Loading...
HomeMy WebLinkAboutADM19-0081 ECP (2)ROPI]SED LI]CKED GATE \nupusED cirNEX sruRAGE BASE CT]NSTRUCTIDN SITE ENTRANCE RI]POSED TEMPT]RARY CLASS II AGGREGATE LINE APRX, E FEET T[ ALLIW FER FIBER RDLL INSTALLATIUN ARNUND PERIMETER T]F SITE FENCE ON ALL SIDES CONSTRUCTION LAY DOWN YARD APRX. 0.93 ACRES LEG EN D -TEMPORARY FENCING RBER ROLL / I I {7tF UNDISTURBED AREA REPOSED FIBER RELL L!JOM () t! OO K[J \¿f REPESED TEMPTRARY FENCING / RIPERTY LINE OF GENERAL NOTES:1. ASSUMED MINIMAL GRADING OF EXISTING SITE.2. PARK EQUIPMENT IN APPROVED CONSTRUCTION LAY DOWN AREA.3. FOR VEHICLE FUELING AND MAINTENANCE, FOLLOW BMPS NS_g AND NS-10.4. IMPLEMENT STREET SWEEPING (SE-7) AS NEEDED TO KEEP PAVED STREET FREE OF MATERIAL.5. TEMPORARY CONSTRUCTION ENTRANCE SHALL BE SURFACED WITH AT LEAST 2 INCHES OF CI.ASS 2 AGGREGATE BASE. THE WDTH SHALL BE AS NECESSARY TO ACCOMODATE ANTICIPATED VEHICLES AND EQUIPMENT.6. usE PERTMETER coNTRoL, F|BER RoLLS (sE-5), To PREVENT RUN-oN oNTo AND RUN-OFF OF DISTURBED SOIL AREA, 6.1. USE MINIMUM OF 8 INCH DIAMETER ROLLS.6.2. TURN THE ENDS OF THE FIBER ROLL UP SLOPE TO PREVENT RUNOFF FROM GOING AROUND FIBER ROLL.6.3. STAKE FIBER ROLL INTO A 2 TO 4 INCH DEEP TRENCH WITH A WIDTH EQUAL TO THE DIAMETER OF THE FIBER ROLL.6.3.1. DRIVE STAKES AT THE END OF EACH FIBER ROLL AND SPACED AT 4 FEEÏ MAXIMUM ON CENTER6.3.2. POST_CONSTRUCTION - DISPOSE OF FIBER ROLLS AND DISPOSE OF ACCUMULATED SEDIMENT.7, INSPECT EROSION CONTROL APPLICATIONS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE RAINY SEASON, AND AT TWO-WEEK INTERVALS DURING THE NON-RAINY SEASON. 8. SEDIMENT SHALL BE REMOVED FROM FIBER ROLLS WHEN SEDIMENT ACCUMUI.ATION REACHES ONE_HALF ÏHE DESIGNED SEDIMENT STORAGE DEPTH, .-USUALLY ONE_HALF THE DISTANCE BETWEEN THE TOP OF THE FIBER ROLL AND THE ADJACENT GROUND SURFACE.9. POST_CONSTRUCÏION - APPLY STRAW MULCH AT A MINIMUM RATE OF 4,OOO LBIACRE, ETTHER BY MACHTNE OR BY HAND D|STRTBUTTON.9.1. EVENLY DISTRIBUTE STRAW MULCH ON THE SOIL SURFACE. 9.2. EITHER INCORPORATE STRAW MULCH INTO THE SURFACE BY "PUNCHING" IT INTO THE SOIL MECHANICALLY OR BY APPLYING TACKIFIER TO ADHERE SÏRAW FIBERS. APN 066 -340-003 LAKERIDGE CIRCLE MAGALIA, CA 95954 TOTAL AREA _ 0.93 ACRE EROSION AND SEDIMENT CONTROL PLAN FOR TEMPORARY CONSTRUCTION/LAY DOWN YARD t (o q )REPARED BY: JENNIFER BRYANT, P.E., OSD/OSP CIVIL PE LICENSE NO. 81903; OSD/OSP CERtrlC¡lE NO. 24773 P.O. BOX 506, CHICO, CA 95927 PREPARED FOR: CERES ENVIRONMENTAL SERVICES, INC.DATE: JUNE 1 9, 2019 SCALT: 1 :30