Loading...
HomeMy WebLinkAbout15-038 f �'hldi V"i 1 " I, r I ��IJ � aIJ, ��rPU'PalAnA�M �11�� ` MAIN, Resolution No, 1.5-038 RESOLUTION ADOPTING UPDATES TO ON-SITE WASTEWATER MANUAL WHEREAS, the science and technology of wastewater treatment, dispersal, and management is rapidly changing and advancing; and WHEREAS, practices, procedures, and interpretations of wastewater requirements adopted by the Board need to be continually evaluated so that the public needs are met in the most user-friendly and cost-effective means possible, and WHEREAS, Butte County Code Chapter 19 recognized this need for continual quality improvement by establishing an On-.Site Wastewater Manual setting forth parameters for the application and use of wastewater technology; and WHEREAS, Butte County Code Chapter 19 established the Wastewater Advisory Committee to assist in the development and future revision of the On-Site Wastewater Manual in order to provide continual quality improvement; and WHEREAS, the Wastewater Advisory Committee has recommended certain updates to the On-Site Wastewater Manual for more effective operation of the regulatory prograrn and updated systema requirements based on review of technical data. NOW, THE EFO E, BE IT RESOLVED that the Board of Supervisors of the County of Butte hereby adapts the changes to the On-,Site Wastewater Manual as set forth in Exhibit A. PASSED AND ADOPTED this 24th day of March, 2015, by the following votes: AYES: Supervisors Connelly, Wahl, Kirk, Lambert and Chair Teeter' NOES, None NOT VOTING: None ABSENT; None , t DOUG^TEETER, Chair Butte County Board of Supervisors ATTEST- PAUL "E'ST-PAUL I AHN, hief"Administrative Officer Boar Supervisors and CI..M�k o..�.�h. ..B..,o.ma ��.e.r By: , ... Deputy On-Site Wastewater Manual—Part 1 — Process Adopted March 165, 2010 Fart One** Page 1. Part One-, Process Chapter1. Site Evaluation .............................................................................................. A. Site Preparation and Application ................. ..................................... ..................2 S. Soil Test Hole Excavation............................................... ......... .................. ........2 C. Site lnspection and Evaluation .................... ..................................... ..................4 D. Expiration ....................... ................. ...................................... ........ .................. Groundwater Monitoring .............................. .................. .....................................6 P. Percolation Testing............................................................................................... 10 O. Slopes 15%-30%................ ............. ............ .................. ....... 1 Fl. Suspected Slope Instability ............................................ .................. ................ 12 Chapter 2, Construction Permit......... ......... ..........___....... .......... ......_ 12 A. Application................................................... ...................................................... 12 B. System Design _....... ........ ........... .......... ................. ....................... 12 C. Design Stakeout............... ........... ......... ....... ................. ........ ..._. 14 D. Notification, lnspection, and Final Approval........................................................ 14 P. System Repairs, Replacement„ Modifications, and Expansions......................... 15 Chapter3. Operating Permit............. .......... ..................................... ................ 16 A. Issuance...... ..................................... ................................................................ 16 S. Vapid Operating Permits I egiuired ...................................................................... 1 C. Required Information ......................................................................... ................ 16 D. Cleveland Mills Alquest®Priolo Earthquake Fault Zone .......................... 16 . Richter Magnitude of 5.6 and Above ................................................................... 16 Chapter 4. Testing Septic Tanks to Assure "watertight Construction............................. 16 , Septic Tanks in Use at Time of Testing................................... ......... ................ 16 B. New Construction or Tank Replacement............................................ ................ 17 Chapter 5. Implementation of Certification Requirements......... ................................... 17 A. Installers............................................................................................................. 