HomeMy WebLinkAbout10-076Resolution
RESOLUTION OF THE BUTTE COUNTY BOARD OF SUPERVISORS
REGARDING APPROVAL OF GENERAL PLAN AMENDMENT GPA06-0005
AND REZONE REZ06-0005, FOR JEFF ASHLOCK
WHEREAS, on April 22, 2010 in a public hearing the Planning Commission
considered General Plan Amendment and Rezone applications for 7eff Ashlocle, in
accordance with Butte County Code Chapter 24, Section 30 (General Plan) and Section
25 (Zoning) and Tentative Subdivision Map application TSM06-0012 in accordance with
Butte County Code Chapter 24, on Assessor's Parcel Numbers 075-090-043 and 078-090-
044; and
WHEREAS, by its Resolution No. 10-10 the Planning Commission made
recommendations that the Board of Supervisors approve the General Plan Amendment
and Rezone applications changing the general plan land use designation from I (Industrial}
to LDR {Low Density Residential), HDR (High Density Residential) and C (Commercial}
and the Rezone from M-1 (Light Industrial} to R-1 (Residential), R-4 (Residential) and C-C
{Cornxnunity-Commercial) on the land described as Assessors Parcel Numbers 078-090-043
and 075-490-044; and
. ~ WHEREAS, conditionally approved tentative subdivision map TSM06-0012 is
inconsistent with the current Industrial General Plan designation and M-1 zoning district
and is not operative or entitled until General Plan Amendment and Rezone applications
are approved by the Board of Supervisors; and
WHEREAS, in addition to this resolution to approve the change of the general
plan land use designation from I {Industrial) to LDR{Low Density Residential), HDR (High
Density Residential) and C (Commercial) on the land described as Assessors Parcel
Numbers 078-090-043 and 078=090-044 as shown on Exhibit A to this resolution, the Board
of Supervisors is concurrently considering adoption of an ordinance to change the zoning
district on the same land from M-1 {Light Industrial) to R-1 (Residential}, R-4 (Residential}
and C-C {Community-Commercial) to ensure that the LDR. HDR and C land use
designations and zoning districts are consistent; and
WHEREAS, the application for General Plan Amendment and Rezone were
referred to various affected public and private agencies, County departments, and referral
agencies for review and comments; and
WHEREAS, a duly noticed public hearing of the Board of Supervisors was held
on May 11, 2010; and
WHEREAS, the Board of Supervisors has considered public comments and a
report from the Planning Division.
NOW, THEREFORE, SE IT RESOLVED that the Board of Supervisors:
I. Adopts a Mitigated Negative Declaration with the following findings:
A. An Initial Study was completed in compliance with the California
Environmental Quality Act. Said study did not identify any significant
environmental effects.
B. The Board of Supervisors has considered the Mitigated Negative
Declaration, together with comments received during the review process.
C. On the basis of the whole record before the Board, including the Initial
Study and any comments received, there is na substantial evidence that
General Plan Amendment (GPA06-0005) and Rezone (REZ06-0005) would
have a significant effect on the environment. The custodian of the record
is the Land Development Division of the Public Works Department. The
location of the record is 7 County Center Dnive, Oroville CA 95965.
D. The Mitigated Negative Declaration reflects the independent judgment and
analysis of the County, which is the Lead Agency.
II. Fonds that collection of fees pursuant to Fish and Game Code Section 711.4 is
required, prior to filing a Notice of Determination for the project, unless the
project proponent provides verification from the California Department of Fish
and Game that the project is exempt from the fee requirement. If the required fee
is not paid for the project, the project will not be operative, vested or final and any
local permits issued for the project will be invalid {Section 711.4 (c)(3)).
III. The Board approves the change in general plan land use designation from I
{.Industrial) to LDR (Low Density Residential), HDR (High Density Residential) and
C {Commercial) on the land described as Assessor's Parcel Numbers {APN) 078-
090-043 and 078-090-044. Said change is based on the following findings of
consistency with the following General Plan Goals and Policies:
A. GOAL 1 -General
1.7 Orderly Development -Government Agencies, private companies and the public
at large have invested substantial amounts of money in Butte County's existing
systems of roads, utilities and other facilities. To maximize this investment and the
level of services, utilization of existing facilities is desirable, recognizing that all
designated Iand for development is not immediately available for use. Land owners
have plans and timing of development on their land which is to be respected.
Policy 1.7.a Encourage annexation to existing cities and existing districts.
The project parcel is located in the Oroville's Sphere of Influence and Oroville
Urban Area. The project site is located approximately 1/1-a-mile east of the city
boundary. The City's General Plan 1030 has identified the project parcels as mixed
use. The project proposes a mixed uses (commercial and residential). The project is
condition to develop to urban standards which are is substantial conformance to the
City's requirements. The resulting General Plan Amendment, Rezone and Phased
Tentative Subdivision Map would therefore comply with this policy.
