HomeMy WebLinkAboutB17-2988 039-460-099F y � BUTTE:COUNTY DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (NR) :530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 530 Permit No: B17-2988 Issued: 12/19/2017 APN: 039-460-099 Address: 9309 LA ROSE CT, DURHAM Owner: ZIMMERS JERRY & LINDA Permit Type: SOLAR ROOF -RES Description: Install 4.83kw roof mount to existing meter �jls. /72f� www.tsutteuounty.net/dtls AREA 5 Flood Zone: X (Unsh SRA Area:' LRA SETBACKS for Zoninu- AG_ SRA_ P Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING' Ins ection Type IVIR INP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Sign d Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin nder inin 612 Tiedown/Soft Set System 611 - Do Not Install Floor Sheathing or Slab Until Above Signed ShearwallB.W.P.-Interior 134 ShearwallB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Manometer Test 605 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimmina Pools Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimmina Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 anufactu ed Homes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 - Permanent Foundation System 613 ` Underground Electric '218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals �. w Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL 11Z -Zar *Project Final is a Certificate of Occupancy for(Residential Only) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR, RENEWAL 30 DAYS PRIOR TO EXPIRATION PROJECT OWNER: ZIMMERS, JERRY 9309 LA ROSE CT DURHAM, CA 95938 APN:039-460-099 PH#:530.343.0602 EMAIL:zimmers123@gmail.com CONTRACTOR: ALTERNATIVE ENERGY SYSTEMS INC. 13620 HIGHWAY 99 CHICO, CA 95973 CSLB: 853351 C-10, C-46 BUILDING JURISDICTION: %4Ae SCOPE: Se INSTALL PHOTOVOLTAIC SOLAR SYSTEM ON A TRUSS ROOF, MOUNTED IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES SPECIFICALLY REFERENCING THE 2016 CALIFORNIA ELECTRICAL CODE/ 2014 NEC USING THE FOLLOWING SPECIFIC EQUIPMENT: 1. MODULES: SUNPOWER " (14) SPR -X21 -345 -D -AC 4.83kW SYSTEM 259 SQFT COVERED 2. INVERTER(S): SUNPOWER: (14) MODULE INTEGRATED 320W EACH [S11] SITE MAP PAGE # CONTENT no o PV -1.0 SCOPE PV -2.0 SITE PLAN PV -3.0 ARRAY LAYOUT PV -4.0 ELECTRICAL DIAGRAM PV -4.1 LABEL DIAGRAM PV -5.0 GENERAL NOTES ATTACHMENT MODULE SPECS INVERTER SPECS p G a RACKING SPECS WIRE CALCS _r , �o"-"�r' �:l1f'AS �'=�i..�'�r_' y �•r-�� 4?:. x��-'�,.�'+',r`.� ��_/`1.--_ j- BUTTE COUNTY DEPT. OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE Ir" L OROVILLE, CA 95965 I, I' ) OFFICE#: (530) 538-7601 =�. *' . •1 -. + 41 N FAX#: (530) 538-2140 MON-FRI 8AM-3PM W INSPECTION LINE: (530) 538-4365I�_ REQUESTS PHONED IN BY 2PM WILL BE t ,y • i INSPECTED THE NEXT BUSINESS DAY JL no o a �, m s ZIMMERS, JERRY 9 - Energy For Life 13620 HWY 99 CHICO, CA 95973 C VIII 9309 LA ROSE CT o ` p G a PHONE#: (530) 345-6980 i p D = DURHAM, CA 95938 ®oma FAX#: (530) 892-2360 O APN:039-460-099 PH#:530.343.0602 Alternative Energy Systems Inc. design@solarenergyforlife.com . . • No4uWtl •GVIOlC15-011615 °I VIII PGE METER & ,MODEM AND ROUTER LOCATION ` (E) MAIN SERVICE PANEL .ii - x - -� (E) RESIDENCE, ;'A " (N) AC DISTRIBUTION PANEL (N) MONI RI G- -- _ (E) AC DISTRIBUTION PANEL Aw (E) GARAGE (E) TRUSS ROOF W/ COMP SHINGLES r-11 M .�.' - nr SITE PLAN = , n A m o c m S ZIMMERS, JERRY m Ener For Life 91' 13620 HWY 99 CHICO, CA 95973 � m< z z K 9309 LA ROSE CT o p„ PHONE#: (530) 345 6980 z s IV z D o p D " DURHAM CA 95938 ®®� FAX#: (530) 892 2360' s . z APN:039-460 099 PH#:530.343.0602 Alternative Energy Systems Inc. design@solarenergyforlife.com Naku"hHI02416.011616 U LSL /1' ,U.