17 ggmg a On-Site Wastewater Manual d Part 1 ®Process Adopted March 16, 2010 Park one** Page NAaltlC tl1E,fl.E;84s Part s Chapter 1. Site Evaluation Site evaluations are required for approval of all parcel and subdivision maps and for construction of on-site wastewater systems. Site evaluations are not required for on-site wastewater system modification or replacement, although elements contained in this section, such as soil analysis, may be incorporated into the pro- cess for permitting the construction of said modifications or replacements. A. Site Preparation and Application 1. With the exception of 'Fater Well Reports and complaint infor- mation, LEA parcel files are accessible to the public and customers are encouraged to review their property file before applying for a Site Evaluation. . Site Evaluation applications will only be accepted when determined by the LEA to be complete, including the following information: a. All portions of the application form are completed and legible b. dear, written directions to the site accompanied by a vicinity sketch C, Dimensional site plan that includes location of soil test holes in relationship to property boundaries, and landmarks as necessary d. For other than single family residential systems, information indicating the estimated amount of soil disturbance (in acres) and grading (in cubic yards). e. Signature of the applicant f. Fees as specified in county code I Site Evaluation applications are not considered complete untiil the test holes have been excavated and are ready for inspection and the site is flagged at the road and at the test 'hole location. Flag- ging tape is provided by the LEA at the time of application. B. Soil Fest Node Excavation 1. dumber and Location of best Holes Unless otherwise approved by the LEA, a minimum of 4 test holes will be required for each parcel, with two holes excavated in the primary and two holes excavated in the replacement drainfield are- as. At the discretion of the LEA, additional test holes may be needed to adequately characterize site conditions or fewer test holes may be allowed based on considerations such as space limi- tations on smaller parcels or uniformity of area soil characteristics. f ,f J, On-Site Wastewater Manual—Part 1 — Process l!/ Adapted larch 16, 2010 Part one** Page 3 For legally created parcels five acres or greater in size, the LEA shalll accept soil data recorded at the time of parcel creation in lieu of excavating and evaluating new test holes at the time of site eval- uation. 2. Dimensions of Test Holes a. The holes are generally excavated by a backhoe, but hand dug holes are acceptable when dug to proper dimensions and with adequate spoils pile setback. Test holes only need to be dug into the restrictive layer. When a restrictive layer is not identified during test hole excavation„ test holes must be dug a minimium of 5 feet deep. The reason for this depth is to verify that the site cans accommodate, a 2 foot deep drainfield with an additional 3 foot; of vertical separation. b. Excavator requests for test holes shallower than 5 feet (without encountering a restrictive layer) due to site specific concerns such as soil sloughing characteristics and access to the site by children or animal's, will be considered on a case-by-case basis. The Lbw vwiilll work to identify ways to meet the excavator's concerns other than digging shallow test holes, such as arranging to meet the excavator on site so the holes can be immediately covered. C. ,All holes should be excavated to Cal-OSHA standards, but at a minimum the test holes meed to be dug a minimum of feet deep or into the restrictive layer, whichever is shallower. The holes must be 2 feet wider and long enough for an en- trance ramp. The ramp must be no steeper than 1 foot vert - cal to 1.5 foot horizontal. If the hole is deeper than 4 feet, a platform must be constructed at the 4 foot depth to allow the inspector to complete the test hole inspection while standing no deeper than 4 foot deep. The toe of the spoils pile must be 2 foot from the test hole. uuuwmmmmuxr,vwtil4uuiaiuuuuuuumsawwwua�afouu6�mu WON 7 _.. �"Ja __ _..... d°a° , ,.... �II' MNVWVWiW@VIIlWWY'N'bl!fi ,NVV'�1miM'VN4'ltli'1`01rpV'NtlItlINh10flWNu1fl�W',! 11:1,5 Slope 4 h u e;p �w Fnl 4eio. Ni „ Q,b m..