Policy 1.7.b Promote the full utilization of sites served by existing public facilities.
The project site is currently in the service district, South Feather Water and Power
Agency (SFWPA), for community water. The project is conditioned to extend the
main water service line. The project is proposing to expand the Sphere of Lake
Oroville Area Public Utility District (LOAPUD) and annex into the District to
provide community sewer to the project. Tlie sphere expansion and annexation into
LOAPUD was fully analyzed in the Initial Study/Mitigated Negative Declaration.
The applicant/developer will be required to go through LAFCa (Local Agency
Formation Commission) to complete the sphere amendment and annexation.
To reduce potentially significant impacts to wastewater treatment capacity and
service, the applicant shall enter iota a Pre-Annexation Agreement and
Capacity/Mitigation Agreement or the functional equivalent of these agreements with
Sewerage Commission -- Oroville Region (SC-OR) and LOAPUD. A Capacity Study
was prepared by CHZMHiII for SC-OR in 2009 to determine project-related impacts
to existing SC-OR facilities, including sewer interceptors and wastewater treatment
plants, pursuant to currently adopted SC-OR policies. The Capacity Study concluded
that the current Regional Facility Charge (RFC) for developed parcels, collected at
the tune of issuance of building permits, is sufficient to mitigate for project impacts
on SC-OR facilities without construction of new facilities. However, Both specific
project-related load volumes and phased development timing were estimated for this
study. Actual volumes must be determined at the time of connection pursuant to
adopted SC-OR policy.
The resulting General Plan Amendment, Rezone and Phased Tentative Subdivision
Map would therefore comply with this policy.
Policy 1.7c Encourage development in and around existing communities with
public services.
The project site is currently in the SFWPA service district for community water. The
existing sphere boundary for LOAPUD is located approximately G75 feet north
across Ophir Road. There are only six parcels between the project site and the
District's sphere boundary. The Initial Study/Mitigation Negative Declaration
addresses the minimum growth impact on the intervening parcels with this sphere
expansion and annexation into the District. The resulting General Plan Amendment,
Rezone and Phased Tentative Subdivision Map would therefore comply with this
policy and will reduce these potential effects to a less than signif cant level.
B. GOAL 3 -Residential Development
3.1 Housing Supply and Variety -Housing which provides adequate shelter, security
and space is basic to the welfare of all County residents. Satisfying these housing
needs requires conservation and rehabilitation of existing and construction of new
housing. Because the economic well being of the County and satisfaction of housing
needs are both dependent on balancing housing supply and demand, the County can
best assist the housing market by assuring enough adequate suitable space for new
housing construction.
Policy 3.1.b Provide a diversity of housing sites varying in site, density and
location.
The phased tentative subdivision map includes both multi family and single family
residential. The single family portion includes lots ranging in size from G, 500 square
feet to 19,998 square feet. The multi family portion includes 125 units. The resulting
tentative subdivision map would therefore comply with this policy.
3.2 Densities -The distribution of county population and the needs for public
services and facilities is largely determined by the densities of residences in different
areas of the County. Density is also important in its effect on the quietness, "elbow
room" and overall quality of housing situations, the intensity of residential
development is related to a number of factors, including the natural capabilities of
property, the availability of public facilities, the value of property and proposes
dwelling units, and the developing trend and characteristics of the surrounding area.
Policy 3.2.a Correlate residential densities to soil, slope and other natural site
characteristics.
The project proposes to develop the commercial and multi family, and most of the
single family residential will be located in the western and central portion of the
project site, away from the existing oak trees. The proposed 13 custom single family
lots will be developed to protect as many oak trees as possible. The elevation on-site
ranges from 215-230 feet above sea level with topography mostly level, with areas of
gentle slopes (0 to 4%). The resulting tentative subdivision map would therefore
comply with this policy.
Policy 3.2.b Correlate residential densities to availability of water and sewage
disposal and proximity to other public facilities.
The project will be served by community water and sewer. The project site is already
in the SFWPA District for community water. The applicant will be required to
complete a sphere expansion and annexation into LOAPUD. The project's
cumulative impact related to the sphere expansion and annexation, along with the
impact to the regional wastewater treatment facility were analyzed as part of the
Initial Study/Mitigated Negative Declaration. With mitigation measures, the
residential densities of the project will not significantly impact the service providers
with regard to community water and sewer. The resulting tentative subdivision map
would therefore comply with this policy.
Policy 3.2.c Relate residential densities to intensity and compatibility of adjacent
uses.
