HomeMy WebLinkAboutB17-2060 030-181-0150
It, BUTTE COUNTY,
DEPARTMENT OF DEVELOPMENT SERVICES
INSPECTION CARD MUST BE ON JOB SITE
24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm)
Development Services cannot guarantee inspections on the date requested
Office: 530.538.7601 Fax: 530.538.7785 www.ButteCounty.net/dds
Permit No: B17-2060 Issued: 9/1/2017
APN: 030-181-015
Address: 1114 14TH ST, OROVILLE
Owner: CASTILLO ERNEST & MARY FAMILY
Permit Type: SOLAR ROOF -RES
Description: ROOF MNT SOLAR (6.03 KW)
AREA
1
Flood Zone: None SRA Area: No
SETBACKS for Zon*np- AG_ SRA_ PW
Front: Centerline of Road:
Rear: SRA:
Street: AG:
Interior
Total Setback from Centerline: of Road:
ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING
Pe
Inspection Ty -
IVR INSP DATE
Setbacks
131
Foundations / Footings
111
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
Setbacks
131
Do Not Pour Concrete Until Above are Signed'
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403 ,
Underfloor Framing
149
Underfloor Ducts
319
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
411
Blockin nde inin
612
Tiedown/Soft Set System
611
Do Not Install Floor Sheathing or Slab Until Above Signed
ShearwallB.W.P.-Interior
134
Shearwall/B.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
417
Manometer Test
Do Not Install Siding/Stucco or Roofing Until Above Signed
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
128
Gas Piping House .
403
Gas Test House
404
Shower Pan/Tub Test
408
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final _
813
Fire Sprinkler Test or Final
702
Swimmi
Pools
1
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
142
Swimmi
Pools
Setbacks
131
Pool Plumbing Test
504
Gas Test
404
Pre-Gunite
506
Pre -Deck .
505
Pool Fencin Alarms/Barriers
503
Pre -Plaster
507
Manufactured Homes
Setbacks
131
Blockin nde inin
612
Tiedown/Soft Set System
611
Permanent Foundation System
613
Underground Electric
218
Sewer
407
Underground Water
417
Manometer Test
605
Continuity Test
602
Skirtin /Ste s/Landin s
610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
Insignia:
Public Works Final -538.7681
Fire De artment/CDF 538.6226
Env. Health Final 538.7281
Sewer District Final
i "PROJECT FINAL
*Project Final is a Certificate of Occupancy for (Residential Only)
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
r
BUTTE COUNTY = f
'DEPARTMENT OF DEVELOPMENT SERVICES j
BUILDING PERMIT .
.24 HOUR INSPECTION (IVR)#:530.538.4365
OFFICE #: 530.538.7601 FAX#:530.538.7785
www. ButteCounty.net/dds
N`,,PROJECT'INFORMATION
_ , , l r=> r...r. 'Y 'a: -,,iki :
Site Address: 1114 14TH ST
Owner:
Pernmt NO: B 17-2060
APN: 030-181-015
CASTILLO ERNEST & MARY F
4035 GRASS VALLEY
Issued Irate: 9/1/2017 By DAH
Permit type: MISC
1114 14TH ST
Subtype: SOLAR ROOF -RES `'
OROVILLE, CA 95965
Expiration Date: 9/1/2018
Description: ROOF MNT SOLAR (6.03 KW)
i, ::::LICENSED CONTRACTOR'S'. DECLARATION,
Occupancy: Zoning: SR '
Contractor
Applicant:
square rootage:
HOOKED ON SOLAR INC
HOOKED ON SOLAR INC
Building, Garage Remdl/Addn
4035 GRASS VALLEY HIGHWAY
4035 GRASS VALLEY
OO
i
AUBURN, CA 95602
AUBURN, CA 95602
Other :' Porch/Patio Total
5303203949
5303203949
0 ' 0 0
i, ::::LICENSED CONTRACTOR'S'. DECLARATION,
";: f;_ ' =:tf=t
:. OWNER / BUILDER
DECLARATION
Contractor (Name) State Contractors License No. / Class / Expires
I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for
HOOKED ON SOLAR 949707 / B / 6/30/2019
the reason(s) indicated below by the checkmark(s) I ham placed next to the applicable item(s) (Section
7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter,
improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors'
I HEREBY AFFIRM UNDER PENALTY OF PERJURY that I am licensed under provisions of Chapter 9
(commenting with Section 7000) of Division 3 of the Business and Professions Cade, and my license i
in full force
State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and
and effect. I
'Professions Code) or that he or she is exempt from licensure and the basis for the alleged exemption.
X
Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of
not more than five hundred dollars ($500).):
❑I, as owner of the property, or my employees with wages as their sole compensation, will
Contractor's Signature Date
do U all of or U portions of the work, and they structure is not intended or offered for sale
wfi! WORKERS'XOMPENSATION DECLARATION
I HEREBY AFFIRM UNDER PENALTY OF PERJURY one of the following declarations:
❑I have and will maintain a certificate of consent to self -Insure for workers'
compensation, issued by the Director of Industrial Relations as provided for by Section
3700 of the Labor Code, for the performance of the work for which this permit is issued. Policy
No.
aI have and will maintain workers' compensation insurance, as required by Section 3700 of
the Labor Code, for the performance of the work for which this permit is issued. My workers
compensation insurance carrier and policy number are:
Carrier. STATE Policy Numb®g5o715 Exp. RW2018
❑I certify that, in the performance of the work for which this permit is issued, I shall not
employ any person in any manner so as to become subject to the workers'
compensation laws of California, and agree that, if I should become subject to the workers'
compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those
provisions.
X
(Section 7044, Business and Professions Code: Bre Contractors' State License Law does not
apply to an owner of properly who, through employees' or personal effort, builds or improves the
property, provided that the improvements are not ntended or offered for sale. If, however, the
building or improvement is sold within one year oNamplelion, the Owner -Builder will have the
burden of proving that it was not built or -
improved for the purpose of sale.). ,
I
I, as owner of the property, am exclusively contracting with licensed Contractors to
construct the project (Section 7044, Business and 'Professions Code: The Contractors' State
License Law does not apply to an owner of properts.who builds or improves Hereon, and who
contracts for the projects with a licensed Contractor pursuant to the Contractors State License
Law.).
I
❑I am exempt from licensure under the Contractors' State License Law for the following
reason:
X
Owner's
Date
--•: z..-. ,act=• ,
Signature . Date By my signature below, I certify to each of the fa lowing:
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS I am (_) a California licensed contractor or Uthe property owner' or Uauthorized to
UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES act on the property owner's behalf**. €
AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN I have read this construction permit application end the information I have provided is
ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN correct.
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. I agree to comply with all applicable city and coTty ordinances and state laws relating
to building construction.
authorize representatives of this city or county to enter the above -identified property
." CON STRUCTION.1 LEN DING AGENCY DECLARATION ' for inspection purposes. California Licensed Contractor, Property Owner* or
Authorized Agent": 'requires separate verificatirn form "requires separate -
I hereby affirm under penalty of perjury that there is a construction lending agency for the authorization form
performance of the work for which this permit is issued (Section 3097, Civil Code).
Lender's Name and Address f X
Names of Pwrmiffnc rnirw PAnf n.#e
Lenders Name & Address City • State Zip
Total Fees:
Balance Due:
INFORMATION' -0, }'� •.ti 'j` . _ tr, , a� It, .
$512.00 Fees Paid: $512.00
(None) Job Value: $18,000.00
i
Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in the
following locations:
1. Outside of each separate dwelling unit sleeping area in the immediate vicinity of the
bedroom(s).
2. On every level of a dwelling unit including basements.
R315.1.5 Multiple -purpose alarms: Carbon monoxide alarms combined with smoke alarms
shall comply with Section R315, all applicable standards, and requirements for listing and
approval by the Office of the State Fire Marshal, for smoke alarms.
Butte County's Interpretation of 2013 CRC, Sections 314 & 315 for
Smoke Alarms &Carbon Monoxide Alarms:
Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellings shall be
retrofitted with smoke alarms and those that have attached garages or fuel -burning appliances shall have f
carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms for
Smoke and Carbon Monoxide and in most cases will comply with the aforementioned code requirements
for Carbon Monoxide Alarms.
DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY
As Owner/Contractor, I/we affirm and declare under the penalty of perjury, under the laws
of the State of California, by our signatures below as Owner/Contractor, that I/we will
comply prior to final inspection with Items A & B as specified herein:
A. Both Owner/Contractor have read and clearly understand the aforementioned 2010
California Residential Code (CRC) Carbon Monoxide Alarm requirements. I
B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to
final inspection as per the aforementioned building code and maintaining such
installation. Smoke Alarms will also be installed prior to final inspection as per the 2010
CRC.
