HomeMy WebLinkAbout08-013BOARD OF SUPERVISOF~~ '"` "'
COUNTY OF BUTTE, STATE OF CALIFORNIA
Resolution No . 08-013
A RESOLUTION OF THE BUTTE COUNTY BOARD OF SUPERVISORS
UPHOLDING THE APPEALS TAKEN FROM
THE BUTTE COUNTY PLANNING COMMISSION'S APPROVAL OF THE
M&T CHICO RANCH MINE MINING USE PERMIT AND RECLAMATION PLAN
AND CERTIFICATION OF THE FINAL EIR
AND DENYING THE
M&T CHICO RANCH MINE MINING USE PERMIT AND RECLAMATION PLAN
AND NOT CERTIFYING THE FINAL EIR (MIN 96-03)
BACKGROUND
The M&T Chico Ranch Mine ("Project") applied for by
Baldwin Contracting Company ("Applicant") for approval by
the County of Butte ("County"), was proposed to consist of
a long-term, off-channel gravel mining operation
approximately 5-miles southwest of the City of Chico. The
mining would have taken place on 193-acres of a 235-acre
site over an estimated 20 to 30-year period. The mined
aggregate would have been processed (washed and screened)
on a 40-acre area at the site. The Project site was
proposed to be reclaimed to open-water wetland wildlife
habitat (193 acres) and agricultural uses (40 acres).
The proposed Mining Permit, Reclamation Plan, and
Final Environmental Impact Report {"Final EIR") for the
Project was considered at public hearings before the Butte
County Planning Commission on October 23, 2003, January 22,
2004, March 11, 2004, April 8, 2004, August 26, 2004,
November 30, 2006, December 14, 2006, and January 25, 2007.
On February 22, 2007, the Planning Commission certified the
Final EIR and approved the Mining Permit and Reclamation
Plan. Two appeals were taken from the Planning
Commission's action. Cancellation of the Williamson Act
contract on the Project site was considered at a public
hearing before the Board of Supervisors on April 24, 2007.
The appeals from the Planning Commission actions were
considered at public hearings before the Butte County Board
of Supervisors on May 22, 2007, November 6, 2007, January
8, 2008, and January 29, 2008.
1
RECITALS
1. Lead Agency Status: The County is the lead agency
under the California Environmental Quality Act ("CEQA"),
Public Resources Code sections 21000 et seq., for
preparation and certification of the Final EIR for the
Project.
2. Project Description: The Project would have allowed a
long-term, off-channel gravel mining operation. The mining
would have taken place on 193-acres of a 235-acre site over
an estimated 20 to 30-year period. Approximately six acres
would have been mined each year. The aggregate would have
been processed (washed and screened) on a 40-acre area at
the site.
a) Acreages: The approximate acreages for the Project
were as follows:
Lease area: 627 acres
Project site: 235 acres
Mined area: 193 acres
Equipment area: 40 acres
Topsoil stockpile area: 2 acres
b) Location: The Project would have been located on a
portion of the M&T Chico Ranch approximately 1.5 miles
east of the Sacramento River and approximately 5 miles
southwest of the City of Chico, in an area north of
and adjacent to Ord Ferry Road, and east of, and
partially adjacent to, River Road. Access to the site
would have been provided by River Road.
c) Material proposed to be mined: High quality
construction aggregates including gravel and sand.
The Project site is part of the present Sacramento
River Floodplain and the gravels and sands underlying
the site consist of channel deposits from the river.
d) Production: Production numbers for the Project were
proposed as follows:
Maximum annual mine production: 275,000 cubic yards
(mined)
Maximum annual mine production: 250,000 cubic yards
(marketed)
Average annual mined product amount:66,667 cubic yards
Total production: 5,500,000 cubic yards
2
e) Traffic Volumes for Trucks: According to the
traffic study contained in the Draft EIR, the Project
would have generated approximately 16,667 trips per
year. Average daily trips generated would have been
128 (64 arriving and 64 departing). The Project would
have generated 20 additional AM and PM Peak Traffic
Trips.
3. Preparation of an EIR:
a) Pursuant to CEQA and the CEQA Guidelines, 14 Cal.
