HomeMy WebLinkAbout00-027., ~ G41~1NTY QF BUTTE, STATE QF CALIFORNIA
~c'SOluftOrl ND. 00-27
i2ESOL.U'TION AUTl1OR[7ING F.Xh:CUTION OF
P12(H:ItAl~1 SUYPLE;MEN'T NU, M014 REV. 1
'TO ADMINIS7'E:[21NG AGENC'1' - S'TA~I'F; AGIZEEMEN'C NO. 03-5912
,~t~lODIFIi',D NOVI?MBGR 29, 1995
[xO12 1~[+;DI?RAL-AID I'ROJF:CTS
Rt~!F;12 ROAD BRIDGE: A'1~ BIG CHICO CRF,EK,
PRnJECT NO. 03-BI~'T-O-CR, BRLC)-5912(027)
81+; IT RF,SOLVED by the l3uard ~>CSupervis«r:~; ~~('ihe County of fiutte, State of California, as
fo(I<n~ s:
l~hat said County approve Pru~!ran~ Su~~plen~ent N~~. M01~ Rev. 1 to ~ldministcrin~~ /~gency-
State A~~reemcnt '~~c~. 0 ~-S<> I ~. m~xlitied 1~irn~emhcr ?9. 1995. frn~ Federal-Aid 1'r~~lccts in
~3utte ('~~unt~ and the Chair ul~lhe i3tru~d be autht~rized Co execute said supplunent tin behalf
~,I~;aid C'uunt~-. S~ipplcmcnt N~~. MI) I-l I~cv. I provides for fundin~~ for reimhurticn~cnt of
construction en~~inecrin~~ and cunstructi~~n c~~sts ~~n River Road I~rid~~c at 13i~~ C'hic~.~ C'reel:;
I'rojcct Nt~. 03-f3t!~I~-O-t'R. 13RLO-~91~(()`?7)_
?. l~hat the Clerl: ufthis l3uard he authorized to attach a certified c~~py ~>f~this Rcs~~lution tc~
Program Supplement Nt~. R~OI a Rev. I .
PASSh;D .AND ADOPTI?D by the 13cru-d c~S~Supervis~~rs ol~the Crnu~ty of [3utte. Siatc ~~t
Calil~~~rnia, this 22nddav of February ,'?000.. by the tollowing vote:
4l'`!?5: Supervisors Beeler, Houx, Josiassen, Davis and Chair Dolan
~(}(~;~;: None
A64C.NT: None
NOT VOTING: None ~ (~`~
~~--
~fii< ir, C~oard of Sttpeiti iti~7rs
C~~~ my of Butte, State u( Cali[i>rnia
A`E~ F,fiT:
.It~hn S. 13lacklock_ C'hiel~Adminisirativc
Ohlicer and t'lerl: t~f~thc l~~d
it
~'
C lu h.~ cput}
PROGRAM SIIPPLEMENT NO. M014 Rev. 1
to
ADMINISTERING AGENCY-STATE AGREEMENT
FOR FEDERAL-AID PROJECTS NO. 03-5912
Date :January 26, 2000
Location:03-BUT-O-CR
Project Number:BRLO-591"2(027}
E.A. Number:Q3-9249j4
This Program Supplement is hereby incorporated into the Agency-State Agreement far Federal Aid which was enured into between
ttie Agency and the State on 05/30!97 and is subject to all the terms and conditions thereof: 11~is Program Supplement is adapted in
accordance with Article t of the aforementioned Master Agreement under authority of Resolution No. 00-27
approved by the Agency on 02 J22 J00 (See copy attached). '
The Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with the
covenants or remarks setfarth an the following pages.
PROJECT LOCATION:
On Rir°er Rd at Big Chico Creek, Br Na 12C-0010
TYPE OF WORK: Bridge Replacement hENGTH: 0.3 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[ ~ Preliminary Engineering
[X] Construction Engineering
[ ]Right-Of-Way
[X] Constriction
Estimated Cost Federal Funds Matching Funds
81,02,000.00 117 $1,200,800.00 LOCAL
892,200.00 SB45 STATE
$209,000.00 OTHER
$0.00
+-+~,. ,i r. ~..V V1V1 Z
STATE OF CALIFORNIA
Department of Transportation
>(AN, CHAIR sy
Chief, Office of Local Frograms
Project Implementation
At
T
Date
I hereby certify upon mY gersonal knowledge~/tfhat budgeted funds are available for this encumbrance:
Accounting Of fie ~~~' J Date ~ ' ~~j y ~ 81,409,800.00
Chapter Statutes Item Year Progr~ai BC Category Fund Source AMOUNT
324 1998 2660-101-890 98-~~/ 20.30.0 C 224060 892-F
324 1998 2660-101-042 98-99 20.30.600.620 N 262042 042-"t
1,2oa,8o0.00
209,000.00
Program Supplement 03-5912-M014-R1 ISTEA Page 1 of 4
~>-3li'i~-U-~_'R
BRLO-5912(027)
O1i26'2000
SPECIAL COVENANTS OR REMARKS
1. The Local Agency agrees the payment of Federal funds will be
limited to the amounts approved by the Federal Highway
Administration in the Federal-Aid Project Agreement (PR-2)/Detai_1
Estimate or its modification (PR-2A) or the FNM-76, and accepts
any increases in Exchange Funds, State Matching funds, and\or
Local Agency Funds as shown on the Finance or Bid Letter or its
modification as prepared by the Office of Local Programs.
