Loading...
HomeMy WebLinkAboutB18-0205 000-000-000l --,4DP 3o�w NA -6 A41, �1 0 e OF>/f /v fi.ra=- 10 PERMIT # 6UTTE COUNTY DEVELOPMENT SERVICES Rimer=ril�SRE .1ED FOFOE �, WED DATE 1.0 140 car-, f7AUmlomg 09pr—', talo F� s 00 FE Mo vl�, BN W/S77,0b° AJ 4iU0/N6 +41 -41Z -44P, I AiL, 64NDIIVC5 4.Dr-GcS fib' 0 R BUTTE COUNTY MAR 15 2018 DEVELOPMENT SERVICES F-,)PA)r77"# I 004/Ath- j?,6-2, BUTTE COUNTY MAR 15 2m DEVELOPMENT .� SERVICES 010• U2t-l" R E DMAN �1 4 H O/ME S� CHAMPION 840 W. Palm Ave Lindsay. CA 93247 ALL DIMENSIONS ARE APPROXIMATE, AND MAY Bf SUWECI' 7O CijA , 5 BY CKAMPION NOME BUiLOERS CO. LINOSAY. CA J 1-1 /Y16 DAPIASLRL MODIMATIONS ""E"'09_CAII-4563M SNEU T,T> E; LITERATURE PLAN PROPRIEYA2Y AND CONFIDENTIAL DRAWN.BY. M. sow DATE-Q-2,—Di? 6 �� T«FIE (ltia»� AND XPE"CAttfa6 ARt 0XIGMA NOMNAL 69E.. 2V t 4!7 WIU"r',VARY ANp CWFCFIJI W.{IA'IF.900 O=C>UW iM4 `•�••—�'�"-- AVUALWE. ?0•fG9'?6' soamiax.. 79wmd N4 c".05-10-4 SCALE: 118'- 1'44 TOTAL AREA, I./t9]S 11 F -C2 PIER PLACEMENT GENERAL NOTES COUNTY t.This plan has beon mltulated wo a 20 pound. roof Mad. i AD I -Scam piers have a maximum spacing of It lent do with end piers MAR 15 2018 located no morn ftn 2 feel from 000h ono of N8wfn 3. seie l"SlaflOn fwual for: pier conflg"lons � EVE1 O�NI� SAVAGES 4, Alternate methods of tWail dnli M nual p avid construction may be u� 00�%t`! l r DEVELOPMENT lto0 01 the Champion IrLstaallarion Manus provided the molhDd has designed and stamped oy a registered ArchitW or Engineer and flab D 0 SERVICES meats local and/or state W" code*. pSE r�/� 5. Ad dimensions taken from rear edge of floor. �. �•� S: All utility measutemema ate CODE I.8EAM i -BEAM 1.8EAM I•F!E'AM 36.0 314' 29.0 3W 0. W. 4• ELECTRICAL 14'-11' GAS R8' WRa'ER r THIS PAGE IS FOR INFOI PLEASE REFER CHAMPION4 ►TIONAL PURPOSES ONLY AND IS NOT INTENDED TO BE INSTALLATION MANUAL FOR ALL DETAILS REGARDING _ - mow Desai, PIER F PROPRIETARY ANO CONFIDFUTIAL DRAM 8Y. W Soto a 71!EtED9"WtD AsAVt:CVICAnCl',W.4REoaAawa. PROrRIOARI ANDGOOM01'W UAt; IVA7 Gr l:!WVPWN CCyvR!c+4Ta+976,mmavCJiwr-Kx1 SCALE, 1/8"+f••0' Q _ 1 AS A FOUNDATION PLAN. ER FOUNDATION. •5£3M U-7NDATION F--101 J. 4 Butte County Department of Development Services PERMIT CENTER �«..,�.^�•K.. 7 County Center Drive, Oroville, CA 95965• Main Phone 530.538.7601 Fax 530.538.7785 www.buttecounty.net/dds Butte County Building Division MANUFACTURED HOME SUPPORT DATA FORM NO DBP -52 1�—'C2 BUTTE COUNTY MAR 15 2018 Owner's name:, CNg &A&I Home A. P. # 1/bo - O DEVELOPMENT Manufacturer:J2(agQ� ►liL��'=� 46e Manufacture ar:�D l SERVICES Model Number / Name: Width:_ 6 NI 45PSM a7 (ft.) Length:4—�_(ft.) FOOTINGS: wood -pressure treated or foundation grade [other: ❑ 0 SUPPORTS: Concrete block 0 other: ❑ x�� ����(�����U��rl;/, Provide manufacturer's installation manual, support blocking requirements and state approved or engineered foundation or tie down system specifications. SINGLE WIDE Line 1 Line 2 Line I Line 1 Piers: Minimum size piers: Spacing maximum: From ends maximum: Line 2 Piers: Minimum size piers: Spacing maximum: ends maximum: Line 3 Roof Loads: