Loading...
HomeMy WebLinkAbout055-480-005 B19-0828 revisesd site plan EHBUTTE COUNTY DEPT. OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE OROVILLE, CA 95965 OFFICE#: (530) 538-7601 FAX#: (530) 538-2140 MON-FRI 8AM-3PM INSPECTION LINE: (530) 538-4365 REQUESTS PHONED INBY 2PM WILL BE INSPECTED THE NEXT BUSINESS DAY LAGO VISTA WAY (E) RESIDENCE 356'-11" 273'-10" 393'-2" 255'-9" SCOPE: INSTALL PHOTOVOLTAIC SOLAR SYSTEM ON A GROUND MOUNT, AND UPDATE ELECTRICAL EQUIPMENT AS NEEDED IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES SPECIFICALLY REFERENCING THE 2016 CALIFORNIA ELECTRICAL CODE USING THE FOLLOWING SPECIFIC EQUIPMENT: PROJECT OWNER: CONTRACTOR: PAGE #CONTENT BUILDING JURISDICTION: ALTERNATIVE ENERGY SYSTEMS INC. 13620 HIGHWAY 99 CHICO, CA 95973 CSLB: 853351 C-10, C-46 SCOPE CODE REFERENCE SITE PLAN STRINGING & RAIL LAYOUT SINGLE LINE DIAGRAM LABEL DIAGRAM FOOTING DETAILS MODULE SPECS INVERTER SPECS WIRE CALCS PV-1.0 PV-1.1 PV-2.0 PV-3.0 PV-4.0 PV-4.1 PV-5.0 ATTACHMENT N N PARCEL MAP: DIRECTION MAP: SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-1.0 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 HORNER, CRAIG 4965 LAGO VISTA WAY PARADISE, CA 95969 APN:055-480-005 PH#: (530) 520-0041 EMAIL: sunvalley1986@gmail.com 1. (N)MODULES: REC (56) REC320NP 1007 SQFT COVERED 2.(N) INVERTER(S): ENPHASE: IQ7PLUS-72-2-US (56) MODULE INTERGRATED 240W [N1] 16.262kW AC SYSTEM 3. (E)BATTERY SYSTEM(S): TESLA (1) POWERWALL 5.76kW AC SYSTEM 1" = 60'-0"(1:720) SCOPE 8.FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK. 9.ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75° C MINIMUM. 10.2016 CEC ART. 690.5(C) & 690.35(F) - SEE LABEL DIAGRAM 11.2016 CEC ART. 690.53. - SEE LABEL DIAGRAM 12.2016 CEC ART. 690.17(E). EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: “WARNING!-ELECTRICAL SHOCK HAZARD - DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIZE MAY BE ENERGIZED IN THE OPEN POSITION”. 13.DC DISCONNECT AT THE INVERTER WILL BE READILY ACCESSIBLE AFTER THE INSTALLATION IS COMPLETE PER 2016 CEC ART. 690.17 WHERE TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. PROVIDE A WARNING SIGN OF THE HAZARDS PER 2016 CEC ART.690.17 14.CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS LOCATED ON DWELLINGS PER 2016 CEC ART.690.35. 15.WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXIST, THE DIFFERENT SYSTEMS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER 2016 CEC ART.210.5(C)(1) 16.PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS LOCATED WITHIN 10'-0” OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS. 17.PHOTOVOLTAIC SOURCE CURRENTS MUST BE RATED AT BOTH 125% OF THE PARALLEL MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 156% OF THE LOAD. 18.PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE NOT IN THE SAME LOCATION PER 2016 CEC ART.690.56. 19.INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM SEISMIC EVENTS AND SHOULD COMPLY WITH 2016 CBC SECTION 1613A AND ASCE STANDARD 7-05, CHAPTER 13 13.2.1. 20.PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS. 21.PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS INSTALLED AS SPECIFIED IN THESE DRAWINGS. 