Loading...
HomeMy WebLinkAboutB17-2392 056-290-024i BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARDiMUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot! guarantee inspections on the date requested Office: 530.538.7601 Fax'•. 530 Permit No: 1317-2392 Issued: 10/9/2017 , APN: 056-290-024 Address: 5382 MAJESTIC WAY, FOREST RANCH, Owner: Paul Spurgeon Permit Type: SOLAR ROOF -RES Description: 3.7 KW Roof mount solar ALL PLAN REVISIONS MUST BE Inspection Type IVR INSP DATE Setbacks 131 Foundations / Footings. 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Signed ' Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 ---• Underfloor Ducts 319 Shear Transfer • 136 ' Under Floor Plumbing 412 Under Slab Plumbing 411. Blockin /Under inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B. W.P.-Interior 134 f Shearwall/B. W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Manometer Test 605 - Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208. 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408, Do Not Insulate Until Above Signed Permit Final 802 . Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimming Pools AREA 4 Asa. i ia� w%vw.nuuet_ounty.nevaas Flood Zone: None SRA Area: Yes SETBACKS for Zoneng. AG. SRA. PW Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: BY THE COUNTY BEFORE PROCEEDING Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes ;+ Setbacks —' 131 Blockin /Under inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 - Continuity Test 602. Skirtin /Ste s/Landings 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia - Public Works Final 538.7681 Fire De artment/CDF 538.6226' Env. Health Final - . 538.7281 Sewer District Final 'PROJECT FINAL w i { , *Project Final is a Certificate of Occupancy for (Residential Onl PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A I YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION d DC-1 AC-2 AC-3 •' /---------- (1) 1" EMT (1) 1" EMT w/ (4) N10 PV WIRE CU.& (3) N10 THWN-2 CU. & (1) 11/2" PVC w/ (3)N6THWN-2 CU.& SERVICE VOLTAGE 20 = - 2= 24UV i (1) N10 BARE CU. GRD. (1) N8 THWN-2 CU. GRD. (1) N8 THWN•2 CU. GRD. 120V=N-L2-l3=NAV ' WIRE RUN: 30' WIRE RUN: 30' WIRE RUN: 35' NAV=N-L3-Ll=NAV 2 IMP: 17A IMAX: 15.6A - IMAX: 15.6A 6 METER (12) PV MODULES INVERTER "A" SCHOTT: ASE 310-DGF/50 3.3KW GRID TIED INVERTER (2)STRINGS OF (6) 12.5A/ 1P/ 240V / XANTREX:GT3.3-NA-DS-240 r _600- _ _- - W/INTEGRATED DC DISC. 20A 1P 240V 200A 1P 240V 100A 1P (E)AC DISTRIBUTION PANEL 240- 125A/ 1P/ 240V _ 60A - AC-4 _ (1)11/2" PVC w/ (E) AC SERVICE PANEL (3) N2 TH W N•2 CU. & 20OA/ 1P/ 240V (1) N4 THWN-2 CU. GRD. - SCIR: 10,000 WIRE RUN: 30' - METER#: • AC-5 AC-4 (1) 1" PVC W/ (1) 11/2" PVC w/ (3)N6 THWN-2 CU.& _ (3)N2 THWN-2 CU.& - - - (1)N8 THWN-2 CU. GRD. (1)N4 THWN-2 CU. GRD - - I WIRE RUN: 30' ® SOA J 1P � 240V TRANSFER SWITCH 100A/ 1P/ 240V ' (E)GENERATOR (E)AC DISTRIBUTION PANEL GENERAC: 8KW/ 1P/240V 125A/ 1P/ 240V ELECTRICAL DIAGRAM m ' • s ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE o m < Z 3 m 5382 MAJESTIC WAY. "s ? I a 'o 2016 CALIFORNIA ELECTRIC CODE (CEC), OR LOCAL MUNICIPAL Z FOREST RANCH, CA 95942 O D O G V CODE, .AND FIRE DISTRICT REGULATIONS. + PV ARRAY • COMBINER INVERTER 011C.1141 CT, MAIN �,Y�II�W WWW��I, SUB PANEL METER, P" • AMPS PHASE VOLTS I c WARNING UTILITY INTERACTIVE POWER FLOWING THROUGH THIS PANEL CAUTION: SOLAR CIRCUIT KW SOLAR GENERATOR AC : Installed on all DC conduit every 10' and OPERATING VOLTAGE VAC/ PHASE WARNING on both sides of any penetration .' t DC DISCONNECT LOCATED ON INVERTER(S) DUAL POWER SUPPLY LOCATED PHOTOVOLTAIC SYSTEM CAUTION! Per NEC 690.54, Interactive Point of Per NEC 705.10, Point of Connection,,'. SOLAR CIRCUIT Interconnection installed at all Electrical Located On Main Service Panel. VOLTAGES UP TO 100OV MAY BE PRESENT Distribution Panel covers that provide a path;.. from PV to Utility.' AUTHORIZED PERSONNEL ONLY! AC PHOTOVOLTAIC Installed on all DC Junction boxes.. PHOTOVOTAIC DISCONNECT DISCONNECT OPERATING CURRENT: A FOR UTILITY WARNING! SHORT CIRCUIT CURRENT: — A OPERATION OPERATING VOLTAGE: VDC ELECTRIC SHOCK HAZARD MAX SYSTEM VOLTAGE: THE DC CONDUCTORS OF THIS _VDC Per NEC 690.14,' Disconnection means at WARNING SHOCK HAZARDI the single AC Disconnect or Main Breaker. PHOTOVOTAIC SYTEM ARE UNGROUNDED DO NOT TOUCH TERMINALS. TERMINALS OF BOTH LINE AND AND MAY BE ENERGIZED LOAD SIDE MAY BE