Loading...
HomeMy WebLinkAboutB17-2169 042-020-038k BUTTE'COUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES' S INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 530.538.7785 www.ButteCounty.net/dds Permit No: B17-2169 Issued: 9/13/2017 APN: 042-020-038 , Address: 3378 NORD AVE, CHICO Owner: MOFFETT EULA J Permit Type: SOLAR ROOF -RES . Description: Install 7.59kw roof mount to existing meter, 5 Flood Zone: None SRA Area: No SETBACKS for Zoninfy. AG. SRA. Pi Front: Centerline of Road: . Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: . ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Insvection TY12e IVR INSP DATE Setbacks 131 Foundations / Footings 111 - Pier/Column Footings 122 Eufer Ground 216 ` Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Signed Pre -Slab 124 Gas Test Underground/floor• 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319- 19-Shear ShearTransfer 136 _ Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin nder inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed ShearwallB.W.P.-Interior 134. ShearwallB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Manometer Test 605 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 " Gas Piping House 403 f Gas Test House 404 + Shower Pan/Tub Test 408- 08-Do DoNot Insulate Until Above Signed, Permit Final 802 IG I . Electrical Final 803 " Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 r Swimming Pools Inspection Type IVR INSP DATE T -Bar Ceiling - 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes - Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin /Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final --PROJECT FINAL lCJ — -rrojcc[ rinal Is a t-ertincafe of Occupancy for (Kesidenthat Only) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A I YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION PROJECT OWNER: MOFFETT, EULA 3378 NORD AVE. CHICO, CA 95973 APN: 042.020.038 PH#:530.519.7134 EMAIL:bethannie68@hotmail.com CONTRACTOR: ALTERNATIVE ENERGY SYSTEMS INC. 13620 HIGHWAY 99 CHICO, CA 95973 INA &%Ve SCOPE: INSTALL PHOTOVOLTAIC SOLAR SYSTEM ON A TRUSS ROOF, MOUNTED IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES SPECIFICALLY REFERENCING THE 2016 CALIFORNIA ELECTRICAL CODE/ 2014 NEC USING THE FOLLOWING SPECIFIC EQUIPMENT: 1. MODULES: SUNPOWER (22) SPR -X21 -345 -D -AC 7.59kW SYSTEM 402 SQFT COVERED CSLB: 853351 C-10, C-46 2. INVERTER(S): SUNPOWER (22) MODULE INTEGRATED 326W BUILDING JURISDICTION: SITE MAP , BUTTE COUNTY DEPT. OF DEVELOPMENT SERVICES 7j 7 COUNTY CENTER DRIVE iir liy OROVILLE, CA 95965 OFFICE#: (530) 538-7601 FAX#: (530) 538-2140 MON-FRI 8AM-3PM t 0 PAGE # CONTENT PV -1.0 SCOPE PV -2.0 SITE PLAN PV -3.0 ARRAY LAYOUT PV -4.0 ELECTRICAL DIAGRAM PV -4.1 LABEL DIAGRAM PV -5.0 GENERAL NOTES ATTACHMENT MODULE SPECS n p o INVERTER SPECS O og RACKING SPECS WIRE CALCS INSPECTION LINE: (530) REQUESTS PHONED IN BY 2PM WILL BE INSPECTED THE NEXT BUSINESS DAY r. ti•�_ �+=�i . �!' `�/ p m o m 13620 HWY 99 = S MOFFETT, EULA Energy For Lie CHICO, CA 95973 p 1 o 9 o n m p o oo " 3378 NORD AVE. ��® PHONE#: (530) 345-6980 n p o O O og CHICO, CA 95973 FAX#: (530) 892-2360 Z o Alternative Ener Systems Inc. APN: 042.020.038 PH#:530.519.7134 9Y y design@solarenergyforlife.com f (P) MONITORING & MON%S� DISTRIBUTION PANE4fiE)CA(E) PGE METER'& (E.) SE, ,,ICE PANEL O"UTE, LOCATIOT. N ` 1, w `r•" . �l' _ -• ,j���,,�, _ r - - ] (E) POOL � L +ice-� 1,L J (E) COMPOSITIONF�O'0 y W/:.WOOD TRUSSES d RESIDENCE SITE P<LA,N o m ° > s MOFFETT, EULA 13620 HWY 99 Energy For Ufe CHICO, CA 95973 `- N ' ° ^ p 3378 NORD AVE. PHONE#: (530) 345-6980 o s << '° O '- CHICO CA 95973 ' FAX#: (530) 892-2360 Z 9 > o °� APN: 042.020.038 PH#:530.519.7134 Alternative Energy'Systems Inc. design@solarenergyforlife.com FIRE CODE O ' M j NI o fV •gypp • - ' ARRAY LAYOUT n p o o ' m $- _ m� S MOFFETT EULA ' .13620 HWY.99 Energy For Life *CHICO, CA 95973 r "•,� A `- s <; W Z D ° Z o 3 a �� 3378 NORD AVE. , moo!, PHONE#: (530) 345 6980 o z +' CHICO CA 95973 'FAX#: (530) 892 2360 o Z D c a • APN: 042.020.038 PH#:530.519.7134`' Alternat(ve Ener 3 stems Inc: 9Y y _ design@solarenergyforlife.com _ _ / _ — _ — _ — — _ _ AC -1 ON ROOF w/ AC"2 - (1) 3/4" EMT I SERVICE VOLTAGE .. _ • (2) TRANSITION CABLE(3)#8 WIRE RUN: 5' THWN-2 CU.& (1) #10 THWN-2 CU. GRD. 120V=N-L2-L3=NAV 1 I .IMP: 20A - (2) #10 - 2 WIRE NM CABLE CU. WIRE RUN: SO'. NAV=N-L3-Ll=NAV u WIRE RUN: 20' IMAX: 37A IMAX: 20A I METER (22) PV MODULES/INVERTERS JUNCTION SUNPOWER:SPR-X21-345-D-AC' I BOX • 240V/1P/1.33A ( / 20A 1P - _ 240V .. 20A 200A 1P - 1P 240V 240V19- 1P 240V 40A (N)AC DISTRIBUTION PANEL - 125A/ 1P/ 240V • - - p •. (E) AC SERVICE PANEL _ - 200A/ 1P/ 240V _ SCIR: 10,000 METER#:1007331121 - AC -MONITORING . .. .. (1) 1/2" EMT w/ - - .