HomeMy WebLinkAboutBUTTE COUNTY PLANNING COMMISSION AGENDA REPORT - JANUARY 25, 2007.R BUTTE COUNTY PLANNING. COMMISSION
` AGENDA REPORT —January 25, 2007
Baldwin Contracting Company
Applicant:. (Rene Vercruyssen,
representative) Application: M & T Chico Ranch Mine
r
Owner: Pacific Realty
Lease Area: 627 acres
Project Site: 235 acres
File #: MIN 96-03 Parcel Size: Mined Area: 193 acres
Equipment Area: 40 acres
Topsoil Stockpile: 2 acres
Supervisor 1
General Orchard and Field Crops District:
Plan:
Pete Calarco
Zoning: A-40 (Agricultural, 40 -acre Assistant Director
(9 Planners: parcel) Dan Breedon, AICP_
'
Principal Planner ,
Attachments:
APNs: 039-530-019 & 020 Exhibit 2 —.Conditions of
A Approval to Resolution
Approving Mining Use
Permit
B Final EIR Errata
C Public Works Memo
Letter to OMR
D Regarding October 2,-
2006 Transmittal of
Reclamation Plan
E Correspondence
RECOMMENDATION
1. Adopt the attached resolution certifying the Final Environmental, Impact Report
(EIR) as consistent with the requirements of the California Environmental Quality -
Act (CEQA) including the Findings of Fact and Mitigation Monitoring Plan.
2. Adopt the attached resolution approving the Mining Permit 96-03 including the
a Butte County Department of Development Services a Planning Division a
® M & T Mine MIN 96-03 a Agenda Report ® January 25, 2007 ® Page 1 of 5®
reclamation plan, financial assurance cost estimate and a statement of overriding
considerations
SUMMARY
This application was continued from the December 14, 2006 Planning Commission
meeting after receipt of public testimony and discussion. Clarifications and responses
to Planning Commission direction are provided for the proposed projects' compliance
with the Williamson Act; determination of prime or non -prime agricultural lands; existing
setting and project setting; traffic; and transmittal of the Reclamation Plan to the
Department of Conservation.
ANALYSIS
The Project's Compliance with the Williamson Act
The applicant has requested immediate cancellation from the Williamson Act (California
Land Conservation Act of 1965) contract. This request has been evaluated by the
County's Land Conservation Act committee (LCA), an advisory committee to the Board
of Supervisors. The LCA's recommendation to the Board is that four of the five required
statutory consistency findings (Government Code §51282 (b)) for cancellation could be
made.' .The LCA determined that one of the required findings could. not be made,
thereby constituting a recommendation to the Board not to approve the immediate
cancellation request. The required finding which the LCA advised could not be made is
as follows:
(5) That there is no proximate noncontracted land which is both available and
suitable for the use to which it is proposed the contracted land be put, or,
that development of the contracted land would provide more contiguous
patterns of urban development than development of proximate
noncontracted land.
As used in this subdivision "proximate, noncontracted land" means land
not restricted by contract pursuant to this chapter, which is sufficiently
close to land which is so restricted that it can serve as a practical
alternative for the use which is proposed for the restricted land.
As used in this subdivision "suitable" for the proposed use means that
the salient features of the proposed use can be served by land not
restricted by contract pursuant to this chapter. Such nonrestricted land
may be a single parcel or may be a combination of contiguous or
discontiguous parcels.
A requirement of filing an immediate cancellation request is that the applicant file and
record a notice of non -renewal. Alternatively, a Williamson Act contract can go through
a landowner initiated non -renewal process commonly referred to, as a nine-year roll-out
meaning that the property taxes are increased over a nine-year period until full taxation
is reached upon contract expiration. Williamson Act.non-renewal is not a discretionary
■ Butte County Department of Development Services ■ Planning Division w
■ M & T Mine MIN 96-03 ■ Agenda Report ■ January 25, 2007 ■ Page 2 of 5 ■
t
action. A notice of non -renewal has been recorded on the area proposed to be mined.
This means that the mine area will not be in a Williamson Act contract nine years from
the date of filing that non -renewal regardless.of the action by the Board of Supervisors
on the immediate cancellation request .and regardless of the decision on the proposed
mining project.
The Board of Supervisors will consider the adequacy of the Final EIR as it relates to the
immediate cancellation request. As stated, Government Code requires that the Board
make all of the statutory consistency findings in order to approve the request for
immediate cancellation. If the request for immediate cancellation is denied, an
approved project could proceed upon completion of the non -renewal process.
