interactive Point of Interconnectin installed at all Electrical > Per NEC 705.10, Point of Connection, • fi t Distribution Panel covers that porvide a Located On Main Service Panel. path from PV to Utility. r AC PHOTOVOLTAIC DISCONNECT FOR UTILITY OPERATION Y Per NEC 690.14, Disconnection means at the single AC Disconnect or Main Breaker. SOLAR DO NOTRELOCATE a - Solar breaker label @ any breaker passing Bi -Directional Power LABEL DIAGRAM m o m > BROWN, MARK & CORINNA 13620 HWY 99 n mo 0 1923 6TH ST y. . 4' aCHICO, CA 95973 - `— ° = p o OROVILLE, CA 95965 c f PHONE#: (530) 345-6980 z '~ o` 'z ' o _ FAX#: (530) 892-2360 m A APN:031-212-014 PH#:530.533.4928 . �.� Alternative Energy Systems Inc. _ design@solarenergyforlife.com ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2014 NATIONAL ELECTRIC CODE (NEC), OR LOCAL MUNICIPAL CODE, AND FIRE DISTRICT REGULATIONS. 1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. 2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM. 3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION BOXES, COMBINER BOXES, AND SWITCHES. 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ART.250,690. S. NEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES. 6. NEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING. 7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF NEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF NEC 408.16(F) (408.36 IN 2014 NEC. 8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK. 9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75' C MINIMUM. 10.' NEC ART. 690.14. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM 11. NEC ART. 690.53. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM 15. WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXIST, THE DIFFERENT SYSTEMS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER 2014 NEC ART.210.4D 16. PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT 15 LOCKABLE IN OPEN POSITION AND IS LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS. 17. PHOTOVOLTAIC SOURCE CURRENTS MUST BERATED AT BOTH 125% OF THE PARALLEL MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 156% OF THE LOAD. 18. PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE NOT IN THE SAME LOCATION PER 2014 NEC ART.690.56. 19. INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7-05, CHAPTER 13. 20. PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS. 21. PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS INSTALLED AS SPECIFIED IN THESE DRAWINGS. 22. DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE, CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL OR PHYSICAL PLACEMENT. 23. FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL UTILITY. 12. NEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK 24. A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM HAZARD -DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAYBE ENERGIZED IN EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2014 NEC THE OPEN POSITION". 