Minimum size piers: Location (from front). Minimum size piers: Location (continued): Line 4 Roof Loads: \ Minimum size piers: Location (from front): Minimum size piers: Location (continued): Revised 12.19.2016 Pier Footing Sizes and Locations ------------------------------------------- Section I ------------------------------------------- ------------------------------------------- Section 2 ------------------------------------------- ------------------------------------------- Section 3 K ►/ X[2. ] ' D " MULTI -WIDE Line 1 Line 2 Line 3 8 Line 2 Line 4 (triple w"& only) Line 2 m Snow Load: U 0 psf Snow Load requirements may be obtained at http://sk.chicomapworks.com/ Insert AP #, view snow load in lower right corner. Line 1 Openings: Minimum size pier [ ` K. ] X [ ] Required at each side of openings over From wide. t� t 01 MULTI -WIDE Line 1 Line 2 Line 3 8 Line 2 Line 4 (triple w"& only) Line 2 m Snow Load: U 0 psf Snow Load requirements may be obtained at http://sk.chicomapworks.com/ Insert AP #, view snow load in lower right corner. Line 1 Openings: Minimum size pier [ ` K. ] X [ ] Required at each side of openings over From wide. JO\ T P- PX Ck DEPARTMENT OF'BUILDING AND SAFETY TYKCAL UNCOVE'RE *D'LANDING DE TAIL A covered laadl.nu requires a permit. MiLIMIL1111 SIZC. YxYiMaxi i 4=.. irnurn size: 4'x4l An uncovered landi.ng larger than 4'x4' and more than 30 inches above grade requires a PCrIIIIt. All uncovered fkaming lumber and decking exposed to weather isi-r u* , 1 eq -.trcd*Jb'bc naturally dUrable or prcssu'rc treated\-voocl. Decking may be redwood, 1).rc8.-;urp_ treaW i r Composite. Inatcrial. More than. 3. ..risers. -:.handrail required 11 3.4" to 38" off ni , )se,.of tread -6.iftch tic decking= re c.6d, pe.e-ssiire &ei ted 7 or. c .landing to gtLaO6 7 314?'n3a'x. n*$'e ret' — treated J`re&i�od Oi. kae. ird(i. 1-9-4-cr.dsbr nkre IM . 9 RX bPlqw 4U 4'0- C niax. 42"min 04 P*T 14 T. o.(, eq UaL -4- !/V, X. 4' PT More than. 3. ..risers. -:.handrail required 11 3.4" to 38" off ni , )se,.of tread -6.iftch tic decking= re c.6d, pe.e-ssiire &ei ted 7 or. c .landing to gtLaO6 7 314?'n3a'x. n*$'e ret' — treated J`re&i�od Oi. kae. ke6 Q 44/ A—Z U obilt hom.cIanding. ..,q --reqtxir*.C-'fb.u.fiqgS:-as cfeialled.--abave- 0 0 Mtj$(.4d!ehd fr*btii-(4p reser e. 'Out r18 "NI. 0 Q 40 I :ail.X. 0 not acqdptable 4 !46-:sbApp,s inay'be.-ac'66otable- Soft Set nio�i.ilc ftbrhe Nhdings:-do not'requir.e. iuoti'4p aid musf use prossurc t-roat*Qd'-vv.00d . QNTYRIYU L6 rrd:t rt" 6 1 J� d.at--b1IIeXiL§-aiid at bottom of stairs ex .gs are requge its X 36' in. leingth) No-.r.E: 7 3/4' . niaximmn step down. to latiding provided door. doesnot. swing but liver Lindir Ig ird(i. 1-9-4-cr.dsbr nkre IM . 9 RX bPlqw 4U ke6 Q 44/ A—Z U obilt hom.cIanding. ..,q --reqtxir*.C-'fb.u.fiqgS:-as cfeialled.--abave- 0 0 Mtj$(.4d!ehd fr*btii-(4p reser e. 'Out r18 "NI. 0 Q 40 I :ail.X. 0 not acqdptable 4 !46-:sbApp,s inay'be.