HomeMy WebLinkAboutB17-2988 039-460-099F y �
BUTTE:COUNTY
DEPARTMENT OF DEVELOPMENT SERVICES
INSPECTION CARD MUST BE ON JOB SITE
24 Hour Inspection Line (NR) :530.538.4365 (Cut off time for inspections is 3pm)
Development Services cannot guarantee inspections on the date requested
Office: 530.538.7601 Fax: 530
Permit No: B17-2988 Issued: 12/19/2017
APN: 039-460-099
Address: 9309 LA ROSE CT, DURHAM
Owner: ZIMMERS JERRY & LINDA
Permit Type: SOLAR ROOF -RES
Description: Install 4.83kw roof mount to existing meter
�jls. /72f� www.tsutteuounty.net/dtls
AREA
5
Flood Zone: X (Unsh SRA Area:' LRA
SETBACKS for Zoninu- AG_ SRA_ P
Front: Centerline of Road:
Rear: SRA:
Street: AG:
Interior
Total Setback from Centerline of Road:
ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING'
Ins ection Type
IVIR INP DATE
Setbacks
131
Foundations / Footings
111
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
Setbacks
131
Do Not Pour Concrete Until Above are Sign d
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor Framing
149
Underfloor Ducts
319
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
411
Blockin nder inin
612
Tiedown/Soft Set System
611 -
Do Not Install Floor Sheathing
or Slab Until Above Signed
ShearwallB.W.P.-Interior
134
ShearwallB.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
Manometer Test
605
Do Not Install Siding/Stucco or Roofing Until Above Signed
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
128
Gas Piping House
403
Gas Test House
404
Shower Pan/Tub Test
408
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
Swimmina
Pools
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
142
Swimmina
Pools
Setbacks
131
Pool Plumbing Test
504
Gas Test
404
Pre-Gunite
506
Pre -Deck
505
Pool Fencing/Alarms/Barriers
503
Pre -Plaster
507
anufactu ed Homes
Setbacks
131
Blockin nder inin
612
Tiedown/Soft Set System
611 -
Permanent Foundation System
613 `
Underground Electric
'218
Sewer
407
Underground Water
417
Manometer Test
605
Continuity Test
602
Skirtin Ste s/Landin s
610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
Insignia:
Finals �. w
Public Works Final 538.7681
Fire De artment/CDF 538.6226
Env. Health Final 538.7281
Sewer District Final
"PROJECT FINAL 11Z -Zar
*Project Final is a Certificate of Occupancy for(Residential Only)
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR,
RENEWAL 30 DAYS PRIOR TO EXPIRATION
PROJECT OWNER:
ZIMMERS, JERRY
9309 LA ROSE CT
DURHAM, CA 95938
APN:039-460-099 PH#:530.343.0602
EMAIL:zimmers123@gmail.com
CONTRACTOR:
ALTERNATIVE ENERGY SYSTEMS INC.
13620 HIGHWAY 99
CHICO, CA 95973
CSLB: 853351 C-10, C-46
BUILDING JURISDICTION:
%4Ae
SCOPE:
Se
INSTALL PHOTOVOLTAIC SOLAR SYSTEM ON A TRUSS
ROOF, MOUNTED IN ACCORDANCE WITH ALL
APPLICABLE BUILDING CODES SPECIFICALLY
REFERENCING THE 2016 CALIFORNIA ELECTRICAL
CODE/ 2014 NEC USING THE FOLLOWING SPECIFIC
EQUIPMENT:
1. MODULES: SUNPOWER "
(14) SPR -X21 -345 -D -AC
4.83kW SYSTEM
259 SQFT COVERED
2. INVERTER(S): SUNPOWER:
(14) MODULE INTEGRATED 320W EACH [S11]
SITE MAP
PAGE #
CONTENT
no
o
PV -1.0
SCOPE
PV -2.0
SITE PLAN
PV -3.0
ARRAY LAYOUT
PV -4.0
ELECTRICAL DIAGRAM
PV -4.1
LABEL DIAGRAM
PV -5.0
GENERAL NOTES
ATTACHMENT
MODULE SPECS
INVERTER SPECS
p G a
RACKING SPECS
WIRE CALCS
_r , �o"-"�r' �:l1f'AS �'=�i..�'�r_' y �•r-�� 4?:. x��-'�,.�'+',r`.� ��_/`1.--_ j-
BUTTE COUNTY
DEPT. OF DEVELOPMENT SERVICES
7 COUNTY CENTER DRIVE Ir" L
OROVILLE, CA 95965
I,
I' )
OFFICE#: (530) 538-7601 =�. *' . •1 -. + 41 N
FAX#: (530) 538-2140
MON-FRI 8AM-3PM W
INSPECTION LINE: (530) 538-4365I�_
REQUESTS PHONED IN BY 2PM WILL BE t ,y •
i
INSPECTED THE NEXT BUSINESS DAY
JL
no
o
a
�, m
s ZIMMERS, JERRY
9
- Energy For Life
13620 HWY 99
CHICO, CA 95973
C
VIII
9309 LA ROSE CT
o
`
p G a
PHONE#: (530) 345-6980
i p D
=
DURHAM, CA 95938
®oma
FAX#: (530) 892-2360
O
APN:039-460-099 PH#:530.343.0602
Alternative Energy Systems Inc.
design@solarenergyforlife.com .