Current surrounding uses include light industrial, rural residential, a little
agriculture and undeveloped parcels. The proposed Butte County General Plan
2030 land use designations for the surrounding parcel include Mixed Use, Industrial
and Resource Conservation. The project would be consistent with the Mixed Use
designation. The project's commercial component will provide commercial services
to existing and future residential uses. The resulting general plan amendment,
rezone and tentative subdivision map would therefore comply with this policy and
will reduce these potential effects to a less than signif cant level.
Policy 3.2.d Balance residential densities with traffic-carrying capacities of existing
and proposed circulation plans.
The proposed project has analyzed traffic an adjacent and nearby roads and
intersections. A mitigation measure and project conditions are included that will
reduce project related impacts on adjacent and nearby roads and intersections. The
project will not create significant impacts to the surrounding circulation system. The
resulting general plan amendment, rezone and tentative subdivision map would
therefore comply with this policy.
3.3 Commercial Uses -Small business in the home can provide self-employment and
a degree of financial independence for the residents. Similarly, offices and
commercial uses in residential areas can sometime provide convenient services to
area residents. Home business and same offices and services can be compatible with
residential uses if sufficient limitations and conditions are placed upon the business
activities, Several of the County's existing categories currently allow certain limited
types of commercial use.
Policy 3.3.b Regulate visibility, employment, advertising, parking, etc. of
businesses allowed in residential areas in order to maintain a predominantly
residential character.
The project includes a commercial component, approximately 120, 000 square feet on
14.1 S acres. The commercial area is located in the northwest corner and the northern
edge of the project site. The future commercial uses will need to be consistent with
the proposed GP2030 Mixed Use land use designation. This Mixed Use designation
includes commercial and residential as primary uses. The resulting commercial
development would therefore comply with this policy.
C. GOAL 4 -Economic Development
4.1 Economic Growth -Economic growth and vitality is based on a strong, stable
and diversified economy that provides a wide range of meaningful employment and
investment opportunities. lndividuaIs who enter the business sector gain
independence for themselves, create jobs for others and help increase the tax base.
Policy 4.1.a Provide sites and facilities to accommodate a variety of economic
activities.
The project proposes to provide a mix of different commercial and professional
services. The future uses will be determined by the Mixed Use land use designation
and the zoning. The resulting commercial development would therefore comply with
this policy.
4.2 Property Rights -Enhancing the value of private property increases both the
potential sale prices and the assessed value, bringing benefits to both the private and
public sectors. The American concept of property rights requires the County to allow
wherever possible a profitable economic use far each parcel and to maintain
surrounding property values.
Policy 4.2.a Maintain economic use and value of private property.
The proposed general plan amendment and rezone will allow for a mixed use
development that will provide commercial service to the future residents and
customers for the future commercial services. The project site is also located at the
intersection of two major roadways, ~phir Road (east-west) and Lincoln Boulevard
(north-southJ. The project site is ideally suited for mixed use development. The
resulting projects would therefore comply with this policy.
4.3 Commercial Services -The purpose and function of commercial facilities relates
directly to the market demand for each service. The public derives the mast value for
its investments when individuals are encouraged to enter the market place who are
willing to compete in offering goods and services in relation to "supply and demand."
Policy 4.3.a Encourage a full range of commercial services at the regional,
community and neighborhood levels.
The project proposes to provide a mix of different commercial and professional
services. The future uses will be determined by the Mixed Use land use designation
and the zoning. The resulting commercial development would therefore comply with
this policy.
Policy 4.3.b Coordinate future commercial facilities with existing and proposed
transportation systems, utilities and other public facilities.
The project site is located at the intersection of two major roadways, Ophir Road
(east-west} and Lincoln Boulevard (north-south}. The project site is ideally suited for
mixed use development. The resulting commercial portion of the project would
therefore comply with this policy.
Policy 4.3.d Designate retail and service commercial areas in close proximity to
residential development.
The proposed project is located in an area that will serve existing residents in the
south and southeast Oroville areas, the north Palermo area and people travelling
east on Ophir Road to Lake Oroville. The commercial services will also serve future
residents on the project site and in the south Oroville area. The resulting project
would therefore comply with this policy.
D. GOAL 5 -Public Facilities
5.2 Water and Sewer,,,, SW,ystem -Approximately 85% of the County's residents
currently receive domestic water andlor sewer service from community systems.
County Health Department guidelines allow much higher densities on property
served by such systems than on parcels with individual wells and septic tanks.
Consequently, the location of water and sewer lines largely determines the size and
shape of urban development in the County. Because the extension of such lines so
significantly affects government costs and land use patterns, all annexations to public
systems must be reviewed and approved by the County-Ievel Local Agency
Formation Commission.
Policy 5.2.a Encourage expansion of public water and sewer systems where
development to be served conforms to adapted land use plans.