-ac'66otable- Soft Set nio�i.ilc ftbrhe Nhdings:-do not'requir.e. iuoti'4p aid musf use prossurc t-roat*Qd'-vv.00d . QNTYRIYU L6 rrd:t rt" 6 1 J� d.at--b1IIeXiL§-aiid at bottom of stairs ex .gs are requge its X 36' in. leingth) No-.r.E: 7 3/4' . niaximmn step down. to latiding provided door. doesnot. swing but liver Lindir Ig STAMMS 1-1/4"MI-N 1- 1/2" . x Bc tle County Department of Development Services ;TIM SNELLINGS, DIRECTOR I PETE CALARCO; ASSISTANT DIRECTOR 7 County Confer Drive Oroville,-CA96966' (530) 538-7601 Telephone (530) 638-7785 Facsimile c +.hu aco tty;leu,,,t d; wuuw. u cmen&talplan,net` ADMINISTRATIONBUILDING" PLANNING Skirting for Manufactured/Mobile Homes in a State Responsibility Area Notqo; 1. These are acceptable opflons where there Is no' parlmeter masonry foundation. 2. Siding must be supported a minimum of So above finish grade, exaeptwhen concrete slab (option 3)Is used. 3. Siding must be a product approved by the Celiibmla State f=ire -Marshall and Installed ac cording Wthe manull 6turees, Hating. Approved products maybe viewed: at: , fAttn�/yrwrnt o&tin fire. ao is fofl�nglnor/iadflbmllwutnrrr��duats.adf - Om�.. Y �NA�aJgL ata.2�c�4'' 1 c,.lrltst7� �� i CdlAl'I�i1�l�OLI@v tl 11 _�t t � LMt Qrade AWa From manufao ur :d No: .® to: a Dtatanze of 6 .Feet. Minlmum;,(.T ,pina.l all. Q .eton ) st.p1►J�1 ��,'TlFlck co�lcr�t>^ •'aid r r � r •' �� r�: t _x • v i L :I...& . R t .eA § 1337. support Inspection. At the Ume.of inspection, the Installa n of the -MI -1 -unit on its support system shall be complete and the for Inspection. area under the MH -unit shall be accessiblebeen approved by the enforcement (a) Skirting shall not be Installed until all underfloor Installations have agency. (b) Masonry walls shall not be Installed until all under -floor Installations have booovlde perimeter support to the n approved'by the enforcement agency, unless the installation of the masonry wall is required to�pr MH-unIL NOTE: Authority cited Section 18300, Health and Safety Code. Reference: Section U613, Health and .* Code. Xi2 Ground System Xi2 Foundation System Installation Instructions for California for Ground & Concrete Systems BUTTE California Residential Code (CRC)26_ -f3, 1TY Wind 55 mph, Exposure C; Seismic Design Category C & D DEVELOPMENT Ey 'Tie Down Ei'eering sFRVrcEs GQ� AO!,g�oFE Xi2 Concrete System Engineer Approval State Approval MAMUFACTURED HO IODILE HOXIS FOLNDATIONS\'S'f m WLT8 AND SAFETY CODE. SECTION 18SSt APPROVED APPROVAL DOES NOT AUTHORIZE OR APPROVE ANY OMISSIONS OR DEVIATION FROM REQUIREMENTS OF APPLICABLE STATE LAWS AND REGULATIONS Slale of California Department of Housing and Community Developmad O F CODES AND STANDARD$ DATE Zai 1 G Approval Exp"&- I L( 7-'t I Page 1 of 8 0 0 0 r 97, ® Foundation System t i Installation Instructions for California for Ground & Concrete Systemis CIBC -2013, 85 mph Wind Exposure C; Seismic Category C & �^ By Tie Down Engineering REQUIREMENTS: r.:. • These plans and specifications meet the requirements of ' Title 25 Section 1333 and Wind & Seismic, Requirements, CRC 2013: * The Xi2 System, with either a concrete footer or. the'steel pan, is installed at or in place of one of the piers requiredby the home manufacturer's set up instructions. The systems must be placed