Code Regs. sections 15000 et seq. ("CEQA Guidelines"),
an EIR was prepared for the Project to analyze the
environmental effects of the Project.
b) On January 25, 2007, the County held a duly noticed
public hearing before the Planning Commission to
consider certification of the Final EIR, approval of
the Mitigation and Monitoring Program, approval of
Mining Use Permit No. MIN 96-03, the M&T Chico Ranch
Mine Reclamation Plan, and the Financial Assurances
Cost Estimate, and adoption of a Statement of
Overriding Considerations. In addition, staff returned
to the Planning Commission with responses to public
comments that were received at the December 14, 2006
hearing. The Planning Commission voted 3-2 to adopt a
Motion of Intent to: (1) adopt a resolution certifying
the Final EIR and approving a Mitigation Monitoring
and Reporting Program; and (2) adopt a separate
resolution approving Mining Use Permit No. MIN 96-03,
including the M&T Chico Ranch Mine Reclamation Plan
and the Financial Assurances Cost Estimate, and
adopting a Statement of Overriding Considerations.
c) On February 22, 2007, the Planning Commission acted
on the Motion of Intent, and voted 3-2 to: (1) adopt a
resolution certifying the Final EIR and approving a
Mitigation Monitoring and Reporting Program; and (2)
adopt a separate resolution approving Mining Use
Permit No. MIN 96-03, including the M&T Chico Ranch
Mine Reclamation Plan and the Financial Assurances
Cost Estimate, and adopting a Statement of Overriding
Considerations.
4. Documents Comprising Final EIR: The Final EIR for the
M&T Chico Ranch Mine Project includes the following items
(collectively referred to as the "Final EIR"}:
3
a) M&T Chico Ranch Mine Draft EIR (SCH 97022080)
dated September 2002;
b) Comments and responses to comments on the Draft
EIR, dated October 23, 2003;
c) Draft EIR Errata containing corrections and
clarifications made to the text of the Draft EIR;
d) Updated Response to Comments Regarding Williamson
Act, dated November, 2006;
e) Updated Draft EIR Errata Regarding Environmental
Setting and Project Description; and
f) Mitigation Monitoring and Reporting Program.
5. Appeals. Two appeal letters were filed within the
appeal period of the Planning Commission decision to
certify the Final EIR and approve the project.
6. Action by the Board of Supervisors.
a) The Planning Commission did not consider the
Petition for Partial Cancellation because, under both
state and county law, Petitions for Cancellation are
beyond its purview. On April 24, 2007, the Board of
Supervisors held a duly noticed public hearing to
consider the Petition for Partial Cancellation of the
Williamson Act contract applicable to the Project
site. The Board of Supervisors voted 5-0 to deny the
Petition for Partial Cancellation and continued the
public hearing to May 22, 2007.
b) On May 22, 2007, the Board of Supervisors opened
the public hearing on the appeal request regarding
certification of the Final EIR and approval of the
project and continued the item to November 6, 2007.
c) On November 6, 2007, the Board of Supervisors
opened the said public hearing and continued the item
to January 8, 2008.
d) On January 8, 2008, the Board of Supervisors
concluded the said public hearing.
e) On January 29, 2008, the Board of Supervisors:
4
deliberated; adopted a motion on a 3-2 vote upholding
the appeals from the Planning Commission's approval of
the mining use permit and reclamation plan, denying
the mining use permit and reclamation plan, and
denying certification of the Final EIR; and directed
county staff to prepare findings in support of the
motion and in accordance with the reasons specified by
the Board majority.
7. Description Of The Record: The administrative record
for the Project consists of those items listed in Section
21167.6 (e) of the Public Resources Code (Chapter 1230,
Statutes of 1994) including but not limited to:
a) All application materials and correspondence
contained in the County's Project files (MIN 96-03);
b) The original Draft EIR;
c) The revised Draft EIR;
d) The Final EIR;
e) All Notices of Availability, the Notice of
Determination, staff reports and presentation
materials related to the Project;
f) All studies contained in, or referenced by, staff
reports, the Draft EIR, or the Final EIR;
g) All public reports and documents related to the
Project prepared for the County and other agencies;
h) All documentary and oral evidence received and
reviewed at public hearings and workshops, and all
transcripts and minutes of those hearings related to
the Project and to cancellation of the Williamson Act
agreement on the Project site;
i) For documentary and informational purposes, all
locally-adopted land use plans and ordinances,
including, without limitation, general plans, area
plans and ordinances, master plans together with
environmental review documents, findings, mitigation
monitoring programs and other documentation relevant
to planned growth in the area; and
5
j} All deliberations of the Butte County Planning
Commission and Board of Supervisors considering the
project.