The project site is currently in the service district, South FeatTter Water and Power
Agency (SFWPA), for community water. The project is conditioned to extend the
main water ser-vice line. The project is proposing to expand the Sphere of Lake
Oroville Area Public Utility District (LOAPUD} and annex into the District to
provide community sewer to the project. The sphere expansion and annexation into
LDAPUD was fully analyzed in the Initial Study/Mitigated Negative Declaration.
The applicant/developer will be required to go through LAFCo (Local Agency
Formation Commission) to complete the sphere amendment and annexation. The
resulting General Plan Amendment, Rezone and Phased Tentative Subdivision Map
would therefore comply with this policy.
V. The Board finds General Plan Amendment and Rezone to be substantially consistent with
the LDR {Low Density Residential), HDR (High Density Residential) and C
(Commercial} Site Design Criteria as follows:
Low Densi Residential
1. Needed for urban residential within 20 years.
The County GP2030 has identified this area, known as Las Plumas, as a growth
area, The area is served by infrastructure, including, but not limited to community
water (South Feather Water and Power Agency}, community sewer (Lake Oroville
Area Public Utility District}, schools and county-maintained paved roads. The
proposed project is consistent with overall growth projects for the area and the
County over the next 20 years. Proposed residential land use designations in the
project area include medium density (4 to 6 du/ac), medium-high density (7 to 14
du/ac) and mixed use.
2. Adequate water supply.
The project site is located in the South Feather Water and Power Agency District
(SFWPA). SFWPA has determined that they have adequate water supply to serve the
proposed development of the project. They are requiring an extension their main
water line.
3. Sewers available or natural conditions well suited to septic tanks.
Lake Oroville Public Utility District has determined the sphere expansion and
annexation into their service district is acceptable. The project will be required to
provide a mainline extension, a regional pump station and force main facilities with
capacity to serve the much larger basin, which includes this project. The pump
station and pipelines must be constructed to District standards. The District will
consider a phased design that allows expandability to meet the future growth needs
of the basin.
~. Adjacent or near existing utilities, roads and single-family residential development.
The project site is located in the Oroville Urban Area and City of Oroville's Sphere
of Influence. Power and water are adjacent to project site, while sewer will need to
be extended to the project site. An expansion of the sewer provider sphere and
annexation into the district is required.
The project site is located at the intersection of two major roadways, Ophir Road
(east-west) and Lincoln Boulevard (north-south). The project site is ideally suited for
mixed use development.
5. Good accessibility to commercial services, schools, fire protection and other
community facilities.
The project site is located approximately 2.7 miles south of full commercial services
in the City of Oroville. There are several neighborhood commercial services located
north, east and south of the project site. With build-out of the project, the will be
approximately 120, 000 square feet of commercial services proposed on site. Schools
are located between 1.3 and 2.3 miles from the project site. The closest Cal-
Fire/Butte County Fire station is located approximately 2.3 miles south in Palermo.
Access would be via Palermo Road and Lincoln Boulevard, both county-maintained
paved roads.
Hioh Density Residential
l . Needed for higher-density residential development within 2Q years.
The County GP2030 has identified this area, known as Las Plumas, as a growth
area. The area is served by infrastructure, including, but not limited to community
water (South Feather Water and Power Agency), community sewer {Lake Oroville
Area Public Utility District), schools and county-maintained paved roads. The
proposed project is consistent with overall growth projects for the area and the
County over the next 20 years. Proposed residential land use designations in the
project area include medium density (4 to 6 du/ac), medium-high density (7 to 14
du/ac) and mixed use.
2. Within service areas of community water systems.
The project site is located in the South Feather Water and Power Agency District
(SFWPA). SFWPA has determined that they have adequate water supply to serve the
proposed development of the project. They are requiring an extension their main
water line.
3. Sewers available or natural conditions well suited to septic tanks.
Lake Oroville Public Utility District has determined the sphere expansion and
annexation into their service district is acceptable. The project will be required to
provide a mainline extension, a regional pump station and force main facilities with
capacity to serve the much larger basin, which includes this project. The pump
station and pipelines must be constructed to District standards. The District will
consider a phased design that allows expandability to meet the future growth needs
of the basin.
~1. Adjacent or near exisf~ng utilities and urban development.
The project site is located in the Oroville Urban Area and City of Oroville's Sphere
of Influence. Power and water are adjacent to project site, while sewer will need to
be extended to the project site. An expansion of the sewer provider sphere and
annexation into the district is required.
The project site is located at the intersection of two major roadways, Ophir Road
(east-west) and Lincoln Boulevard (north-south). The project site is ideally suited for
mixed use development.
5. Excellent accessibility to commercial services, schools, fire protection and other
community facilities.