as evenly, as possible; when 4 systems are needed they are to be installed on.either the first or second pier in from each end of the home and when a 3rd or 5th system is ' needed it should go approximately at the mid -point of the home. Components of the Xi2 system such as the longitudinal strut and connecting hardware, may extend beyond the pier location. • Maximum vertical projection at sidewall is 9% Higher walls may be used when the design loads are adjusted accordingly. ' - • Main'rail spacing must be 75.5" — 99.5" *Except 95"-99.5" for single section: • The lateral and longitudinal components of the Xi2 System replace standard frame ties. Additional Vertical anchor ties that are unique to a home's design. may, be required. by the home manufacturer. These locations may include shear walls, marriage line ridge beam support posts, and rim plates. Check manufacturers set-up requirements: Maximum pier height is 48". Except 36" maximum for single sections. • Steel piers must be fastened to the I-beam with clamps provided with steel pier., ~ • Designed for up to 7:12 roof slope. * Except 20 degrees max (4.37:12 pitch) for single section., • Flood Zone: A, AE or AH Zone flood plain (riverine or inland flood area); Max flood. velocity -1 fps: No waves,. Bottom of home main beam is at or above BFE; bottom of main beam max 36". above natural grade. Not suitable for V zones, coastal A zones or floodways.. Install Tie Down Engineering anchors per table (on page 8) to resist flotation. • Designed to provide resistance to seismic Category C &"6 Earthquake Loads. Additional Requirements for Concrete Systems Poured. concrete must be 2,500 PSI minimum at 28 days. • Square concrete pads minimum is 18" wide by 12" deep. Round concrete pads minimum is 18" wide by 14" deep. Strip'footings minimum is 18" wide by 14' long by 6" deep. Full slab minimum is 4". * Xi2 components exceed HUD code 3280.3068 requirements stating "Anchoring equipment exposed to weathering shall have a resistance to weather deterioration at least equivalent to that provided by a coating of zinc on steel of not less than 0.30 ounces per square foot of surface coating...." Page 2 of 8 G 'Installation of X02 Ground Systems 1. Identify the number of systems to be used on ,the home using the chart provided. 2. Identify the location where the systems will be installed. 3. Clear all organic matter and debris from the pad site. 4. Place U -bolts through holes in pan provided. 5. Place' pad centered under beam with'the lateral strut bracket towards the inside of the home. 6. Press or drive pan into ground until level and flush with prepared surface. 7. Build,pier according to State, Local or Home Manufacturers guidelines. (Figure 1) 8. Attach the end of the smaller tube to the inside of pan using U -bolt & nuts provided 9. Attach the flag end of the larger tube to the opposite I-beam using the "J" bolt over the top of the I-beam with the nut & washer provided. (Figure 2) 10. Install a minimum of four (#12 x 1" tek screws) self -tapping screws into the holes provided in the lateral strut so that the two tubes are connected together. (Figure 1) i . 