(-. MAXIMUM ARRAY LAYOUT'. •y m m • �-+ r '- • r; .r � ` � "" ATTACHMENTS MAX 72 OC + a' _ t p < < y .'o • z 3 ' " 9309 LA ROSE CT Energy For Life CHICO, CA95973 .f Z, $ " W Z F. >' - �\ g®� DURHAM, CA 95938. ' PHONE#: (530) 345-6980. , Z o c ° D T FAX#: (530)'892-2360 • OA A_v , . N Alternative Energy Systems Inc. ` design@sola.renergyforlife.com .y 1 + • - - Pohu:x+l L�� • ✓ ppy.,oza sou5a , � • . - , 00 r =� r ! f ' ? RAFTERS 24" OC ; L 20'-10" F1 ga� U LSL /1' ,U.(-. MAXIMUM ARRAY LAYOUT'. m m S ZIMMERS, JERRY f 13620 HWY 99 p < < y .'o • z 3 ' " 9309 LA ROSE CT Energy For Life CHICO, CA95973 .f Z, $ " W Z F. >' - �\ g®� DURHAM, CA 95938. ' PHONE#: (530) 345-6980. Z o c ° D T FAX#: (530)'892-2360 • OA A_v APN:039 460 099 PH#:530.343.0602, Alternative Energy Systems Inc. ` design@sola.renergyforlife.com + • - - Pohu:x+l L�� • ✓ ppy.,oza sou5a , � • . - , ( AC -2 AC -1 (1) 1/2" EMT w/ ON ROOF w/ _ (3) #10 THW N-2 CU. & - - t. (2) TRANSITION CABLE(S) (1) #10 THWN-2 CU. GRD. WIRE RUN: 5, AC -1 WIRE RUN: 10' - - IMP: 20A i (2) #10-2 WIRE NM CABLE CU. [MAX: 23A - - WIRE RUN: 30' IMAX: 20A - -1- EXIISlSTING (1 SERVICE VOLTAGE 11 =2 120V=N-L2-L3=NAV NAV=N-L3-LI=NAV METER t 6 200A 1P (6) PV MODULES/INVERTERS[S11I 240V SUNPOWER: SPR -X21 -345 -D -AC 1.33A/1P/240V 8 20P 25A 240V 1P 20A 240V V 1P 240V (8) PV MODULES/INVERTERS[S11) ]-BOX SUN POWER: SPR -X21 -345 -D -AC` SOA 1.33A/1P/240V (E)AC DISTRIBUTION PANEL 1P 125A/ 1P/ 240V 240V (E) AC SERVICE PANEL - - 20OA/ 1P/ 240V SCIR:10000 METER#:1007906252 SSA 4 1P 240V (N)AC DISTRIBUTION PANEL 125A/ 1P/ 240V AC -MONITORING (1) 1/2" EMT w/ (2) #14 THWN-2 CU. & (1) #14 THWN-2 CU. GRD. WIRE RUN: 10' SUNPOWER - PVS5X - MONITORING - . � I �/ CATS [S111ALL SOLAR'INVERTERS _ INSTALLED ARE SMART INVERTERS PER CALIFORNIA RULE 21 ENH2oz ENrizoz (E) ROUTER ELECTRICAL DIAGRAM = n o 0 13620 HWY 99 0 > ZIMMERS, JERRY o C o m Energy For Life CHICO, CA 95973 a I D p_ 0 9309 LA ROSE CT PHONE#: (530) 345-6980 D p > ° ti M DURHAM CA 95938 `� K S 6, Z c ®®o FAX#: (530) 892-2360 O A APN:039-460-099 PH#:530.343.0602 Alternative Energy Systems Inc. design@solarenergyforlife.com z � w� - I norw:wW GP� w,w.ozas.o»5� , •• � � � � .. - • mss: • � • k• _ r Y y , + L • �t \ ' itA 7-1 PV ARRAY _ - i, t 'DISCO N Ci :MAIN ♦ R <• IL ' �:r • ' J - • SUB PANEL . ' , �` - - �, . ' • t METER,M. .. [IN1111 •'�_ - : . N 1 aws onus � {... f •AM PS ^ ' • } r - 1 �' J PHASE ' z.: • - . + - • yR. .. - 1` ••., - - VOLTS + WARNING UTILITY INTERACTIVE POWER FLOWING THROUGH THIS PANEL KW SOLAR GENERATOR AC OPERATING VOLTAGE: WARNING PHOTOVOLTAIC SYSTEM EQUIPPED DUAL POWER SUPPLY WITH RAPID SHUTDOWN _PHOTOVOLTAIC PER CEC 690.54 Interactive Point of - - Interconnectin installed at all Electrical ' Per CEC 705.10, Point of Connection, w Located On Main Service Panel. Distribution Panel covers that porvide a ` ` • <, r path from PV to Utility. - i AC PHOTOVOLTAIC DISCONNECT -•. OPERATION r Per CEC 690.14, Disconnection means at • - the single AC Disconnect or Main Breaker. + SOLAR BREAKER DO NOT RELOCATE �* r .• + . r Solar breaker label @ any breaker passing Bi -Directional Power LABEL DIAGRAM n m o c, ZIMMERS, JERRY 13620 HWY 99 . ti . • o ➢ s o Z • �, m 0 9309 LA ROSE CTe ' 1 ; • Energy For CHICO, CA 95973 PHONE#: (530) 345 6980` :5 o _ ^ �' D a D - DURHAM, CA 95938 i FAX#: (530) 892-2360' �' p p • �. APN:039 460-099 PH#:530.343:0602 Alternative Ener S stems Inc., 9y y design@solarenergyforlife.com ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2016 CALIFORNIA ELECTRICAL CODE (CEC.) ALL WORK SHALL COMPLY WITH 2016 CALIF. BUILDING CODE, 2016 CALIF. FIRE CODE. 2016 CALIF. GREEN ENERGY STANDARDS AND LOCAL MUNICIPAL CODE AND FIRE DISTRICT REGULATIONS. 1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. . 