The project site is located approximately 2.7 miles south of full commercial services
in the Ciry of Oroville. There are several neighborhood commercial services located
north, east and south of the project site. With build-out of the project, the will be
approximately 120, 000 square feet of commercial services proposed on site. Schools
are located between 1.3 and 2.3 miles from the project site. The closest Cal-
Fire/Butte County Fire station is located approximately 2.3 miles south in Palermo.
Access would be via Palermo Road and Lincoln Boulevard, bath county-maintained
paved roads.
Commercial
1. Needed for commercial development within 20 years.
The project site is located in an area that has been designated as a growth area by
the draft Butte County GP2030. Anticipated growth for the area is approximately
4,000 residential dwellings over the next 20+ years. With this growth, additional
commercial services will be necessary to support the additional residential growth.
The proposed commercial portion of the project will assist in the needed commercial
services.
2. Goad road accessibility to service area or traveling public.
The project site is located at the intersection of two major roadways, Ophir Road
(east-west) and Lincoln Boulevard (north-south). The commercial portion of the
project site will provide services to existing residents, future residents and people
traveling south from Oroville and east to Lake Oroville. The project site is ideally
suited for mixed use development.
3. Adjacent or near utilities, walkways and commercial development.
The project site is located in the Oroville Urban Area and City of Oroville's Sphere
of Influence. Power and water are adjacent to project site, while sewer will need to
be extended to the project site. An expansion of the sewer provider sphere and
annexation into the district is required.
There are no sidewalks or pedestrian trails in the project vicinity. The project does
include improvements of sidewalks in the interior portion and along Ophir Road and
Lincoln Boulevard parcel frontage. They also propose a series of open space
recreation trails in the open space area of the project site.
The project site is located approximately 2.7 miles south of full cornrnercial services
in the City of Droville. There are several neighborhood cornrnercial services located
north, east and south of the project site. With build-out of the project, the will be
approximately 110, 000 square feet of commercial services proposed on site.
4. Less than 20% slopes.
The elevation on-site ranges from 215-230 feet above sea level with topography
mostly level, with areas ofgentle slopes (0 to 4%}.
5. Adequate ire and police protection.
The closest Cal-Fire/Butte County Fire station is located approximately 2.3 miles
south in Palermo. Access to the site is on county-maintained paved roads which
allows for reasonable response time for emergencies.
Law enforcement in the Las Plumas area is provided by the Butte County Sherds
Ojjzce (BCSD}. The project development will add 190 units, or approximately S16
persons (1.77persons per housing unit), and would require less than one (O.S26} BCSO
officer and one (1.052} OPD officer to maintain the targeted service ratios. Law
enforcement services are funded through property taxes. Because this funding will
increase at a rate commensurate with development, significant impacts to the level of
law enforcement services due to increases in population are not anticipated.
6. Adequate water supply and sewage disposal capabilities.
The project site is located in the South Feather Water and Power Agency District
(SFWPA). SFWPA has determined that they have adequate water supply to serve the
proposed development of the project. They are requiring an extension their main
water line.
Lake Droville Public Utility District has determined the sphere expansion and
annexation into their service district is acceptable. The project will be required to
provide a mainline extension, a regional pump station and force main facilities with
capacity to serve the much larger basin, which includes this project. The pump
station and pipelines must be constructed to District standards. The District will
consider a phased design that allows expandability to meet the future growth needs
of the basin.
VT. The Board finds the General Plan Amendment and Rezone to be substantially consistent
with the LDR (Low Density Residential), HDR (High Density Residential) and C
(Commercial} Zoning liactors as follows:
Low and High Density Residential
1. Existing parcel sizes and residential densities.
The project site is located in the Droville Urban Area and City of Oroville's Sphere
of .Influence. Current surrounding land use is dominated by vacant lands to the
north, scattered low-density residential east and south, and isolated commercial/light
industrial businesses adjacent to vacant lands and residences to the west.
Surrounding parcel sizes range from 0.1& to 61.z acres. Surrounding residential
parcel sizes range from 0.59 acres to IO.S acres with density range from 0.1 to 1.G7
dwelling units per acre.
According to the draft Las Plumas Master Environmental Assessment (MEA),
approximately 2,200,000 square feet of lands zoned industrial currently exist within the
Las Plwnas area. Only 87,120 square feet (or less than 4%} are anticipated for
buildout by 2030 (Butte County 2009}. Preferred Land Use Alternatives for the 2030
Butte County General Plan indicate a shift toward predominantly Mixed Use
designations for the parcels surrounding the project, Conservation designation for
parcels east of the project area, and designations yet to be developed (currently
indicated Industrial) for lands south of the project area.
2. (Low Density Residential) -Availability of sewers or sui#ability for septic tanks.
