Loading...
HomeMy WebLinkAboutB17-1503 027-020-05911! 6EVELOPMENT SEltVlCE$ BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES AREA INSPECTION CARD MUST. BE 'ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 530.538.7785 www.ButteCounty.net/dds L Permit No: B 17-15031. Issued: 7/26/2017. ,APN: 027-020-059 Address: 201 DISTRICT CENTER DR, OROVILLE Owner: Brock Stratton -PermitType: SOLAR ROOF -RES ' Description:- 15.68 kW(DC) roof mounted PV; (56) modules Flood Zone: -None SRA Area: *es qlFT Zon*nfy- AG Front: Centerline of Road: Rear: SRA: Street: AG:-' Interior Total Setback froin Centerline of Road: ALL PLAN, REVISIONS MU'ST'BE'APPROVEi) BY THE COUNTY BEFORE PROCEEDING Inspection Type IVR INSP DATE Setbacks - - 131 Foundations / Footings ill Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 13�0 4' F� 06'Not Pour Concrete Until -Above are Signed Pre -Slap -a 124 Gas Test Underground/floor 404 Gas Pi in Underground/floor 403 :Underfloor Framing, 149 Underfloor Ducts 319 'Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blocking/Underpining 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 Shearwall/B.W.P.-Exterior .135 Roof Nail/Drag Trusses 129 417 Manometer Test Do Not Install Siding/Stucco or Roofing Until Above Signed Rough'Frarriing' 153' RmghPlurnbirig 406. Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Pi in House 403*. Gas Test House 404 Shower Pan/Tub Test - 408 Do Not Insulate Until Above Signed* Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813. Fire Sprinkler Test or Final 702 Swimm* R Pools Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimm* R Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fenciu/Alarms/Barriers. 503 Pre -Plaster 507 Manufactured Homes Setbacks 131 Blocking/Underpining 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 ,Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirting/Ste vs/Landings 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: 'Public Works Final 538.7681 Fire Departmeht/CDF 538.6226 Env. Health final • 538.7281 Sewer District Final "PROJECT FINAL I . . . . .1 . . .. I I _ I i, j , *Project Final is a Certificate of Occupancy for (Residential Only) PERMITS BECOME NULL AND VOID .1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FORA 1 YEAR RENEWAL 30 DAYS PRIOR TO'EXPIRATION PPT 15.68 kW (DC) ROOF MOUNTED PV ARY, � ' • _ _�. � �� �� FOR T' HE� STRATTON RESIDENCE i cc �n N ROOF INFO: AZIMUTH: 190° TILT: 10 & 20° TYPE: COMP - CONTRACTOR: Sunfinity• Solar - CA LLC ' 4612 Roseville Road, Suite 112 Sacramento, CA 95660 I Phone: 1-844-786-3461 LIC. #1013931 Exp.: 5/31/18 SCOPE OF WORK: System composed of 4 strings of 16 Hyundai HIS-S280RG Modules each connected to 1 Enphase r ;; M250-60-2LL-S22 Micro -Inverter. 56 modules and Micro -Inverters total. BILL OF MATERIALS: . 56 THIS-S280RG 56 - Enphase M250-60-2LL-S22 1 - 70AMP 2 -Pole Circuit Breaker , 4 - 20AMP 2 -Pole Circuit Breakers 1 - 15AMP 2 -Pole Circuit Breaker 26 - IronRidg e- XR-.1000 Aluminum Rails . (204") • 62 - IronRidge F1ashFoot2.. MSP Requirements: NONE GENERAL NOTES: } 1. ALL COMPONENTS ARE UL LISTED AND CEC CERTIFIED, WHERE WARRANTED. 2. THE SOLAR PV SYSTEM WILL BE INSTALLED IN ACCORDANCE WITH ARTICLE 690 OF THE 2016 CEC AND 2016 CBC. ' 3. WHERE METALLIC CONDUIT CONTAINING, DC CONDUCTORS IS USED INSIDE THE BUILDING, IT SHALL BE IDENTIFIED AS "CAUTION: SOLAR71 CIRCUIT" EVERY IOFT. , 4. A DC DISCONNECTING MEANS SHALL BE INSTALLED AT A READILY ACCESSIBLE LOCATION EITHER OUTSIDE OF THE BUILDING OR ;,,�.­, STRUCTURE OR INSIDE NEAREST POINT OF ENTRANCE OF THE SYSTEM CONDUCTORS AS PER SECTION 690.14 OF THE CEC. 5. HEIGHT OF THE INTEGRATED AC/DC DISCONNECT SHALL NOT EXCEED 6'-7" PER NEC CODE 240.24. 6. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH CEC 690.47 AND 250.50 THROUGH 60 AND 250-166 SHALL BE PROVIDED. PER CEC', GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS'� INACCESSIBLE OR INADEQUATE A SUPPLEMENTAL GROUNDING ELECTRODE WILUBE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT. GROUND ROD WITH ACORN CLAMP. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO ; LARGER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 7. PHOTOVOLTAIC MODULES ARE TO BE CONSIDERED NON-COMBUSTIBLE. e i 8. -PHOTOVOLTAIC INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING. MECHANICAL, OR BUILDING ROOF VENTS. THE SMOKE ALARMS ` SHALL BE INSTALLED OR VERIFY TO ENSURE THE SMOKE ALARMS ALREADY EXISTING WHEN ALTERATION OR REPAIR TO GROUP R-3 OCCUPANCY EXCEEDS $1,000 CRC R314.22. 8.1. ON THE CEILING OR WALLS OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF BEDROOMS • 8.2. IN EACH ROOM USED FOR SLEEPING PURPOSES, J ' 8.3. IN EACH STORY WITHIN A DWELLING UNIT, INCLUDING BASEMENTS BUT NOT INCLUDING CRAWL SPACES AND UNINHABITABLE. l ATTICS. 8.4. ALL SMOKE ALARMS SHALL BE LISTED IN ACCORDANCE WITH UL217 AND INSTALLED IN ACCORDANCE'WITH THE PROVISIONS OFY:aI'�ti THIS CODE AND THE HOUSEHOLD FIRE WARNING EQUIPMENT PROVISIONS OF NFPA 72. SYSTEMS AND COMPONENTS SHALL BE^ CALIFORNIA STATE STATE FIRE MARSHAL LISTED AND APPROVED IN ACCORDANCE WITH CA CODE OF REGULATIONS, TITLE 19, DIVISION l ' FOR PURPOSE FOR WHICH THEY ARE INSTALLED:•"•t 9. CARBON MONOXIDE ALARMS IF NOT ALREADY EXISTING ARE REQUIRED TO BE INSTALLED WITHIN A RESIDENTIAL DWELLING WHEN THE VALUATION OF AN ADDITION, ALTERATION OR REPAIR TO GROUP R-3 OCCUPANCY EXCEEDS $1',000 CRC R315.22 CARBON MONOXIDE ALARMS ARE REQUIRED AT THE FOLLOWING LOCATIONS: t ; A. ON THE CEILING OR WALLS OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF BEDROOMS B. ON EACH STORY WITHIN A DWELLING UNIT, INCLUDING BASEMENTS. C. THE CARBON MONOXIDE AtiARMS SHALL BE LISTED AS COMPLYING WITH THE REQUIREMENTS OF UL 2034. CARBON r MONOXIDE DETECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THIS CODE, THE CURRENT EDITION OF NFPA 720 r� "STANDARD FOR THE INSTALLATION OF CARBON MONOXIDE (CO) DETECTION AND WARNING EQUIPMENT" AND THE MANUFACTURER'S y INSTALLATION INSTRUCTIONS PER 2016 CRC SECTION R315.2.2. r� gel f1, Vicinity Map: .I Aerial: ' Sheet List Table • t: Sheet Title • 1 Title Page 2 Site Plan 2.1 Mounting Detail 2.2 Equipment Elevation 3 Sheet List Table Sheet Number Sheet Title • 1 Title Page 2 Site Plan 2.1 Mounting Detail 2.2 Equipment Elevation 3 Single Line Drawing 4 Module 4.1 Module Grounding 5 Inverter Enphase Micro -Inverter 5.1 Enphase Envoy -S 6 Mounting Type' 6.1 Racking Type 7 Engineering 8 Labels 9 As -Built Date: July 21, 2017 PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 190° U. � Urn U 0�UWo H • �00Ea� U' U01) -> O '> No. Revision/Issue Date Date: July 21, 2017 Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461 . RNiedzwiecki@sunfinitysolar.com sunfinitysolar.com Title: TITLE PAGE Sheet: 00 C` C) 1 J.MC ' , '. ._ } _ � " f •�1; ,1 ' . .: •tee •L' �.