- (2)#14 THWN-2 CU.& _ (1)#14THWN-2 CU. GRD. - • WIRE RUN: 10', CAT -5 SUNPOWER PVS5X . - r - • . .. '/% - �- ] MONITORING { 1. f. �' _ r . r i . ROUTER ELECTRICAL DIAGRAM 0 m 0 > S MOFFETT, EULA - 13620 HWY 99 p 0 C a n n A m m o o m 3378 NORD AVE.. 9Y [n, er for[!fe CHICO, CA 95973 PHONE#: (530) 345-6980 `- Z 3 S • - ° g N CHJCO, CA 95973 ®La0 FAX#: (530) 892-2360 0 . > o oz APN: 042.020.038 PH#:530.519.7134 Alternative Energy'Systems Inc. design@solarenergyforlife.com 1 16 AC PV ARRAY DISCO N MAIN SUB PANEL -"METER AMPS PHASE VOLTS I— WARNING UTILITY INTERACTIVE POWER FLOWING THROUGH THIS PANEL KW SOLAR GENERATOR AC OPERATING VOLTAGE: __J_VAC/_PHASE WARNING PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN DUAL POWER SUPPLY PHOTOVOLTAIC SYSTEM Per NEC 690.54, Interactive Point of interconnection installed at all Electrical Per NEC 705.10, Point of Connection, F Distribution Panel covers that provide a path'. Located On Main Service PaAel. • from PV to Utility. AC PHOTOVOLTAIC DISCONNECT FOR UTILITY OPERATION Per, NEC 690.14, Disconnection means at: the single AC DiiConnect or Main Breaker. SOLAR BREAKER DO NOT RELOCATE Solar breaker label @ any breaker passing Bi-Di.rectional Power LABEL -DIAGRAM -13620 HWY 99 0 'MOFFETT, EULA 111r9Y PCe CHICO, CA 95973 0 G. 3378 NORD AVE. > .80 PHONE#: (530) 345-6980 — 21 > Pm on CHICO, CA 95973 .0 WOM FAX#: (530) 892-2360 l'-" 0 Aliternaii1v En Az APN: 042.020.038 PH4:530.519.7134 �erqy'SXstenns Inc. design@solarenergyforlife.com ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2014 NATIONAL ELECTRIC CODE (NEC), OR LOCAL MUNICIPAL CODE, AND FIRE DISTRICT REGULATIONS. 1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. 2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM. 3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION BOXES, COMBINER BOXES, AND SWITCHES. 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ART.250,690. 5. NEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES. 6. NEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING. 7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF NEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF NEC 408.16(F). 8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK. 9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75° C MINIMUM. 10. NEC ART. 690.14. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM 11. NEC ART. 690.53. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM 12. NEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK HAZARD- DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAY BE ENERGIZED IN THE OPEN POSITION". 13. GROUNDING OF ALL DWELLINS SHALL BE CONFIRMED. 14. CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS LOCATED ON DWELLINGS PER 2014 NEC ART.690.17. 15. WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXIST, THE DIFFERENT SYSTEMS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER 2014 NEC ART.210.41D 16. PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS. 17. PHOTOVOLTAIC SOURCE CURRENTS MUST BERATED AT BOTH 125% OF THE PARALLEL MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 156% OF THE LOAD. 18. PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE NOT IN THE SAME LOCATION PER 2014 NEC ART.690.56. 19. INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7 -OS, CHAPTER 13. 20. PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS. 21. PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS INSTALLED AS SPECIFIED IN THESE DRAWINGS. 22. DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE, CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL OR PHYSICAL PLACEMENT. 23. FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL UTILITY. 24. A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2014 NEC 690.5(H) AND IN ACCORDANCE WITH 2O14`NEC 705.10. 25. A NON FOLDING LADDER WILL BE IN PLACE AND SECURED TO THE ROOF TO PROVIDE ACCESS FOR ALL INSPECTIONS. ALL BOXES WILL BE OPENED UPON REQUEST. 26. SMOKE AND CARBON MONOXIDE ALARMS WILL BE INSTALLED IN ACCORDANCE WITH CRC R314 R315 m ^0 °� S MOFFETT, EULA 13620 HWY 99 g ^ Z z A m 3 m 3378 NORD AVE. Ener For gy, CHICO, CA 95973 PHONE#: (530) 345 6980 N o Z Z o ' A ^ O - = CHICO, CA 95973 FAX#: (530) 892-2360 ° m m D APN: 042.020.038 PH#:530.519.7134 Alternative Energy'Systems Inc. design@solarenergyfor!ife.com June 22, 2017 To Whom it May Concern, In order to meet future advanced grid requirements, SunPower® is transitioning from Type C AC modules to Type D• AC modules. The purpose of this letter is todemonstrate the mechanical and electrical equivalency of Type C AC modules and Type D AC modules. -Type D AC modules are drop-in replacements for Type CAC modules and are available at the . same DC and AC power levels. Type D AC rriodules have the same form, fit, and function as Type C AC modules. The AC electrical output specifications of Type C'AC modules and Type D AC;modules are equivalent, ensuririg interchangeability for AC conductors, overcurrent protection devices, and grounding.