The project is proposing to expand the Sphere of Lake Oroville Area Public Utility
District (LOAPUD) and annex into the District to provide community sewer to the
project. The sphere expansion and annexation into LOAPUD was fully analyzed in
the Initial Study/Mitigated Negative Declaration. The applicant/developer will be
required to go through LAFCo (Local Agency Formation Commission) to complete
the sphere amendment and annexation.
To reduce potentially significant impacts to wastewater treatment capacity and
service, the applicant shall enter into a Pre-Annexation Agreement and
Capacity/Mitigation Agreement or the functional equivalent of these agreements with
Sewerage Commission - Oroville Region (SC-OR) and LOAPUD. A Capacity Study
was prepared by CH2MHill for SGOR in 2009 to determine project-related impacts
to existing SC-OR facilities, including sewer interceptors and wastewater treatment
plants, pursuant to currently adopted SC-OR policies. The Capacity Study concluded
that the current Regional Facility Charge (RFC} for developed parcels, collected at
the time of issuance of building permits, is suffrcient to mitigate for project impacts
on SC-OR facilities without construction of new facilities. However, both specif c
project-related load volumes and phased development timing were estimated for this
study. Actual volumes must be determined at the time of connection pursuant to
adopted SC-OR policy.
(High Density Residential) -Method and capability of sewage disposal.
The project is proposing to expand the Sphere of Lake Oroville Area Public Utility
District (LOAPUD) and annex into the District to provide community sewer to the
project. The sphere expansion and annexation into LOAPUD was fully analyzed in
the Initial Study/Mitigated Negative Declaration. The applicant/developer will be
required to go through LAFCo (Local Agency Formation Commission) to complete
the sphere amendment and annexation.
To reduce potentially significant impacts to wastewater treatment capacity and
service, the applicant shall enter into a Pre-Annexation Agreement and
Capacity/Mitigation Agreement or the functional equivalent of these agreements with
Sewerage Commission - Oraville Region (SC-OR) and LOAPUD. A Capacity Study
was prepared by CH2MHil1 for SC-OR in 2009 to determine project-related impacts
to existing SGOR facilities, including sewer interceptors and wastewater treatment
plants, pursuant to currently adopted SC-OR policies. The Capacity Study concluded
that the current Regional Facility Charge (RFC) for developed parcels, collected at
the time of issuance of building permits, is sufficient to mitigate for project impacts
an SGOR facilities without construction of new facilities. However, both specific
project-related load volumes and phased development tuning were estimated for this
study. Actual volumes must be determined at the time of connection pursuant to
adopted SC-OR policy. .
3. Effects on adjacent uses, water quality, air quality, noise, traffic flow az~d safety, and
general environmental quality.
Current surrounding land use is dominated by vacant lands to the north, scattered
low-density residential east and south, and isolated commercial/light industrial
businesses adjacent to vacant lands and residences to the west. The project will have
minimal effect on adjacent uses.
The project will be served by public sewer and public water. The project includes
conditions that will address drainage (grading} and storrnwater runoff. It will not
violate any water quality or waste discharge standards, or otherwise substantially
degrade groundwater or surface water.
Several attributes of the project minimize contributions to criteria pollutants to air
quality and reduce the project's potential to create a significant impact. Project
design incorporates "living streets" standards, including sidewalks, nature and
bicycle paths, and pedestrian friendly streets. This design encourages residents
within the development to walk or use a bicycle rather than drive a vehicle.
Additionally, the block of neighborhood commercial lots in the northwest corner will
encourage development of essential services, including grocery stores and
restaurants. This will reduce trip generation from within the development and from
residences south of Ophir Road by providing an alternate location to Ora Dam
Boulevard for essential services. This establishment of an alternate neighborhood
commercial center will relieve congestion within downtown Droville, resulting in a
decreased contribution of vehicular pollutants for vehicles originating within the
project area, as well as in surrounding areas. The project will not conflict with
applicable air quality plans, nor will it expose sensitive receptors to substantial
pollutant concentrations or create objectionable odors.
Project construction is likely to increase short-term noise levels in the project area from
on-site activities and construction traffic. A mitigation is included that will restrict
construction tune between the hours of 7.'(JO a.m. and 7.'OOp.rn. Construction equipment
typically generates on the order of 80 to 45 dB at a distance of 50 feet. As a result,
receptors in the vicinity may experience sign~cantly increased noise levels during
project construction. However, current regulations for air quality that limit the idling of
trucks may also decrease local ambient noise levels during construction.
The project site is located at the intersection of two major roadways, Ophir Road
(east-west} and Lincoln Boulevard (north-south}. The proposed project has analyzed
traffic on adjacent and nearby roads and intersections. A mitigation measure and
project conditions are included that will reduce project related impacts on adjacent
and nearby roads and intersections. The project will be design to reduce safety
issues by providing turn pockets and deceleration and acceleration lanes. The
project will not create sign scant traffic or safety unpacts to the surrounding
circulation system.