1-3/4"Tube J-Boit Nut & Washer . � � Lateral5trut5 Strut (flag end) _Tube 4-#12x11 / Tek 5crews i -Beam Figure 2 U -Bolt & mounting - } Figure 1 Bracket • ' d of Nom x> 11. Install frame bracket clamps. to I-beam on in �n side of block/pier. Do not tighten nuts at this time. ' 12.. Attach longitudinal strut to U -bolt in pan using - nuts provided. a ; .: , nom-"..+,. _:,.._•�:�.-;. ;.,,:;r; -r;=.,- : Y .:x , y 13. Insert strut in the frame bracket clamp; attach with ' nut and bolt. Do not tighten at this time. ry e 14. Pull the frame bracket clamp with the fastened strut outward to remove any slack. 15. Tighten all nuts and bolts on the struts and beam clamps. Page 3 of 8 - O 0 A 1"i2 Ground Parts Detail Xi2 Ground Lateral System Part Number 59306 Includes: 5' Strut, pad & hardware kit (#59329-1 includes all nuts and bolts). Longitudinal Hardware Kit Part Number 59331 Includes: 2 I-beam brackets & 2 U -bolts with all nuts and bolts. Lateral and Longitudinal Combination Part Number 59333 Includes: 5' Strut, Pad, Longitudinal Strut (#59329), Lateral and Longitudinal Hardware Kit with all nuts and bolts. Struts for Longitudinal Systems Part Strut Pier Height No. Length Up To: 59330-44 44" 4 Blocks or 32" 59330-65 65" 6 Blocks or 48" For Double I Beam Attachment Use.- se:59352 59352 Double Beam Longitudinal Bracket 29329-3 Double Beam lateral Ground kit For C 'or CR Beams use: 59618 C Beam Bracket kit "�'IItg ®�Qttt Ground Longitudinal Hardware Kit #59331 Lateral & Longitudinal Combination #59333 Q: 0 0 _-Il Longitudinal Strut #59330-44 #59330-65 r it Xi2 Stabilization Pier Placement for Ground6or Concrete 1 } Xi2 Pier Placement i i LJ Extra Pier Placement I Single Section Home 0 -80' (76' Box) 4 Xi2 Systems 4th 4th Double Section Home 0 -62' 3 Xi2 Systems* 631-801 4 Xi2 Systems *2 Xi2 systems can be placed at either end of the home. Triple Section Home 0 -62' 4 Xi2 Systems 63' - 80' 5 Xi2 Systems Page 4 of 8 .., Offset Placeefit y Diagrams represent examples of double and �--- triple section offsets.. f Total size is determined - by the lengtWof unit plus offset , a The number of systems needed would be based 1-- - ' on Home Size Charts on 4 4 the bottom of page 4. EPBStaflation of Xi2 C®ncrete Systems , 1. Identify the number of systems to be used on the home using the chart provided 2. Identify the location where the systems_, will be installed. 3. Build pier according to State, Local or Home Manufacturers guidelines. ' 4., Drill two 3/8"x 3" deep holes in th; concrete using holes in galvanized bracket as a guide. Attach bracket to concrete pad using 3/8"z. 3-1/2" wedge anchors provided. Place nut & washer on. anchor, leave enough room for 1 to 2 threads showing on top of bolt. Using a hammer, tap the wedge bolts into We through bracket, leaving nut & washer flush with bracket. Using a 9/16" socket wrench, tighten wedge/anchor bolt, securing bracket to the concrete. ' 5. Attach the end of the smaller tube to the bracket mounted on the pad, using the grade 5,1 /2" x 2-1/2" bah/nut provided: 6. Attach the flag end of