` � t DO a i I ti EXISTING'200�A MAIN PANEL _ '{'� •W ^ (L0CA ED ON UTILITY POLE) y � � � tel_ 'r • !^� - ` +_ � ! R�� _'' 11SN � Z..,� NEW Enphase M250-60-2LL-S22 MICRO INVERTERS [ I PER MODULE (MOUNTED UNDER MODULE)] NEW 56 Hyundai HIS-S280RG MODULES ATTACHED TO IronRidge XR-1000 RAILS s NEW SUB PANEL & MONITOR BOX W/ ENVOY -S �s� �. Date: July 21, 2017 Scale: 1" = 10' Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: SITE PLAN Sheet: PROJECT INFO ON^^00 Enphase Cn c, Stringing: 14, 14, 14 Q U � Q a. p ®'o`m U v] 01 � � M U w Date: July 21, 2017 Scale: 1" = 10' Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: SITE PLAN Sheet: PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 190° U w Q A x � Oo Z H Udo 0 °.�°UVo N � 00 No. Revision/Issue Date Date: July 21, 2017 Scale: 1" = 10' Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: SITE PLAN Sheet: MODULE 10 & 20° MODULE PROFILE SCALE: NTS ROOF TYPE: I -STORY, COMPOSITION SHINGLE TRUSS SYSTEM: RAFTER SIZE: 2 X 4 RAFTER SPACING: 24" O.C. UNSUPPORTED SPAN: 8' L -FOOT SYSTEM: ARRAY WEIGHT: 2731 LBS. LBS PER SQUARE FOOT: 2.77 LBS PER RACKING FOOT: 37.72 r MOUNTING HARDWARE RAFTER & SHEATHING .FLASHING PLYWOOD SHEATHING. --J . 5/16" X 3-1/2" LAG BOLT W/ HOLE PRE -FILLED WITH SEALANT „ 12' MAX SPAN PER MNFR 3' MIN FIRE SETBACK Y r L -FOOT 2.5 MIN RAFTER MOUNTING` DETAIL' SCALE: NTS NOTES: 1. Standoff locations on plans are not exact. Locations are subject to field verification and are per manufacturers specifications.. —7 2 X 4 RAFTER @ 24" O.C. 0 ANCHOR I., I I I _— �1�. I— 00 a yIn on =3 a C.0 ®. UmUX 7) M A O_ CA CnC f� �N�?U Date: July 20, 2017 Scale: V — 4' I I I I I I I I I I I I I I Drawn By: RNiedzwiecki I IX,I I I I• I I I' I I I I Office 1-844-786-3461 _ — RNiediwiecki@sunfinitysolar.com Title: MOUNTING DETAIL Dr Sheet: IL 1 PLAN VIEW III m� � o PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14; 14 Azimuth(s): 190', U - A � � Woo H f� Z o O U. W o � 0 -'o Q� U 0 -4 v� GQkn�O� iNo.1 Revision/Issue Date Date: July 20, 2017 Scale: V — 4' I I I I I I I I I I I I I I Drawn By: RNiedzwiecki I IX,I I I I• I I I' I I I I Office 1-844-786-3461 _ — RNiediwiecki@sunfinitysolar.com Title: MOUNTING DETAIL Dr Sheet: IL 1 PLAN VIEW III m� � o t Date: July 21, 2012 'Scale: F = 2'' Drawn By: RNiedzwiecki Office1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: EQUIPMENT ELEVATION Sheet: 2 • PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 190° � Q A x ° kn z, O 00 F-4 � 4UU,No F.y W,[ a Q� o o w/ C) jNo.j Revision/Issue I Date. t Date: July 21, 2012 'Scale: F = 2'' Drawn By: RNiedzwiecki Office1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: EQUIPMENT ELEVATION Sheet: 2 • 9 Notes: 1 • This system meets the requirements of NEC 690.35 and is exempt / 2 Photovoltaic system ground will be tied into existing ground at main Electrode Conductor shall not be smaller then the largest conductor surn the System Y grounding requirements of NEC 690.41 S 3 The DC conductors are not bonded to service from D 4 C Disconnect/ as per NEC System Grounding. NEC 690.43(C) Structure as Equipmentground and the micro -inverters pphed b the system and not smaller. than #8AW Y y P Sec. 250.166 (B). "The Grounding 5• The devices listed and identified for Gro riding 's ('f applicable) o not require a GEC. C'' g Conductor allows fore equipment -(if he devices li and modules if e d forbondrou the ackin equipment ma 9 pment to be used as o e BGC in a Manufacture's Cable and is used to maybe stand-alone grounding Photovoltaic system. 6. Equipment operating I50 volts d greater shall only g with listed and approved g c°mPonents or UL -2703 listed mounting ground the other photovoltaics Founding components, the EGC or an enclosure which require use of tools to open. system components. hardware. Microinverters provided to th_e microinverters through the 7 y be serviced or replaced by qualified personnel. Field protection ma Solar Photovoltaic 8• Local utility System equipment'will be installed in accordance with the requirements of An. 9 NO ty provider shall be notified Y be in the form of conduit, closed cabinet sheet metal or tech screws shall be used to ground disconnect enclosure with tin- lat Prior to use and activation of any solar 10• All solar modules, equipment, photovoltaic installation0 of the 2014 NEC. 11 • PV modules Cannot be installed over or block an 9 pment, and metallic components are to be 12• grounded in accordancedaluminum w with code ndgs. the m per grounding/bar Wiring must be e Y attic vents, 13 PV Permanently and completely held off of the roof surface vents, fir g/bar kits must be used. breaker shall be installed o anufacturer's installation instructions. Opposite end of the buss bar from mace or water heater vents etc. 14. NEC 705.12(D)(3)(a)g�(b) the sum of 125% of total inverterout output c per NEC 110.2, 110.3 the Main Breaker per NEC 705.12(D)(2) )10.3(B) & 300.4 Circuit ifl _ YA P un'ent plus the MOCPD of the busbar shall not exceed the am aci P ty of the bulbar. MAXIMUM OF 16 MODULES IN THIS STRING TOTAL MODULES IN THIS + STRING 14. — ®®�� + CIRCUIT #1 #14 s #2 CIRCUIT #4 (CIRCUIT #2 IS IDENTIC TO CIRCUIT #2 AL TO CIRCUIT #1) (CIRCUIT #3 IS IDENTICAL TO TO CIRCUIT #3 CIRCUIT #1) MAXIMUM OF 16 MODULES IN THIS STRING. TOTAL MODULES IN THIS STRING 14. �-- #14 TERMINATION CAP, Typ (INSTALL AT END OF STRING) #2 ENPHASE ENGAGE CABLE WITH: BLACK - L I, RED - L2, WHITE - NEUTRAL, GREEN - GND Size AWG 60°C or kcmil OfConductors ** UOPPER - - -)-u 90°C **10 20 25 30 ALUMINUM r 30 35 40 1S 20 25 <g 40. SO 30 30 35 4 70 65 75 55 40 50 45 t 85 95 55 . 3 85 100 115 55 65 75 2 95115 130 75 75 85 **REFER TO 240.4(D) 90 100 PER NEC 690.12, EN13HASE SYSTEMS ARE EQUIPPED WITH RAPID SHUTDOWN ANI' ADDITION WN WITHOUT TECHNICAL BRIEF SU P EQUIPMENT. SEE Existin Sub Panel S ecificanons: ME1vTAI DOCUMENT. BUSS Size: MOCPD Size: 225 A 200 A Sub Panelboard S BUSS Size: � ecs: I Micro -Inverter Breaker Size: 200 A # ofMods X I =IMP (4) 20 A MSP S ecifications. 