Tlae project site is designed to reduce environmental impacts. The majority of the
development will occur in the grassland portion of the site, in order to protect as
many oak trees as possible. A mitigation measure is included that addresses the oak
trees to be removed. Approximately I1.4 acres is called as open space, which will
protect a large percentage of the existing oak trees and identified wetlands. As stated
above, the project is designed to encourage a walkable neighborhood by providing
commercial services on site. 1't will also provide additional local commercial to
existing and future residences in the surrounding area.
4. 1'raximity to major streets, commercial services and all public facilities.
The project site is located at the intersection of two major roadways, Ophir Road
(east-west) and Lincoln Boulevard (north-south). The project site is located
approximately 2.7 miles south of full commercial services in the City of Oroville.
There are several neighborhood commercial services located north, east and south of
the project site. Schools are located between 1.3 and 2.3 miles from the project site.
The closest Cal-Fire/Butte County Fire station is located approximately 2.3 miles
south in Palermo. Access would be via Palermo Road and Lincoln Boulevard, both
county-maintained paved roads.
5. Distance from airports, railroads and industrial uses.
The only airport in the area, Oroville Municipal Airport, is approximately 4.3 miles
northwest of the project and does not contribute appreciably to the ambient noise within
the site. There are no private airstrips in the project vicinity.
The nearest railroad (Union Pacific) is located approximately 1,250 feet west of the
project site. According to the Butte County General Plan 2030 Setting and Trends
Report (August 2007), the noise decibel, without warning hor~as, is 60 dB at 858 feet.
With the project site being another 400 feet away, the decibel Level at the project site
would be under the acceptable level for single family residential (60 to 70 dB), multi-
family residential (65 to 70 dB) and commercial (70 dB).
The project site is adjacent to existing industrial to the south. Butte County General
Plan 2030 proposes an industrial land use designation along the south boundary of the
project site. Design and setback requirements will reduce or eliminate impacts between
residential and industrial uses.
6. Existing utilities, walkways and drainage facilities.
The project site is located in the Oroville Urban Area and City of Oroville's Sphere
of Influence. Power and water are adjacent to project site, while sewer will need to
be extended to the project site. An expansion of the sewer provider sphere and
annexation into the district is required.
There are no sidewalks or pedestrian trails in the project vicinity. The project does
include improvements of sidewalks in the interior portion and along Ophir Road and
Lincoln Boulevard parcel frontage. They also propose a series of open space
recreation trails in the open space area of the project site.
According to the Department of Public Works, there are no storm drainage facilities
in the area. The project will create new impervious surfaces (roads, driveways, and
raafs) that will increase the rate of surface runoff during storm events. Roads and
driveways create new sources for polluted runoff water. However, several aspects of
project design serve to minimize this impact. Several detention basins have been
included in the design which will capture peak stormwater discharge and limit erasion.
These detention basins are planned both far the eastern and western portions of the
project area, directing excess flow toward multiple existing outflow points. Significant
open space (approximately 15 acres, centrally situated) in the eastern portion of the site
serves as a natural detention basin for excessive stormwater volumes and is an existing
drainage path toward Wyman Ravine.
7. Local desires.
Many of the surrounding landowners have been part of the Las Plumas Study Area,
which has looked at growth and specific uses in the project area over the next 20 to
25 years. Based an this interest, the proposed project is consistent with the local
desires of the area and with General Plan 2030 Land use designations. Apart from
the landowners mentioned above, the County does not have information about the
local desires of surrounding property owners regarding this proposal. The public
noticing and public hearing process associated with reviewing and approving a
General Plan Amendment, Rezone and Tentative Subdivision Map projects helps to
gauge local desires through public input and comment.
Cozxzmercial
1. Existing types of commercial and non-commercial uses in area.
Current surrounding land use is dominated by vacant lands to the north, scattered
law-density residential east and south, and isolated cornmercialllight industrial
businesses adjacent to vacant lands and residences to the west. The closest regional
cornrnercial is located approximately 2.7 miles in the City of Oroville. There are
several neighborhood commercial services located north, east and south of the
project site.
As the area grows, additional commercial services will be needed to serve the
growing population. The project will be a component of the necessary commercial
development needed over the next 20~ years.
2. Traffic volumes on nearby streets.
The proposed project has analyzed traffic on adjacent and nearby roads and
intersections. A mitigation measure and project conditions are included that will
reduce project related impacts on adjacent and nearby roads and intersections. The
project will not create significant impacts to the surrounding circulation system.
Number of residents in service area.
The project site is located in an area that has been designated as a growth area by
the draft Butte County GP2030. Anticipated growth for the area is approximately
4,000 residential dwellings over the next 20+ years. With this growth, additional
cornrnercial services will be necessary to support the additional residential growth.