Smoke and Carbon Monoxide alarms are now installed in the following locations:
Owner's name (print): f r�r
Owner's signature:
Date: of ' —11 — 1
Contractor's name (print): kNUVRO o rl 5 0 Gr CSLB License: _r1'A J'
Contractor's signature: Date: I
Project Address: \\NA ��� � ��' Permit
KANEW - WEBSITRBuilding�Building Forms & Documents\2014\2014 Forms - Completed\DBI\DBI-
01 _Declaration_for_Smoke_&_Carbon_Monoxide_ Detectors_ REV'D_ 8.13.14_AKM.doc
Page 2 of 2
OUTtF Butte County Department of Development Services
. �: • PERMIT CENTER
• 7 County Center Drive, Oroville, CA 95965
•coUN�y• - Main Phone (530) 538-7601 Fax (530) 538-7785
www.buttecounty.net/dds
Declaration of Installation
for Smoke Alarms and Carbon Monoxide Alarms
FORM NO
DBI -01
The newly adopted 2013 California Residential Code requires the installation of Carbon
Monoxide Detectors in dwelling units and in sleeping units within which fuel -burning appliances
are installed and in dwelling units that have attached garages. The policy for Carbon Monoxide
Alarms in Butte County states: "Any permit obtained in which the value of work exceeds $1000
associated with a Residential Group R Dwelling Unit or Sleeping Unit shall con-orm to the
following 2013 California Residential Code requirements for Smoke and Carbon Monoxide
Alarms (Section R314 & R315)."
2013 California Residential Code requirements for Carbon Monoxide Alarms:
R315.1 New construction: An approved carbon monoxide alarm shall be instawed in dwelling
units and in sleeping units within which fuel -burning appliances are installed anc in dwelling
units that have attached garages.
R315.1.2 Power supply: For new construction required carbon monoxide alarms shall receive
their primary power from the building wiring where such wiring is served from a commercial
source and shall be equipped with a battery back-up. Alarm wiring shall be directly connected to
the permanent building wiring without a disconnecting switch other than as required for over -
current protection.
Exceptions:
1. In dwelling units where there is no commercial power supply the carbon monoxide alarm may be solely
battery operated.
2. In existing dwelling units a carbon monoxide alarm is permitted to be solely battery operated where
repairs or alterations do not result in the removal of wall and ceiling finishes
or there is no access by means of attic, basement or crawl space.
R315.1.3 Interconnection. Where more than one carbon monoxide alarm is required to be
installed within the dwelling unit or within a sleeping unit the alarm shall be interconnected in a
manner that activation of one alarm shall activate all of the alarms in the individual unit.
Exception:
1. Interconnection is not required in existing dwelling units where repairs do not res-jlt in the
removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl
space, and no previous method for interconnection existed.
R315.2 Where required in existing dwellings: Where a permit is required for alterations;
repairs or additions exceeding one thousand dollars ($1,000), existing dwellings or sleeping
units that have attached garages or fuel -burning appliances shall be provided with a carbon
monoxide alarm in accordance with Section R315.1. Carbon monoxide alarms shall only be
required in the specific dwelling unit or sleeping unit for which the permit was obtained.
R315.2.6 Alarm requirements: No person shall install, market, distribute, offer for sale or sell
any carbon monoxide device in the State of California unless the device and instructions have
been approved and listed by the State Fire Marshal.
KANEW_WEBSITE\Building\Building Forms & Documents\2014\2014 Forms - Completed\DBI\DBI-
01 _Declaration_for_Smoke_&_Carbon_Monoxide_Detectors_RE V'D_8.13.14_AKM. doc
Page 1 of 2
iff
SHEET INDEX
PV -1.0
COVER & NOTES PAGE ;; _
PV -2.0
SITE PLAN ,
PV -3.0
ANCHOR & DETAILS
PV -4.0
ELECTRICAL DIAGRAM & CALCS
PV -5.0
ACPV MODULE -INVERTER SPEC '
PV -6.0
RACKING METHOD '
PV -7.0
MOUNTING AND FLASHING
PV -8.0
GROUNDING METHOD ,-
PV -9.0 '
SAFETY LABELS
PV -10.0.
MICRO INVERTER MAP (FIELD USE) -.
o
1. - SMOKE ALARMS SHALL BE LISTED IN ACCORDANCE WITH
PROPOSED 'EXISTING ,
(P) (E),
ELECTRICAL
EQUIPMENT
0 VENTS Q "
APPLICABLE CODES:
• 2016 CALIFORNIA BUILDING STANDARDS (CBC)
• 2016 RESIDENTIAL BUILDING CODE (CRC) .
• 2016 CALIFORNIA'ELECTRICAL CODE (CEC),
2016 CALIFORNIA FIRE CODE (CFC) '
GENERAL NOTES.
1..' ALL COMPONENTS ARE UL LISTED AND CEC CERTIFIED, WHERE
SUNP'OWERG
WARRANTED. ,4
2.+ THE SOLAR PV SYSTEM WILL BE INSTALLED IN ACCORDANCE by Hooked on Solar
WITH ARTICLE 690 OF THE 2016 CEC AND 2016 CRC.
3. PER CEC 705.12(d)(7), LOCATION OF BACK FED BREAKER SHALL SSESORS PARCEL#:
BE INSTALLED FARTHEST / OPPOSITE END FROM THE MAIN 000-000-000
OVER -CURRENT DEVICE OR MLO. _ PARCEL ACRES:
' ^ O.00AC t'
WHERE METALLIC CONDUIT CONTAINING DC,CONDUCTORS IS • ..
USED INSIDE THE BUILDING, IT SHALL -BE IDENTIFIED AS 1,7
"CAUTION: SOLAR CIRCUIT" EVERY.1OFT. "
5: A DC DISCONNECTING MEANS SHALL BE INSTALLED AT A
READILY ACCESSIBLE LOCATION EITHER OUTSIDE OF THE
BUILDING OR STRUCTURE OR INSIDE NEAREST.POINT OF,
< ENTRANCE OF THE SYSTEM CONDUCTORS AS PER SECTION,
690.14 OF THE CEC.
6. HEIGHT OF THE INTEGRATED AC/DC DISCONNECT SHALL NOT
EXCEED 6'-7" PER NEC CODE 240.24.
7. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH
CEC 690.47 AND 250.50 THROUGH 60 AND 250-166 SHALL BE
PROVIDED. PER CEC GROUNDING ELECTRODE SYSTEM OF
EXISTING BUILDING MAY BE USED AND BONDED TO THE
SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE OR
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES: i
(18) SPR-X21-335-BLK-C-AC
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27°
AZIMUTH:
270'
INSTALL TYPE:
COMP
INADEQUATE A SUPPLEMENTAL GROUNDING ELECTRODE WILL
BE USED AT THE INVERTER LOCATION CONSISTING OF A UL - SP LEASE # 1139379
• *2012 C LARKE B LISTED 8 FT. GROUND ROD WITH ACORN CLAMP. GROUNDING' . .
•• REFERENCE SEC. 605.11.1. ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG
•• SMOKE DETECTORS AND CARBON MONOXIDE AND NO LARGER THAN #6 AWG COPPER AND BONDED TO THE SIGNED BY:
ALARMS SHALL BE INSTALLED IN
AGN
EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A
ACCORDANCE WITH CRC R314 AND CRC R315.-
_
COMPLETE SYSTEM.
•
8. PHOTOVOLTAIC MODULES ARE TO BE CONSIDERED
-Ave.- •'•
:
FIRE ACCESS
NON-COMBUSTIBLE.
9. PHOTOVOLTAIC INSTALLATION WILL•NOT OBSTRUCT ANY
_w.i - Biggs - Big(
NOTES:
'r,.
t t
''
-ALL
r• . PLUMBING. MECHANICAL, OR BUILDING ROOF VENTS. THE
'
o
1. - SMOKE ALARMS SHALL BE LISTED IN ACCORDANCE WITH
SMOKE ALARMS SHALL BE INSTALLED OR VERIFY TO ENSURE '
OROVILLE, CA 95965. y" .
T"I
UL217 AND INSTALLED IN ACCORDANCE WITH THE PROVISIONS
THE SMOKE ALARMS ALREADY EXISTING WHEN ALTERATION
SHEET TITLE: , -
COVER/
SITE PLAN .
OF THIS CODE AND THE HOUSEHOLD FIRE WARNING
SHEET M ,
2012 CLARKE; B
.
Lj
DATE:"
8/29/17
--
'
OR REPAIR TO GROUP R-3 OCCUPANCY EXCEEDS $1,000 CRC
EQUIPMENT PROVISIONS OF NFPA 72.'SYSTEMS AND
•
a
COMPONENTS SHALL BE CALIFORNIA STATE FIRE MARSHAL'
R314.6. f
LISTED AND APPROVED IN ACCORDANCE WITH CA CODE OF
t
REGULATIONS, TITLE 19,.DIVISION 1 FOR PURPOSE FOR WHICH,.• -
;CARBON MONOXIDE NOTES: �a b
E
111414th Street
,
THEY ARE INSTALLED..' •`. 4 • - :.
f 1. CARBON MONOXIDE ALARMS ARE REQUIRED AT THE
2. • ROOF ACCESS POINTS SHALL BE LOCATED IN AREAS THAT DO
� ' FOLLOWING LOCATIONS:- '
I
NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER '
:t
1.1. ON THE CEILING OR WALLS OUTSIDE OF EACH SEPARATE..
.Estates Or
'Chateau ,!"`""'
"�
OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT
SLEEPING AREA IN THE IMMEDIATE VICINITY OF BEDROOMS
Mobile j
STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS
1.2. ON EACH STORY WITHIN A DWELLING UNIT, INCLUDING
_wlHorne Estates Senior... « _
WHERE THE ACCESS POINT DOES NOT CONFLICT WITH •
BASEMENTS.