8. Custodian of the Record: The administrative record is
maintained at the Butte County Department of Development
Services, 7 County Center Drive, Oroville, California.
FINDINGS
Having considered all the written and documentary
information submitted, the staff reports, oral testimony,
other evidence presented, and the administrative record as
a whole, the Board of Supervisors hereby finds and decides
as follows:
1. THERE ARE SIGNIFICANT AND UNAVOIDABLE IMPACTS WHICH
WOULD BE CAUSED BY THE PROJECT.
CEQA requires the County to balance the benefits of the
proposed Project against its unavoidable environmental
risks. (CEQA Guideline section 15093). Implementation of
the Mitigation Measures discussed in the Final EIR, as
certified by the Planning Commission on February 22, 2007,
would not avoid or substantially lessen the proposed
Project's impacts on air quality (both project-level and
cumulative) and traffic to a less than significant level.
These impacts, as identified within Chapter 4.0 of the
Draft EIR and set forth below, are each found to be
significant and unavoidable:
a) Impact 4.5-5: Addition to Carbon Monoxide (CO)
Hot Spots
Certain intersections in the vicinity of the Project
would experience congestion under cumulative
conditions. Carbon monoxide emissions from vehicle
traffic would increase at congested intersections due
to increased idling time. Under Butte County Air
Quality Management District thresholds of
significance, the creation of a CO hot spot is a
significant impact.
There are no feasible mitigation measures to reduce
traffic congestion at the impacted intersections. The
air quality impacts are a direct result of traffic
congestion. Therefore, there are no feasible
mitigation measures for the air quality impacts. This
6
is a significant and unavoidable impact.
b) Impact 4.6-4: Highway 32/West 5th Street
Intersection
The proposed Project would add 10 or more trips per
day to the intersection of State Highway 32/West Stn
street. This intersection was identified in the Draft
EIR as a location having 4 or more accidents in a 12-
month period over the prior three years. This
location also had more than one accident over a 12-
month period, which involved heavy vehicles. This is
considered a significant impact.
The intersection of SR-32/West 5th Street had a total
of 13 accidents with 6 occurring in 1997. Two of the
accidents in 1997 involved heavy vehicles. In 1999,
seven accidents occurred with no heavy vehicle
involvement.
Signal phasing could be improved to increase safety.
Currently there are protected left-turns for the SR-32
approaches and permitted left turns for the West 5th
Street approaches. With permitted phasing, vehicles
turning left must yield to opposing through and right-
turn movements. Field observations also revealed the
absence of all-red time at this intersection;
consequently, vehicles are not able to clear the
intersection between signal phases.
The following Mitigation Measure was set-forth:
"Mitigation Measure 4.6-4: The project applicant
shall contribute a fair share contribution to improve
the intersection of SR 32/West 5th Street by modifying
the existing traffic signal to provide split phase
timing, including three seconds of yellow time and one
second of all-red time per phase. The fair share
contribution amount should be based upon the relative
proportion of project vehicles traveling through the
impacted intersection."
Even if this mitigation could be implemented to
improve conditions at the intersection, it is found
that the impact would still be considered significant
and unavoidable. However, it is further found that the
measure could not be implemented because the signal at
the intersection is of a type which cannot be modified
7
as proposed, and the fair share contribution would not
be adequate to finance installation of a newer type
signal which could be programmed as proposed.
c) Impact 4.6-5: Park Avenue/East 20th Street/East
Park Avenue
The proposed Project would exacerbate LOS F operating
conditions on Park Avenue from East 20th Street to East
Park Avenue under cumulative conditions.
The segment of Park Avenue between East 20th Street and
East Park Avenue is expected to operate at LOS F under
cumulative no Project conditions. The addition of
Project trips would exacerbate unacceptable operating
conditions. Possible mitigation measures would
include physically expanding the facility or rerouting
Project traffic. The physical constraints of this
roadway segment (i.e., city streets with pedestrian
and bicycle facilities, minimal setbacks to existing
buildings) prohibit expansion from four to six lanes.
Project trips may be rerouted to avoid this roadway
segment, however, this would be difficult to enforce.
The cumulative no project daily traffic volume on this
roadway segment is 36,000. The Project would add an
additional 20 trips to this segment, which would be
significant based upon the criteria listed in the
Impacts and Mitigation Measures section of the Draft
EIR.