Alternatively, the Board of Supervisors may find that the project is consistent with the
Williamson Act. In any of these three scenarios, the Board of Supervisors could
approve the proposed project as consistent with the requirements of the Williamson Act.
While compliance with the Williamson Act is part of the project description, staff has.
added an additional condition of approval clarifying this. requirement (see attached
Exhibit 2 — Conditions of Approval).
Determination of Prime or Non -Prime Agricultural Lands
Testimony was provided to the Planning Commission regarding the Final EIR's
determination of the project site as prime or non -prime agricultural lands. Section.
51201(c) of Government Code (the Williamson Act). provides any of five criteria may be
used for determining prime agricultural land for purpose of the Act as follows:
51201. As used in this chapter, unless otherwise apparent from the
context:.. .
(c) "Prime agricultural land" means any of the following:
(1) All land that qualifies for rating as class l.or class 11 in the Natural
Resource Conservation Service land use capability classifications.
(2) Land which qualifies for rating 80 through 100 in the Storie Index
Rating.
(3) Land which supports livestock used for the production of food -and
fiber and which has an annual carrying capacity equivalent to at least one
animal unit per acre as defined by the United States Department of
Agriculture.
(4) Land planted with fruit- or nut -bearing trees, vines, bushes or crops
which have a nonbearing period of less than five °years and which will
normally return during the commercial bearing period on an annual basis
from the production of unprocessed agricultural plant production not less,
than two hundred dollars ($200) per acre.
(5) Land which has returned from the production of unprocessed
agricultural plant products an annual gross. value of not less than two
hundred dollars ($200) per acre for three of the previous five years.
® Butte County Department of Development Services s Planning Division m
a M & T Mine MIN 96-03 ■ Agenda Report ® January 25; 2007 ® Page 3 of 5®
The Williamson Act does not require a detailed site-specific analysis for a determination
of prime or non -prime for the all of the agricultural lands contained within a LCA
contracted area. Evidence in the Final EIR indicates that the site-specific conditions on
the specific area proposed for mining do not support a prime agricultural land
designation, as defined above. The Assessor's Office determination regarding prime or
non -prime contracted lands does not invalidate or conflict with the information in the
Final EIR for CEQA purposes.
Clarification of Existing Settinq and Project Description
As directed by the Planning Commission at the December 14, 2006 meeting,
clarifications (errata) to the text in the Final EIR are provided (see attached). The errata
includes a description of the Llano Seco Ranch as part of the Regional Environmental
Overview and reference to the Williamson Act immediate cancellation request as part of
the Detailed Project Description.
Traffic
Attached is a memorandum from Butte County Public Works in response to testimony
provided at the December 14, 2006 meeting and Planning Commission direction to
return with information regarding alternative/exclusive circulation routes. Routes
addressed in the memorandum include River Road to SR 32 and Ord Ferry Road to Dayton
Road, to Hegan Lane, to Midway, rejoining the original route at Midway and East Park Avenue.
Transmittal of Reclamation Plan to Department of Conservation and Response to
Comments
Testimony was provided to the Planning Commission regarding the Department of
Conservation Office of Mine Reclamation's review of the proposed Reclamation Plan in
compliance with requirements of the Surface Mining and Reclamation Act of 1975
(SMARA - Public Resources Code §2710 et. seq.). Attached is a letter from
Development Services to the Office of Mine Reclamation confirming that the responses
and submittal required in Section 2774(d)(2) of SMARA has been fulfilled. A portion of
2774(d)(2) is provided below:
The lead agency shall prepare a written. response to the director's
comments describing the disposition of the major issues raised by the
director's comments, and submit the lead agency's proposed response to
the director at least 30 days prior to approval of the reclamation plan, plan
amendment, or financial assurance. The lead agency's response to the
director's comments shall describe whether the lead agency proposes to
adopt the director's comments to the reclamation plan; plan .amendment,
or financial assurance. If the lead agency does not propose to adopt the
director's comments, the lead agency shall specify, in detail, why the lead
agency proposes not to adopt the comments.
e Butte County Department of Development Services ■ Planning Division ■
■ M & T Mine MIN 96-03 ■ Agenda Report ■ January 25, 2007 ■ Page 4 of 5s'..