.
•
No4uWtl •GVIOlC15-011615
°I
VIII
PGE METER &
,MODEM AND ROUTER LOCATION ` (E) MAIN SERVICE PANEL
.ii - x -
-�
(E) RESIDENCE,
;'A
" (N) AC DISTRIBUTION PANEL
(N) MONI RI G- -- _ (E) AC DISTRIBUTION PANEL
Aw
(E) GARAGE
(E) TRUSS ROOF W/
COMP SHINGLES
r-11 M
.�.'
- nr
SITE PLAN = ,
n
A
m o
c m
S ZIMMERS, JERRY
m
Ener For Life
91'
13620 HWY 99
CHICO, CA 95973
�
m<
z
z K
9309 LA ROSE CT
o
p„
PHONE#: (530) 345 6980
z
s IV
z
D o
p D
"
DURHAM CA 95938
®®�
FAX#: (530) 892 2360'
s . z
APN:039-460 099 PH#:530.343.0602
Alternative Energy Systems Inc.
design@solarenergyforlife.com
Naku"hHI02416.011616
U LSL /1' ,U.(-. MAXIMUM
ARRAY LAYOUT'.
•y
m
m
• �-+ r '-
•
r; .r �
`
� ""
ATTACHMENTS MAX 72 OC
+
a' _ t
p
< <
y
.'o
•
z
3 '
" 9309 LA ROSE CT
Energy For Life
CHICO, CA95973
.f
Z,
$
" W
Z
F. >'
- �\
g®�
DURHAM, CA 95938.
' PHONE#: (530) 345-6980.
,
Z
o
c °
D
T
FAX#: (530)'892-2360
•
OA
A_v
, . N
Alternative Energy Systems Inc. `
design@sola.renergyforlife.com
.y
1
+
•
- -
Pohu:x+l L�� • ✓ ppy.,oza sou5a ,
� • . - ,
00
r
=�
r
! f
' ?
RAFTERS 24" OC ;
L 20'-10"
F1 ga�
U LSL /1' ,U.(-. MAXIMUM
ARRAY LAYOUT'.
m
m
S ZIMMERS, JERRY
f
13620 HWY 99
p
< <
y
.'o
•
z
3 '
" 9309 LA ROSE CT
Energy For Life
CHICO, CA95973
.f
Z,
$
" W
Z
F. >'
- �\
g®�
DURHAM, CA 95938.
' PHONE#: (530) 345-6980.
Z
o
c °
D
T
FAX#: (530)'892-2360
•
OA
A_v
APN:039 460 099 PH#:530.343.0602,
Alternative Energy Systems Inc. `
design@sola.renergyforlife.com
+
•
- -
Pohu:x+l L�� • ✓ ppy.,oza sou5a ,
� • . - ,
(
AC -2
AC -1 (1) 1/2" EMT w/
ON ROOF w/ _ (3) #10 THW N-2 CU. & - -
t. (2) TRANSITION CABLE(S) (1) #10 THWN-2 CU. GRD.
WIRE RUN: 5, AC -1 WIRE RUN: 10' - -
IMP: 20A i (2) #10-2 WIRE NM CABLE CU. [MAX: 23A - -
WIRE RUN: 30'
IMAX: 20A -
-1- EXIISlSTING
(1
SERVICE VOLTAGE
11 =2
120V=N-L2-L3=NAV
NAV=N-L3-LI=NAV
METER
t
6
200A
1P
(6) PV MODULES/INVERTERS[S11I
240V
SUNPOWER: SPR -X21 -345 -D -AC
1.33A/1P/240V
8
20P
25A
240V
1P
20A
240V
V
1P
240V
(8) PV MODULES/INVERTERS[S11)
]-BOX
SUN POWER: SPR -X21 -345 -D -AC`
SOA
1.33A/1P/240V
(E)AC DISTRIBUTION PANEL 1P
125A/ 1P/ 240V
240V
(E) AC SERVICE PANEL
- - 20OA/ 1P/ 240V
SCIR:10000
METER#:1007906252
SSA
4 1P
240V
(N)AC DISTRIBUTION PANEL
125A/ 1P/ 240V
AC -MONITORING
(1) 1/2" EMT w/
(2) #14 THWN-2 CU. &
(1) #14 THWN-2 CU. GRD.
