HomeMy WebLinkAboutB17-2392 056-290-024i
BUTTE COUNTY
DEPARTMENT OF DEVELOPMENT SERVICES
INSPECTION CARDiMUST BE ON JOB SITE
24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm)
Development Services cannot! guarantee inspections on the date requested
Office: 530.538.7601 Fax'•. 530
Permit No: 1317-2392 Issued: 10/9/2017 ,
APN: 056-290-024
Address: 5382 MAJESTIC WAY, FOREST RANCH,
Owner: Paul Spurgeon
Permit Type: SOLAR ROOF -RES
Description: 3.7 KW Roof mount solar
ALL PLAN REVISIONS MUST BE
Inspection Type
IVR INSP DATE
Setbacks
131
Foundations / Footings.
111
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
Setbacks
131
Do Not Pour Concrete Until Above are Signed '
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor Framing
149 ---•
Underfloor Ducts
319
Shear Transfer •
136 '
Under Floor Plumbing
412
Under Slab Plumbing
411.
Blockin /Under inin
612
Tiedown/Soft Set System
611
Do Not Install Floor Sheathing
or Slab Until Above Signed
Shearwall/B. W.P.-Interior
134 f
Shearwall/B. W.P.-Exterior
135
Roof Nail/Drag Trusses
129
Manometer Test
605 -
Do Not Install Siding/Stucco or Roofing Until Above Signed
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208.
4 -Way Rough Framing
128
Gas Piping House
403
Gas Test House
404
Shower Pan/Tub Test
408,
Do Not Insulate Until Above Signed
Permit Final
802 .
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
Swimming
Pools
AREA
4
Asa. i ia� w%vw.nuuet_ounty.nevaas
Flood Zone: None SRA Area: Yes
SETBACKS for Zoneng. AG. SRA. PW
Front: Centerline of Road:
Rear: SRA:
Street: AG:
Interior
Total Setback from Centerline of Road:
BY THE COUNTY BEFORE PROCEEDING
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
142
Swimming
Pools
Setbacks
131
Pool Plumbing Test
504
Gas Test
404
Pre-Gunite
506
Pre -Deck
505
Pool Fencing/Alarms/Barriers
503
Pre -Plaster
507
Manufactured Homes ;+
Setbacks —'
131
Blockin /Under inin
612
Tiedown/Soft Set System
611
Permanent Foundation System
613
Underground Electric
218
Sewer
407
Underground Water
417
Manometer Test
605 -
Continuity Test
602.
Skirtin /Ste s/Landings
610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
Insignia -
Public Works Final 538.7681
Fire De artment/CDF 538.6226'
Env. Health Final - . 538.7281
Sewer District Final
'PROJECT FINAL w i
{ , *Project Final is a Certificate of Occupancy for (Residential Onl
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A I YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
d
DC-1 AC-2
AC-3 •'
/----------
(1) 1" EMT (1) 1" EMT w/
(4) N10 PV WIRE CU.& (3) N10 THWN-2 CU. &
(1) 11/2" PVC w/
(3)N6THWN-2 CU.&
SERVICE VOLTAGE
20 = - 2= 24UV
i
(1) N10 BARE CU. GRD. (1) N8 THWN-2 CU. GRD. (1) N8 THWN•2 CU. GRD.
120V=N-L2-l3=NAV
'
WIRE RUN: 30' WIRE RUN: 30'
WIRE RUN: 35'
NAV=N-L3-Ll=NAV
2
IMP: 17A IMAX: 15.6A -
IMAX: 15.6A
6
METER
(12) PV MODULES
INVERTER "A"
SCHOTT: ASE 310-DGF/50
3.3KW GRID TIED INVERTER
(2)STRINGS OF (6)
12.5A/ 1P/ 240V
/ XANTREX:GT3.3-NA-DS-240
r
_600- _ _- -
W/INTEGRATED DC DISC.