'
Pecan Or i
OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR
1.3. THE CARBON MONOXIDE ALARMS SHALL BE LISTED AS
� Rhoads Ehd RV Palk
SIGNS t
COMPLYING WITH THE REQUIREMENTS OF UL 2034. CARBON
Jiffy Food Stores (D 0' -� Roser'
3'. `, ... SOLAR PANELS SHALL BE NO HIGHER THAN 3 FEET BELOW THE
MONOXIDE DETECTORS SHALL BE INSTALLED IN
f'
'bz �` : Oro Dam Blvd V�1~ '' Oroville Dam
RIDGE IN ORDER TO ALLOW FOR FIRE DEPARTMENT' SMOKE ,
• •'
ACCORDANCE WITH THIS CODE, THE CURRENT EDITION OF
'��fir-----.-t;--"`
VENTILATION OPERATIONS -
NFPA 7)0 "STAND THE INSTALLATI NOF
„ ARD FOR O CARBON
.- r _ •.MONOXIDE (CO) DETECTION AND WARNING -EQUIPMENT"
.- PROJECT SITE },•' Y ;, v AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS
NTS - . = `' PER 2016 CRC SECTION R315.3.
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:'
BERTRAM CLAKE -- -
1114 14TH STREET. _ -
OROVILLE, CA 95965. y" .
530-354-9531 .
bertram542004@yahoo.com .,
SHEET TITLE: , -
COVER/
SITE PLAN .
PROJECT M
SHEET M ,
2012 CLARKE; B
DATE:"
8/29/17
--
'
1:10
N S U N PYO W E "R�
- _ by Hooked on Solar,
SSESORS PARCEL #:
000-000-000
PARCEL ACRES:
_ O.00AC
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE: ,
6.03 kW (DC)'. -.-
MODULES: '
(18) SPR-X21-335=BLK-C-AC' .
CIRCUITS:
CIRCUIT.#1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
.1 27°
AZIMUTH: ,
270°
INSTALL TYPE:
COMP
r '
€ SP LEASE # 1139379
: , L { ,t , ♦ I, } s F 'SIGNED BY: AY( b' .`
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
� r
W) 'COMMU,NICA110N5
BERTRAM CLAKE , •.
111414TH STREET '. • ._
OROVILLE, CA 95965
530-354-9531 '7
bertrat,fi542004@yah9o.com
..
•f •t
y
t' N' 5�pVI a- TAN L -
a
,
PROJECT M
) 6
•R. 1
.er
2012 CLARKE, B
�'2,01
-
\•0•.1MA1
•
�.
Y .,y.' ` iiStSti
i S
- -
,
r
.o
•
,
..
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
� r
CUSTOMER NAME: "
BERTRAM CLAKE , •.
111414TH STREET '. • ._
OROVILLE, CA 95965
530-354-9531 '7
bertrat,fi542004@yah9o.com
SHEET -TITLE ~ _
SITE, PLAN
PROJECT M
SHEET M
2012 CLARKE, B
�'2,01
-
DATE:.
8/29/17 ``
1:10
• •, ♦ ' y 'r }• 4w 4
12 L -FOOT S U N P O W E RCR
6
F -RAIL r - � 1.25 by Hooked on Solar
�I I MODULE - DECK
SSESORS PARCEL #:
000-000-000
PARCELACRES:
(E) 2x4(TRUSS/RAFTER) 2x6 RAFT I I .3.00 O.00AC
ANCHOR WITH I. I
FLASHING
(E) TRUSS LAYOUT
24" O.C.
i' MIN FIRE SETBACK
.I} LI� I I I I ��I I I I A I. I I I I'� �'�' l• '
10:
i
NOTES:
1. RAILS TO BE 2" MIN -14" MAX FROM EDGE OF PANEL WHEN IN LANDSCAPE ORIENTATION.
2. RAILS TO BE 2" MIN - 16" MAX FROM EDGE OF PANEL WHEN IN PORTRAIT ORIENTATION.
RAIL A CHOR
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965
530-354-9531
bertram542004@yahoo.com
SHEET TITLE:
COVER/
SITE PLAN
(ACING
SHEET #:
3.0
11 1
NTS
HORIZ NTALI S
I
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27'
AZIMUTH:
270'
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: I A4;c11t
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965
530-354-9531
bertram542004@yahoo.com
SHEET TITLE:
COVER/
SITE PLAN
PROJECT #:
2012 CLARKE, B
SHEET #:
3.0
DATE:"
s/29i17
NTS
EXISTING: l r
s
ti
MAIN SERVICE-'
PANEL RATINGS
{
MFG/MODEL CUT HAM.
.
} INVERTER OUTPUT CIRCUIT CONDUCTORS ARE.
,BUS AMP RATING 125
A
SERVICE VOLTAGE 240
V
MAIN OCPD RATING 100
A
TOTAL SYSTEM RATING 30
A
TOTAL INVERTER RATING 30
'A
AC SUB PANEL,
RATINGS "
BUS AMP RATING 125 A
SERVICE VOLTAGE 240` V
MAIN OCPD RATING 130 A
INVERTER OCPD RATING AS SHOWN
]-BOX I I ,, > ., 4 *s - , .
NEMA 3R MINIMUM: ' ` •• INSTALLER NOTE: - •'` ,� ;• 1;
• .. s :f :
_ �+ '
+
S U N P.0 W E R�
.
} INVERTER OUTPUT CIRCUIT CONDUCTORS ARE.
+ - ,
' `„
RATING _
REQUIRED WITH t
- +�
'(P) RAIL (TYP) y
�t
WATERPROOF SPLICES POLARITY SENSITIVE.
� *
.FV • •, I...1 -•
,�F
••`i�
OR OTHER APPROVED " ' i • -
' ' ' HOOKED ON SOLAR SHALL BE OBLIGATED TO MATCH'
t
'
by Hooked on SOIdI .��
AC SUB PANEL,
RATINGS "
BUS AMP RATING 125 A
SERVICE VOLTAGE 240` V
MAIN OCPD RATING 130 A
INVERTER OCPD RATING AS SHOWN
]-BOX I I ,, > ., 4 *s - , .
NEMA 3R MINIMUM: ' ` •• INSTALLER NOTE: - •'` ,� ;• 1;
• .. s :f :
_ �+ '
+
S U N P.0 W E R�
.
} INVERTER OUTPUT CIRCUIT CONDUCTORS ARE.
+ - ,
' `„
RATING _
REQUIRED WITH t
- +�
'(P) RAIL (TYP) y
240' V
WATERPROOF SPLICES POLARITY SENSITIVE.
� *
.FV • •, I...1 -•
,�F
••`i�
OR OTHER APPROVED " ' i • -
' ' ' HOOKED ON SOLAR SHALL BE OBLIGATED TO MATCH'
t
'
by Hooked on SOIdI .��
TERMINATION ••
+ CONDUCTORS FROM TRANSITION CABLE TO SUPPLIED"
•`,
,t
METHOD. *
ACPV OUTPUT CONDUCTORS_. ti
RECEPTACLE PROTECTIVE CAP
r� - ^
' J—BOX z
INSTALLED ON THE LAST MODULE_
—
SSESORS PARCEL #:
y g, •
CABLE OF THE BRANCH CIRCUIT
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
.`
0007000-000
'-:CIRCUIT#1
PARCEL ACRESAl
0.
AC DISCONNECT,
DG221 NRB
'USE 30A FUSE
DISCONNECT AMP
30 A
RATING _
• � • `
DISCONNECT,VOLT
240' V
RATING
� *
.FV • •, I...1 -•
,�F
• r ✓ - ` .. .' ', "t F, Y ;c �.�� f ` r - • • + • ! ,. rte,• -
.5
<' _�*
•
SUPERVISOR `
f
't=
t; y , - i -
MODULE #1 r' MODULE #2 z 'MODULE #12
r , '
CONDUIT SIZE:
• � • `
F +
_ s
CONDUCTOR SIZE: 12 AWG r .
� *
.FV • •, I...1 -•
,�F
••`i�
�`
r
-
" •
r•� ;
'.
•. •7 • - �
i '�'
n s,.
j
r
~�
SHEET•TITLE:
ELECTRICAL .
, DIAGRAM &
CALCULATIONS
�t MAX OF 12 MODULES INA
.' r • '
1) IF UTILITY REQUIRES A VISIBLE -BREAK SWITCH, DOES THIS SWITCH MEET
THE REQUIREMENT? YES X NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
° ,• - ti '
,. r
+
'-:CIRCUIT#1
,'
k _ . A —
;�»
BRANCH_CIRCUIT- THIS -'-ti
�i
J•.