WIRE RUN: 10'
SUNPOWER -
PVS5X
- MONITORING -
. � I �/ CATS
[S111ALL SOLAR'INVERTERS _
INSTALLED ARE SMART INVERTERS
PER CALIFORNIA RULE 21 ENH2oz ENrizoz (E) ROUTER
ELECTRICAL DIAGRAM
= n o 0 13620 HWY 99
0 > ZIMMERS, JERRY
o C o m Energy For Life CHICO, CA 95973
a I D p_ 0 9309 LA ROSE CT PHONE#: (530) 345-6980
D p > ° ti M DURHAM CA 95938 `�
K S 6, Z c ®®o FAX#: (530) 892-2360
O A APN:039-460-099 PH#:530.343.0602 Alternative Energy Systems Inc. design@solarenergyforlife.com
z � w�
- I norw:wW GP� w,w.ozas.o»5�
,
•• � �
� � .. - • mss:
•
�
• k• _ r Y y ,
+
L
• �t \ ' itA
7-1
PV ARRAY _
-
i,
t
'DISCO N Ci :MAIN ♦ R <•
IL
'
�:r • '
J
- •
SUB PANEL .
' ,
�` - -
�, .
'
• t
METER,M.
..
[IN1111
•'�_
-
:
.
N
1
aws onus
�
{...
f
•AM PS
^ '
• } r
-
1
�'
J
PHASE
' z.:
• - . +
- • yR.
..
- 1` ••., - -
VOLTS
+
WARNING
UTILITY INTERACTIVE POWER
FLOWING THROUGH THIS PANEL
KW SOLAR GENERATOR
AC OPERATING VOLTAGE:
WARNING
PHOTOVOLTAIC SYSTEM EQUIPPED
DUAL POWER SUPPLY
WITH RAPID SHUTDOWN
_PHOTOVOLTAIC
PER CEC 690.54 Interactive Point of
-
-
Interconnectin installed at all Electrical '
Per CEC 705.10, Point of Connection,
w
Located On Main Service Panel.
Distribution Panel covers that porvide a `
`
• <, r
path from PV to Utility. -
i
AC PHOTOVOLTAIC
DISCONNECT
-•.
OPERATION
r Per CEC 690.14, Disconnection means at
•
-
the single AC Disconnect or Main Breaker. +
SOLAR BREAKER
DO NOT RELOCATE
�* r .• + . r Solar breaker label @ any breaker passing
Bi -Directional Power
LABEL DIAGRAM
n m o
c, ZIMMERS, JERRY
13620 HWY 99 . ti .
•
o
➢ s
o
Z
• �,
m
0
9309 LA ROSE CTe '
1
; •
Energy For CHICO, CA 95973
PHONE#: (530) 345 6980`
:5
o
_ ^
�'
D a
D
-
DURHAM, CA 95938
i FAX#: (530) 892-2360'
�'
p
p •
�.
APN:039 460-099 PH#:530.343:0602
Alternative Ener S stems Inc.,
9y y design@solarenergyforlife.com
ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2016 CALIFORNIA ELECTRICAL CODE (CEC.)
ALL WORK SHALL COMPLY WITH 2016 CALIF. BUILDING CODE, 2016 CALIF. FIRE CODE. 2016 CALIF.
GREEN ENERGY STANDARDS AND LOCAL MUNICIPAL CODE AND FIRE DISTRICT REGULATIONS.
1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN
INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. .
2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE
COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM.
3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION
BOXES, COMBINER BOXES, AND SWITCHES.
4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF CECART.250,690.
5. CEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT
DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES.
6. CEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED
TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT
CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING.
7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF
CEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN
PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF CEC 408.16(F)
8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK.
+9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75'C MINIMUM.
10. 'CEC ART. 690.14. - SEE SHEET PV -4.1 FOR LABEL DIAGRAM
11. CEC ART. 690.53. -SEE SHEET PV -4.1 FOR LABEL DIAGRAM
12. CEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK
HAZARD - DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAYBE ENERGIZED IN
THE OPEN POSITION".
13. GROUNDING OF ALL DWELLINS SHALL BE CONFIRMED.
14. CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS
LOCATED ON DWELLINGS PER 2016 CEC ART.690.17.
Z -.m
8
C,"
ZIMMERS, JERRY
G
Z
Z
9
9309 LA ROSE CT
r
D
y_
O
o
o
_
DURHAM, CA 95938
p
p
a C,
APN:039-460-099 PH#:530.343.0602
15. WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXIST, THE DIFFERENT SYSTEMS SHALL
BE IDENTIFIED BY PHASE AND SYSTEM PER 2016 CEC ART.210.41)
16. PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS
LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS.
17. PHOTOVOLTAIC SOURCE CURRENTS MUST BERATED AT BOTH 125% OF THE PARALLEL
MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 156% OF THE
LOAD.
18. PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE
DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE
NOT IN THE SAME LOCATION PER 2016 CEC ART.690.56.
19. INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM
SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7-05,
CHAPTER 13.
20. PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL
RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER
ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS.
21. PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE
CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS
INSTALLED AS SPECIFIED IN THESE DRAWINGS.
22. DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE
EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE,
CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL
OR PHYSICAL PLACEMENT.
23. FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL
UTILITY.
24. A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM
EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2016 CEC
690.5(H) AND IN ACCORDANCE WITH 2016 CEC 705.10.
25. A NON FOLDING LADDER WILL BE IN PLACE AND SECURED TO THE ROOF TO PROVIDE ACCESS
FOR ALL INSPECTIONS. ALL BOXES WILL BE OPENED UPON REQUEST.