22.DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE, CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL OR PHYSICAL PLACEMENT. 23.FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL UTILITY. 24.A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2016 CEC 690.4(D) AND IN ACCORDANCE WITH 2016 CEC 705.10. 25. SOLAR INVERTER INSTALLED IS A SMART INVERTER PER CALIFORNIA RULE 21 1.ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTING LABORATORY AN INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. 2.ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM. 3.ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION BOXES, COMBINER BOXES, AND SWITCHES. 4.ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF 2016 CEC ART.250,690. 5.2016 CEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES. 6.2016 CEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING. 7.PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF 2016 CEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF 2016 CEC 408.16(F) (408.36 IN CEC. ALL WORK SHALL BE IN ACCORDANCE WITH: 2016 CALIFORNIA RESIDENTIAL CODE (CRC) 2016 CALIFORNIA BUILDING CODE (CBC) 2016 CALIFORNIA FIRE CODE (CFC) 2016 CALIFORNIA ELECTRICAL CODE (CEC) 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC) SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-1.1 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 NTS CODE REFERENCE 20'-0" 32'-0" 186'-2" 151'-4" 53'-2" 96' TO PROPERTY LINE SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-2.0 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 (E) COMPOSTION ROOFW/ WOOD TRUSSESROOF CONDITIONS:(N) AC DISCONNECT (N) AC GENERATION PANEL & (N) MONITORING LOCATION (E) COMPOSTION ROOFW/ WOOD TRUSSES (E) PROPERTY SETBACKS (E) JUNCTION BOX (P) TRENCH 1 SOIL CONDITION: EASY DISTANCE:30' 0" (P) TRENCH 2 SOIL CONDITION: EASY DISTANCE:35' 0" (E) MAIN SERVICE PANEL & (E) PG&E METER LOCATION (R) AC DISTRIBUTION PANEL (E) TESLA GATEWAY (2)(N) AC LOAD PANEL 10' VEGETATION FREE AREA (E) 2" UNDERGROUND CONDUIT (E) RESIDENCE (N) LINE OF SIGHT ANTENNA (N) LINE OF SIGHT ANTENNA (P) ARRAY 1 LOCATION(28) (P) ARRAY 2 LOCATION(28) (E) LEACH LINES (E) SEPTIC TANK 1" = 20'-0"(1:360) SCALE: 1" = 20'-0"(1:240) N SITE PLAN VLDR - 1.75ACRE PROPERTY SETBACKS: FRONT YARD: 20'-0" STREET SIDE: 10'-0" PARCEL SIDE: 20'-0" REAR YARD: 20'-0"SITE PLAN LEGEND EXISTING LEACH LINES EXISTING IRRIGATION LINE PARCEL LINE EXISTING GAS LINE PROPOSED TRENCH EXISTING CONDUIT(P) = PROPOSED (E) = EXISTING (N) = NEW (R) = REMOVE NOTE LEGEND = 10' BRUSH FREE ZONE SETBACK LEGEND = PROPERTY SETBACK 20'10'0'40' SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-3.0 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 ATTACHMENT DIAGRAMATTACHMENT DIAGRAM Q CABLE TERMINATOR LEGEND PARALLEL CONNECTION SEALING CAP 0 ' - 0 " 8 ' - 0 " 1 6 ' - 0 " 2 4 ' - 0 " 3 2 ' - 0 " 0'-0" 8'-9" 0 '-0 " 2 '-8 " 5 '-6 " 8 '-2 " 1 3 '-9 " 1 1 '-1 " 1 6 ''-7 " 1 9 '-3 " 2 2 '-1 " 2 4 '-1 0 " 2 7 '-8 " 3 0 '-4 " 3 3 '-3 " 3 5 '-1 1 " 1 8 0 ° A Z 1 3 ° T I L T SCALE: 1/8" = 1' SCALE: 1/4" = 1' STRINGING DIAGRAM ARRAY 2 SCALE: 1/8" = 1'STRINGING DIAGRAM ARRAY 1 AS NOTED STRINGING & RAIL LAYOUT (N) LINE OF SIGHT