No feasible mitigation measure will reduce the level
of impact to this roadway segment. This is considered
a significant unavoidable impact.
d) Impact 4.6-6: East Park Avenue/Park
Avenue/Highway 99
The proposed Project would exacerbate LOS F operating
conditions on East Park Avenue from Park Avenue to
Highway 99 under cumulative conditions.
The segment of East Park Avenue between Park Avenue
and Highway 99 is expected to operate at LOS F under
cumulative no project conditions. The addition of
Project trips would exacerbate unacceptable operating
conditions. Possible mitigation measures would
include physically expanding the facility or rerouting
Project traffic. The physical constraints of this
8
roadway segment (i.e., city streets with pedestrian
and bicycle facilities, minimal setbacks to existing
buildings) prohibit expansion from four to six lanes.
Project trips may be rerouted to avoid this roadway
segment, however, this would be difficult to enforce.
The cumulative no project daily traffic volume on this
roadway segment is 40,000. The Project will add an
additional 40 trips to this segment, which would be
significant based upon the criteria listed in the
Impacts and Mitigation Measures Section of the Draft
EIR.
No feasible mitigation measure will reduce the level
of impact to this roadway segment. This is considered
a significant and unavoidable impact.
e) Impact 4.6-7: Bruce Road/Highway 32/Skyway
The proposed Project would exacerbate LOS E operating
conditions on Bruce Road from Highway 32 to Skyway
under cumulative conditions.
The segment of Bruce Road between Highway 32 and
Skyway is expected to operate at LOS E under
cumulative no project conditions. The addition of
Project trips would exacerbate unacceptable operating
conditions. Possible mitigation measures would
include physically expanding the facility or rerouting
Project traffic. The physical constraints of this
roadway segment (i.e., city streets with pedestrian
and bicycle facilities, minimal setbacks to existing
buildings) prohibit expansion from four to six lanes.
Project trips may be rerouted to avoid this roadway
segment, however, this would be difficult to enforce.
The cumulative no project daily traffic volume on this
roadway segment is 31,500. The Project will add an
additional 30 trips to this segment, which would be
significant based upon the criteria listed in the
Impacts and Mitigation Measures Section of the Draft
EIR.
No feasible mitigation measure will reduce the level
of impact to this roadway segment. This is considered
a significant unavoidable impact.
f) Impact 4.6-8: Baldwin Plant Driveway/Skyway
The proposed Project would exacerbate LOS F operating
9
conditions in the a.m. peak hour and LOS D in the p.m.
peak hour at the intersections of the Baldwin Plant
driveway and Skyway under cumulative conditions.
The intersection of the Baldwin Plant driveway and
Skyway is expected to operate at LOS F in the a.m.
peak hour and LOS D in the p.m. peak hour under
cumulative no project conditions. The addition of
Project trips will exacerbate unacceptable operating
conditions. The peak hour volume signal warrant
contained in the Traffic Manual, Caltrans, July 1995,
is not met at this location due to the low volumes at
the driveway to the Baldwin Plant.
Improvements to the median crossing, acceleration
/deceleration lanes, improved signing and striping,
and channelization of the driveway approach could
improve the safety characteristics of this
intersection, and this would be reflected as a
condition of the Mining Permit. In addition,
signalization of the Skyway/Honey Run Road
(anticipated by 2005) may provide sufficient gaps in
through traffic on Skyway to improve ingress and
egress from the driveway. However, no feasible
mitigation measure would reduce the level of impact to
this roadway segment. This is considered a
significant and unavoidable impact.
2. BECAUSE OF THE SIGNIFICANT AND UNAVOIDABLE IMPACTS
ASSOCIATED WITH THE PROJECT, AS SET FORTH IN FINDING 1
ABOVE, THE PROJECT WOULD BE UNREASONABLY INCOMPATIBLE WITH
AND INJURIOUS TO SURROUNDING PROPERTIES AND DETRIMENTAL TO
THE HEALTH AND GENERAL WELFARE OF PERSONS RESIDING AND
WORKING IN THE NEIGHBORHOOD AND TO THE GENERAL HEALTH,
WELFARE AND SAFETY OF THE COUNTY.
3. THERE ARE NO DOCUMENTED BENEFITS FROM THE PROJECT
WHICH OUTWEIGH THE IDENTIFIED SIGNIFICANT AND UNAVOIDABLE
IMPACTS ASSOCIATED WITH THE PROJECT, AND A FINDING OF
OVERRIDING CONSIDERATIONS IS NOT WARRANTED.