-,' SunPower Type D AC modules are certified per UL 1741 SA to the following SRDs: IEEE 1547, IEEE 1547a, and CPUC Rule 21 Phase 1'. These additional certifications and fur'ctionality enable Type D AC modules to meet California CPUC Rule 21 - Phase 1 smart inverter requirements. The following table lists_ the Type'C AC'modul_e models and their respective,Type D equivalents, as of the`date_ of this letter: i ,Where Type D AC modules are substituted in the field for Type CAC modules, no changes to the physical layout, structural • 'loading, electrical design, or interconnection are required: f ' r ' Should you have any questions or concerns, please contact SunPower Technical'Support at 1-800-786-7693. Best Regards, , Matt Mayberry ' Director_ Residential Product Management o- 1l e- oe 5 oe e E19 -320 -C -AC E19 -3207'D -AC` E20-327-C-AC,•E20-327-D-AC X21-335-BLK-GAC .,... X21-335-BLK-D-AC . X21 -335 -C -AC X21 -335 -D -AC X21 -345=C -AC - t X21 -345 -D -AC ' X22 -360 -C -AC, ' X22=360 -D -AC i ,Where Type D AC modules are substituted in the field for Type CAC modules, no changes to the physical layout, structural • 'loading, electrical design, or interconnection are required: f ' r ' Should you have any questions or concerns, please contact SunPower Technical'Support at 1-800-786-7693. Best Regards, , Matt Mayberry ' Director_ Residential Product Management o- 1l e- oe 5 oe e E19 -320 -C -AC E19 -3207'D -AC` E20-327-C-AC,•E20-327-D-AC X21-335-BLK-GAC .,... X21-335-BLK-D-AC . X21 -335 -C -AC X21 -335 -D -AC X21 -345=C -AC - t X21 -345 -D -AC ' X22 -360 -C -AC, I 174 At - Power° X21 -345 -D -AC Design -Driven Advantages' #1 module aesthetics and efficiency' Unmatched module reliability2 • I No electrolytic capacitors 25 -year Combined Power and Product Warranty, California Rule 21 Phase 1 compliant Maximize Value for Roof Size system for roof, not string inverter Optimize performance of each module Expand Deployment Options. Complex roofs and partial shading Small systems System expandability Simplify & Speed Installation Factory.integrated microinverter Robust, double -locking AC connectors. Design flexibilityoffsite and onsite No DC string sizing process Fewer installation steps than competing systems Intuitive commissioning ,Component of Complete System Built for use with SunPower'* Invisilvountl" and the SunPower Monitoring System (PVS5x) Superior system reliability and aesthetics idential AC Module Series Optimize System and Installation Efficiency X SERIES SunPower11AC modules, which include a factory -integrated SunPower microinverter, provide a revolutionary combination of high efficiency, high reliability, and'module-level DC -to -AC power conversion. Designed specifically for use with SunPower InvisiMouncTm and the SunPower Monitoring System, SunPower AC modules enable rapid installation, best - in -class system aesthetics, and intuitive visibility into system performance. All this comes with the best Combined Power and -Product Warranty in the industry. Grid Support Utility -Interactive Smart Inverter SunPower's new Type D AC module is UL tested and certified to UL 1741 SA and provides advanced smart inverter functions. SunPower Type D AC modules'are fully compliant with the California Rule 21 Phase 1 requirements; and the Rule 21 grid profile is easily set during commissioning with SunPower PVS5x monitoring hardware. sunpower.com y 4 Optimize System and Installation Efficiency X SERIES SunPower11AC modules, which include a factory -integrated SunPower microinverter, provide a revolutionary combination of high efficiency, high reliability, and'module-level DC -to -AC power conversion. Designed specifically for use with SunPower InvisiMouncTm and the SunPower Monitoring System, SunPower AC modules enable rapid installation, best - in -class system aesthetics, and intuitive visibility into system performance. All this comes with the best Combined Power and -Product Warranty in the industry. Grid Support Utility -Interactive Smart Inverter SunPower's new Type D AC module is UL tested and certified to UL 1741 SA and provides advanced smart inverter functions. SunPower Type D AC modules'are fully compliant with the California Rule 21 Phase 1 requirements; and the Rule 21 grid profile is easily set during commissioning with SunPower PVS5x monitoring hardware. sunpower.com 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 =1 rank in TV Module Durability Initiative Public Report,' Fraunhofer CSE, Feb 2013. Five out of the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/.acts for details. 