690.5(H) AND IN ACCORDANCE WITH 2014 NEC 705.10. 13. GROUNDING OF ALL DWELLINS SHALL BE CONFIRMED. 25. A NON FOLDING LADDER WILL BE IN PLACE AND SECURED TO THE ROOF TO PROVIDE ACCESS FOR ALL INSPECTIONS. ALL BOXES WILL BE OPENED UPON REQUEST. 14. CONTRACTOR TO PROVIDF, GRnl INTI FAI11 T PRnTFrTInN FnR RnnF Mn1 INTFn PHnTON101 TAir, AeonY5 LOCATED ON DWELLINGS PER 2014 NEC ART.690.17. 26. SMOKE AND CARBON MONOXIDE ALARMS WILL BE INSTALLED IN ACCORDANCE WITH CRC R314 R315 m 13620 HWY 99 Z � � o � m BROWN, MARK & CORINNA �.r a < Z z K 1923 6TH ST CHICO, CA 95973 Z n a1.0 0JJ� PHONEf1: (530) 345-6980 Z o n p= p v r OROVILLE CA 95965 �+ �. ? A APN:031-212-014 ` PH#:530.533.4928 Alternative Energy Systems Inc. FAX#: (530) 892 2360 design@so!arenergyfor!ife.com Design -Driven Advantages ilrih•=CieCi t;;0*! - ,a ;3 { Maximize Value for Roof Size Tys-Lem iCr roc) 1e=. suit;, iirlv=;T-i Expand Deployment Options r r,pl .z t." ifs arra Simplify & Speed Installation •� - • rJ� 'e;° l�Xi^It{i� C'irM :l:- - i. (lei i\O tar Qr nc?ss ;.c.'.{ It•-laifc;lt'tin:.i'J�. li�Grl C�in��j=:liriC • E�;tuiti�. � cos,irnissir,;?ing , Component of Complete System �, ,. r ,:i? CLS r-,U�t�/Er4: 1; 1`ilj'h•:i �-l�:i�i.x nd.in= Suni?o,%er Dior, �nrinE _,rscem G,. ,, • Siao._.;orys�_:� r.rn�i,ly _. oe.,i,le-_ics X SERIES Optimize System and Installation Efficiency ., .. 'J •C '�,'. .- �� :�': •:.'•_ -_:V 'tee �f .f� :f�t,^,�•:-,•ril-r �-�: _~� , _ : �• _ - r..-1� 'Y. _ -'-..� i�l�.ti . -- _. ^I - "�,. T- 'JI%�•1 = it ri �tl -!�_ ..;1 i _ , _ . `fir - i,a _. i?-, � - �Y=:..:Il "'i _ 1.: � t•nvJi-� _� �.t� .r _ � _ � ' s sunpower.com 01-':.' 62 ui:, 0,hO r:, 30 .J,'_!nz`ron: -- 1 .rch 1?-(rmlQ7rne:--r r._1l-1: e2rnp1,. t13 M,�-:c• o• T.x � irR? s�;:o c ;tarps' af:,:' o�il,� �1��..•-• i�.r .. Fri _'1, =]rSWnc_ Xn-ye;fikrn•.r,r.=r E.Fb'4t3-r.Pn,�,L,c jpr;r <VSes'r r� o , lzrr ;taG : if cww Ea al C—rera wv plj•� >4r �Jv+'.' ti � r:d�- ''-t. s' i+'. ,_ - ww Sa.` fxvr. : •x -r.,. s `�i CE. AS < i6 1,7 ---S : r one - 1,I):-' a eY,r r + ce,ZM i 5 ;'.` _] ranE..ri l dtN3 +?rd,aY>:c rl^a5 -J-1 tie ;A,�heh4�f: -n T2'^«. nr!nt' ertoril� ').t;.:.±.,��«r ili-`i•. ^1..d:.fa:. (... 1P.r 'h�;•$r�'P1�n'La'u5'r. iKl� . ter +-. •..� �pn a �^, s _ 'e'�rrr�r a a1`^+• u iC � • r ^.b 2 e-,1205 iE- ? "r'lt:. :d';;t»Su i'.3sF�ce"S L���C,L+� - =a'.. rjr f+', •'y' r`.�-yx � � 1 �+ _-:i=.. =�' J 375 AC C,)fir -ous 0 -[P, -ix C!ifrf-n*. _� 'CS L` i!G:_ �'�i'.�L=U .— "✓i x f t f r ' ^ch 47!rc ;' '_ ?° y ? tsfI pha__.f t Fri .c. t'r;z_ - _ - ] ^ r?r n Ci -CL . {,1 2n`. Vjt's (�+•C ,.: t ! 01-':.' 62 ui:, 0,hO r:, 30 .J,'_!nz`ron: -- 1 .rch 1?-(rmlQ7rne:--r r._1l-1: e2rnp1,. t13 M,�-:c• o• T.x � irR? s�;:o c ;tarps' af:,:' o�il,� �1��..•-• i�.r .. Fri _'1, =]rSWnc_ Xn-ye;fikrn•.r,r.=r E.Fb'4t3-r.Pn,�,L,c jpr;r <VSes'r r� o , lzrr ;taG : if cww Ea al C—rera wv plj•� >4r �Jv+'.' ti � r:d�- ''-t. s' i+'. ,_ - ww Sa.` fxvr. : •x -r.,. s `�i CE. AS < i6 1,7 ---S : r one - 1,I):-' a eY,r r + ce,ZM i 5 ;'.