56 X 1.25 = ISC 56 AI Manufacturer: G.E. WITH JUNCTION BOX 70 A BUSS Size: I MOCPD Size; 200 A Sub Feeder Size: NONE IRREVERSIBLE . GROUND SPLICE I 200 A LOCATED ON ROOF ENVOY I ICOMMUNICATION I L -_j #1 '20A 5A 20A ?OA 70A �„ 2ooA, 20A I s CONDUIT TYPE; EMT + + - CONDUIT SIZE: I,, CONDUCTOR TYPE: THHN/THWN_2 ® i CONDUCTOR SIZE: #10 € EXISTING 2/O AWG # OF CONDUCTORS: 4 - RED 4 _ BLK f CONDUCTORS & #4 AWG GROUND 1 - #8 WHT,1 -GRN i CONDUIT TYPE: EMT CONDUCTOR TYPE: THHN/TH; EXISTING GEC GROUND UND SYS7 # OF CONDUCTORS: I _CONDUCTOR SIZE: #6 RED, 1 - BL K, I - WHT, 1 -GRN Size AWG or kcmil . I10 8 6 4 3 2 L_PROJECTINFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Slinging: 14, 14, 14 Azimuth(s): 1900 i W z W A A W� z Hyo O 6� 6. O � 06 (S °°E-'a� U 00 N C)&Aoz Revision/Issue Date Date' July 21, 201 Scale: NTS Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzw4ecki@sun finitysolar.com SINGLE LINE DRAWING t 3 N t f �, t n 0 HyunuaT :�)(Maff Hyundai Heavy Industries was founded in 1972 and is a Fortune 500 company. The company employs more than 48,000 people, and has a global leading 7 business divisions with sales of 51.3 Billion USD in 2013. As one of our core businesses of the company, Hyundai Heavy Industries is committed to develop and invest heavily in the field of renewable energy. Hyundai Solar is the largest and the longest standing PV cell and module manufacturer in South Korea. We have 600 MW of module production capacity and provide high-quality solar PV products to more than 3,000 customers worldwide. We strive to achieve one of the most efficient PV modules by establishing an R&D laboratory and investing more than 20 Million USD on innovative technologies. PERL Multi -crystalline Type HiS-M265RG 1 HiS-M270RG HiS-M275RG RG -Series Mono-crystallineType HiS-S280RG , HiS=S285RG I HiS-5290RG Mechanical Characteristics 0 Several models are under certification process. 998 mm (39.29")(W) x 1,640 mm (64.57")(L) x 35 mm (138")(H) Approx.18.7 kg (41.2 Ibs) ^ 60 -cells in series (6 x10 matrix) with _PERL technology (Hyundai cell, Made in Korea) ,, _ t 4 mm' (12AWG) cables with polarized weatherproof connectors _ _ . IEC certified (UL listed), Length 1.0 m (39.4') _ IP67, weatherproof, IEC certified (UL listed) 3 bypass diodes to prevent power decrease by partial she i Front: Anti -reflective coating low -iron tempered glass, 3.2 mm (0.126') u- Encapsulant:EVA Back Sheet: Weatherproof film T iw��M® Clear anodized aluminum alloy type 6063 (Black) tmww.hhi-green.com/solar/en a ra High Quality - um N ��®��® ®® IEC61215 (Ed.2) and IEC 61730 byVDE UL listed (UL r tolerance 1 for Class A Fire Rating - Oman ®® •Output power tolerance +3/-0 % • I50 9001:2000, ISO 14001:2004 and ISO 50001:2011 Certified �®�®�® ® . OHSAS 180012007 Certified Advanced Mechanical Test (8,000 Pa Passed (IEC) / Mechanical Load Test (401bs/ft2) Passed (UL) M um Ammonia Corrosion Resistance Test Passed • IEC 61701 (Salt Mist Corrosion Test) Passed ' Limited Warranty 1st year. 97 •After 2nd year: 0.7 %arinual degradation 80 %for 25 years Please refer to the Hyundai Limited Warranty for more details. 3K Important Notice on Warranty The warranties apply only to the PV modules with Hyundai Heavy Industries Co, Ltd.'s logo (shown below) and product serial number on it. ' Electrical Characteristics N VCY�E `C-� %� Enphase AHYUN®AI Multi -crystalline Type Sales & Marketing Hyundai Bldg., 75,Yulgok•ro,longno•gu, Seoul 03058, Korea MODULE U W ° O � M INDUSTRIES FSC a � . r0 103 o Nominal output (Pmpp) W 265 270 _ 275 Voltage atPmax (Vmpp) V_ _ 31_3 ~� 31.4 F -0o _ x_31.5 Current at Pmax (Impp) A 8.5 8.6 8.7� ! Open circuit voltage (Voc) V i91 _ 38.2 Short circuit current (Isd A - 9.2 Y� I 9.3- CO_utputtolerance % ' +3/-0 - - No. of cells & connections PCs - 60 in series 6" Multi -crystalline silicon with PERL technology (Hyundai j Cell type cell, Made in Korea)- 16.2 16-5 • Module efficiency 45 16.8 - CTe_mperaturecoefficient of_P_mpp 95/K _ -0.41 .� -0.41 - _ - -0.41__ -0.32 --0.32 Temperature coefficient of Voc %/K -0.32_ I Temperature coeffidient of Isc %/K 0.039 , . - -- 0.039. Y �- 0.039 MAII data at STC (Standard Test Conditions). Above data may be changed without prior notice. - - - Mono -crystalline Type 4- MR- • 1 Nominal output (Pmpp) W 280 285 290 F Voltage at P_maz (Vmpp) V - _ _ -_ 31.7 y 32.0 - -it .8 8.9 Current at Pmax (Impp) A • 8.8 9.1 I Open circuit voltage (Voc) V _ - 38.5 _ _ _ 38.7 TM aM" _ ____38.8, 9.4 9.5 _ ' Short circuit current (Isc) A 9.7 Y- Output tolerance +3/-0 _ _ 60 in series No. of cells & connections pcs _ Cell type^N6"Mono-crystalline silicon with .PERIL technology (Hyundai cell, Made in Korea)_ Module efficiency % 17.1 17.4 _ 17.7 _ /KTem-_� 4 -0 _4fi _ 0� Temperature coefficient of Voc %/K -0.30 -0.30 -0.30 perare coefficient of Isc _ { Temtu - %/K. ^- --�. 0.047_ 0.047 0.047 _--_71 t�tAll data at STC (Standard Test Conditions). Above data may be changed without prior notice. ' Module Diagram I (unit: mm, inch) I IN Curves 10 1 V 1 - $C \ 3 -arc 6x0]{II 03i -65C R Hous tB 1.1 1+1 DETAILA . 139371 X211 B0I YOT THR3 1 Im CABlt6 6 CABItb - eagelvl • � o o"rr,3tw vo GRWNDMAW( DETARB 4x012 •,8 0.]17 O1QINDHOIt .1 , l °-BOOW/M b ' 954137S61 � � . 1 S -400 WAN 60 QAI 1 ' c 3s3ros6n gcnoNc-c 01 n m 3s m u • +s so vdugeivt IInstallation Safety Guide e,. • 46ct2` wl 1 Only qualified personnel should install or perform maintenance. e .A. -40- 85•C Be aware of dangerous high DC voltage. DC 1,000V (IEC) Do not damage or scratch the rear surface of the module., DC 600_ V (UL) y Do not handle or install modules when they are wet. 15A ( Primed Date: December 20151 +�DVE N VCY�E `C-� %� Enphase AHYUN®AI ,►R1,ted Fcertid �mwre43bwoe Sales & Marketing Hyundai Bldg., 75,Yulgok•ro,longno•gu, Seoul 03058, Korea MODULE U W ° O � M INDUSTRIES FSC Tel: +82-2-746-4671, 7635, 8556 Fax:+82-2-746-7675 A HYUN®AI HEAVY INDUSTRIES _ t L Date: July 19, 2017 N 56 Hyundai HIS-S280RG Enphase 00 Stringing: 14, 14, 14 Azimuth(s): 190° MODULE U W ° O � M - C/5_ 401 M C C W r0 103 o Date: July 19, 2017 PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 190° MODULE - �W F -i W Q z �Oct F,Uo U F -0o op(-.4aN C/3 r-••1 �I UN oo O No. Revision/Issue Date Date: July 19, 2017 Scale: None Drawn By: - RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunftnitysolar.com Title: MODULE Sheet: r /rte IRONRIDGE - - - Integrated Grounding System Simplified Grounding 1117111:1 For Greater Safety & Lower Cost 01 Traditionally, solar modules are grounded by attaching lugs; bolts or clips to the module frame, then connecting these to a copper conductor that runs throughout the - r array. This process adds time and cost to the installation, ; - and often results in improper grounding, creating - significant long-term safety risks. _ The IronRidge Integrated Grounding System solves these = challenges by bonding modules directly to the mounting _ rails. This approach eliminates separate module F ' grounding Parqware, and it creates many parallel U grounding paths throughout the array, providing - greater safety for system owners. Grounding Mid Clamp ; Each Grounding Mid Clamp pierces through the w anodized coatings of both the module frame and the mounting rail to form secure electrical bonds, which are repeated throughout the array. - ,t 3 2 - 56 Hyundai HIS-S28ORG Grounding Strap // n Grounding Straps are used to 1900' bond rail -to -rail connections., 1 They are only required on the rail with the grounding lug.-. 