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN_ L.
7• `• �•~ , _ -
690.64(B)(2)(a)? YES- X NO N/A
5) INVERTER CALCULATIONS PER ACPV AS SHOWN:
*
,
"
.CIRCUIT -HAS 12 MODULES.
_
1 74
.^
ACPV..
A
µ�•
r •
r
3 - t
.5
<' _�*
•
SUPERVISOR `
f
r
t; y , - i -
MODULE #1 r' MODULE #2 z 'MODULE #12
r , '
CONDUIT SIZE:
• � • `
F +
_ s
CONDUCTOR SIZE: 12 AWG r .
� *
.FV • •, I...1 -•
,�F
••`i�
f+'
'
,
-
b+.
EGC SIZE 8 AWG (NEC 250.122) • F } - • F
r•� ;
'.
•. •7 • - �
i '�'
n s,.
~�
SHEET•TITLE:
ELECTRICAL .
, DIAGRAM &
CALCULATIONS
0.
•'
- - " • • . ".
1) IF UTILITY REQUIRES A VISIBLE -BREAK SWITCH, DOES THIS SWITCH MEET
THE REQUIREMENT? YES X NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
° ,• - ti '
s
+
4 y
20 A
k _ . A —
DC DC ,
'
-
= _
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN_ L.
7• `• �•~ , _ -
690.64(B)(2)(a)? YES- X NO N/A
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:,,
6.03 kW (DC)
MODULES: 4,,
` ,(18) SPR-X21-335'BLK-C-AC r
CIRCUITS: 1 s
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES -- 6
TILT: '
27'
AZIMUTH: x
270°.
INSTALL TYPE:
_ COMP
Ac
DISCONNECT
MAX OF 12 MODULES IN A `
30 A 20 A CIRCUIT #2 BRANCH CIRCUIT - THIS
CIRCUIT HAS 6 MODULES.
15A
MAIN oLi E
MODULE #1 - MODULE #2 r` MODULE #6
_ _ SUB ► ,
INSULATED EGC ` *' SEE NOTE 3 FOR INVERTER
8 AWG, GREEN CONDUIT TYPE: ROMEX
CONDUIT SIZE: 12/3 -
CONDUCTOR TYPE: THWN-2 ,
CONDUCTOR SIZE: 12 AWG - • +
NUMBER OF CONDUCTORS: - • '
" (2 RED, 2 BLACK, 2 GRND)
+ ' _ SEE NOTE 4 FOR INVERTER
'SEE NOTE 4 FOR INVERTER
+' CONDUIT TYPE: EMT
j
CONDUIT TYPE: EMT
' • CONDUIT SIZE: 3 4"
CONDUIT SIZE:
• ; CONDUCTOR TYPE: THWN-2.
CONDUCTOR TYPE: THWN-2
CONDUCTOR SIZE: 10 AWG = ' i
CONDUCTOR SIZE: 12 AWG r .
_
* • NUMBER OF CONDUCTORS:
J
NUMBER OF CONDUCTORS:
RED, 1 WHITE, 1 BLK, 1 GREEN) _
(1 RED, 1 WHITE, 1 BLK, 1 GREEN) i' "' = �' i• f,,
a ' ' EGC SIZE 8 AWG (NEC 250.122)
b+.
EGC SIZE 8 AWG (NEC 250.122) • F } - • F
~�
SHEET•TITLE:
ELECTRICAL .
, DIAGRAM &
CALCULATIONS
NOTES FOR INVERTER CIRCUITS
•'
- - " • • . ".
1) IF UTILITY REQUIRES A VISIBLE -BREAK SWITCH, DOES THIS SWITCH MEET
THE REQUIREMENT? YES X NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
° ,• - ti '
REQUIREMENT? YES . NO N/A X
+
4 y
3) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING JO
k _ . A —
INVERTER OCPD AMPERE RATING. +
4) TOTAL OF 1 INVERTER OCPD(S), ONE FOR EACH INVERTER, DOES TOTAL
= _
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN_ L.
7• `• �•~ , _ -
690.64(B)(2)(a)? YES- X NO N/A
5) INVERTER CALCULATIONS PER ACPV AS SHOWN:
- 1 X 1.33A (MAX OUTPUT) X .99 (POWER FACTOR) X 1.25%.= 1.645875A / ACPV
,
+ r• %
SP LEASE # 1139379
SIGNED BY: I , ' XIO
DRAWN BY:
AGN -
CHECKED BY:
SAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE '
1114 14TH STREET
OROVILLE, CA 95965
530-354=9531
bertram542004@yahoo.com.
SHEET•TITLE:
ELECTRICAL .
, DIAGRAM &
CALCULATIONS
PROJECT #:
2012 CLARKE, B
SHEET #:
4.0
DATE:
8/29/17 "
S.
L '
Win, nPower° X-211-335-BLK-C-AC Residential AC Module Series
-. •. •
No electrolytic capacitors
Combined P• • Product
Warranty
Maximize Value for Roof
Size system for roof, not string inverter
Optimize performance of each module
Expand Deployment Options
Complex roofs and partial shading
Small systems
• System expandability
fb.
Output @ 240 V (min./nom./max.)
Output @ 208 V (min./nom./max.)
Simplify & Speed Installation
Optimize System and Installation Efficiency
.. 335 W 327 W
Factory -integrated microinverter
+5/-0% +5/-0%
Avg. Panel Efficiency'
Robust, double -locking AC connectors
SunPoi AC Modules, which include a factory -integrated
-0.29%/OC
Design flexibility offsite and onsite
SunPower microinverter, provide a revolutionary combination of high t
Max. Units Per 20 A Branch Circuit @ 240 V
Max. Units Per 20 A Branch Circuit @ 208 V
No active phase balancing.for 3 phase
installations
No DC string sizing process
efficiency, high reliability, and module -level DC -to -AC power conversion.
Fewer installation steps than competing
'
n
systems
Designed specifically for use with SunPower InvisiMounCm and the
+
Intuitive commissioning
SunPower Monitoring System, SunPower AC Modules enable rapid .
Of over 3,200 silicon solar panels, Phoron Module Sun'ey, Feb. 2014
741 in "PV Fraunhofer
Component of Complete System
installation, best -in -class system aesthetics, and intuitive visibility into -
Built for use with SunPower° InvisiMountlm
system performance. All this comes with the best Combined Power
and the SunPower Monitoring System
and Product Warranty in the industry.
superior system reliability and aesthetics
t
_
17, X21-335-BLK-C-AC Residential AC Module Series
`
fb.
Output @ 240 V (min./nom./max.)
Output @ 208 V (min./nom./max.)
SPR-X21-335-BLK-C-AC SPR-X20-327-BLK-C-AC
Nominal Power3(Pnoin) "
.. 335 W 327 W
Power Tolerance w
+5/-0% +5/-0%
Avg. Panel Efficiency'
21.0% 20.4%
Temp. Coef. (Power)
-0.29%/OC
Shade Tolerance
Three bypass diodes
Integrated module -level maximum power
point tracking
`
Warranties. 25 -year limited power warranty
25 -year limited product warran
UL listed to UL 1741, including:
IEEE154711547a and IEEE1547.1/1547.1a Utility
Interactive
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables (load
break disconnection)
UL 1703 PV Modules (Type 2 fire rating)
Certifications 'Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and outside
the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703)
Integrated grounding and bonding
Class Afire rated
PID Test Potential -induced degradation free
280 mm
[11.021n1
I i I
fb.
Output @ 240 V (min./nom./max.)
Output @ 208 V (min./nom./max.)
211/240/264 V
183/208/229 V
Operating Frequency (Iain./nom./max.)
59.3/60.0/60.5 Hz
Output Power Factor (min.)
0.99
AC Max. Continuous Output Current @ 240 V
AC Max. Continuous Output Current @ 208 V
1.33 A
1.54 A
AC Max. Cont. Output Power
320 W
DC/AC CEC Conversion Efficiency
96.0%
Max. Units Per 20 A Branch Circuit @ 240 V
Max. Units Per 20 A Branch Circuit @ 208 V
No active phase balancing.for 3 phase
installations
12 (single phase)
10 (two pole)
Warranties. 25 -year limited power warranty
25 -year limited product warran
UL listed to UL 1741, including:
IEEE154711547a and IEEE1547.1/1547.1a Utility
Interactive
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables (load
break disconnection)
UL 1703 PV Modules (Type 2 fire rating)
Certifications 'Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and outside
the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703)
Integrated grounding and bonding
Class Afire rated
PID Test Potential -induced degradation free
280 mm
[11.021n1
I i I
fb.