26. SMOKE AND CARBON MONOXIDE ALARMS WILL BE INSTALLED IN ACCORDANCE WITH CRC R314
R315
27. ALL SOLAR INVERTERS INSTALLED ARE SMART INVERTERS PER CALIFORNIA RULE 21
Energy For Life
MOO
Alternative Energy Systems Inc.
nwDar
CERTIFIED
13620 H WY 99
CHICO, CA 95973 21
PHONE#: (530) 345-6980
FAX#: (530) 892-2360
design@solarenergyforlife.com
E
Design -Driven Advantages
#1 module aesthetics and effic!encyl
Unmatched module reliability2
No electrolytic capacitors
25 -year Combined Power and Product
Warranty
California Rule 21 Phase 1 comoliant
Maximize Value for Roof
Size system for roof, not string inverter
Optimize performance of each module
Expand Deployment Options
Complex roofs and partial shading
Small systems
System expandability
Simplify & Speed Installation
Factory -integrated microinverter
Robust, double -locking AC connectors
Design flexibility offsite and onEite
No DC string sizing process
Fewer installation steps than cc mpeting
systems
Intuitive commissioning
Component of Complete System
Built for use with SunPowerO Ir-visiMountTm
and the SunPower Monitoring System (PVS5x)
Superior system reliability and aesthetics
l
N a
Optimize System and Installation, Efficiency.
SunPoweri°ACmodules, which include a factory -integrated SunPOwf
microinverter, provide a revolutionary combination of high efficiency, high..
reliability, and module -level DC -to -AC power conversion. Designed
,specifically for use with SunPower InvisiMountTM and the SunPower
Monitoring System, SunPower AC modules enable. rapid installation, best -
in -class system aesthetics, and•intuitive visibility,into system performance.
All this comes wish the best Combined Power and Product Warranty in..
the industry. * -
Grid Support Utility -Interactive Smart Inverter
SunPQwer's new Type D AC -module is UL tested and certified to 6L•1741•
SA and provides advanced smart inverter functions.-SunPowerType D AC .
modules are fully compliant with the California Rule•21 Phase 1
-requirements, and the Rule 21 grid profile is easily set during `
commissioning with SunPower PVS5x monitoring hardware.. -
sunpower.com `
s
SPR -X21 -345 -D -AC .SPR -X21 -345 -D -AC
s.
345 W 335 W
Power Tolerance
+5/-0% +5/-0% "
IEEE 1547a-20143
CA Rule 213
SRD Profile
-0.29%/°C "
(default settings)
min. / nom. /,max.
Recommended Max.
Module Spacing
1.3 in. (33 mm)
in. / nom. / max.
Frequency (Hz)
59.5 / 60.0 / 60.5
58.5 / 60.0 / 60.5 -.
Power Factor
,
0.99 / 1.00 / 1.00
.0.85 lead. / 1.00 / 0.85 lag.
Reactive Power
=169 Var
Volt-VAr
Voltage
@240 V
211.2 / 240 / 264 V
'183'/
@208 V
208 / 228.8 V
'
Max. Current
@240 V
1.33 A
@208 V
1.54 A
DC/AC CEC Conversion Efficiency - -
@240 V ' .
96.0%
@208 V
95.5%
Max. Units Per 20 A Branch Circuit
@240 V
12 (single phase)
@208 V
10 (tw/o pole) wye
Power
320 W, 320 VA
No active phase balancing for 3 phase installations
s
SPR -X21 -345 -D -AC .SPR -X21 -345 -D -AC
Nominal Power,,' (Pnom)
345 W 335 W
Power Tolerance
+5/-0% +5/-0% "
Avg. Panel Efficiency'
21.5% 21.0%
_Temp. Coef. (Power),, ..
-0.29%/°C "
Shade Tolerance
Three bypass diodes. r
-.Integrated module -level maximum power point
tracking
'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014
#1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of '
the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module
Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details.
'-Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during
commissioning. See the Equinox Instollodon Guide #518701 for more information.
'Standard Test Conditions (1000 W/mz irradiance, AM 1.5, 25° Q. NREL calibration standard:
SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. '
'Based on average of measured power values during production.
See vaww.sunpoweccom/facts for 'note reference information.
For, more details, see extended datasheet: www.sunpower.com/datasheets.
Warranties 25 -year limited power warranty
25 -year limited product warranty ,
UL listed to UL,1741 SA -
SRDs: IEEE 1547-2003, IEEE 1547a-2014, CA
Rule 21 Phase 1.
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables
(load break disconnection)
UL 1741 AC Module (Type 2 fire rating)
Certifications- Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and
outside the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703):
Integrated grounding and bonding
Class Afire rated `
PID Test Potential -induced degradation free .
1046 mm
[412 In] - - 'i -.-• ,
1 '30 mm
(1.2 In]
AC WCDLU
i 7558 mmI 1 �A��
Imo_ [613 in] ®` N �
wwvwroo.�H
r 1��� 6678J70
ED
Please read the safety and installation instructions for details- Module Fire I'mformence: Type 2
518982 RevB
- . e. M.