` _] ranE..ri l dtN3 +?rd,aY>:c rl^a5 -J-1 tie ;A,�heh4�f: -n T2'^«. nr!nt' ertoril� ').t;.:.±.,��«r ili-`i•. ^1..d:.fa:. (... 1P.r 'h�;•$r�'P1�n'La'u5'r. iKl� . ter +-. •..� �pn a �^, s _ 'e'�rrr�r a a1`^+• u iC � • r ^.b 2 e-,1205 iE- ? "r'lt:. :d';;t»Su i'.3sF�ce"S � Warraniies'�`an d Certificati ons 3X _-7 a^C • �._ �'Uz _ _� Y:nc^ iR5L�i1�nYJir arc_- •, - rz -. L �V�- ,�f-ii_�' •h ;]• :r S.r�l�:•�1�'C'x n� ✓l F]?'i ,�S�I"�c•�.':;,,yaan _rc� �c r-c:o�a-�r�f�ir cCw:Co +1- ✓'rCh Ta -C - _ 1c•:,} r i• _, L?1-ir�t. C7 QCt '.�)c.NOfl f .2 ri 1S5i —, Fleas. :', 1r51..A'.Ons lo, C'e--, ii Docdrien;;: 515215 R:v.31L'R .i5 J 375 i!G:_ �'�i'.�L=U �f"1=�3_-�: _A I✓. �. f^',r+.r�.--i '.:dat=. =gµ � Warraniies'�`an d Certificati ons 3X _-7 a^C • �._ �'Uz _ _� Y:nc^ iR5L�i1�nYJir arc_- •, - rz -. L �V�- ,�f-ii_�' •h ;]• :r S.r�l�:•�1�'C'x n� ✓l F]?'i ,�S�I"�c•�.':;,,yaan _rc� �c r-c:o�a-�r�f�ir cCw:Co +1- ✓'rCh Ta -C - _ 1c•:,} r i• _, L?1-ir�t. C7 QCt '.�)c.NOfl f .2 ri 1S5i —, Fleas. :', 1r51..A'.Ons lo, C'e--, ii Docdrien;;: 515215 R:v.31L'R .i5 _l WSQ'_—ou_n_fC �Mpqne t -Ir ges ads a rj C '-40' L 1 9L' '!eS ur3 "':r vb Lrz-rE, cmruflc.'icos CiFSS "'Ire raCnq %',hen distancz modui= 1­6rre !S !� 3.5' )oi Atlacnme,2.t 3 (2. RL 7 ,!,7j !C- "7&. lf�_Ss ' :gid_-�v E'iaJ IC 37 ads a rj C '-40' L 1 9L' '!eS ur3 "':r vb Lrz-rE, cmruflc.'icos CiFSS "'Ire raCnq %',hen distancz modui= 1­6rre !S !� 3.5' Corr Snecifiuvo^sancluaed in this d itasheet me scop -ci tc ch;'.nge...vlt.-IN:'.nc.Tjce ;'OE )oi Atlacnme,2.t Corr Snecifiuvo^sancluaed in this d itasheet me scop -ci tc ch;'.nge...vlt.-IN:'.nc.Tjce ;'OE INVISIMOUNT RACKING DETAIL T lila V 1J11'1lJVlla 1 f\P11L CLAMP * EACH MID CLAMP GROUNDS THE AIL L-1 VV 1 INVISIMOUNT RAIL Greenl=,asten" G1=1 - Product. Guide f' ,.� 5 2 Consult an engineer or go to www.ecofastensolar.com for engineering data. 3 Installation Instructions with Compression'Brackc;t r .•,��, ,.'_rte W 4a 4b 4c 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3. Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when tourqued. See page 2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses. 4. Line up pilot hole with GreenFasten flashing hole. 4a Insert the lag bolt through the EPDM washer, the top compression component bracket (L- 102-3, L-102-6*, SCL-101-3*, Z-101*, Conduit Mount Bracket*) and the gasketed hole in the flashing and into the rafter. 4b Insert the lag bolt through the EPDM washer, the Comp Mount Slide compression bracket and the gasketed hole in the flashing and into the rafter. 4c Insert the lag bolt through the SS washer, the third -party bracket, the EPDM bonded washer, the CP -SQ -Slotted compression bracket and the gasketed hole in the flashing and into the rafter. 5.. Torque:The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. *not pictured. 877-859-3947 FwFasleii Solat`'All cunteul lNotected t.IIidel copyliglit. All 6.11 its wserveect. 7/24/2014 2.1 F wFasieil Solas ooducls aie ulutected by (he hilowulcl U t;, Pattn06HA'i 1,522 1128. l!,3.700 IS'G 0 18 ):M8 lit 8 '2112171:1 1.4_' 8 1410 7981 1"', 8 :%09 914 k? H 24h 4'"d 14;'. 