Butte County has reviewed and responded to the comments of the Department of
Conservation, including their letters of November 18, 2002 and June 10, 2004. It. is
staff's recommendation that, in conditionally approving proposed Reclamation Plan, the
Planning' Commission determine that the plan is consistent with the requirements of
SMARA. County staff transmitted the Reclamation Plan, including responses to the
Director of Conservation's comments, in compliance with 2774(d)(2) on. October 2,
2006. ' Those materials are included in' the attached letter to the Office of Mine
Reclamation (OMR).
3
® Butte County Department of Development Services a Planning Division ■
m M &-T Mine MIN 96=03 m Agenda Report m January 25, 2007 m Page 5 of 5m
EXHIBIT 2.
CONDITIONS OF APPROVAL FOR M&T CHICO RANCH MINING USE
PERMIT AND RECLAMATION PLAN (MIN 06-03 BALDWIN CONTRACTING
COMPANY)
1. This Mining Use Permit allows the extracting, processing, and sale of up to
5,500,000 cubic yards of aggregates within Assessor Parcels 039-530-019 and
020 ("Project") in accordance with County ordinances and land use regulations
subject to the following terms and conditions. This approval also allows
construction of facilities ancillary to the mining project and related improvements.
2. Failure to comply with the conditions specified herein as the basis for approval of
application and issuance of the Mining Use Permit constitutes cause for the
revocation of said permit in accordance with the procedures set forth in the
County Zoning Ordinance, including County Code Sec. 24-45.65.
3. Unless otherwise provided for in a special condition to this Mining Use Permit, all
conditions must be completed prior to or concurrently with the establishment of
the granted use. Owner/Operator shall commence operations within 5 (five) years
from the date of issuance of the final permit. Should operations not commence
within said 5 (five) years the final permit shall expire and become void, unless
extended by the Planning Commission prior to expiration.
4. Amendments to an approved Mining Use Permit may be submitted to the
Planning Commission, detailing proposed changes to the original plan.
Substantial deviations from the original plan shall not be undertaken until such
amendments have been filed with and approved by the Planning Commission.
The Planning Commission shall set a public hearing regarding such amendments
in the same manner as provided for in County Code Section 13-107.
5. The terms and conditions of this permit shall run with the land and shall be
binding upon and be to the benefit of the heirs, legal representatives, successors,
and assigns of Owner/Operator.
6. Financial assurances to ensure compliance with the_ approved Reclamation Plan
shall be in place to the satisfaction of the Director of the Department of
Development. Services or his/her designee prior to the establishment of the
approved mining use. Financial assurances have been initially calculated at
$103,526.93.
7. Prior to use of the site for the proposed use Owner/Operator shall contact the
Planning Division for a field inspection to verify that all conditions and ordinance
requirements have been met.
Planning Division:
8. All Reclamation work shall 'be in substantial compliance with the approved
Reclamation Plan.
9. All mine operations shall comply with. the Project Description and Mining Use
Permit application as submitted and approved and set forth in the M&T Chico
Ranch Certified Final Environmental Impact Report ("Final EIR"), dated October
M & T Mining (UP 96-03) Page ] of 6
2003.
10. Annual inspection of the mine shall be conducted in accordance with the Surface
Mining and Reclamation Act. All applicable inspection fees shall be paid in
accordance with adopted rates.
11. Mine Operation and Reclamation shall be in accordance with the Mitigation
Measures contained within the Final EIR incorporated herein by reference.
12. All Mitigation Measures as identified in the Final EIR for the M&T Chico Ranch
Mine are adopted as conditions of this Mining Use Permit and as such the
Mitigation Measures have full weight and authority in the same manner as
conditions of the Mining Use Permit.
13. Mitigation Monitoring and Reporting shall commence and proceed in accordance
with the Mitigation Monitoring Reporting Plan referenced within the Final EIR.
The owner/operator is responsible for all costs associated with monitoring and
reporting activities including but not limited to the hourly rate of County staff
time, as approved by the Board of Supervisors and as amended, and any contract
services as may be necessary to conduct such work on behalf of the County as
determined by the Director or designee.
14. Mining, processing, maintenance and load -out activities shall occur from 7:00 am
to 5:00 pm (nine hours per day) from November through April, and from 6:00 am
to 5:00 pm (ten hours per day) from May through October. Operations shall take
place five days per week; however, Saturday operations may occur sporadically to
meet customer demands. Aggregate load -out for delivery to the plant could also
occasionally, not to exceed 30 times per year to be verified by log book, begin by
5:00 am. Only during times of declared emergency (when aggregate resources
are needed to address flood damage or other natural disaster) either under
executive order from the State or County, operations are allowed 24 hours until
such time as the emergency is declared over.