'Factory set to 154.7a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Installation Guide #518101 for more information. 'Standard Test Conditions (1000 w/m� irradiance, AM 1.5, 25' Q. NREL calibration standard: SOMS current, LA.CCS FF and voltage. All DC voltage is fully contained within the module. 'Based on average of measured power values during production. Seevmv.sunpower.com/facts for more reference information. For more details, see extended datasheet: vnvw.sunpower.com/datasheets. 0•- • • • OR SPR -X21 -345 -D -AC SPR -X21 -345 -D -AG Nominal Power' (Pnom) t IEEE 1547a-20143 - CA Rule 21 SRD Profile 21.5% 21.0% ' (default settings) min. / nom. / max. Shade Tolerance • Three bypass diodes Integrated module -level maximum power point tracking ' min. / nom. J max. Equipment Grounding Frequency (Hz) UL 6703, UL 9703 Connectors and cables 59.5 / 60.0 / 60.5 58.5 / 60.0 / 60.5 Power Factor UL 1741•AC Module (type 2 fire rating) 0.99 V1.00 / 1.00. - 0.85 lead./ 1.00 / 0.85 lag. Reactive Power NEC 690.6 -169 Var outside the array) Vol[-VAr Voltage @240 V 211.2 / 240 / 264 V W nen used with InvisiMount racking (UL 2703): @208 V. 183 / 203 / 228.8 V ?Class A fire rated Max. Current @240 V 1.33 A @208 V 1.54 A 4 DC/AC CEC Conversion Efficiency @240 V 96.0% @208 V .95.5% Max. Units Per 20 A Branch Circuit @240 V 12 (single phase) @208 V 10 (two pole)'nlye Power .320 W, 320 VA " No acdve.phase'balancing for 3 phase installations 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 =1 rank in TV Module Durability Initiative Public Report,' Fraunhofer CSE, Feb 2013. Five out of the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/.acts for details. 'Factory set to 154.7a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Installation Guide #518101 for more information. 'Standard Test Conditions (1000 w/m� irradiance, AM 1.5, 25' Q. NREL calibration standard: SOMS current, LA.CCS FF and voltage. All DC voltage is fully contained within the module. 'Based on average of measured power values during production. Seevmv.sunpower.com/facts for more reference information. For more details, see extended datasheet: vnvw.sunpower.com/datasheets. 0•- • • • Operating Temp. SPR -X21 -345 -D -AC SPR -X21 -345 -D -AG Nominal Power' (Pnom) 345 W 335 W Power Tolerance +5/-0% -.5/-0% Avg. Panel Efficiency 5 21.5% 21.0% ' Temp. Coef. (Power) -0.29%/'C Shade Tolerance • Three bypass diodes Integrated module -level maximum power point tracking ' 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 =1 rank in TV Module Durability Initiative Public Report,' Fraunhofer CSE, Feb 2013. Five out of the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/.acts for details. 'Factory set to 154.7a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Installation Guide #518101 for more information. 'Standard Test Conditions (1000 w/m� irradiance, AM 1.5, 25' Q. NREL calibration standard: SOMS current, LA.CCS FF and voltage. All DC voltage is fully contained within the module. 'Based on average of measured power values during production. Seevmv.sunpower.com/facts for more reference information. For more details, see extended datasheet: vnvw.sunpower.com/datasheets. 0•- • • • Operating Temp. -40e F to =185° F (-40°.•C to =85° C) Max. Ambient Temp. '122° F (500 C) Max. Load Wind: 62 psf, 3000 Pa, 305 kc, M2 front & back • Snow: 125 psf, 6000 Pa, 611 kg/m2 front Impact Resistance 1 inch (25 mm) diameter hail at 52 mph 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 =1 rank in TV Module Durability Initiative Public Report,' Fraunhofer CSE, Feb 2013. Five out of the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/.acts for details. 'Factory set to 154.7a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Installation Guide #518101 for more information. 'Standard Test Conditions (1000 w/m� irradiance, AM 1.5, 25' Q. NREL calibration standard: SOMS current, LA.CCS FF and voltage. All DC voltage is fully contained within the module. 'Based on average of measured power values during production. Seevmv.sunpower.com/facts for more reference information. For more details, see extended datasheet: vnvw.sunpower.com/datasheets. �. Solar Cells 96 Monocrystalline Maxeon Gen III Front Glass High -transmission tempered glass with anti - reflective coating Environmental Rati g Outdoor raced Frame Class 1 black anodized (highest AAMA rating) Weight 45.5 lbs (20.6 kg) Recommended Flax. Module Spacing 1.3 in. (33 mm) 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 =1 rank in TV Module Durability Initiative Public Report,' Fraunhofer CSE, Feb 2013. Five out of the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/.acts for details. 