3 Installation Overview t aInstall Roof Attachments p • Install appropriate roof flashing and/or standoff for roof type. • Attach L -Feet to flashing or standoff. ® Prepare Rail Connections / ' • Insert splice into first rail, then secure with Grounding Strap and z a self -drilling screw. Q• • Slide second rail over splice; then secure with opposite end of \� Grounding Strap and self -drilling screw. Mount & Ground Rails • Attach rails to L -Feet and level rails. • Install one Grounding Lug per row of modules. • Connect Grounding 9 grounding Lu to roundin conductor. , Install Modules & Clamps • Install first module using End Clamps and Grounding Mid Clamps. • Install additional modules using Grounding Mid. Clamps. Finish row with a second pair of End Clamps. Testing &- Certification The IronRidge Integrated Grounding System has been tested and certified to UL 2703 by Intertek Group plc. UL 2703 is a proposed UL standard for evaluating solar module mounting and clamping devices. It ensures these devices will maintain strong electrical and mechanical connections over an extended period of time in extreme outdoor environments. The testing process closely mirrors that of UL 1703, the solar module testing standard, including temperature and humidity cycling, electrical and mechanical load testing, and manufacturing quality reviews. rel Module Frame Compatibility Dimension Range A 31.Omm - 51.0mm A B 5.08mm (minimum) LAny module frames whose parameters are not listed in the provided table have not been tested for compatibility. Lj The Grounding Clamp has proven robust in grounding 60 -cell and 72 -cell solar module frames with box construction and a range of anodization thicknesses. All solar modules listed to UL 1703 and with frame construction within the parameters stated above are compatible with the IronRidge Integrated Grounding System. QGo to ironridge.com/ig 00 X. ado^ 6Z a a a C "tea X O ®. 0 W O � � M � � C O� E „ '• C O ' O It \ C = "4 � V PROJECT INFO 56 Hyundai HIS-S28ORG Enphase M250-60-2LL-S22 // Grounding Lug 1900' A single Grounding Lug 1 connects an entire row of PV modules to the grounding conductor. Installation Overview t aInstall Roof Attachments p • Install appropriate roof flashing and/or standoff for roof type. • Attach L -Feet to flashing or standoff. ® Prepare Rail Connections / ' • Insert splice into first rail, then secure with Grounding Strap and z a self -drilling screw. Q• • Slide second rail over splice; then secure with opposite end of \� Grounding Strap and self -drilling screw. Mount & Ground Rails • Attach rails to L -Feet and level rails. • Install one Grounding Lug per row of modules. • Connect Grounding 9 grounding Lu to roundin conductor. , Install Modules & Clamps • Install first module using End Clamps and Grounding Mid Clamps. • Install additional modules using Grounding Mid. Clamps. Finish row with a second pair of End Clamps. Testing &- Certification The IronRidge Integrated Grounding System has been tested and certified to UL 2703 by Intertek Group plc. UL 2703 is a proposed UL standard for evaluating solar module mounting and clamping devices. It ensures these devices will maintain strong electrical and mechanical connections over an extended period of time in extreme outdoor environments. The testing process closely mirrors that of UL 1703, the solar module testing standard, including temperature and humidity cycling, electrical and mechanical load testing, and manufacturing quality reviews. rel Module Frame Compatibility Dimension Range A 31.Omm - 51.0mm A B 5.08mm (minimum) LAny module frames whose parameters are not listed in the provided table have not been tested for compatibility. Lj The Grounding Clamp has proven robust in grounding 60 -cell and 72 -cell solar module frames with box construction and a range of anodization thicknesses. All solar modules listed to UL 1703 and with frame construction within the parameters stated above are compatible with the IronRidge Integrated Grounding System. QGo to ironridge.com/ig 00 X. ado^ 6Z a a a C "tea X O ®. 0 W O � � M � � C O� E „ '• C O ' O It \ C = "4 � V Date: July 19, 2017 PROJECT INFO 56 Hyundai HIS-S28ORG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 1900' MODULE GROUNDING Sheet: _ ILI fil A A x O O W Z H U d o 0 �°.4U od 00 F-4Cq N Utrlj ^QOo ooz No. Revision/Issue Date Date: July 19, 2017 Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: MODULE GROUNDING Sheet: y Data Sheet Enphase Microinverters Enphase The versatile Enphase M250 Microinverter' performs M250 -in both residential and commercial solar PV installations and is compatible with both 60 -cell and 72 -cell modules. With its all -AC approach and integrated grounding, the M250 delivers increased energy harvest and reduces design and installation complexity. The Enphase M250 Microinverter integrates seamlessly with the Enphase Engage" Cable, the Enphase Envoy" communications gateway, and Enphase Enlighten'" monitoring and analysis software. U` To learn more about Enphase offerings, visit enphase.com Productive Designed for a wide range of modules Maximizes energy production Minimizes impact of shading, dust, and debris Simple No DC design or string calculation required No GEC needed for microinverter Easy installation with Engage cable Reliable 4th -generation product More than 1, million hours of testing and millions of units shipped Industry-leading warranty, up to 25 years ENPHASE. To learn more about Enphase offerings, visit enphase.com © 2017 Enphase Energy. All rights reserved. All trademarks or brands used are the property of Enphase Energy, Inc.\ - ENPHASE. 2017-01-19 N �p 00 ¢V,�� • � U R ¢ X rn� crn r U c E c 0 o c p. Aa y�CU �o .a Enphase M250 Microinverter 56 Hyundai HIS-S280RG Enphase INPUT DATA (DC) MODELS: MODELS: Stringing: 14, 14, 14 M250-60-2LL-S22, M250-72-2LL-S22, M250-60-2LL-S25 M250-72-2LL-S25 rW V Commonly used module pairings' 210 - 350+ W 210 - 350+ W Compatibility 60 -cell PV modules 60 -cell and 72 -cell PV modules - Maximum input OC voltage 48V 62 V A Peak power tracking voltage 27 V - 39 V 27 V - 48 V Operating range 16V -48V 16 V - 60V ' Min/Max start voltage 22V/48V 22 V / 48 V Max DC short circuit current 15 A. 15A OUTPUT DATA (AC) Peak output power 250.W Maximum continuous output power 240 W I Nominal output current 1.15 A @ 208 VAC 1,0 A @ 240 VAC [--I Nominal voltage/range 208 V / 183-229 V @208 VAC V1 240 V / 211-264 V @ 240 VAC Nominal frequency/range 60.0 / 57-61 Hz Extended frequency range 57-62.5 Hz Power factor 4.95 Maximum units per 20 A branch circuit 24 (three-phase 208 VAC) jNo.j 16 (single phase 240 VAC) Maximum output fault current 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency 96.5% Peak inverter efficiency 96.5' Static MPPT efficiency (weighted, reference EN50530) 99.4% Night time power consumption 65 mW max MECHANICAL DATA Ambient temperature range 40°C to +65°C Dimensions (WxHxD) 171 mm x 173 mm x 30 mm (without mounting bracket) Weight 1.6 kg (1416s) Cooling Natural convection - No fans Enclosure environmental rating Outdoor- NEMA 6 Connector type MC4: M250-60-2LL-S22 and M250-72-2LL-S22 Amphenol H4: M250 -60 -21_L -S25 and M250-72-2LL-S25 FEATURES, ' Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 690.35. Equipment ground is provided in the Engage Cable. No additional GEC or ground is required. Ground fault protection (GFP) is integrated into the microinverter. Monitoring Enlighten Manager and MyEnlighten monitoring options Transformer design High frequency transformers, galvanically isolated Compliance UL 2703 recognized, 1.16741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 NO. 0-M91 0.4-04, and 107.1-01 + This product is UL Listed as. PV Rapid Shut Down Equipment and conforms I with NEC -2014 and NEC -2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, foi AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at enphase.com/en-us/support/module-compatibility. 2. Frequency ranges can be extended beyond nominal if required by the utility. To learn more about Enphase offerings, visit enphase.com © 2017 Enphase Energy. All rights reserved. All trademarks or brands used are the property of Enphase Energy, Inc.\ - ENPHASE. 2017-01-19 N �p 00 ¢V,�� • � U R ¢ X rn� crn r U c E c 0 o c p. Aa y�CU �o .a Date: July 19, 2017 - Scale: NTS Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: INVERTER ENPHASE MICRO -INVERTER Sheet: 5 PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 190° rW V Q A x �NUVo 00 W o 00 F -.t W W C,4U��>o a [--I V1 GQ "c� O d jNo.j Revision/Issue Date Date: July 19, 2017 - Scale: NTS Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: INVERTER ENPHASE MICRO -INVERTER Sheet: 5 Enphase Envoy -S Enphase Envoy -S Series �e enphase • �. E' N E R 6 Y i The Enphase Envoy -ST" communications gateway delivers solar production and energy consumption data to Enphase Enlighten- monitoring and analysis software for comprehensive, remote maintenance and management of the Enphase Microinverter System. With revenue grade production metering and consumption monitoring options, Envoy -S is the platform for total energy management and integrates with the Enphase AC BatteryTM SMART - Enables web -based monitoring and control - Bidirectional communications for remote upgrade [e] enphase® E N E R G Y j SIMPLE - Easy system configuration using Installer Toolkit mobile app - Flexible networking with Wi-Fi, Ethernet, or cellular RELIABLE Designed for installation indoors or outdoors - Five-year warranty U� LISTED To learn more about Enphase Microinverter technology, a 1 enphase® visit enphase.com E N E R G Y ® 2015 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. 12/12/2015 Date: July 21, 2017 Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: ENPHASE ENVOY -S Sheet: 5.1 .,.�. 'U .�.. p . Q U Q x `m U u] o 3 n Cn N M E c E o N U Enphase Envoy -S // DATA MODEL NUMBERS Enphase Envoy -S StandardT^' Enphase Envoy -S communications gateway with basic PV production monitoring (+/- 5%). � J ENV -S -AB -120-A Enphase Envoy -S Metered'"' Enphase Envoy -S communications gateway with integrated revenue grade PV production ENV -S -AMI -120 - metering (ANSI C12.20 +/- 0.5%) and optional consumption monitoring (+/- 2.5%). ACCESSORIES (Order Separately) PROJECT INFO I Enphase Mobile ConnectT" Plug and play industrial grade cellular modem with five-year data plan for systems up to CELLMODEM-01 • '60 microinverters. (Available in the U.S, Canada, Mexico, Puerto Rico, and the US Virgin 56 Hyundai HIS-S280RG I - _ Islands, where there is adequate"cellular service in the installation area) Enphase M250-60-2LL-S22 Consumption Monitoring CT For use with ENV -S -AMI 120, split -core current transformers enable whole home consump- Stringing: 14, 14, 14 CT -200 -SPLIT tion metering (+/- 2.5%) Azimuth(s): 190° . POWER REQUIREMENTS Cord connected 120 VAC, 60 Hz (ENV-S=AB-120-A) Max 15 A overcurrent protection required - HaldwheJ i2u'Jr+rl, OU 11L (GIVV°J HO=ILU=H) 120/240 VAC split -phase (ENV -S -AMI -120) Max 15 A overcurrent protection required CAPACITY r , W I Number of microinverters polled Up to 600 W Q Z E -i O W p z (71, o V O00 F-4 I O ^y U O N U N OO W O I �I � 00 (--j a ' N U ONO > O o 0 0 0 z MECHANICAL DATA _ Dimensions (wxHxD) 21.3 x 12.6 x 4.5 cm (8.4" x 5" x 1.8") Weight 176 oz (498 g) Ambient temperature range -40° to 65° C (-40° to 149° F) =40° to 46° C (-40" to 115" F) if installed in an enclosure Environmental rating IP30. For installation indoors or in an NRTL-certified, NEMA type 3R enclosure. }, Altitude To 2000 meters "(6,560 feet)- INTERNET CONNECTION OPTIONS Integrate_d_W_i-Fi 802.11b/g/n Ethernet 1 802.3, CatSE (or Cat 6) UTP Ethernet cable (not included) Cellular -� ,�. Optional, CELLMODEM-01 (not included) V COMPLIANCE M P -I �N 1 Compliance. UL 916 - CAN/CSA C22.2 No. 61010-1 47 CFR, Part 15, Class B, ICES 003 IEC/EN 61010-1:2010,' EN50065-1, EN61000-4-5, EN61000-6-1, EN61000-672 Metering: ANSI C12.20 accuracy class 0.5 (ENV-S-AM1-120) No. Revision/Issue Date To learn more about Enphase Microinverter technology, a 1 enphase® visit enphase.com E N E R G Y ® 2015 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. 12/12/2015 Date: July 21, 2017 Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: ENPHASE ENVOY -S Sheet: 5.1 //d IRONRIDGE The Strongest Attachment in Solar FlashFoot2 'Installation Features O' i; A 1 Alignment Markers IronRidge FlashFoot2 raises the bar in solar roof protection. The unique water seal design is both Quickly align the flashing with chalk lines to find pilot holes. elevated and encapsulated, delivering redundant layers of protection against water intrusion. In addition, the twist -on Cap perfectly aligns the rail attachment with the lag bolt to maximize mechanical strength. _ I t }'. 0 Rounded Corners • / w r I Makes it easier to handle and insert under the roof shin Inc IIIIIIIII Twist -On Cap ' FlashFoot2's unique Cap design encapsi the lag bolt and locks into place with a sir twist The Cap helps FlashFoot2 deliver superior structural strength, by aligning the rail and lag bolt in a concentric load path. it st,w Single Socket Size A custom -design lag bolt allows you to install FlashFoot2 with the same 7/16" socket size used on other Flush Mount VVV System components. jazn Reinforcement Ribs Help to stiffen the flashing and prevent any bending or r crinkling during installation. 'Three -Tier Water Seal I k� 19• FlashFoot2's seal architecture utilizes three layers of protection. An elevated platform — diverts water away, while a stack of rugged • I . .