ANTENNA (N) LINE OF SIGHT ANTENNA (N)EATON BRS225 (E) UNDERGROUND JUNCTION BOX (N)ARRAY 2 (N)ARRAY 1 (N)POLARIS IPLD 250-3 DUAL ENTRY 3 PORT CONNECTOR FIELD VERIFIED TORQUE VALUE (E) HOME SUB PANEL FEEDERS SPLICE ON FEEDERS SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-4.0 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 (N)AC-MONITORING 1 (1) 1/2" EMT w/ (3) #14 THWN-2 CU. & (1) #14 THWN-2 CU. GRD. WIRE RUN: 10' (E) #1 CU. (N) AC-1 (1) 1" PVC w/ (6) #10 THWN-2 CU. & (1) #10 THWN-2 CU. GRD. WIRE RUN: 40' IMAX: 14.52A (N) AC-2 (1) 1" EMT w/ (6) #10 THWN-2 CU. & (1) #10 THWN-2 CU. GRD. WIRE RUN: 10' IMAX: 14.52A (N) AC-3 (1) 2" PVC w/ (3) #3/0 XHHW-2 AL. & (1) #4 XHHW-2 AL. GRD. WIRE RUN: 35' IMAX: 67.76A (E) 1 1/2" EMT w/ (N)AC-4 (3) #1/0 THWN-2 CU. & (1) #6 THWN-2 CU. GRD. WIRE RUN: 10' (E) 1 1/2" EMT w/ (N)AC-4 (3) #1/0 THWN-2 CU. & (1) #6 THWN-2 CU. GRD. WIRE RUN: 10' (N) AC-5 (1) 1 1/2" EMT w/ (3) #3 THWN-2 CU. & (1) #4 THWN-2 CU. GRD. WIRE RUN: 10' (N)ENPHASE ENVOY (E) ROUTER (E) 2" PVC DISTANCE: 125' (N) AC-3 (3) #3/0 XHHW-2 AL. & (1) #4 XHHW-2 AL. GRD. WIRE RUN: 135' IMAX: 67.76A (E) AC (E) AC (E) AC SERVICE PANEL200A/ 1Ø/ 240VSCIR:XXXXX NOTES 15A2P 125A ENH202 TRANSFER SWITCH GENERATOR 120V=N-L1-L2=240V 120V=N-L2-L3=NAV NAV=N-L3-L1=NAV SERVICE VOLTAGE METER#1009864388 (E)200A (E) AC SERVICE PANEL 400A BUS SPLIT/ 1Ø/ 240V SCIR: 22000 MILBANK WEST: M400-UG-APS-LC GENERATION PANEL (N)AC DISTRIBUTION PANEL 125A/ 1Ø/ 240V CUTLER-HAMMER: BR1224L125R 4 12 12 (N) JUNCTION BOX (N) AC- CABLES w/ (3) TRANSITION CABLE(S) WIRE RUN: 5' IMAX: 14.52A (28) PV MODULES/INVERTERS[N1] REC:REC320NP ENPHASE:IQ7PLUS-72-2-US 1.21A/1Ø/240V 4 12 12 (N) JUNCTION BOX (N) AC- CABLES w/ (3) TRANSITION CABLE(S) WIRE RUN: 5' IMAX: 14.52A (28) PV MODULES/INVERTERS[N1] REC:REC320NP ENPHASE:IQ7PLUS-72-2-US 1.21A/1Ø/240V (N)20A 2P (E)200A (N)90A 2P (E) TESLA POWERWALL LOCATION: GARAGE + - (N)30A 2P HOME SUB-PANEL (E)AC DISTRIBUTION PANEL 125A BUS/ 1Ø/ 240V (N)15A 2P SUM OF ALL BREAKERS IN SERVICE PANEL TO BE EQUAL TO SERVICE PANEL RATING PER 2016 CEC 705.12(D)(2)(3)(c) RELOCATE ALL LOADS LESS THAN 30A IN (E) SERVICE PANEL TO (N) LOAD PANEL (N)150A 1Ø 240V (E) TESLA BACKUP GATEWAY LARGE LOAD PANEL (N)AC DISTRIBUTION PANEL 125A/ 1Ø/ 240V CUTLER-HAMMER: BR816L125RP (N)90A 2P (N)40A 2P (N)60A2P(N)60A2P (E)40A 2P RELOCATE ALL LOADS GREATER THAN 30A IN (E) SERVICE PANEL TO (N) LOAD PANEL (N)150A LOAD PANEL (N)AC DISTRIBUTION PANEL 225A BUS/ 1Ø/ 240V CUTLER-HAMMER: BR4242B225R (N)60A 2P LOAD RELOCATION SUM OF ALL OCPD SHALL NOT EXCEED AMPACITY OF BUSBAR IN ACCORDANCE WITH CEC 705.12(D)(3)(c) SUM OF ALL OCPD SHALL NOT EXCEED AMPACITY OF BUSBAR IN ACCORDANCE WITH CEC 705.12(D)(3)(c) (N)20A 2P (N)15A2P (N)20A 2P (N)20A 2P (N)15A 2P 10FT RULE LOAD SIDE TAP LOAD SIDE CONNECTION PER CEC 2016 ARTICLE 240.21(B)(1) [N1]:SOLAR INVERTER INSTALLED IS A SMART INVERTER PER CALIFORNIA RULE 21. ENH202 ENH202 (N)CAT-5 DISTANCE: SINGLE LINE DIAGRAM NTS ELECTRICAL LINES AND SYMBOLS PHOTOVOLTAIC PANEL INTEGRATED INVERTER AC MODULE GROUNDING ELECTRODE EQUIPMENT BOND INVERTER # # # SPLICE POINT 2 POLE CIRCUIT BREAKER AC NON-FUSED DISCONNECT AC FUSED DISCONNECT MAIN CIRCUIT BREAKER