2. The Local Agency will advertise, award and administer this
project in accordance with the current Local Assistance
Procedures Manual.
3. The Local Agency will reimburse the State for their share of
costs for work requested to be performed by the State.
4. All maintenance, involving the physical condition and she
operation of the improvements, referred to in Article III
MAINTENANCE of the aforementioned Master Agreement will be the
responsibility of the Local Agency and shall be performed at
regular intervals or as required for efficient operation of the
completed improvements.
5. This PROJECT is programmed to receive funding from the 1998 :Mate
Transportation Improvement Program (STIP}, as amended. Funding
may be provided under one or more components. A component(s)
specific fund allocation is required, in addition to other
requirements, before reimbursable work can occur for the
component(s) identified. Each allocation will be assigned an
effective date and identify the amount of funds allocated per
component(s).
This PROGRAM SUPPLEMENT has been prepared to allow reimbursement
of eligible PROJECT expenditures for the component(s) allocated.
The start of reimbursable expenditures is restricted to the later
of either 1) the effective date of the Master Agreement, 2)the
effective date of the PROGRAM SUPPLEMENT, or 3)the effective date
of the component specific allocation.
6. STATE and ADMINISTERING AGENCY agree that additional funds made
available by future allocations will be encumbered on this
PROJECT by use of a STATE approved Allocation Letter and Finance
Letter. ADMINISTERING AGENCY agrees that STATE funds available
for reimbursement will be limited to the amount allocated by the
Program Supplement03-5912-M014-R1 ISTEA Page 2 of 4
03-t3L-T-~-C~R
BRL~O-5912(027}
01 !26:20(}0
SPECIAL COVENANTS OR REMARKS
California Transportation Camrnission (CTC) and/or the STATE.
7. This PROJECT is subject to the timely use of funds provisions
enacted by Senate Bill 45 (SB 45}, approved in 1997, and
subsequent CTC guidelines and State procedures approved by the
CTC and STATE, as outlined below:
Funds allocated for the environmental & permits, plan
specifications & estimate, and right-of-way components are
available for expenditure until the end of the second fiscal year
following the year in which the funds were allocated.
Funds allocated for the construction component are subject to an
award deadline and contract completion deadline. ADMINISTERING
AGENCY agrees to award the contract within 12 months of the
construction fund allocation and complete the construction or
vehicle purchase contract within 35 months of award.
8. Upon ADMINISTERING AGENCY request, the CTC andJor STATE may
approve supplementary allocatians, time extensions, and fund
transfers between camponents. An approved time extension will
revise the timely use of funds criteria, outlined above, for the
components} and allacation{s} requested. Approved supplementary
allocations, time extensions, and fund transfers between
components, made after the execution of this FROGRAM SUPPLEMENT
will be documented and considered subject to the terms and
conditions thereof.
Documentation for approved supplementary allocations, time
extensions, and fund transfers between components, will be a
STATE approved Allocation Letter, Fund Transfer Letter, Time
Extension Letter, and Finance Letter, as appropriate.
9. This PROJECT will be administered in accordance with the CTC STIP
guidelines, as adopted or amended, and the STATE Procedures for
Administering Local Grant Projects in the State Transportation
Improvement Program (STIP), the Local Assistance Program
Guidelines, and the Local Assistance Procedures Manual. The
submittal of invoices for project costs shall be in accordance
with the above referenced publications and the following.
lO.The ADMINISTERING AGENCY shall invoice STATE for environmental &
Program Supplement03-5912-M014-R1 ISTEA Page 3 of 4
~~-u~ f~ -~-~.~~
BRLO-5912(027}
0 1 /2 612 000
SPECIAL COVENAN'PS OR REMARKS
permits, plans specifications & estimate, and right-of-way costs
no later than 180 days after the end of last eligible fiscal year
of expenditure. For construction costs, the ADMINISTERING AGENCY
has 184 days after project completion to make the final payment
to the contractor and prepare the final Report of Expenditures
and final invoice, and submit to STATE for verification and
payment.
11.A11 funding obligations of STATE under the conditions of this
PROGRAM SUPPLEMENT are subject to the appropriation of resources
by the Legislature and the encumbrance of funds under this
PROJECT. Funding and reimbursement are available only upon the
passage of the State Budget Act containing these STATE funds.
1Z. The Local agency has passed a Resolution requesting Alternative
Construction Progress Payment Procedure as referenced in Local
Programs Procedures (LPP} 98-05, Expedited Payment Procedures.
Local agency agrees to follow all procedures as outlined in the
LPP 98-05, including scheduling, invoicing, final reporting and
overpayment.
Failure by the local agency to adhere to all the terms of this
Procedure will result in the termination of the Alternative
Canstruction Progress Payment Procedure for this project, and a
return to payment of invoices based on the actual work
accomplished.
Program Supplement03-5412-M014-R1 ISTEA Page 4 of 4