Operating Temp.
-401 F to =185° F (-40e C to +85e Q
Max. Ambient Ten p.
122° F (50° Q
Max. Load
Wind: 62 psf, 3000 Pa, 305 kg/m2 front & back
-Snow:
Frame
125 psf, 6000 Pa, 611 kg/m2 front
'Impact Resistance.
1 inch (25 mm) diameter,hail at 52 mph (23 m/s)
'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014
#1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of '
the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module
Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details.
'-Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during
commissioning. See the Equinox Instollodon Guide #518701 for more information.
'Standard Test Conditions (1000 W/mz irradiance, AM 1.5, 25° Q. NREL calibration standard:
SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. '
'Based on average of measured power values during production.
See vaww.sunpoweccom/facts for 'note reference information.
For, more details, see extended datasheet: www.sunpower.com/datasheets.
Warranties 25 -year limited power warranty
25 -year limited product warranty ,
UL listed to UL,1741 SA -
SRDs: IEEE 1547-2003, IEEE 1547a-2014, CA
Rule 21 Phase 1.
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables
(load break disconnection)
UL 1741 AC Module (Type 2 fire rating)
Certifications- Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and
outside the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703):
Integrated grounding and bonding
Class Afire rated `
PID Test Potential -induced degradation free .
1046 mm
[412 In] - - 'i -.-• ,
1 '30 mm
(1.2 In]
AC WCDLU
i 7558 mmI 1 �A��
Imo_ [613 in] ®` N �
wwvwroo.�H
r 1��� 6678J70
ED
Please read the safety and installation instructions for details- Module Fire I'mformence: Type 2
518982 RevB
- . e. M.
Solar Cells
96 Monocrystalline Maxeon Gen III
Front Glass
. High -transmission tempered glass with anti -
reflective coating .
Environmental Rating
Outdoor rated
Frame
Class 1 'black anodized (highest AAMA rating)
Weight
455Ibs (20.6 kg)
Recommended Max.
Module Spacing
1.3 in. (33 mm)
'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014
#1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of '
the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module
Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details.
'-Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during
commissioning. See the Equinox Instollodon Guide #518701 for more information.
'Standard Test Conditions (1000 W/mz irradiance, AM 1.5, 25° Q. NREL calibration standard:
SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. '
'Based on average of measured power values during production.
See vaww.sunpoweccom/facts for 'note reference information.
For, more details, see extended datasheet: www.sunpower.com/datasheets.
Warranties 25 -year limited power warranty
25 -year limited product warranty ,
UL listed to UL,1741 SA -
SRDs: IEEE 1547-2003, IEEE 1547a-2014, CA
Rule 21 Phase 1.
PV Rapid Shutdown Equipment
Equipment Grounding
UL 6703, UL 9703 Connectors and cables
(load break disconnection)
UL 1741 AC Module (Type 2 fire rating)
Certifications- Enables installation in accordance with:
NEC 690.6
NEC 690.12 Rapid Shutdown (inside and
outside the array)
NEC 690.15 AC Connectors, 690.33(A) - (E)(1)
FCC and ICES -003 Class B
When used with InvisiMount racking (UL 2703):
Integrated grounding and bonding
Class Afire rated `
PID Test Potential -induced degradation free .
1046 mm
[412 In] - - 'i -.-• ,
1 '30 mm
(1.2 In]
AC WCDLU
i 7558 mmI 1 �A��
Imo_ [613 in] ®` N �
wwvwroo.�H
r 1��� 6678J70
ED
Please read the safety and installation instructions for details- Module Fire I'mformence: Type 2
518982 RevB
,a
Module* / Mid Clamp and Rail Module* / End Clamp and Rail
Mid Clamp End Clamp
w�KYMMiMi 1 • • • V►iiMG!
Component
Material
weight
Mid Clamp.
Black oxide stainless steel AISI 304
63 g (2.2 oz)
End Clamp
Black anodized aluminum alloy 6063-T6
110a (3.35 oz)
Rail
Black anodized aluminum alloy 6005-T6
330 g/m (9 oz/ft)
Rail Splice
Aluminum alloy 6005 -TS
330 g/m (9 oz/ft)
Ground Lug
Assembly
304 stainless
(A2-70 bolt; tin-plated copper lug)
106.5 g/m (3.75 oz)
End Cap
Black acetal (POM) copolymer
10.4 g (0.37 oz) ,
End Cap
• r
• •'god r 91• • •
Temperature -40° C to 90° C (-40° F to 194° F)
Max. Load 2400 Pa uplift
5400 Pa downforce
warranties 25 -year product warranty
5 -year finish warrano/
UL 2703 Listed
Certifications Class A fire rating when distance between
roof surface and bottom of SunPower
module frame is <- 3.5"
Composition Shingle Rafter Attachment
Application Composition Shingle Roof Decking Attachment ' • • •
Curved and Flat Tile Roof Attachment
Universal Interace for Other Roof Attachments Refer to roof attachment hardware manufacturer's documentation
*Module frame that is compatible with the InvisiA'ount system required for hardware interoperability.