20A
1P
240V
200A
1P
240V
100A
1P
(E)AC DISTRIBUTION PANEL
240-
125A/ 1P/ 240V
_
60A
-
AC-4
_
(1)11/2" PVC w/
(E) AC SERVICE PANEL
(3) N2 TH W N•2 CU. &
20OA/ 1P/ 240V
(1) N4 THWN-2 CU. GRD. -
SCIR: 10,000
WIRE RUN: 30'
- METER#:
• AC-5
AC-4
(1) 1" PVC W/
(1) 11/2" PVC w/
(3)N6 THWN-2 CU.&
_
(3)N2 THWN-2 CU.& -
-
-
(1)N8 THWN-2 CU. GRD.
(1)N4 THWN-2 CU. GRD
-
-
I
WIRE RUN: 30'
®
SOA
J
1P
�
240V
TRANSFER SWITCH
100A/ 1P/ 240V
'
(E)GENERATOR
(E)AC DISTRIBUTION PANEL GENERAC: 8KW/ 1P/240V
125A/ 1P/ 240V
ELECTRICAL DIAGRAM
m
' •
s
ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE
o m
<
Z
3
m 5382 MAJESTIC WAY.
"s
?
I
a 'o
2016 CALIFORNIA ELECTRIC CODE (CEC), OR LOCAL MUNICIPAL
Z
FOREST RANCH, CA 95942
O
D
O G
V
CODE, .AND FIRE DISTRICT REGULATIONS.
+
PV ARRAY • COMBINER INVERTER 011C.1141 CT, MAIN
�,Y�II�W
WWW��I,
SUB PANEL
METER,
P"
•
AMPS
PHASE
VOLTS
I
c
WARNING
UTILITY INTERACTIVE POWER
FLOWING THROUGH THIS PANEL
CAUTION: SOLAR CIRCUIT KW SOLAR GENERATOR
AC :
Installed on all DC conduit every 10' and OPERATING VOLTAGE
VAC/ PHASE WARNING
on both sides of any penetration .'
t DC DISCONNECT LOCATED ON INVERTER(S) DUAL POWER SUPPLY
LOCATED PHOTOVOLTAIC SYSTEM
CAUTION! Per NEC 690.54, Interactive Point of
Per NEC 705.10, Point of Connection,,'.
SOLAR CIRCUIT Interconnection installed at all Electrical
Located On Main Service Panel.
VOLTAGES UP TO 100OV MAY BE PRESENT Distribution Panel covers that provide a path;..
from PV to Utility.'
AUTHORIZED PERSONNEL ONLY!
AC PHOTOVOLTAIC
Installed on all DC Junction boxes..
PHOTOVOTAIC
DISCONNECT
DISCONNECT
OPERATING CURRENT: A FOR UTILITY
WARNING! SHORT CIRCUIT CURRENT: — A OPERATION
OPERATING VOLTAGE: VDC
ELECTRIC SHOCK HAZARD
MAX SYSTEM VOLTAGE:
THE DC CONDUCTORS OF THIS _VDC Per NEC 690.14,' Disconnection means at
WARNING SHOCK HAZARDI the single AC Disconnect or Main Breaker.
PHOTOVOTAIC SYTEM ARE UNGROUNDED DO NOT TOUCH TERMINALS. TERMINALS OF BOTH LINE AND
AND MAY BE ENERGIZED LOAD SIDE MAY BE ENERGIZED IN OPEN POSITION. SOLAR BREAKER
Per NEC 690.35(F), Warning shock hazard, at, Per NEC 690.14, Solar Disconnect on the 00 NOT RELOCATE
each junction box, combiner box or other front of all PV DC Disconnects. Filled out w Solar breaker label @ any breaker passing
device opened during service:in accordance with NEC 690.55 Bi -Directional Power
-LABEL DIAGRAM
>
< 0
Z,
2 0 Z
>
0
SUB PANEL
METER,
P"
•
AMPS
PHASE
VOLTS
I
c
WARNING
UTILITY INTERACTIVE POWER
FLOWING THROUGH THIS PANEL
CAUTION: SOLAR CIRCUIT KW SOLAR GENERATOR
AC :
Installed on all DC conduit every 10' and OPERATING VOLTAGE
VAC/ PHASE WARNING
on both sides of any penetration .'
t DC DISCONNECT LOCATED ON INVERTER(S) DUAL POWER SUPPLY
LOCATED PHOTOVOLTAIC SYSTEM
CAUTION! Per NEC 690.54, Interactive Point of
Per NEC 705.10, Point of Connection,,'.