SOLADECK ROUTER LINE OF SIGHT ANTENNA CAT-5 CABLEWIRE/CONDUIT UNDERGROUND WIRE/CONDUIT (E)TO HOME SUB-PANEL w/ (3) 3/0 CU WARNING UTILITY INTERACTIVE POWER FLOWING THROUGH THIS PANEL 16.262kW SOLAR GENERATOR AC OPERATING CURRENT: 67.76A AC OPERATING VOLTAGE: 240VAC PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN WARNINGPOWERWALL BREAKERS MUST BE SWITCHED OFF TO SHUTDOWN SOLAR CIRCUITS. BREAKER LOCATIONS NEXT TO SERVICE PANEL. WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR Per 2016 CEC 705.12(D)(2)(3)(c) SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-4.1 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 PER 2016 CEC 690.54 Interactive Point of Interconnectin installed at all Electrical Distribution Panel covers that porvide a path from PV to Utility. METER AMPS PHASE VOLTS AMPS PHASE VOLTS AMPS PHASE VOLTS AMPS PHASE VOLTS AMPS PHASE VOLTS WARNING DUAL POWER SUPPLY PHOTOVOLTAIC SYSTEM Per 2016 CEC 705.10, Point of Connection, Located On Main Service Panel. SOLAR BREAKER DO NOT RELOCATE Solar breaker label @ any breaker passing Bi-Directional Power AMPS PHASE VOLTS SUB PANEL MAIN SERVICE +-+- +-+- +- +- +- +- +- +- +- +- +-+-+-+-+-+- AC PV ARRAY ELECTRICAL LABEL DIAGRAM BATTERY BREAKER DO NOT RELOCATE Battery breaker label @ any breaker passing Bi-Directional Power NTS 1 3 ° 14'6" 9' 0" FOOTING LAYOUT 8'-0" MAX 12'-0" MAX 1 '-9 " 8'-0" MAX 12'-0" MAX 1 '-9 " ±24" DIA. PEIR FOOTING±16" DIA. PEIR FOOTING 1 1/2" POST, TYP. 8'-0" MAX DETAIL B 1 1/2" HOLLAENDER "T", TYP. PRO SOLAR RAIL HORIZONTAIL PIPE, TYP. 2'-9" 8'-9" ±2'-3" ±3'-11 ±1'-9" 2'-9" TOLERANCE: XX'-X" ±6" DETAIL A HORIZONTAIL PIPE, TYP. 1 1/2" POST, TYP. 1 1/2" HOLLAENDER "T", TYP. STANDARD U-BOLT PRO SOLAR RAIL SHEET REVISION 1 3 6 2 0 H W Y 9 9 C H I C O , C A 9 5 9 7 3 P H O N E #: (5 3 0 ) 3 4 5 -6 9 8 0 F A X #: (5 3 0 ) 8 9 2 -2 3 6 0 d e s i g n @ s a v i n g e n e r g y f o r l i f e .c o m PV-5.0 CONSULTANT: DESIGNER: J. MIKLES D. VELAZQUEZ DATE MODIFIED SCALE 06/20/2019 H O R N E R , C R A I G 4 9 6 5 L A G O V I S T A W A Y P A R A D I S E , C A 9 5 9 6 9 A P N :0 5 5 -4 8 0 -0 0 5 P H #: (5 3 0 ) 5 2 0 -0 0 4 1 NTS TYPICAL POST TYPICAL POST TYPICAL POST TYPICAL POST 1 '-6 " (2) #5 CONT. TOP & BOTTOM (FOUR TOTAL) BEDROCK 3/8" DIA. M.B. THRU POST AT BOTTOM OF FOOTING 6" TYP. 8 "M A X 3 " C L R . 1'-9"(2) #5 x 18" LONG REBAR EMBED 6" INTO BEDROCK AT 32" O.C. ±1 8 " ±24" DIA. PIER FOOTING 1 '-4 " 8 " M A X3" C L R (2) #5 CONT. TOP & BOTTOM (FOUR TOTAL) #3 TIE AT PEDESTAL OPTIONAL 12"x12"x6" PEDESTAL AT COLUMN 6 "M A X 3 " 3/8 DIA M.B. THRU POST AT BOTTOM OF FOOTING ±16" DIA. PIER FOOTING ±2 8 " PIER FOOTING DETAIL ALTERNATE PIER FOOTING DETAIL ALTERNATE SEMI-CONTINUOUS FOOTING DETAIL ALTERNATE SEMI-CONTINUOUS FOOTING AT BEDROCK DETAIL SIDE VIEW (2) #5 CONT. TOP & BOTTOM (FOUR TOTAL) (2) #5 CONT. TOP & BOTTOM (FOUR TOTAL) TYPICAL POSTTYPICAL POST SIDE VIEWSIDE VIEWSIDE VIEW TOP VIEWTOP VIEWTOP VIEWTOP VIEW BACK OF ARRAY VIEW SEE FOOTING DETAIL POSTS: 1 1/2" DIA. SCHED. 40 GALV. PIPE, TYP. U.N.O. 1 1/2" HOLLAENDER "T", TYP. HORIZONTAIL PIPE: 1 1/2" DIA. SCHED. 40 GALV. PIPE, TYP. U.N.O. PRO SOLAR RAIL SOLAR MODULES PER PLAN **MAX HEIGHT 8'-0" SECTION VIEW