Pursuant to CEQA Guidelines section 15042, a project may be
disapproved if necessary in order to avoid one or more
significant effects on the environment that would occur if
the project were approved as proposed. The County has
weighed the economic, legal, social, technological, and
other benefits of the Project against the significant and
unavoidable impacts specified in finding 1 above, and has
10
determined that the adverse environmental impacts are not
acceptable because there are no documented benefits from
the Project which would outweigh these impacts, as found in
subsections a through f below, and that the project should
therefore be disapproved:
a) The Project would not provide essential aggregate
material to Butte County because an adequate supply is
available for current use and reserves for future use
to account for anticipated population growth, for use
in local public and private construction projects,
from other sources, both within the County and in
adjacent counties.
b) The Project's proposed fair share monetary
contributions cannot be considered as an economic
benefit because they would only be a mitigation for
project impacts, and they, together with other
available funding, would not be adequate to improve
and maintain transportation facilities in the area
which would be damaged or otherwise impacted by heavy
truck traffic generated by the Project. Specifically,
the following improvements and maintenance which would
be necessary would not be adequately funded, even with
the contributions which would be required by the
specified Mitigation Measures: Little Chico Creek
Bridge reconstruction; reconstruction of Ord Ferry
Road at Little Chico Creek (Mitigation Measure 4.6-1);
pavement improvement on River Road between Chico River
Road and the Project access (Mitigation Measure 4.6-
2); installation of a traffic signal and improvement
of lane configurations at the Durham-Dayton Highway
and Midway intersection (Mitigation Measure 4.6-9).
c) The relocation of the
operations from Glenn County to
site in Butte County would not
benefit to Butte County because
not result in any significant dE
fuels or resulting air quality
County.
applicant's mining
the proposed Project
be an environmental
the relocation would
'crease in the use of
impacts within Butte
d) The proposed mining operations and the resulting
creation of an open water pond and wetland habitat
area as proposed by the Project's reclamation plan
will result in the loss of prime agricultural land, in
conflict with Agricultural Element Policy 1.5, of the
Butte County General Plan, and the resulting
11
introduction of industrial uses, as well as additional
waterfowl and other wildlife, into the area may have
harmful effects on adjacent agricultural operations,
in conflict with Agricultural Element Goal 3, Policy
3.2, Program 3.5, and Program 2.3, and Land Use
Element Policy 2.1.b, of the Butte County General
Plan.
e) The Project will not increase storage of
floodwaters or provide improved flood protection.
f) There is no substantial evidence in the record
that the Project would generate increased employment
opportunities for County residents associated with
mining of aggregates, required monitoring and
reporting, construction associated with on-site
facilities and improving and maintaining roadway
facilities, and restoration of wildlife areas.
4. THE LOCATION OF THE PROJECT IS NOT SUITABLE BECAUSE:
a) Traffic
1. Safety. There was disputed factual evidence
concerning the impact of the increased truck traffic
on the projected haul routes. The Board of
Supervisors finds that the increased truck traffic in
already congested areas and on narrow rural roads
would not be mitigated and would adversely affect the
safety of motorists, pedestrians, cyclists, and farm
equipment operators.
2. Road Impacts. There was disputed factual
evidence concerning the ability of the proposed
contributions to be made by the applicant to effect
repair to roads damaged due to increased truck
traffic. The Board of Supervisors finds that although
the project applicant would have contributed a certain
amount of funds, this amount of funds would not
contribute sufficient funds to Butte County to
mitigate the damage to the roads caused by the
increased truck traffic. In addition the project
would contribute to the degradation of the roads in
the City of Chico which will not be mitigated.
b) Impact on Agriculture
12
1. Loss of Prime Agricultural Land. The proposed
reclamation plan for the Project would reclaim the 40
acre plant area for agricultural uses, but the 193
acre mining area would be reclaimed as open water and
wetlands for wildlife habitat. As discussed at page 7
of the staff report dated January 8, 2008, and
addressed to the Board of Supervisors, there was
disputed factual evidence concerning the nature of the
soil in the project area. The dispute concerned
whether the soil was prime agricultural land versus
non-prime. The Board of Supervisors finds that the
soil at the project site is prime agricultural soil.