L 2015 SunPower Corporation. All Rights Reserved. SUNPOwER, the SUNPOINER logo, acid INVISIMOUNT are trademarks or registered
trademarks of SunPower Corporation. All other trademarks are the property of their respective owners. sunpower.com
Specifications included in this datasheet are subject to change without notice. Document 11509506 Rev 8
INVISIMOUNT RACKING DETAIL
c�i n n nn�ri u r
J
CLAMP
EACH MID CLAMP
GROUNDS THE
AIL '
L-1 VV 1
[NVISIMOUNT RAIL
GreenFasten'" GF1 -Product Guide
11
2
' Consult an engineer or go to www.ecofastensolar.com
for engineering data.
Installation Instructions with Compression Bracket
3 4a 4b 4c
1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for
each GreenFasten flashing.
2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar
recommends an EPDM mastic.
3. Insert the flashing so the top part is under the next row of shingles and pushed far enough
up slope to prevent water infiltration through vertical joint in shingles. The leading edge of
flashing must butt against upper row of nails to prevent turning when tourqued. See page
2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses.
4. Line up pilot hole with GreenFasten flashing hole.
4a Insert the lag bolt through the EPDM washer, the top compression component bracket (L-
102-3, L-102-6*, SCL-101-3*, Z-101*, Conduit Mount Bracket*) and the gasketed hole in the
flashing and into the rafter.
4b Insert the lag bolt through the EPDM washer, the Comp Mount Slide compression
bracket and the gasketed hole in the flashing and into the rafter.
4c Insert the lag bolt through the SS washer, the third -party bracket, the EPDM bonded
washer, the CP -SQ -Slotted compression bracket and the gasketed hole in the flashing
and into the rafter.
5. Torque:The range is between 100-140 torque inch -pounds depending on the type of wood
and time of year. The visual indicator for proper torque is when the EPDM on the underside
of the bonded washer begins to push out the sides as the washer compresses. If using an
impact wrench to install the fasteners be careful not to over torque the fastener. You may
need to stop and use a ratchet to finish the install.
*not pictured.
877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014
EcoFasten Solar products are protected by the following U.S. Patents: 8,151.522 132 8.153,700 B2 8.181.398 132 8.166.713 B2 8.146.299 82 8.209.914 B2 8.245.454 132 8,272,174 B2 8.225.557 132
2.1
N"
O
2
' Consult an engineer or go to www.ecofastensolar.com
for engineering data.
Installation Instructions with Compression Bracket
3 4a 4b 4c
1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for
each GreenFasten flashing.
2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar
recommends an EPDM mastic.
3. Insert the flashing so the top part is under the next row of shingles and pushed far enough
up slope to prevent water infiltration through vertical joint in shingles. The leading edge of
flashing must butt against upper row of nails to prevent turning when tourqued. See page
2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses.
4. Line up pilot hole with GreenFasten flashing hole.
4a Insert the lag bolt through the EPDM washer, the top compression component bracket (L-
102-3, L-102-6*, SCL-101-3*, Z-101*, Conduit Mount Bracket*) and the gasketed hole in the
flashing and into the rafter.
4b Insert the lag bolt through the EPDM washer, the Comp Mount Slide compression
bracket and the gasketed hole in the flashing and into the rafter.
4c Insert the lag bolt through the SS washer, the third -party bracket, the EPDM bonded
washer, the CP -SQ -Slotted compression bracket and the gasketed hole in the flashing
and into the rafter.
5. Torque:The range is between 100-140 torque inch -pounds depending on the type of wood
and time of year. The visual indicator for proper torque is when the EPDM on the underside
of the bonded washer begins to push out the sides as the washer compresses. If using an
impact wrench to install the fasteners be careful not to over torque the fastener. You may
need to stop and use a ratchet to finish the install.
*not pictured.
877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014
EcoFasten Solar products are protected by the following U.S. Patents: 8,151.522 132 8.153,700 B2 8.181.398 132 8.166.713 B2 8.146.299 82 8.209.914 B2 8.245.454 132 8,272,174 B2 8.225.557 132
2.1
GreenFasten- GF1 - Product Guide
tv
Installation Instructions
* Use for vertical adjustment when leading edge of flashing hits nails in upper shingle courses
. Slide flashing tap under shingles until leading edge 2. Remove flashing and cut"V"notch at marks where nail shafts
engages nails. Measure remaining distance to adjust engaged leading edge of flashing the distance desired in Step 1.