ENERGIZED IN OPEN POSITION. SOLAR BREAKER Per NEC 690.35(F), Warning shock hazard, at, Per NEC 690.14, Solar Disconnect on the 00 NOT RELOCATE each junction box, combiner box or other front of all PV DC Disconnects. Filled out w Solar breaker label @ any breaker passing device opened during service:in accordance with NEC 690.55 Bi -Directional Power -LABEL DIAGRAM > < 0 Z, 2 0 Z > 0 SUB PANEL METER, P" • AMPS PHASE VOLTS I c WARNING UTILITY INTERACTIVE POWER FLOWING THROUGH THIS PANEL CAUTION: SOLAR CIRCUIT KW SOLAR GENERATOR AC : Installed on all DC conduit every 10' and OPERATING VOLTAGE VAC/ PHASE WARNING on both sides of any penetration .' t DC DISCONNECT LOCATED ON INVERTER(S) DUAL POWER SUPPLY LOCATED PHOTOVOLTAIC SYSTEM CAUTION! Per NEC 690.54, Interactive Point of Per NEC 705.10, Point of Connection,,'. SOLAR CIRCUIT Interconnection installed at all Electrical Located On Main Service Panel. VOLTAGES UP TO 100OV MAY BE PRESENT Distribution Panel covers that provide a path;.. from PV to Utility.' AUTHORIZED PERSONNEL ONLY! AC PHOTOVOLTAIC Installed on all DC Junction boxes.. PHOTOVOTAIC DISCONNECT DISCONNECT OPERATING CURRENT: A FOR UTILITY WARNING! SHORT CIRCUIT CURRENT: — A OPERATION OPERATING VOLTAGE: VDC ELECTRIC SHOCK HAZARD MAX SYSTEM VOLTAGE: THE DC CONDUCTORS OF THIS _VDC Per NEC 690.14,' Disconnection means at WARNING SHOCK HAZARDI the single AC Disconnect or Main Breaker. PHOTOVOTAIC SYTEM ARE UNGROUNDED DO NOT TOUCH TERMINALS. TERMINALS OF BOTH LINE AND AND MAY BE ENERGIZED LOAD SIDE MAY BE ENERGIZED IN OPEN POSITION. SOLAR BREAKER Per NEC 690.35(F), Warning shock hazard, at, Per NEC 690.14, Solar Disconnect on the 00 NOT RELOCATE each junction box, combiner box or other front of all PV DC Disconnects. Filled out w Solar breaker label @ any breaker passing device opened during service:in accordance with NEC 690.55 Bi -Directional Power -LABEL DIAGRAM > < 0 Z, 2 0 Z > 0 ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2014 NATIONAL ELECTRIC CODE (NEC), OR LOCAL MUNICIPAL CODE, AND FIRE DISTRICT REGULATIONS. 1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. 2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM. 3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION. BOXES, COMBINER BOXES, AND SWITCHES. 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ART.250,690. 5. NEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM -ALL SOURCES. 6. NEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING. 7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF NEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF NEC 408.16(F). 8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK. 9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75° C MINIMUM. 10. NEC ART. 690.14. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM 11. NEC ART. 690.53. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM 12. NEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK HAZARD -DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAYBE ENERGIZED IN THE OPEN POSITION". 13. GROUNDING OF ALL DWELLINS SHALL BE CONFIRMED. 14. CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS LOCATED ON DWELLINGS PER 2014 NEC ART.690.17. 16. PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS. 17. PHOTOVOLTAIC SOURCE CURRENTS MUST BERATED AT BOTH 125% OF THE PARALLEL MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 1569 OF THE LOAD. 18. PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE NOT IN THE SAME LOCATION PER 2014 NEC ART.690.56. 19. INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7-05, CHAPTER 13. 20. PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS. 21. PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS INSTALLED AS SPECIFIED IN THESE DRAWINGS. 22. DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE, CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL OR PHYSICAL PLACEMENT. 23. FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL UTILITY. 24. A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2014 NEC 690.5(H) AND IN ACCORDANCE WITH 2014 NEC 705.10. 25. A NON FOLDING LADDER WILL BE IN PLACE AND SECURED TO THE ROOF TO PROVIDE ACCESS. FOR ALL INSPECTIONS. ALL 1 BOXES WILL BE OPENED UPON REQUEST. 26. SMOKE AND CARBON ALARMS WILL BE INSTALLED IN ACCORDANCE WITH CRC R314 R31 27. SOLAR INVERTER INSTALLED IS A SMART INVERTER PER CALIFORNIA RULE 21 c m o S T D H 2 9 < G z 3 0 O O A o 0o Z D �