2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM. 3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION BOXES, COMBINER BOXES, AND SWITCHES. 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF CECART.250,690. 5. CEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES. 6. CEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING. 7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF CEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF CEC 408.16(F) 8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK. +9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75'C MINIMUM. 10. 'CEC ART. 690.14. - SEE SHEET PV -4.1 FOR LABEL DIAGRAM 11. CEC ART. 690.53. -SEE SHEET PV -4.1 FOR LABEL DIAGRAM 12. CEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK HAZARD - DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAYBE ENERGIZED IN THE OPEN POSITION". 13. GROUNDING OF ALL DWELLINS SHALL BE CONFIRMED. 14. CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS LOCATED ON DWELLINGS PER 2016 CEC ART.690.17. Z -.m 8 C," ZIMMERS, JERRY G Z Z 9 9309 LA ROSE CT r D y_ O o o _ DURHAM, CA 95938 p p a C, APN:039-460-099 PH#:530.343.0602 15. WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXIST, THE DIFFERENT SYSTEMS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER 2016 CEC ART.210.41) 16. PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS. 17. PHOTOVOLTAIC SOURCE CURRENTS MUST BERATED AT BOTH 125% OF THE PARALLEL MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 156% OF THE LOAD. 18. PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE NOT IN THE SAME LOCATION PER 2016 CEC ART.690.56. 19. INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7-05, CHAPTER 13. 20. PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS. 21. PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS INSTALLED AS SPECIFIED IN THESE DRAWINGS. 22. DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE, CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL OR PHYSICAL PLACEMENT. 23. FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL UTILITY. 24. A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2016 CEC 690.5(H) AND IN ACCORDANCE WITH 2016 CEC 705.10. 25. A NON FOLDING LADDER WILL BE IN PLACE AND SECURED TO THE ROOF TO PROVIDE ACCESS FOR ALL INSPECTIONS. ALL BOXES WILL BE OPENED UPON REQUEST. 26. SMOKE AND CARBON MONOXIDE ALARMS WILL BE INSTALLED IN ACCORDANCE WITH CRC R314 R315 27. ALL SOLAR INVERTERS INSTALLED ARE SMART INVERTERS PER CALIFORNIA RULE 21 Energy For Life MOO Alternative Energy Systems Inc. nwDar CERTIFIED 13620 H WY 99 CHICO, CA 95973 21 PHONE#: (530) 345-6980 FAX#: (530) 892-2360 design@solarenergyforlife.com E Design -Driven Advantages #1 module aesthetics and effic!encyl Unmatched module reliability2 No electrolytic capacitors 25 -year Combined Power and Product Warranty California Rule 21 Phase 1 comoliant Maximize Value for Roof Size system for roof, not string inverter Optimize performance of each module Expand Deployment Options Complex roofs and partial shading Small systems System expandability Simplify & Speed Installation Factory -integrated microinverter Robust, double -locking AC connectors Design flexibility offsite and onEite No DC string sizing process Fewer installation steps than cc mpeting systems Intuitive commissioning Component of Complete System Built for use with SunPowerO Ir-visiMountTm and the SunPower Monitoring System (PVS5x) Superior system reliability and aesthetics l N a Optimize System and Installation, Efficiency. SunPoweri°ACmodules, which include a factory -integrated SunPOwf microinverter, provide a revolutionary combination of high efficiency, high.. reliability, and module -level DC -to -AC power conversion. Designed ,specifically for use with SunPower InvisiMountTM and the SunPower Monitoring System, SunPower AC modules enable. rapid installation, best - in -class system aesthetics, and•intuitive visibility,into system performance. All this comes wish the best Combined Power and Product Warranty in.. the industry. * - Grid Support Utility -Interactive Smart Inverter SunPQwer's new Type D AC -module is UL tested and certified to 6L•1741• SA and provides advanced smart inverter functions.