I Inclnno Notch depth not to exceed 2" length by 1/2"width.
shingle
Placement of"V" notch
�frp10", ,
% ! �i • ,�'"l , tom- 2
4. Position notched leading edge underneath nail heads as shown.
JNails beneath shingle
877-859-3947 EcoFasten Solar®All content protected under copyright. All rights reserved. 7/24/2014 -
EcoFasten Solar products are protected by the following U.S. Patents: 8.151,522 B2 8.153,700 B2 8.181,398 B2 8,166.713 B2 8.146.299 B2 8.209.914 B2 8,245,454 B2 8,272.174 B2 8,225.557 B2
2.2
GreenFasten- GF1 - Product Guide ,_ r �:t Cut Sheets: GF1
yI } � i•
yy
jl,iit{ ; Ny1 .. �
(P-, k]
1g t` ti r y
SECTION A A'
i ftp r � _ 1. •
V
v j r 877-8ght. All rights reserved. 7124/2014 3.1
59-3947 EcoFasten Solar®AII content protected under copyri
EcoFasten.Solar products are protected by the following U.S. Patents: 8,151,522 62 8,153,700 62 8,181.398 62 8,166,713 82 8,146,299 82 8,209,914 62 8,245.454 B2 8.272.174 B2 8.225,557 B2
117
i1, `i GreenFasten'" GF1 -, Product Guide, ' Cut Sheets: GFI'*812
8 `170
43 1/32"±lool I f.
t
t
1 41
R�( 0 1 b. z ! It ,I , i. , � +� ��<< .� •
Jai � � 5/64
DETAIL A
4" SCALE: 2:1 ,
'Q it '11 .. , ♦ r. .I ' ,
Finish Options
4 .BLK = Matte Black
' �v\;:.r'.MLL•=Mill Finish
877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014 3.2
EcoFasten Solar products are protected by the followino U.S. Patents: 8.151,522 B2 8,153,700 B2 8.181.398 B2 8,166,713 B2 8.146,299 B2 8,209.914 B2 8,245.454 B2 8.272,174 B2 8,225.557 82
GreenFasten'" GF1 = Product Guide T Cut Sheets: Bracket Options -.CP -SQ -Slotted
r 1.50 —
��GG�f � �' ,} ,. �• �'I'� r,• y .0116 .50' � �.; F ,r.: •• ,
.38 - f
2.00
•�d �i ' 1.00'
+01
�• a F ,1 �� 1'.00 _ 0 0.38 = .00 Z 0.50
It N
0 0.88±.O1 X 820
I � � = r;�� i � _ • •� � .,2.00
' is '��' ±�^+ 11 - ,+ + rs,. •+ i . .' .i •� _ `t• .. - .. - •" .`
,yy i `a` jjjj,
T � � 11.1 � .� , . _ I �y " " ♦ �' 'R Y . — � - . ♦ F ' , e
877-859-3947 EcoFasten Solar®All content protected under copyright. All rights reserved. 7/24/2014. r _ ' 3:3
EcoFasten Solar products are protected by the followinq U.S. Patents: 8,151,522 B2 8.153.700 B2 8.181,398 B2 8,166.713 B2 8,146.299 82 8,209,914 B2 8.245.454 B2 8.272,174 B2 8,225.557.62
GreenFasten--GF1 - Product Guide Cut Sheets: Bracket Options - SCL-101-3
3/81-1
46 SERRATIONS -
. }
�a k�.f��r;,���� '�`��,� `• f •' � Y :. �- :. _ R 1 / 161,
1. ,t,1 —
G 1 %4 00
A..� .. 3/41 . ' '. • •' ' l /16'T � •- _
F a.l 1 ^
2X R.01 a
��� �'', •.J '.�• * 11 `�• - - -_ _ ___ ___- - r .. _ , ,'. •
60.00
+°'
006 '
'
�f 0 3/811
—.002 1 /8„
%/$ X 829 DETAIL A ,
r} �, SCALE 3:1
tit
877-859-3947, EcoFasten Solar®AII content protected under copyright. All rights reserved. 7/24/2014* 3.5
EcoFasten Solar products are protected by the followinq U.S. Patents: 8,151.522 B2 8.153.700 62 8.181.398 62 8.166.713 B2 8.146.299 B2 8,209.914 B28,245,454 82 8,272.174 B2 8.225.557 82
�'
I,� 4 GreenFasten GF1 —Product Guide Cut Sheets: Bracket Options - L-102=3
} �1 ii i' • r ' ti F 2X.3/8" :t ,
I t
tA
#;O 46 SERRATIONS, -
l �' •r_ 1 °I y' Z
L .
R•1 / 16"
00
R.005
p it U-)
R.0 10
-2 X,R.01,
60.000 -
Qi` Sl�
+.006
,'� f . • t 0' 3/8"-- .002 1 /8.. -
It�f:..{{Y�� ►, i, .. - �/ :875 ±.O 10 X 82 ° DETAIL A' "
SCALE 3: 1 "
t
877-859-3947 Eco Fasten Solar® All content protected under copyright. All rights reserved. 7/24/2014 3.6
EcoFasten Solar products are protected by the following U.S. Patents: 8.151.522 B2 8.153.700 B2 8.181.398 B2 8.166.713 B2 8,146.299 B2 8,209.914 1]128,245,454 B28,272.174 1328,225.557132
N
A
15/16:
'1 7/8"
R•1 / 16"
00
R.005
p it U-)
R.0 10
-2 X,R.01,
60.000 -
Qi` Sl�
+.006
,'� f . • t 0' 3/8"-- .002 1 /8.. -
It�f:..{{Y�� ►, i, .. - �/ :875 ±.O 10 X 82 ° DETAIL A' "
SCALE 3: 1 "
t
877-859-3947 Eco Fasten Solar® All content protected under copyright. All rights reserved. 7/24/2014 3.6
EcoFasten Solar products are protected by the following U.S. Patents: 8.151.522 B2 8.153.700 B2 8.181.398 B2 8.166.713 B2 8,146.299 B2 8,209.914 1]128,245,454 B28,272.174 1328,225.557132
AC Circuit'Ampacity Calculator 4 '� .Meter #: 1007906252
r' Customer Name: ZIMMERS, JERRY
Location: 9309 LA ROSE CT., DURHAM, CA 95938
Wire Note: AC -1 Description: AC MODULES TO AC DISTRIBUTION PANEL
Wire Calculation _ _ _
3.84 kWatts - 240 VAC Split j Voltage Configuration TRUE TL Inverter?