Solar Cells '
96 Monocrystalline Maxeon Gen III
Front Glass
High -transmission tempered glass with
Temp.
anti -reflective coating
Environmental Rating
Outdoor rated
Frame
Class 1 black anodized (highest AAMA
Impact Resistance
rating)
Weight
45.5 lbs (20.6 kg)
Max. Recommended
Module Spacing
1.3 in. (33 mm)
Warranties. 25 -year limited power warranty
25 -year limited product warran
UL listed to UL 1741, including:
IEEE154711547a and IEEE1547.1/1547.1a Utility
Interactive
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables (load
break disconnection)
UL 1703 PV Modules (Type 2 fire rating)
Certifications 'Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and outside
the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703)
Integrated grounding and bonding
Class Afire rated
PID Test Potential -induced degradation free
280 mm
[11.021n1
I i I
CHECKED BY:
JAA
'Operating Temp.
-40° F to +185° F (-40° C to +85° q
Max. Ambient
Temp.
122° F (50' Q
Max. Load
Wind: 62 psf, 3000 Pa, 305 kg/m2 front & back
Snow: 125 psf, 6000 Pa; 611 kg1m2 front
Impact Resistance
• 1 inch (25 mm) diameter. hail at 52 Inph (23
m/s)
Warranties. 25 -year limited power warranty
25 -year limited product warran
UL listed to UL 1741, including:
IEEE154711547a and IEEE1547.1/1547.1a Utility
Interactive
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables (load
break disconnection)
UL 1703 PV Modules (Type 2 fire rating)
Certifications 'Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and outside
the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703)
Integrated grounding and bonding
Class Afire rated
PID Test Potential -induced degradation free
280 mm
[11.021n1
I i I
SUNPOW ERG
by Hooked on Solar
SSESORS PARCEL #:
000-000-000
PARCELACRES:
O.00AC
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-6_AC r
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
270
AZIMUTH:
2700
INSTALL TYPE:
.COMP
SP LEASE # 1139379
SIGNED BY:
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
046 m E m
(43.6 In] m Vly
[41.2 int
130
111ighesi
n
SHEET TITLE:
MODULE
SPECS
�°
+
DATE:
8/29/17 -
` 4'
Of over 3,200 silicon solar panels, Phoron Module Sun'ey, Feb. 2014
741 in "PV Fraunhofer
rank Module Durability Initiative Public Report,"CSE, Feb 2013. Five out of
�
4 (� .,,,�J
-'
t
_
-
the top eight largest manufacturers vere tested. Campeau, L et al.'SunPower Module
1558
\J
-
Degradation Rate," SunPrncer vi paper, Feb 2013. See mviv.sunpowecconviacts for details,
I� I (61.3In1
rr
s u n p owe r. c o m
'Standard Test Conditions 0000 Wi hradiance. AM 1.5,25a Q. NREL ca'ibrallon standard: SOMS
current, LACCS FF and voltage. All DC voltage is fully contained %i the module.
_ -
'Based on average of measul power values during production.
Please read the safety and installation instructions for details. -`
See a4•.w.sunpower.com/faus; for more reference Information.
For more details, see extended datasheet 1+'.vv.sunpovier.corn/datasheets.
Document N 515216 Rev D /LTR_US
yi•:
:. _ .— _ �.
i<Z.•q �'.:�
t -
_�'fY
-`(4.- r •• ..
. ..
1.`147.
y
Ml.Mr4 F".
L1T..ry
.
SUNPOW ERG
by Hooked on Solar
SSESORS PARCEL #:
000-000-000
PARCELACRES:
O.00AC
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-6_AC r
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
270
AZIMUTH:
2700
INSTALL TYPE:
.COMP
SP LEASE # 1139379
SIGNED BY:
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE -
1114 14TH STREET
OROVILLE, CA 95965'
530-354-9531
bertram542004@yahoo.com
SHEET TITLE:
MODULE
SPECS
PROJECT #:
2012 CLARKE, B
SHEET #:
5.0
DATE:
8/29/17 -
` 4'
Best -in -class system aesthetics
Elegant Simplicity
Premium, low -profile design
Component
POWE Re
SunPower® InvlsiMOuntTM is a SunPower-designed •
Hidden mid clamps and end clamps
rail -based mounting system. The InvisiMount system .
hardware, and capped, flush rails
End Clamp
Black anodized aluminum alloy 6063-T6
addresses residential sloped roofs and combines faster
Part of Superior System
installation time, design flexibility, and superior aesthetics.
Built for use with SunPower DC and AC modules
'Simple and Fast Installation
t
'Integrated module -to -rail grounding
Combine with SunPower modules and
Pre -assembled mid and end clamps
monitoring app
Levitating mid clamp for easy placement
I.
Mid clamp width facilitates even
DATE:
8/29/17
module spacing
t--
Simple, pre -drilled rail splice
r~
UL 2703 Listed integrated grounding
Flexible Design.
Addresses nearly all sloped residential roofs
' a ;:
Design in landscape and portrait
�
Rails enable easy obstacle management
Customer -Preferred Aesthetics
• #1 module and #1 mounting aesthetics
Best -in -class system aesthetics
Elegant Simplicity
Premium, low -profile design
Component
POWE Re
SunPower® InvlsiMOuntTM is a SunPower-designed •
Hidden mid clamps and end clamps
rail -based mounting system. The InvisiMount system .
hardware, and capped, flush rails
End Clamp
Black anodized aluminum alloy 6063-T6
addresses residential sloped roofs and combines faster
Part of Superior System
installation time, design flexibility, and superior aesthetics.
Built for use with SunPower DC and AC modules
by Hooked on Solar
• Best -in -class system reliability and aesthetics
830 g/m (9 oz/ft)
Combine with SunPower modules and
engineered to pair with SunPower modules. The resulting
monitoring app
system -level approach will amplify the aesthetic and
Black acetal (POM) copolymer
installation benefits for both homeowners and installers. .
DATE:
8/29/17
r~
•-
' a ;:
�
1 .w.,-• �
��i�';�
�`~~���
`I
� � ,r.! ,<<..y!�n��
1 1 1 '
A
i- yr
^�'
P:�i-��r
? t `a p
a
�,_
�" �
bunting System
SunPower° In�isiMountTM
Residential Mounting System
Best -in -class system aesthetics
Elegant Simplicity
Premium, low -profile design
Component
Black anodized components
SunPower® InvlsiMOuntTM is a SunPower-designed •
Hidden mid clamps and end clamps
rail -based mounting system. The InvisiMount system .
hardware, and capped, flush rails
End Clamp
Black anodized aluminum alloy 6063-T6
addresses residential sloped roofs and combines faster
Part of Superior System
installation time, design flexibility, and superior aesthetics.
Built for use with SunPower DC and AC modules
The InvisiMount product was specifically envisioned and
• Best -in -class system reliability and aesthetics
830 g/m (9 oz/ft)
Combine with SunPower modules and
engineered to pair with SunPower modules. The resulting
monitoring app
system -level approach will amplify the aesthetic and
Black acetal (POM) copolymer
installation benefits for both homeowners and installers. .
17
sunpower'com
• Module* / Mid Clamp and Rail Module* /End Clamp and Rail
Mid Clamp
End Clamp
Y�v .
,
Rail 5 Rail Splice Ground Lug Assembly End Cap
I
tftttt_ �;M_, (M R—M
-
• • ••
Warranties -~
Component
Material
Weight
Mid Clamp
Black oxide stainless steel AISI 304
63 g (2.2 oz) .
End Clamp
Black anodized aluminum alloy 6063-T6
110 g (3.88 oz)
Rail
Black anodized aluminum alloy 6005-T6
830 g/m (9 oz/fL)
Rail Splice
Aluminum alloy 6005-T5
830 g/m (9 oz/ft)
Ground Lug
Assembly
304 stainless
(A2-70 bolt; tin-plated copper lug)
106.5 g/m (3.75 oz)
End Cap
Black acetal (POM) copolymer
10.4 g (0.37 oz)
•• • ••• • •
• • ••
• Composition Shingle Rafter Attachment
Application Composition Shingle Roof Decking Attachment ' • • • -
Curved and Flat Tile Roof Attachment
Universal Interface for Other Roof Attachments Refer to roof attachment hardware manufacturers documentation.
• *Module frame that Is compatible with the InvisiMount system required for hardware interoperability. y
(9 2015 SunPower Corporation. All Rights Reserved. SUNPOWER,rthe SUNPOWER logo. and INVISIMOUNT are trademarks or registered
trademarks of SunPower Corporation. All other trademarks are the property of their respective owners. Sunpower.com
Specifications included in this datasheet are subject to change without notice. Document;1509506 Rev 8
Temperature -40• C to 90° C (-40° F to 194° F)
Max. Load 2400 Pa uplift
5400 Pa downforce
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
_ 6.03 M (DIC),
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS: "
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES 6
TILT:
270
AZIMUTH:
270`
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY:
DRAWN BY:
AGN
CHECKED BY:
JAA
Warranties -~
25 -year product warranty
REV
5 -year finish warranty
UL 2703 Listed
Certifications
Class A fire rating when distance between
roof surface and bottom of SunPower _
module frame is <_ 3.5° -
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
_ 6.03 M (DIC),
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS: "
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES 6
TILT:
270
AZIMUTH:
270`
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY:
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965 ,
530-354-9531
bertram542004@yahoo.com.