11 '..'17 1""1 to 8 ?;". 'i';7 1';y . Gre-effasten- GFI Product Guide |11%L]Uatx/n|nsU1-1(Uont, ,U""kxVol Will ^djvsimn`t Wh,nkvJim|nk|"``//|^�.hxx/ho`o..dk,x`v}`|v"oxoq|,..'o'v~ ,� ..Q�eOashingupundershingksund|�adingedge ' engagesnai|s. Measure remaining distance toadjust + \ Y updope >' CU ^ | ' / � �m�4� , 3. Reinstall flashing with notched area upslope. Jinwle 877-859-3947 swposle^uulai'All omo,.xv.mecClu""dxcopvo8it. All /m|xammyved /12412014 2. hatmarkswheenui|shaMs engaged leading edge offlashing the distance desired inStep l. Notch depth not 0oexceed Z^length byl/2^width. �rnot( h 4. J 2.2 • `t • I - I , I I I ` I 1 I i I Im I I I I , s • ^ y I I If F I • . I 4 a r • j • �ti • 3 47 •� j 1 I �W ' ffI a r 1 Bill r Gre,enFasten- GI 'I - Product GLiICIe 'r Cut•Sheets: G�1- 812 •'' •• I,. .. ,, • g"— � � 4,r128', .\�' 1/32,„+ • ,'. _• ,` - l,. .',• �;' t« r . • ,� - ; . ,.,., a .. � f ` .. _ J r ,. . � • •+ r . ��. e ' - - - j •c DETAIL A 4” _ SCALE: 2:1 ,Finish Options' BLK = Matte Black MLL = Mill Finish _ 877-859-3947 EcoF'eSlen SOlBr'f'All cant�!rll I.Iruteriferl Under r.UpyiigIll. All rigIiIs'reseived.,7/24!20'14 3.2 Ecol'asterl Solar Uroclucts are protected by the 1011 iwtnrl U S 8.151,522 132 8. 1533,700 Cit 8,181,103 32 t3 '166.7113 1.12 B 140 2J9 112 8,2011.9114 K S 24f! 4::1 13211 21?'17 4 R2 R 22.i 557 1+2 w r GreenFasten" Gl-'l - Prochict Guicle r -O 1 . M'') - - I,..w.lto', xNe Cut Sheets: Bracket Options - CP- SQ Slotted Otl-OD'I-Jaril tCOf-@Slell b= AlMorAn a PWWded under cunrohL All rghk resm ved "P/'2=01•1 Ec4amenSOIXIMO lud are WNW10dWHOOTMim ME I'm1wh 19152213213AS3YOU1328 131 W8W8V&R3W a U6pA IV H on mm "son now man I ummum"711, ' . � G/ee/Fa Lu.`~GFl— Product Guide Cut Sheets: Bracket Options `S[L'l8l-]" � ^ � 46 SERRATIONS .� �] /]61" / ' r 3/4^ 1 /l6 . � ��� R.0 10 . 60.00� . ^ ' ^ . 'f'006 v^ �.— ' //Y' -^�� ^ -� 7/�" 'X 80') , , - DETAIL ' ' SCALE 3:1 � 877-859-3o:7 EooFayte//Su��All content protected v/ve,cnpvi0|im|.W»� eycva| 7/24/20 14, ` /cyr . . ] 5 sw� pa�^aom'*vu°x,ammn�u�uw/»owmw�muxp^/p,�8, 15 '/.»eun�u,�wn �moua�o o/�ao,o,o^/no,x'wnmwx,^,o*o/^'^�°' un,u"`./''' .r^ "^",,","'"" � � '^ G/ecnFasten`GFl -P/oductGuidc � r r ' ' . ' .. - , ' ~'463ERRATK]N . . . ' � � � � . . CUL SheC(3:Bracket {}ph�h�-L-lOZ-3^ ' � . 2X 3/8.. ` - ' - ' ^` � ` � ' - � ' ` .. � � ' . ` . . .. "''`'" ' � . ^ . � . � -06 O�6 y - - .��� . , � C���7�±����X��" L}E|8|L/\ ' 5C/\LE-3. � l 877-859-3947 EcoFaslei I Sulai'All content poteded under copynghl. All iights iesp.i-v'(,,d. 7/24/2014 398 132, � � 2 X R.0] . ,.� � + � ~ ' � ' '~ ' 3/8 AC Circuit Ampacity Calculator Meter #: `100745662.8 Customer Name: BROWN;`MARK &,CO.RINNA� ' '� • , 5 1923 6TH STS .. , r, --,F,t j , Location. OROVILLE; CA 95965'' Wire Note: AC-1 Description: AC MODULES TO AC DISTRIBUTION PANEL b Wrre'Calculation Y ;; ��«•r-�� i`�-= --,-.•f;�.-„ ; F F i , 1. F_• r i F �; , y'tF �• ^. •,�. 