10 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity - V 10 Minimum Ground Size Based on.NE&
20.00 A Minimum Ciruit Breaker/Fuse Size �8�Actual Ground Size Based on NEC ;
20.00 A Ampacity After Derate 10 Wire Size Based on Ampacity 30 A ±
0.992 % of Voltage Drop 10 Wire Size Based on Voltage Drop' • _ '• 30 A
16 A Circuit Ampacity 1 Factor, 1 Phases ,
0.82 Conditions of Use Derate Factor -
19.51 A, Minimum Conductor Ampacity Based on Conditions of Use
20.00 A Minimum Conductor Ampacity Based on 1.25 Rule
Conditions of Use
0.82 Derate Total. '
-
50 °C Temp Coef (ambient +, Sunlight) 122 °F 0.82 Derate
50 °C Ambient Temp 122 °F
none Sunlight Exposure 32 °F 0 °C Temp adder
• 3 or less Number of Current Carrying Conductors 1 Derate applied to Tem`p'Coeficient 1
Voltage'D_,ro.p Allo.wa_bleRTolerance (SolarGeneration 1%,:Distribution 3%) . ' -
- _
2_40 V Circuit Voltage X16 A Circuit Amps 1.24 Resistance
60 ft One Way Distance 10 Wire Size 0.992 % of Loss -
C_o_nduit'Size (Conduit FiII Can, Not be more than 40%)
PVC Conduit Type Q. 16 Wire Size Diameter �.3✓o Conduit Fill percentage _ v
3/4 Conduit Size - 0.21_2 Ground Wire Size Diameter 0.409 Conduit Internal Diameter.
- 600 V, System Voltage �THWN-2 Wire Type '.. t•
' '-.f '. • MS. � � ` �• .. •r. , C _ ' •Y •-, ti ,. •Y _•i- 1 '� j^i .,R y w _Tr'-
`• .." it rr ` . �• .' - f hl' *- •. r - • r 7-,
•I • +
-, _ice~'• ' + .. e - . , _ :'.' •.• r , '•. .. t '- � ,zt. . ` .".. 'j •r! , , .
AC Circuit AmNacity Calculator Meter :100706252
' J
} 'Customer Name: ZIMMERS, JERRY w s
Location: 9.3.0.9 LA ROS_ E CT., DURHAM, CA 95938
Wire Note: AC -2 Description: AC DISTRIBUTION PANEL TO MAIN
�. .:
' WireCalculation_...__
4.48 kWatts 240 VAC Split Voltage Configuration TRUE TL Inverter? '
10 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity 10 Minimum Ground Size Based on NEC
23.33 A Minimum Ciruit Breaker/Fuse Size 10 Actual Ground Size Based on NEC"'' '
23.33 A Ampacity After Derate, 10 Wire Siie Based on Ampacity 30 A
' 0.1929 % of Voltage Drop 10 Wire Size Based on Voltage Drop, . 30 A s:: • , ,`,
18.667 A Circuit Ampacity J 1 Factor r = 1 Phases
0.82 Conditions of Use Derate Factor ;" • ' '- r �'
J2276A Minimum Conductor Ampacity Based on Conditions of UseA Minimum.Conductor Ampacity Based ori 1.25 Rule k .
,~ C_onditio_ns of Use
`} 0.82 Derate Total
50 °C Temp Coef (ambient + Sunlight) 122 °F'- - • 0.82 Derate "` • `
It, '
50 °C'Ambient Temp 122 °F
none Sunlight Exposure 32 °F °C Temp adder."
3 or less Number of Current Carrying Conductors LTJ Derate applied to Temp Coeficient
Voltage Drop: Allowable Tolerance (Solar Generatiorrl% ; Distribution
^�
2.40 V Circuit Voltage 18.66.7 A Circuit Amps L
1.24 Resistance10 ft One Way Distance t 10 Wire Size 929 % of Loss
Conduit Size (Conduit Fill Can Not be more than 40%) '
EMT Conduit Type 0.16 Wire Size Diameter - ` 26% Conduit Fill percentage
" . 1/2 " ' ,Conduit Size ; ' 0.16 Ground Wire Size Diameter 0.304_ Conduit Internal Diameter,
600 V System Voltage THWN-2 Wire Type - - - -