-SunPowerType D AC . modules are fully compliant with the California Rule•21 Phase 1 -requirements, and the Rule 21 grid profile is easily set during ` commissioning with SunPower PVS5x monitoring hardware.. - sunpower.com ` s SPR -X21 -345 -D -AC .SPR -X21 -345 -D -AC s. 345 W 335 W Power Tolerance +5/-0% +5/-0% " IEEE 1547a-20143 CA Rule 213 SRD Profile -0.29%/°C " (default settings) min. / nom. /,max. Recommended Max. Module Spacing 1.3 in. (33 mm) in. / nom. / max. Frequency (Hz) 59.5 / 60.0 / 60.5 58.5 / 60.0 / 60.5 -. Power Factor , 0.99 / 1.00 / 1.00 .0.85 lead. / 1.00 / 0.85 lag. Reactive Power =169 Var Volt-VAr Voltage @240 V 211.2 / 240 / 264 V '183'/ @208 V 208 / 228.8 V ' Max. Current @240 V 1.33 A @208 V 1.54 A DC/AC CEC Conversion Efficiency - - @240 V ' . 96.0% @208 V 95.5% Max. Units Per 20 A Branch Circuit @240 V 12 (single phase) @208 V 10 (tw/o pole) wye Power 320 W, 320 VA No active phase balancing for 3 phase installations s SPR -X21 -345 -D -AC .SPR -X21 -345 -D -AC Nominal Power,,' (Pnom) 345 W 335 W Power Tolerance +5/-0% +5/-0% " Avg. Panel Efficiency' 21.5% 21.0% _Temp. Coef. (Power),, .. -0.29%/°C " Shade Tolerance Three bypass diodes. r -.Integrated module -level maximum power point tracking 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 #1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of ' the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details. '-Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Instollodon Guide #518701 for more information. 'Standard Test Conditions (1000 W/mz irradiance, AM 1.5, 25° Q. NREL calibration standard: SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. ' 'Based on average of measured power values during production. See vaww.sunpoweccom/facts for 'note reference information. For, more details, see extended datasheet: www.sunpower.com/datasheets. Warranties 25 -year limited power warranty 25 -year limited product warranty , UL listed to UL,1741 SA - SRDs: IEEE 1547-2003, IEEE 1547a-2014, CA Rule 21 Phase 1. PV Rapid Shutdown Equipment Equipment Grounding UL 6703, UL 9703 Connectors and cables (load break disconnection) UL 1741 AC Module (Type 2 fire rating) Certifications- Enables installation in accordance with: NEC 690.6 NEC 690.12 Rapid Shutdown (inside and outside the array) NEC 690.15 AC Connectors, 690.33(A) - (E)(1) FCC and ICES -003 Class B When used with InvisiMount racking (UL 2703): Integrated grounding and bonding Class Afire rated ` PID Test Potential -induced degradation free . 1046 mm [412 In] - - 'i -.-• , 1 '30 mm (1.2 In] AC WCDLU i 7558 mmI 1 �A�� Imo_ [613 in] ®` N � wwvwroo.�H r 1��� 6678J70 ED Please read the safety and installation instructions for details- Module Fire I'mformence: Type 2 518982 RevB - . e. M. Operating Temp. -401 F to =185° F (-40e C to +85e Q Max. Ambient Ten p. 122° F (50° Q Max. Load Wind: 62 psf, 3000 Pa, 305 kg/m2 front & back -Snow: Frame 125 psf, 6000 Pa, 611 kg/m2 front 'Impact Resistance. 1 inch (25 mm) diameter,hail at 52 mph (23 m/s) 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 #1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of ' the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details. '-Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Instollodon Guide #518701 for more information. 