'Factory set to 154.7a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Installation Guide #518101 for more information. 'Standard Test Conditions (1000 w/m� irradiance, AM 1.5, 25' Q. NREL calibration standard: SOMS current, LA.CCS FF and voltage. All DC voltage is fully contained within the module. 'Based on average of measured power values during production. Seevmv.sunpower.com/facts for more reference information. For more details, see extended datasheet: vnvw.sunpower.com/datasheets. 1046 mm ' •' [4121n] - '30mm� 111 In) • 1558 mm a�sUwoerunnr Imo- LACK [6131n] �i ®L G2 snnowa LISTED 6oebo Please read the safety and installation instructions for details. Module Fire Perfomwrxe: Type 2 518982 RevB Warranties 25 -year limited power warranty 25 -year limited product warranty UL listed to UL 1741 SA ' -SRDs: IEEE 1547-2003, IEEE i 547a-2014, CA Rule 21 Phase 1 PV Rapid Shutdown Equipment Equipment Grounding j UL 6703, UL 9703 Connectors and cables (load break disconnection) UL 1741•AC Module (type 2 fire rating) Certifications Enables installation in accordance with: NEC 690.6 NEC 690.12 Rapid Shutdown (inside and outside the array) NEC 690.15 AC Connectors, 690.33(A) - (E)(1) t FCC and ICES -003 Class B W nen used with InvisiMount racking (UL 2703): In[egra(ed grounding and bonding ?Class A fire rated PID Test Potential -induced degradation free 1046 mm ' •' [4121n] - '30mm� 111 In) • 1558 mm a�sUwoerunnr Imo- LACK [6131n] �i ®L G2 snnowa LISTED 6oebo Please read the safety and installation instructions for details. Module Fire Perfomwrxe: Type 2 518982 RevB , Module* / Mid Clamp and Rail Module* / End Clamp and Pail End Clamp , v Rail & Rail Splice End Cap . �. . Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking attachment Curved and Flat Tile Roof Attachment Universal Interface for Other Roof Attachments Temperature -40° C to 90° C (-40° F to 194° F) Max -Load 2400 Pa uplift 5"-00 Pa downforce r • s • Warranties 25 -year product warranty Component Material ' . Weight Mid Clamp Black oxide stainless steel AISI 304 63 ; (2.2 oz) End Clamp Black anodized aluminum alloy 6063-T6 110 a (3.35 oz) Rail - Black anodized aluminum alloy 6005-T6 330 g/m (9 oJft) Rail Splice Aluminum alloy 6005-T5 330 g/m (9 oz/ft) - Ground Lug Assembly 304 stainless (A2-70 bolt; tin-plated copper lug) 106.S g/m (3.75 oz) End Cap Black acetal (POM) copolymer 10.4 g (0.37 oz) �. . Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking attachment Curved and Flat Tile Roof Attachment Universal Interface for Other Roof Attachments Temperature -40° C to 90° C (-40° F to 194° F) Max -Load 2400 Pa uplift 5"-00 Pa downforce r • s • Warranties 25 -year product warranty 5 -year finish warranty UL 2703 Listed Certifications Class A fire rating when distance between roof surface and bottom of SunPower module frame is s 3.5" Refer to roof attachment hardware manufacturer's documentation *Module frame that is compatible with the InvisiMount system required for hardware interoperability. t 2015 SunPower corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo; and INVISIMOUNT are tademarks_or registered trademarks of SunPower Corporation. All other trademarks are the property of their respective owner. sunpower.com Specifications included in this datasheet are subject to change without notice. Document nS09506 Rev 8 INVISIMOUNT RACKING DETAIL GreenFasten'. GF1 — Product Guide Vri 150 plvrl'ka�' I 5 Consult an engineer or go to www.ecofastensolar.com for engineering data. Installation Instructions with Compression Bracket 3 4a 4b 4c 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3. Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when tourqued. See page 2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses. 4. Line up pilot hole with GreenFasten flashing hole. 4a Insert the lag bolt through the EPDM washer, the top compression component bracket (L- 102-3, L-102-6*, SCL-101-3*, Z-101 *, Conduit Mount Bracket*) and the gasketed hole in the flashing and into the rafter. 4b Insert the lag bolt through the EPDM washer, the Comp Mount Slide compression bracket and the gasketed hole in the flashing and into the rafter. 4c Insert the lag bolt through the SS washer, the third -party bracket, the EPDM bonded washer, the CP -SQ -Slotted compression bracket and the gasketed hole in the flashing and into the rafter. 5. Torque:The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque_ the fastener. You may need to stop and use'a ratchet to finish the install. *not pictured. 877-859-3947 EcoFasten Solar' All content protected under copyright. All rights reserved. 