Loading...
HomeMy WebLinkAboutRECLAMATION PLAN AND SUPPORTING DOCUMENTRECI,ANIATION PLAN I'i SUPPORTING DOCUMENTS FOR lVi & T CHICO RANCH 1VIINE SEPTEMBER 2004 (UPDATED NOVEMBER 2006) Reclamation Plan and Supporting Documents for M & T Ranch :Chico Mine,. Table of Contents Attachment 1 i Reclamation Plan Form Attachment, 2: Reclamation Plan Information (November 2003) in Response to Butte County Comments Attachment 3: Reclamation Plan Information (December 2003) in Response to Butte County Comments Attachment 4: Appendix A: M & T Chico Ranch Mine Reclamation Costs Updated November 20:06 Attachment 5: Exhibit 1 - Map depicting Project and Typical: Sections Attachment 6: Exhibit 2 - Map depicting Reclamation PlanView Phase 1 Attachment 7: Exhibit 3 -Map depicting .Location, Typical Plant Community Distribution, Nesting Tsland and Typical Shoreline Undulation and Typical Plan Community" Distribution Attachment 8: Excavation Stability Report 1 Attachment. 9: Hydrology Report Attachment 10: Flooding Study. . Attachment 1:1: Groundwater Quality: Report ' Attachment 12: Mineral Land -Classifi ations for Con i c struct on Aggregate Resources Attachment 13: Jurisdictional Wetland Delineation Attachment 14: Mitigation Measures :4.4-3a, 4.4-3b, 4.4-3c, 4.4 -3d,.4.4 -3e, ..4:4-5, 4.4 -6j,4.4 -7a, 4.4-7b, and 4.4-7c 1 Attachment 15: M & T Chico Ranch Mine Environmental Impact Report Section 4.7, Biological Resources Attachment 16: Design of Little Chico Creek Bypass Channel Attachment 17: Design of Weir Attachment 18: Steve Deverel Letter Regarding Siltation Attachment 19: Preliminary Groundwater Measurements at the M & T Ranch K FOREWORD This reclamation plan is the product of many years of collaborative efforts between Baldwin Contracting Company, Butte County, and the Department of Conservation. As a result of this long history, the reclamation plan contains several parts that reflect the many years of subtle tweaking and modification in response to comments from both Butte County and the Department of Conservation. To make the reclamation plan and its supporting documents more easily referenced, Baldwin Contracting Company has bound all the documents together and bate -stamped the pages.