'Standard Test Conditions (1000 W/mz irradiance, AM 1.5, 25° Q. NREL calibration standard: SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. ' 'Based on average of measured power values during production. See vaww.sunpoweccom/facts for 'note reference information. For, more details, see extended datasheet: www.sunpower.com/datasheets. Warranties 25 -year limited power warranty 25 -year limited product warranty , UL listed to UL,1741 SA - SRDs: IEEE 1547-2003, IEEE 1547a-2014, CA Rule 21 Phase 1. PV Rapid Shutdown Equipment Equipment Grounding UL 6703, UL 9703 Connectors and cables (load break disconnection) UL 1741 AC Module (Type 2 fire rating) Certifications- Enables installation in accordance with: NEC 690.6 NEC 690.12 Rapid Shutdown (inside and outside the array) NEC 690.15 AC Connectors, 690.33(A) - (E)(1) FCC and ICES -003 Class B When used with InvisiMount racking (UL 2703): Integrated grounding and bonding Class Afire rated ` PID Test Potential -induced degradation free . 1046 mm [412 In] - - 'i -.-• , 1 '30 mm (1.2 In] AC WCDLU i 7558 mmI 1 �A�� Imo_ [613 in] ®` N � wwvwroo.�H r 1��� 6678J70 ED Please read the safety and installation instructions for details- Module Fire I'mformence: Type 2 518982 RevB - . e. M. Solar Cells 96 Monocrystalline Maxeon Gen III Front Glass . High -transmission tempered glass with anti - reflective coating . Environmental Rating Outdoor rated Frame Class 1 'black anodized (highest AAMA rating) Weight 455Ibs (20.6 kg) Recommended Max. Module Spacing 1.3 in. (33 mm) 'Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 #1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of ' the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details. '-Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Instollodon Guide #518701 for more information. 'Standard Test Conditions (1000 W/mz irradiance, AM 1.5, 25° Q. NREL calibration standard: SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. ' 'Based on average of measured power values during production. See vaww.sunpoweccom/facts for 'note reference information. For, more details, see extended datasheet: www.sunpower.com/datasheets. Warranties 25 -year limited power warranty 25 -year limited product warranty , UL listed to UL,1741 SA - SRDs: IEEE 1547-2003, IEEE 1547a-2014, CA Rule 21 Phase 1. PV Rapid Shutdown Equipment Equipment Grounding UL 6703, UL 9703 Connectors and cables (load break disconnection) UL 1741 AC Module (Type 2 fire rating) Certifications- Enables installation in accordance with: NEC 690.6 NEC 690.12 Rapid Shutdown (inside and outside the array) NEC 690.15 AC Connectors, 690.33(A) - (E)(1) FCC and ICES -003 Class B When used with InvisiMount racking (UL 2703): Integrated grounding and bonding Class Afire rated ` PID Test Potential -induced degradation free . 1046 mm [412 In] - - 'i -.-• , 1 '30 mm (1.2 In] AC WCDLU i 7558 mmI 1 �A�� Imo_ [613 in] ®` N � wwvwroo.�H r 1��� 6678J70 ED Please read the safety and installation instructions for details- Module Fire I'mformence: Type 2 518982 RevB ,a Module* / Mid Clamp and Rail Module* / End Clamp and Rail Mid Clamp End Clamp w�KYMMiMi 1 • • • V►iiMG! Component Material weight Mid Clamp. Black oxide stainless steel AISI 304 63 g (2.2 oz) End Clamp Black anodized aluminum alloy 6063-T6 110a (3.35 oz) Rail Black anodized aluminum alloy 6005-T6 330 g/m (9 oz/ft) Rail Splice Aluminum alloy 6005 -TS 330 g/m (9 oz/ft) Ground Lug Assembly 304 stainless (A2-70 bolt; tin-plated copper lug) 106.5 g/m (3.75 oz) End Cap Black acetal (POM) copolymer 10.4 g (0.37 oz) , End Cap • r • •'god r 91• • • Temperature -40° C to 90° C (-40° F to 194° F) Max. Load 2400 Pa uplift 5400 Pa downforce warranties 25 -year product warranty 5 -year finish warrano/ UL 