7/24/2014 EcoFasten Solar products are protected by the following U.S. Patents: 8,151.522 B2 8.153.700 B2 8,181.398 B2 8.166.713 B2 8.146,299 B2 8.209.914 B2 8.245.454 B2 8.272.174 B2 8,225.557 B2 2.1 i is GreenFasten- GF1 — Product Guide Installation Instructions /t;,y * Use,for vertical adjustment when leading edge of flashing hits nails in upper shingle courses [IRFS11I1tl- . Slide flashing up under shingles until leading edge engages nails. Measure remaining distance to adjust shingle 2. Remove flashing and cut "V" notch at marks where nail shafts engaged leading edge of flashing the distance desired in Step 1. Notch depth not to exceed 2" length by 1/2" width. Placement of"V" notch ems • .s'ition notched leading edg y �Nails beneath shinglet yt,A yr - a S a �� y��„c ,< K�" .3, 7 yri�i�l..� 3 �a E?�����`"1J"'•r ,r '� .y'�k l.f ,y, ,r. 'r � b �'�-'� i.,,ta •}Y� n ay''t'y°� .r :... ,+. i ••%F� r.t'y �'k y., �.. . -ryi4 f u'rntt cFWi .jjJ K'� ,"ir ''.a:',i -c.6r, Y*.•,�y. .,.r t -� - '�J.f. c � ,. t�.�'a >.:,�j" r �t v.art�>�.• � ,.� ♦,�Sr�1"+��k: i Y L �J�r Ria n •,i �, a. V�� � � •� XS�� �,�' �:,f'}`3� y.� 5 � � � t� _` L Mrr • .jt+i >[i Y 'f,iy' 1^yx . t t �� 01=4 '" Ynt' r < . � r d i ;lS' sy��� � ► - S+=ff ; ;yam „ ' '+,� .,aii � e �,'4t ;+y . " ,}'�'"i�`?n >. t� � 3 .t.i•i S .� A'tYr":.J' .a t L Y 4 ita4. •-t`a�it•'k ts+. . ,:'}r al �s - kli .{t' Ott F F} ��f t`lr'4 t §Y�� e � � -.!.{. �.; 1. /Y .rfF'�t,t..4 } tr.+�,r ,. r,.:� •' h:. S.. jet%l i i scv �' .. =.ty♦ ,p, •` .. 1 s3:+1+�, h`�+ t'� t.P,�.. +�y' �"µ,. p r�'�,SY. ^•1'S'Y ,f •j i �� +j , ` 1 877-859-3947 EcoFasten Solar®AII content protected under copyright. All rights reserved. 7/24/2014 ' EcoFasten Solar products are protected by the following U.S. Patents: 8.151,522 B2 8,153.700 B2 8,181,398 B2 8,166,713 B2 8.146,299 B2 8.209.914 82 8,245,454 B2 8.272.174 B2 8.225.557 B2 2.2 1, k1 i Green'Fasten" GF1 - Product Guide ' Cut Sheets: GF1 jN yid. I { ` - ... • - . ------------------ --------- 7-7 - -------- t 5 , �t1�.r � wit ;l - . " . - - _ - t:. � - .. .- -. ' ••_ • - - aJ ; SECTION A=A : ; VI t ; .!I1 _, 877-859-3947 Eco Fasten Solar" All content protected under copyright. All rights reserved. 7/24/2014 3,1 Ecol:-sten Solar products are orotected by the following U.S. Patents: 8,151,522 82 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8.209.914 B2 8,245,454 B2 8.272.174 82 8,225.557 B2 ' GreenFasten" GF1 =Product Guide Cut Sheets: GF1- 812 $4X R8„ -.'�'-1/32"±16 ` 5/64 - oil ►i 4f`� r 5 T -A 76 a . DETAIL"A r SCALE: .2:1. fill 1�1� i1, � ����' y • 9 a , t' + Finish Options BLK = Matte Black " tVz " i1 MLL = Mill Finish lit - 877 -859-3947 4i F� •r} n � i F f _ 1 , 877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014 3.2 EcoFasten Solar products are protected bv'the following U.S. Patents: 8.151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8.146.299 B2 8.209.914 B2 8,245,454 B2 8.272.174 132 8.225.557 B2 GreenFa_sten"GF1 — Product Guide Cut•She_ets: Bracket.Options - CP -SQ -Slotted IF gill fir; . • ' � , All 'iifcl w' t=►. ` 1.50 !Qj fi �.Ob — .50 �, ����;�", .38' a •; -.'-. - 200-- - _ �1 \ f `• •' �00 ` 01 1'.00 _ 0 0.38_.00 .S 0.50 . 0,881n1.NR2° _ y ,- �, ..o' . .,, - .fs 2.00 — .. {� 4 A yk tv 3. I: , • . s l aha �t •."� �. _ - �- � V e� ri1'' 877-859-3947 EcoFasten Solar ®AII content protected under copyright. All rights reserved. 7/24/2014 3.3 EcoFasten Solar Products are protected by the following U.S. Patents: 8.151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 82 8,146,299 B2 8.209,914 82 8,245,454 B2 8.272.174 62 8.225.557.62 s GreenFasten" GF1 — Product Guide Cut Sheets: Bracket Options - SCL-101-3" 3/g„ i 46 SERRATIONS 00 x 1:7/8'' - R l / l b„ y l/ 16 3/4"l /4 • t' - If1 • [ . _ -•� � _Y � moi. .,' f .. Inh. ' • L y' 1 . R.005R .' t.,•.r,�, .,. f ,2X -R.0 1 60.000 0 3/8..+.006 1 /8„ .002, 0 7/8" X 820 DETAIL'A SCALE 3:1 ' '# 1_ ',� 877-859-3947 EcoFasten Solar" All content protected under copyright: All rights reserved. 7/24/2014 3.5 EcoFasten Solar products are orotected by the following U.S: Patents: 8,151,522 82 8.153,700 B2 8.181,398 B2 8,166,713 B2 8,146.299 B2 8.209,914 82 8,245.454 82 8,272,174 1328.225.557 B2 GreenFasten- GH - Product Guide Cut Sheets: Bracket Options - L-102-3" �� � �. �' 1. i r ♦ � - t 7 �� � .� 411 i I • • ! • F �pI � 0 40 .l 46 SERRATIONS F - LO 1.7 /8r .. - r Rl/16 II ' . 3/4" 1 /4"' /l Err R.005 •r i i 11 a • „ R.010 ,. •' 2. X R.0 I 60.00 006 #; r .4 3/8 -.002 1 /8" k:s=0.875+.010X82° DETAIL - SCALE 3 : 1 . z n° kl p , 877-859-3947 EcoFasten Solar" All content protected under copyright. All rights reserved. 7/24/2014 3.6 ' t� EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 132 8.153,700 B2 8.181,398 B2 8,166,7.13 B2 8,146,299 B2 8,209.914 132 8,245,454 B2 6.272,174 132 8.225.557 132 ° N J15/16" 1 74' - r Rl/16 II ' . 