the larger tube to the opposite I-beam using the "J" bolt over the top of the I-beam with the nut & washer provided. (Figure f next page) 7. • Install a minimum of four (#12 x 1" tek screws) self -tapping screws into the holes provided in the lateral strut so that tte two tubes are connected together 8. Install frame bracket clamps on I-beam on the inside of block/pier. .9. Insert strut in frame bracket clamp: and attach with nut & bolt. Attach opposite end to concrete bracket. 10. Pull the frame bracket clamp with fastened strut outward to remove any slack. 11. Tighten all nuts and bolts on system: Page 5 of 8 1 f Offset Placeefit y Diagrams represent examples of double and �--- triple section offsets.. f Total size is determined - by the lengtWof unit plus offset , a The number of systems needed would be based 1-- - ' on Home Size Charts on 4 4 the bottom of page 4. EPBStaflation of Xi2 C®ncrete Systems , 1. Identify the number of systems to be used on the home using the chart provided 2. Identify the location where the systems_, will be installed. 3. Build pier according to State, Local or Home Manufacturers guidelines. ' 4., Drill two 3/8"x 3" deep holes in th; concrete using holes in galvanized bracket as a guide. Attach bracket to concrete pad using 3/8"z. 3-1/2" wedge anchors provided. Place nut & washer on. anchor, leave enough room for 1 to 2 threads showing on top of bolt. Using a hammer, tap the wedge bolts into We through bracket, leaving nut & washer flush with bracket. Using a 9/16" socket wrench, tighten wedge/anchor bolt, securing bracket to the concrete. ' 5. Attach the end of the smaller tube to the bracket mounted on the pad, using the grade 5,1 /2" x 2-1/2" bah/nut provided: 6. Attach the flag end of the larger tube to the opposite I-beam using the "J" bolt over the top of the I-beam with the nut & washer provided. (Figure f next page) 7. • Install a minimum of four (#12 x 1" tek screws) self -tapping screws into the holes provided in the lateral strut so that tte two tubes are connected together 8. Install frame bracket clamps on I-beam on the inside of block/pier. .9. Insert strut in frame bracket clamp: and attach with nut & bolt. Attach opposite end to concrete bracket. 10. Pull the frame bracket clamp with fastened strut outward to remove any slack. 11. Tighten all nuts and bolts on system: Page 5 of 8 1 f M2 Cohcrdte Pars Detail , Part #59307 12 X' Concrete Includes: 5'• Strut, Bracket, & Hardware Kit #59315-1 System with all nut's and bolt. Longitudinal Struts for "Concrete Systems" Part No. Length Pier Height '�-f,,,_�_,f�_,�.,. :<,�:.-�•_�� #5901 3 44" up to 4 Blocks #59015 65" up to 6 Blocks Longitudinal Hardware Kit Part #59263: Includes 2 sets per kit: I-beam bracket, nuts, bolts and washers'�o Lateral and Longitudinal Combination ..... Part #59332 Longitudinal - includes: 5' Strut, Longitudinal Strut (#59364), Strut Concrete Longitudinal Lateral and Longitudinal Hardware Hardware reit Kit with all nuts and bolts. ` For Double 1 beam Attachment use: me Double Beam Longitudinal Bracket' 59352 Dot O f t-(O f7� 59329-4 Double Beam