2703 Listed Certifications Class A fire rating when distance between roof surface and bottom of SunPower module frame is <- 3.5" Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment ' • • • Curved and Flat Tile Roof Attachment Universal Interace for Other Roof Attachments Refer to roof attachment hardware manufacturer's documentation *Module frame that is compatible with the InvisiA'ount system required for hardware interoperability. L 2015 SunPower Corporation. All Rights Reserved. SUNPOwER, the SUNPOINER logo, acid INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. All other trademarks are the property of their respective owners. sunpower.com Specifications included in this datasheet are subject to change without notice. Document 11509506 Rev 8 INVISIMOUNT RACKING DETAIL c�i n n nn�ri u r J CLAMP EACH MID CLAMP GROUNDS THE AIL ' L-1 VV 1 [NVISIMOUNT RAIL GreenFasten'" GF1 -Product Guide 11 2 ' Consult an engineer or go to www.ecofastensolar.com for engineering data. Installation Instructions with Compression Bracket 3 4a 4b 4c 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3. Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when tourqued. See page 2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses. 4. Line up pilot hole with GreenFasten flashing hole. 4a Insert the lag bolt through the EPDM washer, the top compression component bracket (L- 102-3, L-102-6*, SCL-101-3*, Z-101*, Conduit Mount Bracket*) and the gasketed hole in the flashing and into the rafter. 4b Insert the lag bolt through the EPDM washer, the Comp Mount Slide compression bracket and the gasketed hole in the flashing and into the rafter. 4c Insert the lag bolt through the SS washer, the third -party bracket, the EPDM bonded washer, the CP -SQ -Slotted compression bracket and the gasketed hole in the flashing and into the rafter. 5. Torque:The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. *not pictured. 877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014 EcoFasten Solar products are protected by the following U.S. Patents: 8,151.522 132 8.153,700 B2 8.181.398 132 8.166.713 B2 8.146.299 82 8.209.914 B2 8.245.454 132 8,272,174 B2 8.225.557 132 2.1 N" O 2 ' Consult an engineer or go to www.ecofastensolar.com for engineering data. Installation Instructions with Compression Bracket 3 4a 4b 4c 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3. Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when tourqued. See page 2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses. 4. Line up pilot hole with GreenFasten flashing hole. 4a Insert the lag bolt through the EPDM washer, the top compression component bracket (L- 102-3, L-102-6*, SCL-101-3*, Z-101*, Conduit Mount Bracket*) and the gasketed hole in the flashing and into the rafter. 4b Insert the lag bolt through the EPDM washer, the Comp Mount Slide compression bracket and the gasketed hole in the flashing and into the rafter. 4c Insert the lag bolt through the SS washer, the third -party bracket, the EPDM bonded washer, the CP -SQ -Slotted compression bracket and the gasketed hole in the flashing and into the rafter. 5. Torque:The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. *not pictured. 877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014 EcoFasten Solar products are protected by the following U.S. Patents: 8,151.522 132 8.153,700 B2 8.181.398 132 8.166.713 B2 8.146.299 82 8.209.914 B2 8.245.454 132 8,272,174 B2 8.225.557 132 2.1 GreenFasten- GF1 - Product Guide tv Installation Instructions * Use for vertical adjustment when leading edge of flashing hits nails in upper shingle courses . Slide flashing tap under shingles until leading edge 2. Remove flashing and cut"V"notch at marks where nail shafts engages nails. Measure remaining distance to adjust engaged leading edge of flashing the distance desired in Step 1. I Inclnno Notch depth not to exceed 2" length by 1/2"width. shingle Placement of"V" notch �frp10", , % ! �i • ,�'"l , tom- 2 4. Position notched leading edge underneath nail heads as shown. JNails beneath shingle 877-859-3947 EcoFasten Solar®All content protected under copyright. All rights reserved. 