HomeMy WebLinkAboutADM19-0081 ECP (2)ROPI]SED LI]CKED GATE
\nupusED cirNEX sruRAGE
BASE CT]NSTRUCTIDN SITE ENTRANCE
RI]POSED TEMPT]RARY CLASS II AGGREGATE
LINE APRX, E FEET T[ ALLIW
FER FIBER RDLL INSTALLATIUN ARNUND
PERIMETER T]F SITE FENCE ON ALL SIDES
CONSTRUCTION LAY DOWN
YARD APRX. 0.93 ACRES
LEG EN D
-TEMPORARY
FENCING
RBER ROLL
/
I
I
{7tF
UNDISTURBED AREA
REPOSED FIBER RELL
L!JOM
()
t!
OO
K[J
\¿f
REPESED TEMPTRARY
FENCING
/
RIPERTY LINE
OF
GENERAL NOTES:1. ASSUMED MINIMAL GRADING OF EXISTING SITE.2. PARK EQUIPMENT IN APPROVED CONSTRUCTION LAY DOWN AREA.3. FOR VEHICLE FUELING AND MAINTENANCE, FOLLOW BMPS NS_g AND NS-10.4. IMPLEMENT STREET SWEEPING (SE-7) AS NEEDED TO KEEP PAVED STREET
FREE OF MATERIAL.5. TEMPORARY CONSTRUCTION ENTRANCE SHALL BE SURFACED WITH AT LEAST 2
INCHES OF CI.ASS 2 AGGREGATE BASE. THE WDTH SHALL BE AS NECESSARY
TO ACCOMODATE ANTICIPATED VEHICLES AND EQUIPMENT.6. usE PERTMETER coNTRoL, F|BER RoLLS (sE-5), To PREVENT RUN-oN oNTo
AND RUN-OFF OF DISTURBED SOIL AREA,
6.1. USE MINIMUM OF 8 INCH DIAMETER ROLLS.6.2. TURN THE ENDS OF THE FIBER ROLL UP SLOPE TO PREVENT RUNOFF
FROM GOING AROUND FIBER ROLL.6.3. STAKE FIBER ROLL INTO A 2 TO 4 INCH DEEP TRENCH WITH A WIDTH
EQUAL TO THE DIAMETER OF THE FIBER ROLL.6.3.1. DRIVE STAKES AT THE END OF EACH FIBER ROLL AND SPACED AT 4
FEEÏ MAXIMUM ON CENTER6.3.2. POST_CONSTRUCTION - DISPOSE OF FIBER ROLLS AND DISPOSE OF
ACCUMULATED SEDIMENT.7, INSPECT EROSION CONTROL APPLICATIONS PRIOR TO FORECAST RAIN, DAILY
DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE
RAINY SEASON, AND AT TWO-WEEK INTERVALS DURING THE NON-RAINY
SEASON.
8. SEDIMENT SHALL BE REMOVED FROM FIBER ROLLS WHEN SEDIMENT
ACCUMUI.ATION REACHES ONE_HALF ÏHE DESIGNED SEDIMENT STORAGE DEPTH,
.-USUALLY ONE_HALF THE DISTANCE BETWEEN THE TOP OF THE FIBER ROLL
AND THE ADJACENT GROUND SURFACE.9. POST_CONSTRUCÏION - APPLY STRAW MULCH AT A MINIMUM RATE OF 4,OOO
LBIACRE, ETTHER BY MACHTNE OR BY HAND D|STRTBUTTON.9.1. EVENLY DISTRIBUTE STRAW MULCH ON THE SOIL SURFACE.
9.2. EITHER INCORPORATE STRAW MULCH INTO THE SURFACE BY "PUNCHING" IT
INTO THE SOIL MECHANICALLY OR BY APPLYING TACKIFIER TO ADHERE
SÏRAW FIBERS.
APN 066 -340-003
LAKERIDGE CIRCLE
MAGALIA, CA 95954
TOTAL AREA _
0.93 ACRE
EROSION AND SEDIMENT CONTROL PLAN FOR TEMPORARY CONSTRUCTION/LAY DOWN YARD
t (o q
)REPARED BY: JENNIFER BRYANT, P.E., OSD/OSP
CIVIL PE LICENSE NO. 81903; OSD/OSP CERtrlC¡lE NO. 24773 P.O. BOX 506, CHICO, CA 95927
PREPARED FOR: CERES ENVIRONMENTAL SERVICES, INC.DATE: JUNE 1 9, 2019 SCALT: 1 :30