The Board of Supervisors additionally finds that the
project would lead to a loss of 193 acres of prime
agricultural land which is a valuable resource to
Butte County and is not mitigated in any manner, that
such loss would be contrary to Agricultural Element
Policy 1.5 of the Butte County General Plan, and that
the proposed reclamation plan would be contrary to the
reclamation standard specified in 14 CCR 3707.
2. Incompatible Use. There was disputed factual
evidence concerning whether the project after it is
reclaimed as wetland habitat would be compatible with
surrounding agricultural uses. The Board of
Supervisors finds that the project proposes the
creation of wildlife habitat in an agricultural area
which the Board of Supervisors does not support and
has previously found to be an incompatible use when it
is in close proximity to agricultural uses.
Therefore, the Board further finds that the Project
would be contrary to the following Policies in the
Butte County General Plan that discourage location of
uses that have an adverse impact on surrounding
agricultural lands: Agricultural Element Goal 3,
Policy 3.2, Program 3.5, and Program 2.3, and Land Use
Element Policy 2.1.b.
c) Availability of Alternative Sources of Gravel.
There was disputed factual evidence concerning the
availability of gravel within Butte County and
surrounding areas. The Board of Supervisors finds
that there was substantial evidence presented in the
public hearings on the Project as well as in the
Williamson Act Cancellation hearing that there are
adequate and available alterative sources of gravel
within Butte County and surrounding areas at locations
which are more suitable, including a source of
13
material in the Oroville Wildlife Area, which has
highway access. The Board of Supervisors has approved
mines in other locations and continues to support
mining within Butte County, including its approval of
a lease for mining purposes on county land on Almond
Avenue. The Board of Supervisors is actively
attempting to allow for additional mining in other,
more appropriate, locations.
d) Flooding
There was disputed factual evidence concerning whether
this project would increase or decrease flooding
activity. The Board of Supervisors finds that the
project is proposed in an area subject to flooding in
a recognized flood plain and that the Project would
not alleviate flooding issues.
5. BECAUSE THE LOCATION IS NOT SUITABLE AS SET FORTH IN
FINDING 4 ABOVE, THE PROJECT WOULD BE UNREASONABLY
INCOMPATIBLE WITH AND INJURIOUS TO SURROUNDING PROPERTIES
AND DETRIMENTAL TO THE HEALTH AND GENERAL WELFARE OF
PERSONS RESIDING AND WORKING IN THE NEIGHBORHOOD AND TO THE
GENERAL HEALTH, WELFARE AND SAFETY OF THE COUNTY.
6. THERE ARE UNKNOWN IMPACTS WHICH MAKE APPROVAL OF THE
PROJECT PREMATURE.
Because the area where the project was proposed remains
under a Williamson Act contract from which it will not be
removed until 2014, the project could not commence until
then. The Board further finds that during this lag time
the General Plans for Butte County and the City of Chico
will be updated, and there is substantial projected growth
for the City of Chico and Butte County. It would be
premature to approve the Project when these changed
circumstances and the impact of the Project on them are not
known and cannot be determined.
7. EACH OF THE FINDINGS SET FORTH ABOVE IS SUFFICIENT IN
AND OF ITSELF TO REQUIRE DENIAL OF THE PROJECT.
The Board of Supervisors has considered the totality of
findings 1 through 6, set forth above, in deciding to deny
the Project. However, the Board further finds that each of
said findings and subparts thereof is sufficient in and of
itself to support denial of the Project.
14
ACTION
In view of the findings set forth above and the record as a
whole, the Board of Supervisors takes the following
actions:
1. The appeals taken from the Planning Commission's
approval of the M&T Chico Ranch Mine mining use permit
and reclamation plan and certification of the Final
EIR are upheld.
2. The M&T Chico Ranch Mine mining use permit and
reclamation plan are denied.
3. The Final EIR is not certified by the Board of
Supervisors because certification is not required when
a project is denied. (CEQA Guidelines section 15270.)
PASSED AND ADOPTED by the Board of Supervisors of the
County of Butte, State of California, on the 12th day of
February 2008, by the following vote:
AYES: Supervisors Connelly, Dolan, Kirk, and Chair Josiassen
NOES: Supervisor Yamaguchi
ABSENT : None
NOT VOTING: None '~
,`y ~~
rCURT JOSIASSEN, Chair
Butte County Board of Supervisors
ATTEST:
C. Brian Haddi~.; Chief Administrative Officer
and Clerk q''f the B,bard of Supervisors
,.
j .. ~ - i
~~~
By:, ~> - t
De.~zity
15