Lateral Concrete kit �. F Nut & Washer ; : y Beam Clamp /-' Bracket J-Bolt`= A Figure t a Lateral A° Longitudinal 1-5eam'' �. = %i2 Installation Placement Page 6 of 8 C9 'DOWiN ElJGIEERINGg FEMA Flood Zones A, AE & AH Anchor placement to be the same on single or multiple sections. Evenly spaced from the --- -••--� end of unit, between Xi2 placements. w m 1 •, When using concrete anchors in Lieu of ground auger anchors, the Mass of Concrete Per Anchor from chart would be 21.1 Cu. Ft. (Example: 3'x 3'x 2.5' = 22.5' Cu. Ft., 2' dia. x 3.5'= 22' Cu. Ft) To Reduce the Mass of Concrete, increase the number of tie -downs proportionally To Reduce concrete to 11 cu. ft. (Example:'Z25' x 2.25' x 2.25'=11.4 Cu. Ft.) double the required number of tie downs. Concrete Anchors Concrete must be 2500 PSI minimum slab with a V minimum thickness and must allow 4725 lbs. of vertical tension on anchor without lifting. Minimum distance from the anchor shaft to one edge of the slab is 4" from one edge and 6" from any, other edge. MU2 anchor is designed to be installed into the concrete at the time it is being poured. Slab must be 8" minimum thickness at location under anchor to allow V embediinent of "J" rod anchor. MICS2 anchor is designed to be installed in dry concrete. Drill a 5/8" x 3" hole in the slab place expansion bolt in hole, place washer and nut over bolt and tighten until maximum expansion is achieved. Remove nut and washer and place anchor head overexposed bolt and place washer and nut back on'threaded bolt and tighten nut Ground Anchors All Frame tie ground anchors must be stabilized to prevent horizontal slicing through the soil 1. Position anchor at a slight back angle so that when Fully installed, anchor will be inside skirting wall. .� 2. For vertical or stabilized (Deepset) anchors, fully drive anchor into the ground. Horizontal (Frame Tie) anchors install 2/3 of way in ground and c install stabilizer plate vertically within 3"4" of the shaft, parallel to. home. 3. Drive.anchor fully into ground until head rests on plate and attach strap. Pretension strap to pull anchor against plate with he slightly over top: Frame Tie with Buckle 1. Install soap by pushing the end between the inside of The frame "I" beam and floor. 2. Position the buckle at the upper end of the "I" beam frame. Wrap the end of the strap around the "I" beam. Thread the end of the strap through the slot in the buckle as shown. Push the end of the strap in between the "I" beam and floor. 3. Pull the, strap, making certain the buckle stays in position. Thread loose - end of strap through the slotted tensioning bolt attached to the tension head of anchor. Tighten slotted bolt a minimum of 4-5 turns until all slack in strap is removed. 1. �. 