SHEET TITLE: '
RACKING
SPECS Y
PROJECT #:
2012 CLARKE, B
SHEET #:
6.0
DATE:
8/29/17
r
h — 1
rvv� aTr 1
�'�T/ f 7i ML O
S01
Ez Mount'L Foot
� •.za•r t t L -
ry
for Shingle Roofs
p• T4Y r.. �� J L, a Ya. 1 r _ �. sa++r sy �.g � ,z< ..k
r _.,t,./�� rt � w.J � r.SYr i• � ��. i 'ti., a r�` -1 a.{w' .t _ �.'�. a., ��� ..>�.
1* •„�. tic .: -� I LAY 1' .. c +�'ttil / L t �� r i..•h- ^j2.! �tr ,:it' 1ti 1--i`1..
�_•I :r t tr Y Y a "�. '' �.. +kr•t,� {amt rr
�r� �-r�N a =: �r *r,�.e•1 t ry ♦_: J': � +� t��'t1''r{:�_ad art
�1 F,!-,,, t ry i .. ,. • • r , r ^t .^ s' .� .� r b • f»
��r♦ `r. .�`F.a ,1.J.'r L`'''J� i'S'`. K. •rIr •f ��i �; '`h �� •. 1 i�j f 144•'1
. —
, ,<�,. .n � 1.. :•� wti ay1 i ycl. �. y- f ,� ., ,.a"t /'1 1Y � ,w-1 �,%
► ;,. .• , �'� � ,jr..;•^, c. ,v � •'�$ f. j � �..,rb Y�arCr� .w � � � r?,.«:� /- h.-�•x i• .l�.,��;L:l � g`•
'F -, -a `J S.. ♦ ♦i•,.+ Y.' —�. -�*.. tz SJ '•t -f w�� 1 /.••l l 4, f. ,th#�.r ;•
,�. • �. ♦:�.. r ;L�\ �i J �4. n. r.w.w 1Y2 ..:• M, :^'n, .cf..'e, :i'.•K,-�: t Y .�. 7;f. .•r Y`•'a^'•
The Next Generation
in Flashed Mounts for Shingle Roofs!
,Ac� I� 1905 E 5th St.; Ste. A
'"!L+J Vancouver, WA 98661 Phone: 360-844-0048 www.sunmodo.com
EiRoof M6.'Uilt ... Engineered and Designed.for easy installation.
Our roof mounting system is water tight and durable for any composite/shake roof!
Serrated L Foot allows for
rail mounting on either
side.
Versatile aluminum base for
multiple configurations.
t
Ez4Mount L -Foot Kit for Shingle Roofs
Kit# K10068-001
All kits come complete with the following parts:
i
•;Y =AI Shoe
Part# A20065.001
1=Flashing, 4
:L-.HexCap
Part# A20052.001. _ Pert# A20056-001
Also available:
Flashing designed to redirect
water flow.
' r
I
�t
1- Lag 11301t SS 5/16_ i 4;
Pan# 816015002
r4ory1- Ez L Foot • I
Pan#A20064_-001
•'1- Bolt 318.7 16 2 3/4"
?. 1 -Flange Nut 3/8�
1905 E 5th St.; Ste. A
,.,.��..� c1 ;►. 3 Vancouver, WA 98661
Phone:360-844-0D48 www.sunmodo.com
3.0 Grounding Overview
Warning! Ensure that you fully understand the grounding aspects in this section before proceeding.
This section is intended to provide a well-rounded understanding of all aspects of grounding for SunPower
96 -Cell AC Modules when they are installed with the SunPower® InvisiMount"I Residential Mounting System;
it contains excerpts from the SunPower 96 -Cell AC Module Design and Installation Guide (#515791;
unreleased); and the SunPower AC Module Safety and Installation Instructions (#51744); as well as
references to the applicable NEC Articles and UL Standards.
The InvisiMount system is Listed to UL 2703 for integrated grounding; SunPower AC Modules are a bonding
component and are Listed to UL 1741. If you are installing SunPower AC Modules on the InvisiMount
system, no additional grounding hardware, lugs, or copper wire are required on the roof. '
SunPower InvisiMountn`" + AC Module Ground Achievement
Trans cable
Trans box Houseground
Array a a' r C�; l's,F;
etl� i'�I� klt
t ,
Splice Mid End AC
L foot Rail screw Splice clamp clamp Module
S -UN _P OWE R5 Nov. 2015
Document #515791 RevA
SunPower Proprietary
If you are installing SunPower AC Modules on the SunPower InvisiMountTm mounting system (or any
mounting system that.is Listed to UL 2703 for bonding—notjust for fire classification), no additional
grounding wire is required: '
• The SunPower AC Module is one of the components that bonds all of the metallic non-current carrying
components in the system, and is Listed to UL 1741.
• As part of UL 2703, only AC equipment grounding requirements apply—not DC system grounding
requirements nor DC equipment grounding requirements.
• The equipment grounding conductor (EGC) that's built into the module's AC cable system is sized
appropriately and meets all of the AC equipment grounding requirements for the system.
• . The AC dedicated branch circuit wiring from the readily accessible disconnect to the array must include
an equipment grounding conductor (EGC) in the same raceway or cable as the AC circuit conductors. This
EGC must be connected to the green conductor of the transition cable, which is part of the'AC module
cable system.
• If a module is removed from a circuit, you must install a temporary EGC to bridge the gap by inserting an
AC extension cable or other means, in order to maintain effective ground continuity to subsequent
modules.
• Because the modules are connected in a "daisy chain" fashion, disconnecting one module from the circuit
using the AC cable removes voltage and ground from the other downstream modules in the circuit.
Extreme care should be taken to ensure that no other energized sources are adjacent to these
ungrounded modules, otherwise auxiliary grounding methods must be applied.
• Because the DC power is internal to the module, a grounding electrode conductor (GEC) for the module
or array is not required. The existing AC GEC at the utility service serves as the NEC -required GEC for the
structure.
• The AC cable grounding path has been tested by a NRTL, and its electrical continuity from the AC cable
ground pin to the module frame has been certified.
The AC module interconnecting cable system provides an internal EGC for grounding the AC modules. It
is the installer's responsibility to ground any metallic mounting structure according to local code.
Installers must ensure that whichever mounting system they choose is then grounded according to the
instructions of that mounting system. Some mounting systems can be bonded to the AC modules with
listed devices. Consult the module's included safety instructions for details.
Neither the AC modules nor the array require a GEC, and the neutral conductor within the AC module is
isolated from ground. The AC module must be connected to a dedicated AC branch circuit with the
neutral conductor referenced at the building service entrance.
• The AC interconnecting cable system attached to each module's microinverter is fully insulated:,and
includes an internal EGC. The grounding pin is longer than the others in the plug.
Document #515791.RevA
25 SunPower Proprietary
SUNPOWER�
by Hooked on Solar
0■
SSESORS PARCEL #:
000-000-000
PARCEL ACRES:
O.00AC
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27°
AZIMUTH:
270°
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: I 114"v_
DRAWN BY:
AGN
CHECKED BY:
JAA
24
DATE
SunPower Proprietary
If you are installing SunPower AC Modules on the SunPower InvisiMountTm mounting system (or any
mounting system that.is Listed to UL 2703 for bonding—notjust for fire classification), no additional
grounding wire is required: '
• The SunPower AC Module is one of the components that bonds all of the metallic non-current carrying
components in the system, and is Listed to UL 1741.
• As part of UL 2703, only AC equipment grounding requirements apply—not DC system grounding
requirements nor DC equipment grounding requirements.
• The equipment grounding conductor (EGC) that's built into the module's AC cable system is sized
appropriately and meets all of the AC equipment grounding requirements for the system.
• . The AC dedicated branch circuit wiring from the readily accessible disconnect to the array must include
an equipment grounding conductor (EGC) in the same raceway or cable as the AC circuit conductors. This
EGC must be connected to the green conductor of the transition cable, which is part of the'AC module
cable system.
• If a module is removed from a circuit, you must install a temporary EGC to bridge the gap by inserting an
AC extension cable or other means, in order to maintain effective ground continuity to subsequent
modules.
• Because the modules are connected in a "daisy chain" fashion, disconnecting one module from the circuit
using the AC cable removes voltage and ground from the other downstream modules in the circuit.
Extreme care should be taken to ensure that no other energized sources are adjacent to these
ungrounded modules, otherwise auxiliary grounding methods must be applied.
• Because the DC power is internal to the module, a grounding electrode conductor (GEC) for the module
or array is not required. The existing AC GEC at the utility service serves as the NEC -required GEC for the
structure.
• The AC cable grounding path has been tested by a NRTL, and its electrical continuity from the AC cable
ground pin to the module frame has been certified.
The AC module interconnecting cable system provides an internal EGC for grounding the AC modules. It
is the installer's responsibility to ground any metallic mounting structure according to local code.
Installers must ensure that whichever mounting system they choose is then grounded according to the
instructions of that mounting system. Some mounting systems can be bonded to the AC modules with
listed devices. Consult the module's included safety instructions for details.