--- — ' r• components raises the seal an entire inch. The seal is then fully-encapuslated by the ` Cap. FfashFoot2 is the first solar attachment to pass the TAS -100 Wind -Driven Rain Test. ' - - Benefits of Concentric Loading uoo,' Traditional solar attachments have a ,000 j- - : ' • `i r ` . r -800 - - -r • horizontal offset between the rail and lag t FtashFot_ Lead`ng Competitor t bolt, which Introduces leverage on the lag ;� 60or---- .— ,- - - -- �`� f bolt and decreases uplift capacity._ U _ 400 Y Lo -Cost Competitor _ `.. .. — . FlashFoot2 is the only product to align the 200 L-- - --- -- y - . rail and lag bolt. This concentric loading x design results in a stronger attachment for o i - 2. 3 the system.: Rail -to -Lag Offset (in) Testing & Certification `. Structural Certification Desi ned and Certified for Compliance with the International Building Code & ASCE/SEI-7. Water -Shedding Design An elevated platform diverts water _,... away from the water seal. Water. Seal Ratings Water Sealing Tested to UL 441 Section 27 "Rain Test" and TAS 100-95 "Wind Driven Rain Test" by Intertek. Ratings applicable for composition shingle roofs having slopes between 2:12 and 12:12. UL 2703 ' Conforms to UL 2703 Mechanical and Bonding Requirements. See Flush Mount Install Manual for full ratings. a O`er M U rn U p ® A U i opo rn _ a a. O A O O 3k O N U v `a Date: July 19, 2017 Scale: None Drawn By: ; RNiedzwiecki Office 1-844-786-3461 RNi edzwiecki @sun finitysol ar.com Title: MOUNTING TYPE, Sheet: -• PROJECT INFO _ 56 Hyundai HIS-S280RG • . Enphase M250-60-2LL-S22 Stringing: 14,• 14; `14 Azimuth(s) 1900 U _ a� ,,O • Uro �o O' � UU� 00 kr) 00 F-1 O U 00 �Q�o 00 O , C0o V� No. Revision/Issue Date Date: July 19, 2017 Scale: None Drawn By: ; RNiedzwiecki Office 1-844-786-3461 RNi edzwiecki @sun finitysol ar.com Title: MOUNTING TYPE, Sheet: -• y t %fid IRONRIDGE Roof MountS' stem XR Rails XR10 Rail XR100 Rail XR1000 Rail Internal Splices ii u ' 4. .'� - ^ aka J, Built for solar's toughest roofs. IronRidge builds the strongest roof mounting system in solar. Every component has been tested to the limit and proven in extreme environments. Our rigorous approach has led to unique structural features, such as curved rails and reinforced flashings and is also why our products are fully certified, code compliant and backed by a 20 -year warranty.. Strength Tested PE Certified /LLF�1 All components evaluated for superior Pre -stamped engineering letters structural performance. available in most states. Class A Fire Rating Design Software A low -profile mounting rail The ultimate residential A heavyweight mounting All rails use internal splices for regions with light snow. solar mounting rail. rail for commercial projects. for seamless connections. • 6'spanning capability 8'spanning capability 12'spanning capability Self -tapping screws - • Moderate load capability Heavy load capability Extreme load capability Varying versions for rails • Clear anodized finish Clear & black anod. finish Clear anodized finish - Grounding Straps offered Attachments FlashFoot Slotted L -Feet Standoffs -Tilt Legs Anchor, flash, and mount Drop-in design for rapid rail Raise flush or tilted Tilt assembly to desired with all -in -one attachments. attachment. systems to various heights. angle, up to 45 degrees. • Ships with all hardware High -friction serrated face Works with vent flashing • Attaches directly to rail • IBC & IRC compliant Heavy-duty profile shape Ships pre -assembled Ships with all hardware • Certified with XR Rails Clear & black anod. finish Lengths from 3" to 9" Fixed and adjustable Clamps & Grounding •End Clamps Grounding Mid Clamps @ T Bok Grounding Lugs @ Accessories Slide in clamps and secure Attach and ground modules Ground system using the Provide a finished and modules at ends of rails. in the middle of the rail. rail's top slot. organized look for rails. • Mill finish & black anod. Parallel bonding T -bolt Easy top -slot mounting Snap -in Wire Clips • Sizes from 1.22" to 2.3" Reusable up to 10 times Eliminates pre -drilling Perfected End Caps • O t' IU d CI M'll&bl k p lona n er amps i ac stainless Swivels in any direction VV -protected polymer ,► , Certified to maintain the fire resistance ® Online tool generates a complete bill of 3 rating of the existing roof. materials in minutes. Free Resources 0 Design Assistant 10. A 4 NABCEP Certified Training Integrated Grounding 20 Year Warranty Go from rough layout to fully W Earn free continuing education credits, _ ..._.' i 'engineered system. For free. a J6 while learning more about our systems. UL 2703 system eliminates separate O Twice the protection offered by -''. �' Go to IronRidge.com/rm 0. Go to IronRidge.com/training module grounding components. competitors. r� Notes: 1. Rails shall be no more than 14" from the edge of the modules when in landscape. 2. Rails shall be no more than 16" from the edge of the modules when in portrait. Date: July 19, 2017 ' PROJECT INFO - '. Enphase M250-60-2LL-S22 00 s U N C �.. UU oma. u • .7. N M• 3k C Ri � N � U � Date: July 19, 2017 ' PROJECT INFO - 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 1900 RACKING TYPE Sheet: 6.1 • � •z hyo kn W Z L U°�� H o O a 00 U 4U V ^N. N 00 W o 00M W Q� UoNo�>�' a/ ooQoz w�.orxa. V1 M .�rl O No. Revision/Issue Date Date: July 19, 2017 ' Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461' ' RNiedzwiecki@sunfinitysolar.com Title: RACKING TYPE Sheet: 6.1 • , E 1` SN/to ri i ng 1�i ad 15o.n. tofq ulst, 'I fI'r.: ::onsufting-StrucIur5') and Fnrcasi Enginacrs �-'? 9 :/� P7— 5224 South 39"' Street, Phoenix, Aftona 95040 to]: (602) 4a&2500 fnx: (02) 435-2505 RDC#291316 www.smlangxam IronRidge ]February 17, 2017 1495 Zephyr Ave Page 1 of 20 Haymard, CA' -943" Am Mr. David F. Taggart, Vice President Pro&ots Subject. IronRidge XR1000 Rail, Roof Flush Mounting Syutem. — Structural Anabsis Daae Sir, We ba% -o analyzed The tronRi ge XR1000 Rail 1br the subject solar_ module support *Ttem and determined that, for the con igumdons lmd criteria described below, it its in compliance with the applicable sections of the Wowing 1ieibrenoe Documents., Codes. ASCEISEI 7-10 Mia. Design Loads for Buildings & Other Structures California Building Code 201.6 Edition Other; AC42Ss Acceptance Criteria for Modular Framing Systeme Used to Support PV Modules, dated Efieotive November 1, 2012 by ICC -ES Aluminum Design Manual, 2015 Edition The IlronRidge X11000 Rail is an extruded aluminum section with an overall depth of 3.00 in, and a net alien of 0.607 sg.in. The rails amused to support solar modules, typically, an the roofof a building. See Exhibit 0012 — attached. The modules are clamped to the rails by the IronRidge Module Mounting Clamps as shorn in the attached Exhibit. The rails are attached to alimtinum. angle brackets that we either attached directly to tbs roof Ruing or attached to a stand that is screwed to the roof Taming. The Tails are mounted across the slope with a small clearance (Rush atttiunting) to The un, derlying Toof shutrare. The installed solar modules = st flea same slope as the underlying roof sti uture. All loads are tranArred to the roof framing ftougb The angle brackets by simple bimxigl flexure of the rails. The maximum span of the rails is governed by either the mid -span nextual stresses or tie deflection requirement that the nil not come into contact vdth the roof. The eft of aeisnoic loads (for all deaigo categories A -:F) have been determined to be Was than the ef&ct d>lae to eqind loads in all load conditions and combinations. 