SOLAR CIRCUIT Interconnection installed at all Electrical
Located On Main Service Panel.
VOLTAGES UP TO 100OV MAY BE PRESENT Distribution Panel covers that provide a path;..
from PV to Utility.'
AUTHORIZED PERSONNEL ONLY!
AC PHOTOVOLTAIC
Installed on all DC Junction boxes..
PHOTOVOTAIC
DISCONNECT
DISCONNECT
OPERATING CURRENT: A FOR UTILITY
WARNING! SHORT CIRCUIT CURRENT: — A OPERATION
OPERATING VOLTAGE: VDC
ELECTRIC SHOCK HAZARD
MAX SYSTEM VOLTAGE:
THE DC CONDUCTORS OF THIS _VDC Per NEC 690.14,' Disconnection means at
WARNING SHOCK HAZARDI the single AC Disconnect or Main Breaker.
PHOTOVOTAIC SYTEM ARE UNGROUNDED DO NOT TOUCH TERMINALS. TERMINALS OF BOTH LINE AND
AND MAY BE ENERGIZED LOAD SIDE MAY BE ENERGIZED IN OPEN POSITION. SOLAR BREAKER
Per NEC 690.35(F), Warning shock hazard, at, Per NEC 690.14, Solar Disconnect on the 00 NOT RELOCATE
each junction box, combiner box or other front of all PV DC Disconnects. Filled out w Solar breaker label @ any breaker passing
device opened during service:in accordance with NEC 690.55 Bi -Directional Power
-LABEL DIAGRAM
>
< 0
Z,
2 0 Z
>
0
ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2014
NATIONAL ELECTRIC CODE (NEC), OR LOCAL MUNICIPAL CODE, AND
FIRE DISTRICT REGULATIONS.
1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN
INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS.
2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE
COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM.
3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION.
BOXES, COMBINER BOXES, AND SWITCHES.
4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ART.250,690.
5. NEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT
DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM -ALL SOURCES.
6. NEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED
TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT
CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING.
7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF
NEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN
PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF NEC 408.16(F).
8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK.
9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75° C MINIMUM.
10. NEC ART. 690.14. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM
11. NEC ART. 690.53. - SEE SHEET RE -4.1 FOR LABEL DIAGRAM
12. NEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK
HAZARD -DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAYBE ENERGIZED IN
THE OPEN POSITION".
13. GROUNDING OF ALL DWELLINS SHALL BE CONFIRMED.
14. CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS
LOCATED ON DWELLINGS PER 2014 NEC ART.690.17.
16. PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS
LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS.
17. PHOTOVOLTAIC SOURCE CURRENTS MUST BERATED AT BOTH 125% OF THE PARALLEL
MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 1569 OF THE
LOAD.
18. PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE
DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE
NOT IN THE SAME LOCATION PER 2014 NEC ART.690.56.
19. INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM
SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7-05,
CHAPTER 13.
20. PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL
RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER
ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS.
21. PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE
CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS
INSTALLED AS SPECIFIED IN THESE DRAWINGS.
22. DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE
EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE,
CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL
OR PHYSICAL PLACEMENT.
23. FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL
UTILITY.
24. A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM
EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2014 NEC
690.5(H) AND IN ACCORDANCE WITH 2014 NEC 705.10.
25. A NON FOLDING LADDER WILL BE IN PLACE AND SECURED TO THE ROOF TO PROVIDE ACCESS.
FOR ALL INSPECTIONS. ALL 1 BOXES WILL BE OPENED UPON REQUEST.
26. SMOKE AND CARBON ALARMS WILL BE INSTALLED IN ACCORDANCE WITH CRC R314 R31
27. SOLAR INVERTER INSTALLED IS A SMART INVERTER PER CALIFORNIA RULE 21
c m o S
T D H
2
9 < G
z 3 0
O O A o 0o Z
D �