15. Prior to establishment of the use, the Owner/Operator shall obtain County Board
of Supervisors approval of the partial California Land Conservation Act.
(Williamson Act) immediate cancellation request or determination of
compatibility.
Butte County Air Quality Management District
16. The Butte County Air Quality Management District requires Owner/Operator to
obtain an Authority to Construct Permit to operate. Owner/Operator. shall be
required jo implement all emission controls necessary to assure specified limits
are not exceeded on both mobile sources (mining equipment) and stationary
sources (processing facilities). As noted within the Draft EIR for Impact 4.5-2
(Page 4.5-30) all diesel fueled construction -type equipment shall be required to
meet the emission reduction requirements recently set by the California Air
Resources Board ("CARB"). An equipment inventory shall be maintained at the
project site and available for review by District staff. All equipment shall be
maintained and kept in proper repair per manufacturer's maintenance schedules.
M & T Mining (UP 96-03) Page 2 of 6
Department of Public Works
17. Prior to operations Owner/Operator shall construct improvements to River Road
at the Project's entrance, including acceleration/deceleration lanes, turn pockets,
signing and striping. Improvement plans shall be approved by the Butte County
Public Works Department prior to construction.
18. Prior to operations Owner/Operator shall provide improvements to the median
crossing at the Baldwin Plant site driveway and the Skyway. Improvements to
include acceleration and deceleration lanes, improved signing and striping, and
channelization of the driveway approach. Improvement plans shall be approved
by the Butte County Public Works Department prior to. construction.
19. The project Applicant shall contribute its fair share of the costs to improve the
pavement on River Road between Chico. River Road and Ord Ferry Road with a
two-inch asphalt concrete overlay. The fair share amount shall be based on the
increase in ESALs, which is 51 %. Butte County Public Works estimates the cost
of this, improvement to be approximately $1,200,000. Therefore, the Applicant's
fair share cost would be about $40,000 per year. The .Public Works Department
has indicated that the fee shall be submitted annually based on the tonnage of
material that is hauled from the project site and shall be relative to an inflation
index. Based on the information contained in Table 4.6-9, the cost per ton of
material hauled from the project site would be approximately $0.08.
20. The project applicant shall contribute its fair share of the cost to maintain the
asphalt concrete pavement on the following roads over the 30 year life of the
project:
• River Road; between Chico River Road and Ord Ferry Road;
• Ord Ferry Road; between County Line and Dayton Road;
• Durham Dayton Road; between Dayton Road and SR 99;
• Dayton Road; between Ord Ferry Road and Chico City Limit;
• Hegan Lane; between Dayton Road and Midway; and.
• Chico River Road; between River Road and Chico City Limit.
Road Maintenance shall include a chip seal surface treatment every 10 years with
M & T Chico Ranch Mine project's fair share contribution based on the projected
net increase in ESALs as shown in the attached .Table A. Based on the
information contained in Table A, the cost per ton of material hauled from the
project site would be approximately $0.06 and shall be relative to an inflation
index.
If maintenance costs are rolled into a single fee per ton of material extracted, the:
mitigation fee shall be made up of $0.08 per ton for the overlay on River Road,
plus $0.01 per ton for the improvements to the Ord Ferry Bridge, and. the
M & T Mining (UP 96-03) Page 3 of 6
installation of a signal at Midway and Durham Dayton highway, for a total of
$0.09 per. ton of material removed from the site. The amount intended to
compensate for the extra maintenance required due to the increased truck traffic,
shall be $0.06 per ton of material extracted. These fees shall be deposited by the
operator into the Butte County Road Fund, and shall be adjusted for inflation
based upon the change in the Construction Cost Index for San Francisco, during
the month of January of each year. These fees shall cease to be collected should
the County impose- a countywide tax. or fee for road maintenance based upon
weight of materials moved over the roads.
21. Prior to establishment of the use Applicant shall provide a fully executed
agreement to preserve, maintain, restore and or repair in perpetuity, any and all
mitigation improvements constructed or required as a condition of this project.
These improvements shall include; but are not limited to, any weirs, dykes,.
levees, channels, berms or other flood control devices. All repairs shall be
completed in a timely manner in conformance with the adopted mitigation
measures. This agreement shall be recorded and shall run with the land. In order
to insure compliance with this condition, applicant provide a performance bond,
cash deposit or other County approved security; in an amount equal to 100% of
the construction costs of said improvements. Said security shall be adjusted
annually using the change in Engineering News Record Construction Cost Index
for San Francisco as the basis for adjustment. The County, at its sole discretion,
shall have the authority to call said bond and use the proceeds to perform the
required work. Nothing contained in this condition shall be so construed as to
attach any liability to the County for its actions or failures to act in order to
preserve any of the improvements required by this project.