'Therefore, the trmimum allowable spans for common load cases am shwa in the tables below. Tables IA -9A are for modules with a maximwn long diatnension of 67.5 incites and Tableg IB -91S are for modules with a muxiatr um long dimension of 75.5 inches. Staining Mnfton lLoki;ilst, Inc. CDnWltiag SRUCtUffil and :FutMIC tElTaDWs IronRidge February 17, 2017 Mr. David F. Taggart Page 201of 20 IroriRiidge =00o Rail; Roof Rush Mounting Sjistein -- Struetural Analysis Notes — Tabulated values are based on the folloNVIng.criteria: 1. Building mean roof height - 30.ft Z. Risk Category 1 3. Solar 'niax.V) i in module long dimension is 67.5 inches for Tables 'l A -9A and 78,5 inches for Tables 'l B,9B. 4. Provide '2 yin. *clear between roof and rail 5. End'cantilever span (max) a 0.40 x maximum span (Lmaa) from above tables. See"Figure A 6. No rail splices in.outer 2/3. of end spans, or the middle 1/3 of interior spans based onthe installed attachment spacing (Li,istan): See Figure A 7. single simple span(s). Spans listed in the tables above may be multiplied by E08'for continuous rails of 3 or more spans. 8. Module Mounting Mid Clamps shall not.be installed less than 20 inches from Roof Zone 3 where wind speeds are marked Mth an # in Tables 3B and 6B: 9. Connection of the rail to'the:roof structure is the. responsibility of the end.user:of this letter. SML takes no liability for connections of the rail to the roof by others. rig re H L„, —Maximum attachment spacing provided in the tables above for the project design criteria L:.,. = Actual installed attachment spacing Indicates region of the rail where splice may be installed .Our analysis assumes that the rals,'iiicluding the connections acid associated hardware, are installed ih,a workmanlike manner in accordance with the "IronRidge Flush Mount'Installation Manual" by IronRidge and .generally accepted standards of construction practice. Additional inforniafion is available at the 'lronRidge website, lronRidge.com. Verification of PV Module capacity to support the loads associated with the even array -skull be the respotlsiblity of Tile CpnUactor p"r gwtiet and not IronRidge or Starling Ma&on Lofguist. The adequacy of the: supporting roof framing is to be determined by others: Please feel: free to contaci has art your convenience if you have any questions. 12espectfully,yours, al Tres Warner, PX, ' Design Division Manager Starlin. g Madison X.c►fquisti Inc, (4nSutting Structural and Forensicngineess _20. Date: July 21, 2017 Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: ENGINEERING Sheet: 7 PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Azimuth(s): 190° W U G� W Q A x Z �0�\o Wrn Z L 00�do I�0N0 Wo oo E-4 a fV U^Q>o C) Cn � 'r4 No. Revision/Issue j Date Date: July 21, 2017 Scale: None Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: ENGINEERING Sheet: 7 Solar Label i nl Requ i rementss � S ._ g Junction Box &.Conduit Raceways DC Disconnects Main Service Panel 4C Disconnects • .sml4mrmwar aa.Nan NEC 690.31(E)(3),(4) Wiring Methods, Direct -Current Photovoltaic Source NEC 690.5(C) Ground Fault Protection, labels and Markings and Output Circuits Inside a Building, Marking or Labeling Required A warning label shall appear on the utility -interactive inverter.or be applied by the Marking or Labeling Required. The following wiring methods and enclosures that contain installer near the ground -fault indicator at a visible location, stating the following: PV power source conductors shall be marked with the wording'Photovoltaic Power WARNING Source'by means of permanently affixed labels or other approved permanent marking: ELECTRIC SHOCK HAZARD 1. Exposed raceway, cable trays and other wiring methods IF A GROUND FAULT IS INDICATED, 2. Covers or enclosures of pull boxes and junction boxes - NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED 3. Conduit bodies in which any of the available conduit openings are unused When the photovoltaic system also has batteries, the same warning shall also be applied The labels or markings shall be visible after installation. Photovoltaic power circuit labels by the installer in a visible location at the batteries. shall appear on every section of the wiring system that is separated by enclosures, walls, ®I IBTS INTERPRETATION: A warning label shall be applied to the Inverter or near the partitions, ceilings or floors. Spacing between labels or markings, or between a label and ground fault indicator describing the hazard that would exist in the event of a a marking, shall not be more than 3 m (10 ft.). Labels required by this section shall be ground fault. . suitable for the environment where they are installed. ®I IBTS INTERPRETATION: This code is specific to DC circuits to be Identified as a Photovoltaic Power Source. This includes DC conduit, Junction Boxes, and NEC 690.14(c)(2) Additional Provisions Requirements for Disconnecting Combiner Boxes that are inside or connected to the building structure. Means, Markings Each photovoltaic system disconnecting means shall be permanently marked to identify it as a photovoltaic system disconnect NEC 690.35(F) Ungrounded Photovoltaic Power Systems IBTS INTERPRETATION: Required at any disconnecting means including AC The photovoltaic power source shall be labeled with the following warning at each Disconnect DC Disconnect, and Main Service Panel. Also required at Inverters with junction box, combiner box, disconnect and device where energized, ungrounded circuits - integrated disconnects and subpanels. This label should be applied directly to the may be exposed during service: component and does not apply to the "line of sight" provision. The DC or AC WARNING reference is not specifically required. - , ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS ' OF THE PHOTOVOLTAIC SYSTEM ARE - ' NEC 705.12 (0)(4) Point of Connection, Utility -Interactive Inverters, UNGROUNDED AND MAY BE ENERGIZED. Markings