3.84 kWatts 240 VAC Split sVoltage Configuration TRUE TI-Inverter? .10- Minimum Wire and Conduit Size based on Voltage Drop and Ampacity ' r10> ;, Minimum Ground Size Based on NEC 20.00 A Minimum Ciruit Breaker/Fuse SizeActual Ground Size Based on NEC x'520:00 A Ampacity After Derate 10 Wire Size Based on Ampacity js-:30 A" .0.992 % of Voltage Drop � - 10 Wire Size Based on Voltage Drop X30 A as - `16 A Circuit Ampacity - '1 " ; Factor 1' ' 'i Phases X0.82 Conditions of Use Derate Factor 19:51 A Minimum Conductor Ampacity Based on Conditions of Use . 20.00 A Minimum Conductor Ampacity Based on 1.25 Rule Condliti - i:fU.;. -, _ ,1, 7-7 :, ;i a :4 `.� ,77�' ^'f'. -�, -�,; �,'i. -*. Yc +.: -•i:.y 0:82 Derate Total -, SO 'C Temp Coef (ambient + Sunlight) i-122 •F x-.0.82 Derate 50 •C Ambient Temp 4; `122 `F _ y none Sunlight Exposure } 'r 32 *F 0'' f; °C Temp adder 3 or less Number'of Current Carrying Conductors ~?� 1 '. Derate applied to Temp Coeficient TT age Drop: Allowable Tolerance;(Solar Generation1%Distribution 3%)r 'iK .'-' �:�� �. �- �- r •� �240 V Circuit Voltage 16 _� A Circuit Amps 1124 Resistance 60 ft One Way Distance • 10 w Wire Size 0.992 % of Loss Conduit Size:(Con d4 u_ t Fill°Can:Not be more';than X40%)r' i + 7-7 77777'74. 7�. PVC Conduit Type Wire Size Diameter �✓e Conduit Fill percentage 3/4 Conduit Size ,0:212` Ground Wire Size Diameter [:0-4*62J Conduit Internal Diameter 600 V System Voltage THWN-2 Wire Type , AC Circuit Ampacity Calculator Meter #:71007451 628_ Customer Name BROWN;,MARK &,CORINNA Location 1923 6TH ST�OROVILLE'CA'95965 ".• f' ` _ i Wire Note: AC -2 Description: AC DISTRIBUTION PANEL TO MAIN ;-6 e Calculation '`'.•Y.:, 08 kWatts 240 `r. VAC - y -Split Voltage Configuration TRUE TL Inverter? Minimum Wire and Conduit Size based on Voltage Drop and Ampacity 10 Minimum Ground Size Based on NEC 1`:62 A Minimum Ciruit Breaker/Fuse Size 10 Actual Ground Size Based on NEC 31:67 A Ampacity After Derate 8 Wire Size Based on Ampacity " 55 A 0 % of Voltage Drop 10 Wire Size Based on Voltage Drop zt 30 A 25 333 A Circuit Ampacity + 1. Factor k 1- F Phases ` 0:82 Conditions of Use Derate Factor `30MI A Minimum Conductor Ampacity Based on Conditions of Use 3 1.671 A Minimum Conductor Ampacity Based on 1.25 Rule Conditions of:Use 7 7777. ., ,:� , . ...- 77 , .._ , .0:82 Derate Total F z,,_;50 °C Temp Coef (ambient + Sunlight) ; X1-22 °F . 0.82' Derate 50 °C Ambient Temp none Sunlight Exposure ---32 °F `t 0 °C Temp adder Y' 3 or less Number of Current Carrying Conductors " =1 -`` Derate applied to Temp Coeficient Voltage Drop: Allowable ;lerance�(Solar.Generation'1%,iDistribution`3% 24TftCircuit Voltage 25:333 A Circuit Amps 1'.24 Resistance One Way Distance i)Wire Size i0 % of Loss Conduit Size (Conduit FiII CahW7:be,more than 40%)a ti i EMT J Conduit Type 0212 Wire Size Diameter 1 �o Conduit FIII percentage - .- 1 Conduit Size x'0.16 Ground Wire Size Diameter Lo .86i-3 Conduit Internal Diamete'r 600 V System Voltage THWN-2 Wire Type