3/4" 1 /4"' /l Err R.005 •r i i 11 a • „ R.010 ,. •' 2. X R.0 I 60.00 006 #; r .4 3/8 -.002 1 /8" k:s=0.875+.010X82° DETAIL - SCALE 3 : 1 . z n° kl p , 877-859-3947 EcoFasten Solar" All content protected under copyright. All rights reserved. 7/24/2014 3.6 ' t� EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 132 8.153,700 B2 8.181,398 B2 8,166,7.13 B2 8,146,299 B2 8,209.914 132 8,245,454 B2 6.272,174 132 8.225.557 132 ° AC Circuit Ampacity Calculator. Meter #: 1007331121 Customer Name: JMOFFETTJULA Location: 3378 NORD,AVE, Chico;-CA 95973 ` Wire Note: AC-1 Description: INVERTER TO AC DISTRIBUTION PANEL Wire Calculation 3.84 kWatts -240' VAC. Split Voltage Configuration TRUE TL Inverter?- - 0 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity, Minimum Ground Size Based on NEC , 20_.00 A Minimum Ciruit Breaker/Fuse Size 10 Actual Ground Size Based'on NEC 20,00 A Ampacity After Derate 10 Wire Size,Based on Ampacity 30 A 0:3307 % of Voltage Drop 10 Wire Size Based on Voltage Drop ' _ -3Q A 16 A Circuit Ampacity `1"v'" Factor 1 Phases 0.95 Conditions of Use.Derate Factor - " 1667 A Minimum Conductor Ampacity Based'on Conditions of Use ' k 20.00 A Minimum Conductor Ampacity Based on 1.25 Rule_ Co_ . _ � � nditiF woUz:a` _- � ° M-0.96 Derate Total _' S °C Temp Coef (ambient +Sunlight) 7"95 °F0.96 Derate - 35 °C Ambient Temp , - • 95 °F ' - none Sunlight Exposure 432 °F 0: °C Temp adder 3 or less Number of Current Carrying Conductors' 4 Derate'applied to Temp Coeficient 1 Voltage Drop;�Allowabi6yTolerance (Solar Generation 1%a, pistribution 3%0) - < ­2401V . -Circuit Voltage 16 A Circuit Amps- " 1.24 Resistance , - 20 ft' One Way Distance 10 Wire Size 0 3307 % of Loss Conduit Size.(Conduit FIII Can ,Not be more than 40%) �. None Conduit Type 0;15`' Wire Size Diameter /A. Conduit Fill percentage 1 ifConduit Size 1.-15 - Ground Wire Size Diameter ,#N/A Conduit Internal Diameter . , 600 V System Voltage THWN-2 Wire Type - AC Circuit Ampacity Calculator Meter #:X10077331121~ Customer Name:MOFFETT, EU LA ' Location: 13378 NORD AVE, Chico, CA 95973 Wire Note: AC -2 Description: 1AC DISTRIBUTION PANEL TO AC SERVICE PANEL Wire Calculation 7.04 kWatts 240 VAC Split Voltage Configuration TRUE TL Inverter? 8 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity 0' Minimum Ground Size Based on NEC 36.67 A` Minimum Ciruit Breaker/Fuse Size 10 Actual Ground Size Based on NEC 36.67 A Ampacity After Derate 8 Wire Size Based on Ampacity 55 A Q.1902 % of Voltage Drop L 8 __ Wire Size Based on Voltage Drop 55 A 29.333 A Circuit Ampacity1 Factor, 1 Phases 0.32 Conditions of Use Derate Factor „ 35.77 A Minimum Conductor Ampacity Based on Conditions of.Use 4r ' _. 36.67 A Minimum Conductor Ampacity Based on 1.25 Rule Conditions of Us.e _ r , ; x z . " 0.82 Derate Total ' 50 'C Temp Coef (ambient + Sunlight) 122 °F F. 0.82. Derate 50 °C Ambient Temp 122 °F Lo3le one Sunlight Exposure _ 'r32 'F • 0 `C Temp adder r ssnone of Current Carrying Conductors ` ` 1 '; Derate applied to Temp Coeficient Voltage Dr,9p: Allowable Tolerance (Solar Generaton'1%, pistri,bution 3%) 240 V Circuit,Voltage _ .. _ 29.- - , A, Circuit Amps. ti 0:7781 Resistance 10 ft One Way Distance 8 Wire Size 0.1902 % of Loss - Conduit Size(Conduit FiII Can Not be rnore«thari 40%) = _ a EMT Conduit Type "'.212 Wire Size Diameter o Conduit Fill percentage 3/4 Conduit Size 0.=16 ' Ground Wire Size Diameter 0:533 Conduit Internal Diameter 600 V System Voltage THWN-2 Wire Type' a Carbon, monoxide alarr s: required by Sections 8315.1 and R315.2 shall be installed'in the following locations: !.:Outside of eaeh 'separate dwelling unit sleeping area In the immediate. vicinity .of the bedroo'm(s): 2: On every level of a dwelling unit including basements. R315.1.5 WItipie-purpose alarms: Carbon monoxide alarms combined with smoke alarms shall comply with Section R31.5, all applicable standards, and requirements for listing and approval by the Office of the State. fire Marshal, for smoke alarms. Butte County's lriterpretat.ion of 2013 CRC, Sections 314 & 315 for Smoke Mars & Carbon Mon°oxide, Alarm*s: Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellingsshall be retrofitted with smoke alarms and those that' have attached Zara_;es or fuel -burning appliances shall have. carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms -for Smoke and Carbon Monoxide and -in most cases will comply with the aforementioned.code requirements for Carbon Monoxide Alarms. DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY As Owner/Contractor, 'I/we .affirm and declare ;under the penalty of perjury, under the laws .of the State of California, by o.ur and below as Owner/Contractor, that