IBTS INTERPRETATION: This label should be installed for Ungrounded Photovoltaic Equipment containing overcurrent devices in circuits supplying power to a busbar or Systems on DC components where ungrounded circuits may be exposed during conductor supplied from multiple sources shall be marked to indicate the presence of ^ �( service. This includes thejunction box, combiner box, DC disconnect, and Inverter. all sources. re. .t IBTS INTERPRETATION: This label is required on the main service panel to 11 Identify that the panel is energized from multiple sources, the Utility and a NEC 690.17 Switch or Circuit Breaker �I Photovoltaic system. Label is also required on subpanels, fused AC disconnects, The disconnecting means for ungrounded conductors shall consist of manually operable. or any other component housing an overcurrent protective device: switch(es) or circuit breakers(s) complying with all of the following requirement - - - 1. Located where readily accessible 2. Externally operable without exposing the operator to contact with live parts 705Point of Connection, Inverter Output Connection Unlessss the (7) he panelboard is rated not less than the sum of the ampere ratings of all 3. Plainly indicating whether in the open or closed position I over -current devices supplying it a connection in a panelboard shall be positioned at the 4. Having an interrupting rating sufficient for the nominal circuit voltage and the opposite (load) end from the input feeder location or main circuit location. The bus or current that is available at the line terminals of the equipment conductor rating shall be sized for the loads connected in accordance with Article 220. Where all terminals of the disconnecting means may be energized in the open position, a In systems with panelboards connected in series, the rating of the first overcurrent warning sign shall be mounted on or adjacent to the disconnecting means. The sign shall device directly connected to the output of a utility -interactive inverter(s) shall be used in be clearly legible and have the following words or equivalent the calculations for all busbars and conductors. A permanent warning label shall be WARNING - applied to the distribution equipment with the following or equivalent wording:• ELECTRIC SHOCK HAZARD. WARNING DO NOT TOUCH TERMINALS. TERMINALS INVEDONRTER O RELOCATE TPUT CTION l ON BOTH THE LINE AND LOAD SIDES DO NOT RELOCATE MAY BE ENERGIZED IN THE OPEN POSITION. OVERCURRENT DEVICE CE Exception: A connector shall be permitted to be used as an AC ora DC disconnecting ® IBTS INTERPRETATION: This label must be used when the sum of the Photovoltaic means, provided that it complies with the requirements of69033 and is listed and system breaker/fuse and Main Service Panel breaker/fuse is greater than 100% of identified for the use.` - the busbar rating. It is not required if the sum of those two breakers supplying the �h busbar is equal to or less than the busbar is rated for. YIBTS INTERPRETATION: This label should be installed on the covers of the Example A: 200A maximum rating on busbar. 200A main breaker+20A back disconnecting means that may be energized in the open position.This includes fed PV breaker = label required combiner boxes, DC disconnects and inverters with integrated DC disconnects. Example B: 220A maximum rating on busbar. 200A main breaker+20A back Should be installed on grounded and ungrounded systems. fed PV breaker = no label required. ' Location description or map here ' NEC 690.53 Direct -Current Photovoltaic Power Source NK 690.54 A permanent label for the direct -current photovoltaic power source indicating items 1 NOMINAL 11 NEC 690.14(C)12) -NEAR PV BREAKER through 5 shall be provided by the installer at the photovoltaic disconnecting means: RATED • OUTPUT e • . • 1. Rated maximum power -point current 2. Rated maximum power -point voltage NEC 705.12(D)(4)- ON A LINE SIDE TAP FAILfa II L 3. Maximum system voltage • ' • • Informational Note to 3.: See 690.7 (A) for maximum photovoltaic system voltage. • • • • - , 4. Short-circuit current - II NEC 69054 - ON PANEL COVER Informational Note to 4.: See 690.8 (A) for calculation ofmaximum circuit current. S. Maximum rated output current of the charge controller (if installed) MINAL AC VOLTAGE RATED AC OUTPUT CURRENT; Informational Note. Reflecting systems used forinadfance enhancement may result in increased levels of output current and power. DISCLAIMER ®I IBTS INTERPRETATION: This code reference describes the label content to be present at any DC disconnecting means of a system. If applicable, this includes The purpose of this graphic is to provide a reference guide to solar photovoltaic system labeling requirements in accordance with the inverters with an integrated DC disconnect. 2011 National Electric Code (NEC), National Fire Protection Association (Copyright 2010), as Interpreted by the Institute for Building Technology and Safety (IBTS). Users should always follow the code requirements and interpretations for specific placement of labels of the presiding Authority Having Jurisdiction (AHJ). NFPA 70', National Electrical Code* and NEC- are registered trademarks of the National Fre Protection Association, Quincy, MA. NEC 69056(B) Facilities with Utility Services and PV Systems Buildings or structures with both utility service and a photovoltaic system shall have a permanent plaque or directory providing the location of the service disconnecting means and the photovoltaic system disconnecting means if not located in the same location. ®I IBTS INTERPRETATION: All system disconnects on a Utility -Interactive PV System, are required to have this label identifying where other system disconnecting means are located if not visible from either component. ^ Reprinted with permission from NFPA 70- - 2014, NariondlElecrrkatGode, Copyright 02013, National Fire Protection Assoclarion, Quincy, MA. This reprinted material Is not the complete and official position of the NFPA on the referenced subject which K represented only by the standard in Irs entirety. Q CONTACT CONNECT www.ibts.org facebOOWIBTSSOIar Chris Doyle i Program Director - Solar @IBTS solar cdoyle@ibts.org i 512.452.8899 — ® IBTS - Solar PV IBTSorg ® Institute for Building Technology and Safety, 2014 ® Institute for Building Technology and Safety, 2014 Date: July 19, 2017 Scale: None - Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: LABELS Sheet: ^ Il• . ■ PROJECT INFO 56 Hyundai HIS-S280RG Enphase M250-60-2LL-S22 Stringing: 14, 14, 14 Aziirluth(s): 190' F-1 W -W A MSI . z o O O z Z H' Udo ONO�WO Cq 'U(00I._q~O W1 No. Revision/Issue Date Date: July 19, 2017 Scale: None - Drawn By: RNiedzwiecki Office 1-844-786-3461 RNiedzwiecki@sunfinitysolar.com Title: LABELS Sheet: ^ Il• . ■