The proposed commercial portion of the project will assist in the needed commercial
services.
4. Parcel sizes.
Current surrounding land use is dominated by vacant lands to the north, scattered
low-density residential east and south, and isolated commercial/light industrial
businesses adjacent to vacant lands and residences to the west. Surrounding
commercial uses parcel sizes include parcel sizes of 1.26 acres and 4.97 acres. The
project proposed 14.15 acres of commercial area, which will include approximately
120, 000 square feet of commercial floor area. The project commercial parcel sizes
will range from 0.75 acres to 4.99 acres.
S. Effects on adjacent uses, water quality, air quality, noise, traffic flaw and safety, and
general environmental quality.
Current surrounding land use is dominated by vacant lands to the north, scattered
low-density residential east and south, and isolated commercial/light industrial
businesses adjacent to vacant lands and residences to the west. The project will have
minimal effect on adjacent uses.
The project will be served by public sewer and public water. The project includes
conditions that will address drainage (grading and storrnwater runoff: It will not
violate any water quality or waste discharge standards, or otherwise substantially
degrade groundwater or surface water.
Several attributes of the project minimize contributions to criteria pollutants to air
quality and reduce the project's potential to create a significant impact. Project
design incorporates "living streets " standards, including sidewalks, nature and
bicycle paths, and pedestrian friendly streets. This design encourages residents
within the development to walk or use a bicycle rather than drive a vehicle.
Additionally, the block of neighborhood commercial lots in the northwest corner will
encourage development of essential services, including grocery stores and
restaurants. This will reduce trip generation from within the development and from
residences south of Ophir Road by providing an alternate location to Oro Darn
Boulevard for essential services. This establishment of an alternate neighborhood
commercial center will relieve congestion within downtown Oroville, resulting in a
decreased contribution of vehicular pollutants for vehicles originating within the
project area, as well as in surrounding areas. The project will not conflict with
applicable air quality plans, nor will it expose sensitive receptors to substantial
pollutant concentrations or create objectionable odors.
Project construction is likely to increase short-term noise levels in the project area from
on-site activities and construction trajfic. A mitigation is included that will restrict
construction time between the hours of 7:00 a. m. and 7: DO p.m. Construction equipment
typically generates an the order of 80 to 95 dB at a distance of 50 feet. As a result,
receptors in the vicinity may experience significantly increased noise levels during
project construction. However; current regulations for air quality that limit the idling of
trucks may also decrease local ambient noise levels during construction.
The project site is located at the intersection of ~o major roadways, Ophir Road
(east-west) and Lincoln Boulevard (north-south). The proposed project has analyzed
traj~c on adjacent and nearby roads and intersections. A mitigation measure and
project conditions are included that will reduce project related impacts on adjacent
and nearby roads and intersections. The project will be design to reduce safety
issues by providing turn packets and deceleration and acceleration lanes. The
project will not create significant traffze or safety impacts to the surrounding
circulation system.
The project site is designed to reduce environmental impacts. The majority of the
development will occur in the grassland portion of the site, in order to protect as
many oak trees as possible. A mitigation measure is included that addresses the oak
trees to be removed. Approximately 1.1.4 acres is called as open space, which will
protect a large percentage of the existing oak trees and identif ed wetlands. As stated
above, the project is designed to encourage a walkable neighborhood by providing
commercial services on site, It will also provide additional local commercial to
existing and future residences in the surrounding area.
6. Local desires.
Many of the surrounding landowners have been part of the Las Plumas Study
Area, which has looked at growth and specific uses in the project area over the
next 24 to 25 years. Based on this interest, the proposed project is consistent
with the local desires of the area and with General Plan 2030 land use
designations. Apart from the landowners mentioned above, the County does
not have information about the local desires of surrounding property owners
regarding this proposal. The public noticing and public hearing process
associated with reviewing and approving a General Plan Arriendment, Rezone
and Tentative Subdivision Map projects helps to gauge local desires through
public input and comment.
VYT. Approval of General Plan Amendment and Rezone will not impair the integrity
and character of the zone in which the land lies, and the resulting uses would not
be unreasonably incompatible with, or injurious to surrounding properties, or
detrimental to the health and general welfare of the persons residing or working in
the neighborhood, ar to the general health, welfare and safety of the residents of
the County.
DULY PASSED AND ADOPTED this 11th Day of May 2010, by the following vote:
AYES:Supervisor~ Dolan Kirk Lambert Yzmaguchi and Chair Conneil~
NOES: No~:e
ABSENT: None
ABSTAIN: None
Bill Connelly, Chair
Board of Supervisor
County of Butte, State of California
ATTE
S ~ dy, Inte 'm Chief Admini trative Officer and
er of the Boar
Co ty of Butte, State of Califo a