I/we will cornply.prior to final inspection"with Items A & IB as specified herein: A. Both Owner/Contractor have read' and clearly understand -the aforementioned 2010 California Residential Code (CRC) Carbon.Monoxide Alarm requirements. B. Both Owner/Contractor are. responsible for installing Carbon Monoxide Alarms prior to .final inspection as`per the aforementioned building code and maintaining such installation. Smoke Alarms will also be installed prior to final inspection -as per the 2010 CRC. alarms locations: Owner's'name (print); oe Owner's signature: Date: Contractor's name (print): r< CSLB License: Contractor's signature: Date: A Project Address: C, d I Permit #: A Page •2 of 2 tZu 0 M. C Butte County Department of Development Services FORM NO PEiZMIT CENTER 7 County Center Drive, Oroville, CA 95965 DBI -01 .. �.Main Phone (530) 538-7601 Fax (530) 538-7785 %v,8 %v. buRacw n tv. net d Declaration of Installation for Smoke Alarms and Carbon Monoxide Alarms The newly adopted 2013 California .Residential Code requires the installation of Carbon Monoxide Detectors in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units. that have attached garages. The policy for Carbon Monoxide Alarms in Butte County states: "Any permit obtained in which the value of work exceeds $1000 associated with a Residential Group R Dwelling Unit or Sleeping Unit shall conform to the. following 2013 California Residential Code requirements for Smoke and Carbon Monoxide Alarms (Section R314 & R315)." 2013 California Residential Code requirements for Carbon Monoxide Alarms:_ 8315.1 New construction: An approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. R315.1.2 Power supply: For new construction required carbon monoxide alarms shall. receive their primary power from the building wiring where such wiring is served from a commercial source and shall be equipped with a battery back-up. Alarm wiring shall be directly connected to the permanent building wiring without a disconnecting switch other than as required for over= . current protection. Exceptions: ! L In dwelling units where there is no commercial power supply the carbon monoxide alarm may, be solely battery operated. 2. In existing dwelling units a carbon monoxide alarm is permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. ,i R315.1.3 Interconnection. Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or within a sleeping unit the alarm shall be interconnected in.a. manner that activation of one alarm shall activate all of the alarms in the individual unit" Exception: 1. Interconnection is not required in existing dwelling units where repairs do not result iri'the removal of wall and ceiling finishes there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed. R315.2 Where required in existing dwellings: Where a permit is required for alterations, repairs or additions exceeding one thousand dollars ($1,000), existing dwellings or sleeping units that have attached garages or fuel burning appliances shall be provided with a carbon monoxide alarm in accordance with Section R315.1. Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for which the permit was obtained.; R315.2.6 Alarm requirements: No person shall install, market„ distribute, offer for sale or sell any carbon monoxide device in the State of California unless the device and instructions have been approved and listed by the State Fire Marshal. Page 1 of 2 9/12/2017 eTRAKiT Permit *B17-2169* https://dspermits.buttecounty.net/custom/Permit_Butte.aspz?permitNo=B 17-2169 1 /1 Applied Date: 9/12/2017 BUTTE COUNTY Permit No.: B17-2169 DEPARTMENT OF DEVELOPMENT SERVICES OFFICE #: (530) 538-7601 Type: SOLAR ONLINE 24-HOUR PHONE INSPECTION SCHEDULING Sub -Type: SOLAR ROOF -RES IVR #: (530) 538-4365 24-HOUR ONLINE INSPECTION SCHEDULING / PERMIT PAYMENTS / RENEWALS: !CALIF O R N 1 A www.buttecountv.neUdds Site Address: 3378 NORD AVE CHICO, CA Site APN: 042-020-038 95926 Subdivision: Site Block: Site Lot: Valuation: $22,000.00 Site Tract: Permit Status: APPLIED Description of Work: Install 7.59kw roof mount to existing meter Contractor: ALTERNATIVE ENERGY SYSTEMS INC Address` 13620 HWY 99 CHICO CA 95973 Phone: (530) 345-6980 Owner: MOFFETT EULA J Address: 3378 NORD AVENUE CHICO CA 95973 Phone: (530) 519-7134 Applicant: A.J. Weaver Address:, 13620 HWY 99 CHICO CA 95973 Phone: (530) 345-6980 Account :Description i Amount €Paid Date 0104402300422000 MET RES PHOTO VOLTAIC ROOF MOUNT 480.42 9/12/2017 ' 00104402000422000 D2ET CA SB 1473 10 0.10 9/12/2017 1473-0-280 D2ET CA SB1473 90 0.90 9/12/2017 TOTAL FEES $481.42 TOTAL FEES PAID $481.42 TOTAL FEES DUE .$0.00 *B17-2169* https://dspermits.buttecounty.net/custom/Permit_Butte.aspz?permitNo=B 17-2169 1 /1