7/24/2014 - EcoFasten Solar products are protected by the following U.S. Patents: 8.151,522 B2 8.153,700 B2 8.181,398 B2 8,166.713 B2 8.146.299 B2 8.209.914 B2 8,245,454 B2 8,272.174 B2 8,225.557 B2 2.2 GreenFasten- GF1 - Product Guide ,_ r �:t Cut Sheets: GF1 yI } � i• yy jl,iit{ ; Ny1 .. � (P-, k] 1g t` ti r y SECTION A A' i ftp r � _ 1. • V v j r 877-8ght. All rights reserved. 7124/2014 3.1 59-3947 EcoFasten Solar®AII content protected under copyri EcoFasten.Solar products are protected by the following U.S. Patents: 8,151,522 62 8,153,700 62 8,181.398 62 8,166,713 82 8,146,299 82 8,209,914 62 8,245.454 B2 8.272.174 B2 8.225,557 B2 117 i1, `i GreenFasten'" GF1 -, Product Guide, ' Cut Sheets: GFI'*812 8 `170 43 1/32"±lool I f. t t 1 41 R�( 0 1 b. z ! It ,I , i. , � +� ��<< .� • Jai � � 5/64 DETAIL A 4" SCALE: 2:1 , 'Q it '11 .. , ♦ r. .I ' , Finish Options 4 .BLK = Matte Black ' �v\;:.r'.MLL•=Mill Finish 877-859-3947 EcoFasten SolarO All content protected under copyright. All rights reserved. 7/24/2014 3.2 EcoFasten Solar products are protected by the followino U.S. Patents: 8.151,522 B2 8,153,700 B2 8.181.398 B2 8,166,713 B2 8.146,299 B2 8,209.914 B2 8,245.454 B2 8.272,174 B2 8,225.557 82 GreenFasten'" GF1 = Product Guide T Cut Sheets: Bracket Options -.CP -SQ -Slotted r 1.50 — ��GG�f � �' ,} ,. �• �'I'� r,• y .0116 .50' � �.; F ,r.: •• , .38 - f 2.00 •�d �i ' 1.00' +01 �• a F ,1 �� 1'.00 _ 0 0.38 = .00 Z 0.50 It N 0 0.88±.O1 X 820 I � � = r;�� i � _ • •� � .,2.00 ' is '��' ±�^+ 11 - ,+ + rs,. •+ i . .' .i •� _ `t• .. - .. - •" .` ,yy i `a` jjjj, T � � 11.1 � .� , . _ I �y " " ♦ �' 'R Y . — � - . ♦ F ' , e 877-859-3947 EcoFasten Solar®All content protected under copyright. All rights reserved. 7/24/2014. r _ ' 3:3 EcoFasten Solar products are protected by the followinq U.S. Patents: 8,151,522 B2 8.153.700 B2 8.181,398 B2 8,166.713 B2 8,146.299 82 8,209,914 B2 8.245.454 B2 8.272,174 B2 8,225.557.62 GreenFasten--GF1 - Product Guide Cut Sheets: Bracket Options - SCL-101-3 3/81-1 46 SERRATIONS - . } �a k�.f��r;,���� '�`��,� `• f •' � Y :. �- :. _ R 1 / 161, 1. ,t,1 — G 1 %4 00 A..� .. 3/41 . ' '. • •' ' l /16'T � •- _ F a.l 1 ^ 2X R.01 a ��� �'', •.J '.�• * 11 `�• - - -_ _ ___ ___- - r .. _ , ,'. • 60.00 +°' 006 ' ' �f 0 3/811 —.002 1 /8„ %/$ X 829 DETAIL A , r} �, SCALE 3:1 tit 877-859-3947, EcoFasten Solar®AII content protected under copyright. All rights reserved. 7/24/2014* 3.5 EcoFasten Solar products are protected by the followinq U.S. Patents: 8,151.522 B2 8.153.700 62 8.181.398 62 8.166.713 B2 8.146.299 B2 8,209.914 B28,245,454 82 8,272.174 B2 8.225.557 82 �' I,� 4 GreenFasten GF1 —Product Guide Cut Sheets: Bracket Options - L-102=3 } �1 ii i' • r ' ti F 2X.3/8" :t , I t tA #;O 46 SERRATIONS, - l �' •r_ 1 °I y' Z L . R•1 / 16" 00 R.005 p it U-) R.0 10 -2 X,R.01, 60.000 - Qi` Sl� +.006 ,'� f . • t 0' 3/8"-- .002 1 /8.. - It�f:..{{Y�� ►, i, .. - �/ :875 ±.O 10 X 82 ° DETAIL A' " SCALE 3: 1 " t 877-859-3947 Eco Fasten Solar® All content protected under copyright. All rights reserved. 7/24/2014 3.6 EcoFasten Solar products are protected by the following U.S. Patents: 8.151.522 B2 8.153.700 B2 8.181.398 B2 8.166.713 B2 8,146.299 B2 8,209.914 1]128,245,454 B28,272.174 1328,225.557132 N A 15/16: '1 7/8" R•1 / 16" 00 R.005 p it U-) R.0 10 -2 X,R.01, 60.000 - Qi` Sl� +.006 ,'� f . • t 0' 3/8"-- .002 1 /8.. - It�f:..