Neither the AC modules nor the array require a GEC, and the neutral conductor within the AC module is
isolated from ground. The AC module must be connected to a dedicated AC branch circuit with the
neutral conductor referenced at the building service entrance.
• The AC interconnecting cable system attached to each module's microinverter is fully insulated:,and
includes an internal EGC. The grounding pin is longer than the others in the plug.
Document #515791.RevA
25 SunPower Proprietary
SUNPOWER�
by Hooked on Solar
0■
SSESORS PARCEL #:
000-000-000
PARCEL ACRES:
O.00AC
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27°
AZIMUTH:
270°
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: I 114"v_
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965
530-354-9531
bertram542004@yahoo.com
SHEET TITLE:
GROUNDING
METHOD
PROJECT #:
2012 CLARKE, B
SHEET #:
8.0
DATE:
8/29/17
Solar Label i n Re u i rem=nt 1111111 irrtln
n I ,B! T S I BjjT S
'.." ........ ...
Junction Box & Conduit Raceways
DC Disconnects
Inverter e
NEC 690.5(C) - GROUNDED SYSTEMS
WARNING
ELECTRIC SHOCK HAZARD
IF A GROUND FAULT IS INDICATED,
NORMALLY GROUNDED CONDUCTORS
MAYBE UNGROUNDED AND ENERG2ED
NEC 69035(F) - UNGROUNDED SYSTEMS
WARNING
ELECTRICAL SHOCK HAZARD.
THE DC CONDUCTORS OF THIS
PHOTOVOLTAIC SYSTEM ARE UNGROUNDED
AND MAY BE ENERGIZED.
Main Service Panel
NEC 705.12(D)(7)- NEAR PV BREAKER
AC Disconnects
NEC 690.14f0f21
DISCLAIMER
The purpose of this graphic Is to provide a reference guide to solar photovoltaic system labeling requirements in accordance with the
2011 National Electric Code (NEC), National Fire Protection Association (Copyright 2010), as interpreted by the Institute for Building
Technology and Safety (IBTS). Users should always follow the code requirements and interpretations for specific placement of labels of
the presiding Authority Having Jurisdiction (AHJ). NFPA 701, National Electrical Code* and NEC" are registered trademarks of the
National Fire Protection Association, Quincy, MA. -
O Institute for. Building Technclogy.and Safety, 2014
1. Located where readily accessible
2. Externally operable without exposing the operator to contact with live parts 705Point of Connection, Inverter Output Connection
Unlessss the
(7) he panelboard is rated not less than the sum of the ampere ratings of all
3. Plainly indicating whether in the open or closed position over -current devices supplying it, a connection in a panelboard shall be positioned at the
4. Having an interrupting rating sufficient for the nominal circuit voltage and the ' opposite (load) end from the input feeder location or main circuit location. The bus or
- current that is available at the line terminals of the equipment 1conductor rating shall be sized for the loads connected in accordance with Article 220.
Where all terminals of the disconnecting means may be energized in the open position, a In systems with panelboards connected in series, the rating of the first overcurrent
warning sign shall be mounted on or adjacent to the disconnecting means. The sign shall device directly connected to the output of a utility -interactive inverter(s) shall be used in
be clearly legible and have the following words or equivalent: the calculations for all busbars and conductors. A permanent warning label shall be
WARNING applied to the distribution equipment with the following or equivalent wording:
ELECTRIC SHOCK HAZARD. WARNING
DO NOTTOUCH TERMINALS. TERMINALS INVERTER OUTPUT CONNECTION
ON BOTH THE LINE AND LOAD SIDES DO NOT RELOCATE THIS
MAY BE ENERGIZED IN THE OPEN POSITION. OVERCURRENT DEVICE
Exception: A connectorsholl be permitted to be used as an AC or a DC disconnecting ® IBTS INTERPRETATION: This label must be used when the sum of the Photovoltaic
means, provided that it complies with the requirements of690.33 and is listed and system breaker/fuse and Main Service Panel breaker/fuse is greater than 100% of
identified for the use. the bulbar rating. It is not required if the sum of those two breakers supplying the
busbar is equal to or less than the busbar is rated for.
IBTS INTERPRETATION: This label should be installed on the covers of the Example A: 200A maximum rating on busbar. 200A main breaker+20A back
disconnecting means that may be energized in the open position. This includes fed PV breaker = label required
combiner boxes, DC disconnects and inverters with integrated DC disconnects. Example B: 220A maximum rating on busbar. 200A main breaker+20A back
Should be installed on grounded and ungrounded systems. fed PV breaker = no label required.
NEC 690.56(B) Facilities with Utility Services and PV Systems
NEC 690.53 Direct -Current Photovoltaic Power Source • Buildings or structures with both utility service and a photovoltaic system shall have a
A permanent label for the direct -current photovoltaic power source indicating items 1 permanent plaque or directory providing the location of the service disconnecting means
through 5 shall be provided by the installer at the photovoltaic disconnecting means: and the photovoltaic system disconnecting means if not located in the same location.
1. Rated maximum power -point current . �I IBTS INTERPRETATION: All system disconnects on a Utility -Interactive PV System,
2. Rated maximum power -point voltage �,. - are required to have this label identifying where other system disconnecting means.''
r are located if not visible from either component. - -
3. Maximum system voltage
Informational Note to 3.: See 690.7 (A) for maximum photovoltaic system voltage.
4. Short-circuit current
Informational Note to 4.: See 690.8(A) for calculation ofmoximum circuit current. Reprintedwith permission from NFPA 70- - 2014, NotionolEreariml Code, Copyright 02013, National Fire Protection
Association, This reprinted material is not the complete and official position of the NFPA on the referenced•
5. Maximum rated output current ofthe charge controller (if installed)` subject which is represented only by the standard in bs entirety.
Informational Note: Reflec ting sys tems used for irrodiance enhoncemen t may result in -
increased levels ofoutputcurrent and power. ® CONTACT ® CONNECT
IBTS INTERPRETATION:This code reference describes the label content to be www.ibts.org ® facebook/IBTSSolar
present at any DC disconnecting means of a system. If applicable, this includes Chris Doyle Program Director -Solar
inverters with an integrated DC disconnect. IJ @IBTS solar
cdoyle@ibts.org 1 512.452.8899
IBTS - Solar PV
t ® IBTSorg
Q Institute for BuildingTechnology-and Safety, 2014
SUNPOWERG
by.Hooked on Solar
SSESORS PARCEL #:
000-000-000
PARCEL ACRES:
O.00AC
r - ,
" t ,
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:. ; t -
(18) SPR-X21-335-BLK-C=AC•"
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27.°
�AZIMUTH*
270°
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: I 11114 1tl
DRAWN BY:
AGN
NEC 690.31(E)(3), (4) Wiring Methods, Direct -Current Photovoltaic Source'
NEC 690.5(C) Ground Fault Protection, Labels and Markings
DATE
and Output Circuits Inside a Building, Marking or Labeling Required 4
A warning label shall appear on the utility -interactive inverter or be applied by the
Marking or Labeling Required.The following wiring methods and enclosures that contain
installer near the ground -fault indicator at a visible location, stating the following:
PV power source conductors shall be marked with the wording "Photovoltaic Power
- WARNING
Source"by means of permanently affixed labels or other approved permanent marking:'
ELECTRIC SHOCK HAZARD .
1. Exposed raceway, cable trays and other wiring methods
s + _ IF A GROUND FAULT IS INDICATED, r
2. Covers or enclosures of pull boxes and junction boxes ``
NORMALLY GROUNDED CONDUCTORS MAY
BE UNGROUNDED AND ENERGIZED
SHEET TITLE:
SAFETY
LABELS
3. Conduit bodies in which any of the available conduit openings are unused
•
When the photovoltaic system also has batteries, the same warning shall also be applied ••
DATE:
8/29/17
The labels or markings shall be visible after installation. Photovoltaic power circuit labels '
by the installer in a visible location at the batteries. ,
.•
shall appear on every section of the wiring system that is separated by enclosures, walls,IBTS
INTERPRETATION: A warning label shall be applied to the Inverter or near the
partitions, ceilings or Floors. Spacing between labels or markings, or between a label and '
®I
ground fault indicator describing the hazard that would exist in the event of a
a marking, shall not be more than 3 m (10 h.). Labels required by this section shall be-. <
ground fault
suitable for the environment where they are installed. • .4
IBTS INTERPRETATION:This code is specific to DC circuits to be identified as a r-
®I
Photovoltaic Power Source. This includes DC conduit, Junction Boxes, and
NEC 690.14(c)(2) Additional Provisions Requirements for Disconnecting
Combiner Boxes that are inside or connected to the building structure. i, ,
` v ' "•
Means, Markings " '•' '
_
" + x ? �.