Environmental Health Division
22. Owner/Operator shall a receive a Hazardous Material Release and Response Plan
(Health and Safety Code 25500 et seq.) (Business Plan) for hazardous materials
inventory and emergency response planning.
23. Owner/Operator shall receive a septic and domestic water well permit from the
Environmental Health Division prior to site development for waste water disposal
and drinking water.
Pacific Gas and Electric Company .
24. If there is a conflict between the mining operations and the PG&E natural gas
line, Owner/Operator will be responsible for the relocation of the PG&E gas line
and all associated costs; along with the acquisition of new rights of ways.
25. Weights of all mining equipment shall be provided. to PG&E to ensure that
weights will not damage gas lines.
26. Any use of PG&E easements shall require a review and consent of PG&E. Upon
review a consent agreement would be prepared if the use is appropriate.
M & T Mining (UP 96-03) Page 4 of 6
Mosquito Abatement:
27. Owner/Operator shall be required to comply with Butte County Mosquito and
Vector Control District requirements for the, cost of any future mosquito control
work performed by the District at the Project site. This shall include stocking the
pond with mosquito fish to prey on and control mosquito larvae.
State and Federal Requirements and Conditions:
28. Owner/Operator shall comply with the CleanWater Act and obtain all necessary
approvals, including a 404 Permit for fill or disturbance of wetlands and other
waters of the United States.
29. Owner/Operator shall comply. with the Federal Endangered Species Act, including .
a Section 10a Permit for incidental take of federally -listed threatened or
endangered species or their habitat, if any.
30. Owner/Operator shall comply with the California Endangered Species Act, and
obtain all necessary permits, including a Section 2081 Permit (Fish and Game.
Code 208 1) and Streambed Alteration Agreement (Fish and Game Code 1603) for
incidental take of State -listed threatened/endangered species or habitat (if
anticipated) for possible impacts, if determined to the Swainson's hawk and for
any new stream crossings.
31. Owner/Operator shall comply with the following Regional Water Quality Control
Board requirements, and obtain all necessary approvals, including:
a) NPDES Permit or Waste discharge requirements Permit CFR Title 40, Section
436, Subpart B, for on-site gravel washing and discharge of wash water to on-
site settling basins.
b) Stormwater Pollution Prevention Plan prior to construction activities used to
identify potential pollutants and to eliminate or reduce the amount of
pollutants entering surface waters.
c) General Industrial Activities Storm Water Permit is required if there are storm
water discharges to surface waters.
d) A Review of Groundwater Monitoring Plan prior to approval by.the County.
32. Owner/Operator. shall comply with the following California Department of Water
Resources, Reclamation Board requirements, and obtain all necessary approvals,
including:
a) A Construction Activity Storm Water Permit for any construction activities
where clearing, grading, filling and excavation result in a land disturbance of
five acres or more.
b) A Storm Water Pollution Prevention. Plan must be in place prior to
construction activities.
M & T Mining (UP 96-03) Page 5 of 6
c) Compliance with the California Aboveground Petroleum Storage Act for
owners and operators of above ground petroleum storage. tanks to file a
storage statement . and prepare a federal spill prevention . and control
countermeasure plan.
d) A Section 401 Water Quality Certification is required for projects needing an
Army Corps of Engineers 404. Permit; this certification must verify that the
project does not violate State Water Quality Standards.
33. Owner/Operator shall receive a State Board of Reclamation Encroachment Permit
(CCR Title 23 Section 135) for any encroachment that could reduce or impede
flood flows, or would reclaim any of the floodplain within the Butte Basin, if
necessary.
Agricultural Commissioner's Office
34. Prior to Mining Permit issuance, submit a Weed Management Plan to the
Agricultural Commissioner's Office for review and Approval.'
Butte County Counsel
35. If this entire matter or any finding, action or condition of this matter is
appealed to the Board of Supervisors; Baldwin or any other developer/operator
other than Baldwin agrees to' indemnify the County of Butte from liability or loss
related to the approval of this project and agrees 'to sign an indemnification
agreement in a form approved by County Counsel before the Board's appeal
hearing. If the application is not appealed, these conditions of approval are
deemed satisfied.
Attachment: Table A
M & T Mining (UP 96-03)