{{Y�� ►, i, .. - �/ :875 ±.O 10 X 82 ° DETAIL A' " SCALE 3: 1 " t 877-859-3947 Eco Fasten Solar® All content protected under copyright. All rights reserved. 7/24/2014 3.6 EcoFasten Solar products are protected by the following U.S. Patents: 8.151.522 B2 8.153.700 B2 8.181.398 B2 8.166.713 B2 8,146.299 B2 8,209.914 1]128,245,454 B28,272.174 1328,225.557132 AC Circuit'Ampacity Calculator 4 '� .Meter #: 1007906252 r' Customer Name: ZIMMERS, JERRY Location: 9309 LA ROSE CT., DURHAM, CA 95938 Wire Note: AC -1 Description: AC MODULES TO AC DISTRIBUTION PANEL Wire Calculation _ _ _ 3.84 kWatts - 240 VAC Split j Voltage Configuration TRUE TL Inverter? 10 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity - V 10 Minimum Ground Size Based on.NE& 20.00 A Minimum Ciruit Breaker/Fuse Size �8�Actual Ground Size Based on NEC ; 20.00 A Ampacity After Derate 10 Wire Size Based on Ampacity 30 A ± 0.992 % of Voltage Drop 10 Wire Size Based on Voltage Drop' • _ '• 30 A 16 A Circuit Ampacity 1 Factor, 1 Phases , 0.82 Conditions of Use Derate Factor - 19.51 A, Minimum Conductor Ampacity Based on Conditions of Use 20.00 A Minimum Conductor Ampacity Based on 1.25 Rule Conditions of Use 0.82 Derate Total. ' - 50 °C Temp Coef (ambient +, Sunlight) 122 °F 0.82 Derate 50 °C Ambient Temp 122 °F none Sunlight Exposure 32 °F 0 °C Temp adder • 3 or less Number of Current Carrying Conductors 1 Derate applied to Tem`p'Coeficient 1 Voltage'D_,ro.p Allo.wa_bleRTolerance (SolarGeneration 1%,:Distribution 3%) . ' - - _ 2_40 V Circuit Voltage X16 A Circuit Amps 1.24 Resistance 60 ft One Way Distance 10 Wire Size 0.992 % of Loss - C_o_nduit'Size (Conduit FiII Can, Not be more than 40%) PVC Conduit Type Q. 16 Wire Size Diameter �.3✓o Conduit Fill percentage _ v 3/4 Conduit Size - 0.21_2 Ground Wire Size Diameter 0.409 Conduit Internal Diameter. - 600 V, System Voltage �THWN-2 Wire Type '.. t• ' '-.f '. • MS. � � ` �• .. •r. , C _ ' •Y •-, ti ,. •Y _•i- 1 '� j^i .,R y w _Tr'- `• .." it rr ` . �• .' - f hl' *- •. r - • r 7-, •I • + -, _ice~'• ' + .. e - . , _ :'.' •.• r , '•. .. t '- � ,zt. . ` .".. 'j •r! , , . AC Circuit AmNacity Calculator Meter :100706252 ' J } 'Customer Name: ZIMMERS, JERRY w s Location: 9.3.0.9 LA ROS_ E CT., DURHAM, CA 95938 Wire Note: AC -2 Description: AC DISTRIBUTION PANEL TO MAIN �. .: ' WireCalculation_...__ 4.48 kWatts 240 VAC Split Voltage Configuration TRUE TL Inverter? ' 10 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity 10 Minimum Ground Size Based on NEC 23.33 A Minimum Ciruit Breaker/Fuse Size 10 Actual Ground Size Based on NEC"'' ' 23.33 A Ampacity After Derate, 10 Wire Siie Based on Ampacity 30 A ' 0.1929 % of Voltage Drop 10 Wire Size Based on Voltage Drop, . 30 A s:: • , ,`, 18.667 A Circuit Ampacity J 1 Factor r = 1 Phases 0.82 Conditions of Use Derate Factor ;" • ' '- r �' J2276A Minimum Conductor Ampacity Based on Conditions of UseA Minimum.Conductor Ampacity Based ori 1.25 Rule k . ,~ C_onditio_ns of Use `} 0.82 Derate Total 50 °C Temp Coef (ambient + Sunlight) 122 °F'- - • 0.82 Derate "` • ` It, ' 50 °C'Ambient Temp 122 °F none Sunlight Exposure 32 °F °C Temp adder." 3 or less Number of Current Carrying Conductors LTJ Derate applied to Temp Coeficient Voltage Drop: Allowable Tolerance (Solar Generatiorrl% ; Distribution ^� 2.40 V Circuit Voltage 18.66.7 A Circuit Amps L 1.24 Resistance10 ft One Way Distance t 10 Wire Size 929 % of Loss Conduit Size (Conduit Fill Can Not be more than 40%) ' EMT Conduit Type 0.16 Wire Size Diameter - ` 26% Conduit Fill percentage " . 1/2 " ' ,Conduit Size ; ' 0.16 Ground Wire Size Diameter 0.304_ Conduit Internal Diameter, 600 V System Voltage THWN-2 Wire Type - - - -