Each photovoltaic system disconnecting means shall be permanently marked to identify
y' +, _
'it as a photovoltaic system disconnect t
NEC 690.35(F) Ungrounded Photovoltaic Power Systems
9 Y
The photovoltaic power source shall be labeled with the following warning at each
U
IBTS INTERPRETATION: Required at any disconnecting means including AC r
Disconnect, DC Disconnect, and Main Service Panel. Also required at Inverters with
junction box, combiner box, disconnect and device where energized_, ungrounded circuits F
Integrated disconnects and subpanels.This label should be applied directly to the
f
may be exposed during service:
component and does not apply to the"line of sight"provision. The DC or AC
"
WARNING .,
reference is not specifically required. • +
l 1
•
ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS
I
x``16INTERPRETATION:
1
r. OF THE PHOTOVOLTAIC SYSTEM ARENEC
F • , -
705.12 s r
(D)(4) Point of Connection, Utility -Interactive Inverters,
•
- UNGROUNDED AND MAY BE ENERGIZED. ':� t
Markings r ;
^
INTERPRETATION:This label should be installed for Ungrounded Photovoltaic
Equipment containing overcurrent devices in circuits supplying power to a busbar or
®IIBTS
Systems on DC components where ungrounded circuits may be exposed during
conductor supplied from multiple sources shall be marked to indicate the presence of
service.This includes thejunction box, combiner box, DC disconnect, and Inverter.
all sources.
IBTS INTERPRETATION: This label is required on the main service panel to
r
®I
Identify that the panel is energized from multiple sources, the Utility and a
NEC 690.17 Switch or Circuit Breaker
Photovoltaic system. Label is also required on subpanels, fused AC disconnects,
The disconnecting means for ungrounded conductors shall consist of manually operable
or any other component housing an overcurrent protective device.
✓
switch(es) or circuit breakers(s) complying with all of the following requirement
DISCLAIMER
The purpose of this graphic Is to provide a reference guide to solar photovoltaic system labeling requirements in accordance with the
2011 National Electric Code (NEC), National Fire Protection Association (Copyright 2010), as interpreted by the Institute for Building
Technology and Safety (IBTS). Users should always follow the code requirements and interpretations for specific placement of labels of
the presiding Authority Having Jurisdiction (AHJ). NFPA 701, National Electrical Code* and NEC" are registered trademarks of the
National Fire Protection Association, Quincy, MA. -
O Institute for. Building Technclogy.and Safety, 2014
1. Located where readily accessible
2. Externally operable without exposing the operator to contact with live parts 705Point of Connection, Inverter Output Connection
Unlessss the
(7) he panelboard is rated not less than the sum of the ampere ratings of all
3. Plainly indicating whether in the open or closed position over -current devices supplying it, a connection in a panelboard shall be positioned at the
4. Having an interrupting rating sufficient for the nominal circuit voltage and the ' opposite (load) end from the input feeder location or main circuit location. The bus or
- current that is available at the line terminals of the equipment 1conductor rating shall be sized for the loads connected in accordance with Article 220.
Where all terminals of the disconnecting means may be energized in the open position, a In systems with panelboards connected in series, the rating of the first overcurrent
warning sign shall be mounted on or adjacent to the disconnecting means. The sign shall device directly connected to the output of a utility -interactive inverter(s) shall be used in
be clearly legible and have the following words or equivalent: the calculations for all busbars and conductors. A permanent warning label shall be
WARNING applied to the distribution equipment with the following or equivalent wording:
ELECTRIC SHOCK HAZARD. WARNING
DO NOTTOUCH TERMINALS. TERMINALS INVERTER OUTPUT CONNECTION
ON BOTH THE LINE AND LOAD SIDES DO NOT RELOCATE THIS
MAY BE ENERGIZED IN THE OPEN POSITION. OVERCURRENT DEVICE
Exception: A connectorsholl be permitted to be used as an AC or a DC disconnecting ® IBTS INTERPRETATION: This label must be used when the sum of the Photovoltaic
means, provided that it complies with the requirements of690.33 and is listed and system breaker/fuse and Main Service Panel breaker/fuse is greater than 100% of
identified for the use. the bulbar rating. It is not required if the sum of those two breakers supplying the
busbar is equal to or less than the busbar is rated for.
IBTS INTERPRETATION: This label should be installed on the covers of the Example A: 200A maximum rating on busbar. 200A main breaker+20A back
disconnecting means that may be energized in the open position. This includes fed PV breaker = label required
combiner boxes, DC disconnects and inverters with integrated DC disconnects. Example B: 220A maximum rating on busbar. 200A main breaker+20A back
Should be installed on grounded and ungrounded systems. fed PV breaker = no label required.
NEC 690.56(B) Facilities with Utility Services and PV Systems
NEC 690.53 Direct -Current Photovoltaic Power Source • Buildings or structures with both utility service and a photovoltaic system shall have a
A permanent label for the direct -current photovoltaic power source indicating items 1 permanent plaque or directory providing the location of the service disconnecting means
through 5 shall be provided by the installer at the photovoltaic disconnecting means: and the photovoltaic system disconnecting means if not located in the same location.
1. Rated maximum power -point current . �I IBTS INTERPRETATION: All system disconnects on a Utility -Interactive PV System,
2. Rated maximum power -point voltage �,. - are required to have this label identifying where other system disconnecting means.''
r are located if not visible from either component. - -
3. Maximum system voltage
Informational Note to 3.: See 690.7 (A) for maximum photovoltaic system voltage.
4. Short-circuit current
Informational Note to 4.: See 690.8(A) for calculation ofmoximum circuit current. Reprintedwith permission from NFPA 70- - 2014, NotionolEreariml Code, Copyright 02013, National Fire Protection
Association, This reprinted material is not the complete and official position of the NFPA on the referenced•
5. Maximum rated output current ofthe charge controller (if installed)` subject which is represented only by the standard in bs entirety.
Informational Note: Reflec ting sys tems used for irrodiance enhoncemen t may result in -
increased levels ofoutputcurrent and power. ® CONTACT ® CONNECT
IBTS INTERPRETATION:This code reference describes the label content to be www.ibts.org ® facebook/IBTSSolar
present at any DC disconnecting means of a system. If applicable, this includes Chris Doyle Program Director -Solar
inverters with an integrated DC disconnect. IJ @IBTS solar
cdoyle@ibts.org 1 512.452.8899
IBTS - Solar PV
t ® IBTSorg
Q Institute for BuildingTechnology-and Safety, 2014
SUNPOWERG
by.Hooked on Solar
SSESORS PARCEL #:
000-000-000
PARCEL ACRES:
O.00AC
r - ,
" t ,
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:. ; t -
(18) SPR-X21-335-BLK-C=AC•"
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27.°
�AZIMUTH*
270°
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: I 11114 1tl
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965
530-354-9531
bertram542004@yahoo.com .
SHEET TITLE:
SAFETY
LABELS
PROJECT #:
2012 CLARKE, B
SHEET #:
9.0
DATE:
8/29/17
F
R -CAP
6
1
9
SUNPOWER�
by Hooked on Solar
R
N'
r SSESORS PARCEL #:
Q 000-000-000
PARCEL ACRES:
O.00AC
TO MSP
P
CHECKED BY:
JAA
DESCRIPTION
DATE
R P
R P
R P
MODULE #
RP
MODULE #
R P
MODULE #
R P
MODULE #
R P
MODULE'# '
R P
MODULE # '
6
1
9
SUNPOWER�
by Hooked on Solar
R
N'
r SSESORS PARCEL #:
Q 000-000-000
PARCEL ACRES:
O.00AC
TO MSP
P
CHECKED BY:
JAA
DESCRIPTION
DATE
R P
R P
R P
N
R P
MODULE #
R Iw
LL==uP
MODULE #
O
-
70
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965
530-354-9531
bertram542004@yahoo.com
SHEET TITLE:
AS BUILT/
MICRO INVERTER
MAP
PROJECT #:
2012 CLARKE, B
TO MSP
DATE:
8/29/17
NA
MODULE #
MODULE #
MODULE #
R P
R P
R P
R P
MODULE #
MODULE #
MODULE #
MODULE #
P -CAP
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27°
AZIMUTH:
270'
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: 1 14d'/V //
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
R P
MODULE #
R W P
LLD
MODULE #
R P
MODULE #
R P
MODULE #
R Iw
LL==uP
MODULE #
P -CAP
SMALL-SCALE, SINGLE-PHASE PV
SYSTEM SIZE:
6.03 kW DC
MODULES:
(18) SPR-X21-335-BLK-C-AC
CIRCUITS:
CIRCUIT #1 ACPV IN SERIES = 12
CIRCUIT #2 ACPV IN SERIES = 6
TILT:
27°
AZIMUTH:
270'
INSTALL TYPE:
COMP
SP LEASE # 1139379
SIGNED BY: 1 14d'/V //
DRAWN BY:
AGN
CHECKED BY:
JAA
DESCRIPTION
DATE
REV
CUSTOMER NAME:
BERTRAM CLAKE
1114 14TH STREET
OROVILLE, CA 95965
530-354-9531
bertram542004@yahoo.com
SHEET TITLE:
AS BUILT/
MICRO INVERTER
MAP
PROJECT #:
2012 CLARKE, B
SHEET #:
1 0.0
DATE:
8/29/17
NA