2. Page 7 of 8 Flotation Anchors Total Single Section Anchors Per Side 12'x40' -16'x80' 2 Multiple Section 20'x40' -20'x64' 2 24' x 40' _ 24' x 56' 2 Over 56' 2 28' x 40'- = 28' x 48' 2 28'x49' -28x72' 2 Over 72' 2 32'x56' -32'x64' 2 Over 64' 2 MIJ2 "J" Anchor 3. Stabilizer Plate MICS2 Deepset Anchor 01075, 083116 Soil Classification Chart 1 84533Z Soil Soil Description Recommended Anchors and Stabilizers Tek Screw. #12 x 1" Class Model # . STK# Description Push Nut 1/2 2 Sedimentary and Foliated Rock M12255/8 59090 30" x 5/8" rod / 2 - 4" helix M12233/4 59095 30" x 3/4" rod / 2 - 4" helix 845332 59292 Stabilizer Plate 10640 3 Sandy Gravel and/or Gravel M12H5/8 59080 48" x 5/8" rod'/ 1 - 6" helix (GW and GP) M12H3/4 59085 48" x 3/4" rod / 1 - 6" helix Deepset 59091 30" x 3/4" rod / 2 - 4" helix with stabilizer cap 59272-2 59292 Stabilizer Plate 10926 4 Sand, Silty Sand, Clayed Sand, M12H5/8 59080 48" x 5/8" rod / 1 - 6" helix Silty Gravel M12H3/4 59085 48" x 3/4" rod / 1 - 6" helix Deepset 59092 36" x 3/4" rod / 1 - 4" & 1 - 6 helix with stabilizer cap MI48 59086 48" x 3/4" rod 12 - 4" helix M142 59128 42" x 3/4" rod / 2 - 4" helix 59292 Stabilizer Plate Higher class anchors can be used in lower class soils. Example; Class 4 anchors can be used in Class 3 soils. The required flotation anchors shown in the table are in addition to any other anchors or hold down devices required by the manufacturer. See requirements,. bullet 5, page 2 of 8. Xi2 Hardware Breakdown 459329-1 Hardware for 59306 Lateral System 1 84533Z U -Bolt 1/2=13 x 2.63.x 2.19: thread 1-3/4 zinc 4 10556 Tek Screw. #12 x 1" 1 10631Z J Bolt 1/2 x 5-1/2 grade 5 zinc 2 10640 Push Nut 1/2 1 12107 Flat Washer 1x2" SS 1 10646Y Hex Nut 1/2-13 grade 5 zinc 2 10519 Hex Nut 1/2" w/ Serr flange 459331 Longitudinal Hardware for 59306 2 59272-1 Beam Clamp Base 4 59272-2 Beam Clamp Top Flange 8 10926 Carriage Bolt 1/2-12 x 1-1/4 Full Thread 10 10646Y Hex Nut 1/2-13 grade 5 zinc 2 10801 Carriage Bolt 1/2-12 x 2-1/2 Grade 5' 2 845332 U -Bolt 1/213 x 2.63 x 2.19 thread 1-3/4 zinc 4 10640 Push Nut 1/2 . 4 10519 Hex Nut 1/2" w/ Serf flange #59329 Hardware for 59333 Lateral and Longitudinal combustion 1 59329-1 Hardware IGt 1 59272-1 Beam Clamp Base 2 59272-2 Beam Clamp Top Flange 4 10926 Carriage Bolt 1/2-12 x 1-1/4 full thread 5 10646Y Hex Nut 1/2-13 Grade 5 zinc 1 10801 Carriage Bolt 1/2-12 x 2-1/2 Grade 5 zinc 1 84533Z U -Bolt 1/2-13 x 2.63 x 2.19 Thread 1-3/4 zinc 2 10640 Push Nut 1/2 2 10519 Hex Nut 1/2" w/Serr Flange #59315-1 Hardware for Lateral System 1 10.631Z J Bolt 1%2 x 5-1/2 grade 5 zinc 1 12107 Flat Washer 1/2" SS 4 10556 Tek Screw #12 x 1" 2 10MY Hex Nut 1/203 Grade 5 zinc 1 10826 Carriage Bolt 1/2-12 x I Grade 5 zinc #59027 Hardware Kit for 59307 Lateral System 2 59264 3 Way Concrete Bracket 4 10530 Wedge Anchor 3/8 x3.50 1 59315-1 Hardware IOt #59263 Longitudinal Hardware for 59307 2 59272=1 Beam Clamp Base 4 59272-2 Beam Clamp Top Flange 8 10926 Carriage Bolt 1/2-13 x 1-1/4 Full Thread zinc 12 10646Y Hex Nut 1/2-13 Grade 5 zinc 4 10801 Carriage Bolt 1/2-13 x 2-1/2 Grade 5 zinc. #59364 Hardware for 59332 Lateral and Longitudinal combination 1 59264 3 Way Concrete Bracket 2 10530 Wedge Anchor 3/8 x 3.50 1 59315-1 Lateral Hardware 10t 1 59272-1 Beam Clamp Base 2 59272-2 Beam Clamp Top Flange 4 10926 Carriage Bolt 1/2-13 x 1-1/4 Full Thread zinc 2 10801 Carriage Bolt 1/2-13 x 2-1/2 Grade 5 zinc 6 10646Y Hex Nut 1/2-13 Grade 5 zinc X, 0 in 0 s ;� � _. t __