Loading...
HomeMy WebLinkAbout14-040RESOLUTION AMENDING THE MASTER FEE SCHEDULE FOR SERVICES PROVIDEJ11 BY THE COUNTY EA, the Board of Supervisors established the Butte County Master Fee Schedule by Resolution on March 24, 2009; and WHEREAS the County of Butte is authorized to adopt and implement fees for services, provided however, that such fees r♦ not exceed the estimated reasonableproviding WHEREAS, maintenance of a Master Fee Schedule serves the convenience of the County and all persons affected by said charges; and WHEREAS, a public hearing was noticed and duly conducted to allow consideration of the proposed fee adjustments prior to adoption of this Resolution; and regarding development of • permit recycled water Ii d WHEREAS, Department of Publicprovided an ordinanced Recycled Water (Wastewater) Pond Ordinance for consideration by the Board regarding said recycled water ponds which, if 7clopted, would add Chapter 19B to the Butte County Code; and WHEREAS, r d ordinance d ., implementation of a permitting process related to recycled water ponds, • 1 operating and * lA' .�R i r • • � � �'' Ji^' 111 NOW, THEREFORE, BE IT RESOLVED that the Board of Supervisors of the County of Butte adopts the ..s as delineated in the attached Exhibit1. and amends Butte• Master .. Scheduleo reflect the change. Fee adjustments shall become effective upon the effective implementation date of the new Chapter 9 w of the Butte CountyCode. MIMI AYES: Supervisors Connelly, Wahl, Kirk, Lambert and Chair Teeter NOES: None "i -*is W -i L I a 0 • NOT VOTING: None By: Paul ah'e/f A�d�min`istrative Officer and of Cler the Board of Supervisors -*OUG TEETER, Chair !Aj1tP-0#jj-ib/ - BUTTE COUNTY PUBLIC HEALTH 11���tn. Coo Cnhnel..in EXHIBIT A Activity LIQUID WASTE MANAGEMENT FEES Current Fee Proposed Fee Notes A. Sewage Disposal Fees 1. Site Evaluation for new Construction $525.00 $525.00 2. Construction Permit: a. Single -Family Residence - New System 1. Gravity $265.00 $265.00 2. Pressure distribution (only) $367.00 $367.00 3. Supplemental Treatment System $367.00 $367.00 b. Multifamily or Commercial - New System 1. Gravity $265.00 $265.00 A. First 1,000 gpd Design Flow $576.00 $576.00 B. Each additional 1,000 gpd Design $421.00 $421.00 2. Pressure distribution (only) $367.00 $367.00 A. First 1,000 gpd Design Flow $681.00 $681.00 B. Each additional 1,000 gpd Design $421.00 $421.00 3. Supplemental Treatment System $367.00 $367.00 A. First 1,000 gpd Design Flow $681.00 $681.00 B. Each additional 1,000 gpd Design $421.00 $421.00 3. Operating Permit (Pressure Distribution or $53.00 $53.00 Supplemental Treatment Systems only) 4. Wastewater Professional Certification a. Examination (one time only requirement) $210.00 $210.00 b. Certification (bi-annual renewal) $52.00 $52.00 5. Septic Pump Truck Inspection $52.00 $52.00 6. Wastewater System Repairs $414.00 $414.00 7. Septic Tank Destruction $117.30 $117.30 8. Community Wastewater Systems Design Review $131.00 $131.00 Per hour, with $2,104.00 deposit. 9. Destroy Drainage Well $263.00 $263.00 10. Review Drainage Trench $210.00 $210.00 11. Wastewater System Expansion (On-site Assessment $473.00 $473.00 Required) 12. Construction Permit Renewal $105.00 $105.00 13. Recycled Water Ponds a. Construction Permit (review and issuance) $131.00 Per hour. b. Operating Permit Renewal $300.00