�m wnvagry umrerem wm,wmn.......... d, In .some cases hand dug test holes may be preferred by the applicant or designer. land dug test holes might be prefer- able for sites that have a shallow restrictive layers or sites On-Site Wastewater Manual—Part'I —Process Adapted Parch 16, 2010 Part one** Mage 4 4ydl4tilC M'A:ATXN where construction equipment could damage the usable soil. Nevertheless, in all cases, hand dug test holes must be dug to the specifications listed above. C. Site Inspection and Evaluation 1. Phase One review a. LEA staff will inspect the site, log the soil test hales, and make an initial determination of whether site conditions are suitable for a standard, gravity system, based on the follow- ing factors: (1) 4 ft of native effective soil (2) Slope less than 30% (3) Soils in Soil Groups A-E, as identified in Part 3, Chap- ter 1 of this Manual b. Site Evaluations will provide the applicant with soil profiles, the depth of effective soil, the application rate, a statement of whether the wastewater system would be conventional gravi- ty or require consultant review and possible supplemental' treatment 2. Phase Two Review a. If site conditions are not suitable for a standard gravity sys- tem, the applicant will be asked to select a certifieddesign consultant, who, will contact LEA staff to arrange a joint site evaluation (1) The LEA may request joint site evaluation without ini- tially evaluating the site on cases where site conditions are known to be outside of the range described as suitable for standard, gravity systems as identified in Part 3, Chapter 1 of this Manual. (2) After joint site evaluation, sites may be approved for standard gravity systems where there is less than 4 ft of native, effective soil provided 3 ft vertical separa- tion can be maintained. C. Expiration Site Evaluations have no expiration date, except foir when there is a change in site conditions adversely affecting the drainfield area or when there has been a change in regulatory requirements. On-Site Wastewater Manual®Part 1 — Process Adopted March 15, 2010 - Part One ** Page 5 GI]imrru..ogC ert'usu Butte County Hybrid Model rm Mw...wwwwiwwwmue EiwMORMOO.R OM OMiwMMEN Morl RONimammE�OOR O OMOMEOMOmM a ROME OwiMOwdO RMOOMiM Oman Rosins ama..,21luau , M w� IN O R ____..�..._ a M... Customer Hires Promides for O Backhoe pits and Flags the a Site w M a M R R R M R a Customer Submits Application Site w for Site Evaluation ORE M' Process E w R w M �w LEA Performs Sika Evaluation w E a M w, R m at m R �a am R 9 Maats rrrHerl ..,." °• for Starodarrd N ....„, Carafrit systema .,e'".' N OR O OR Customer Retains Candied Designer O R R O O O M Designer Detains Backhoe w Operator and Oyersees M' Backhoe Ril Excavation R O w� R M a IN Designer Makes Appyinitment is E worth LEA for Joint Site un R Inspection w R w O O m w Designer and LEA Jointly w R Evaluate Soil and perferrm Site w E w w ReM+reva+ O O M WI m N M' Needed or �,`/' N °' R. Reequstedi? m w om Designer Performs Penc.Test M and Submits Data to LEAM wR Peric rest ,r WF.t l)- im o �m w Prociess w O w w REHS Reviews Pere Data va w ma w M M M, m Slid Approved E V swMd+'wl N E Teeahmll syatema m tin wm O,, Site Eyaloaftion Denied m M.., Gustonror May Appeal,Seek, m Siva Eyaluakaan Apprdwad Site±Evaivationroved Variance,or Dig Additional R M, Tt Hulas R, [��i'llillililimmillillinillillilluenisummuuuuuuuuuuuuuuuuuuuuuuuuuuumousm�ioimm W OROO RImOOMim EvmMOEOERRORRIm iOORRMOEmrEMOww OMERM Minimal .111.1 RRMmuERw min OMMwnw O...N E.OEEOREROO.wOOOMOOw RREM'a On-Site Wastewater Manual—Part 1 —Process Adopted March 16, 2010 m Part one** Page 6 E. Groundwater Monitoring 1. Purpose a. The LEA routinely requires groundwater monitoring infor- mation for projects in groundwater concern areas to deter- mine if on-site wastewater and/or suibdivision ordinance re- quirements can be met. b. Unusual situations may require additional groundwater re- view of a specific site completed by a professional such as a. registered engineering hydrologist or geologist. Area Identification Parcels with suspected seasonal groundwater issues requiriing rainy season monitoring include: a. Valleys, Ravines, Swales b. Waterways C. Confined and Unconfined Sand and Gravel Strata d. Shallow Topsoil Areas e. Springs or other indications, such as swampy/marshy ap- pearance or presence of water-loving vegetation such as cattails, willows, perennial grasses f. History of seasonal groundwater in the vicinity of the project g, Visual indication of seasonal groundwater, such as mottling or gleying in soil profiles 1 Application and Coordination Groundwater monitoring may be conducted in the following circum- stances; a. As part of a pre-application review for a land use project b. As a condition for preliminary map approval for land use ap- plications, where the owner has signed a disclosure docu- ment for concurrent review; C. As a condition for site evaluation approval or as a stand- alone review, where the applicant has agreed to payment of the LEA's hourly rate. d. In all cases, the certified designer will discuss the monitoring plan ahead of time with the LEA, and provide the LEA with a map showing the number and location of monitoring wells. 4. Groundwater Observation Period a. The groundwater observation period is November through April. On-Site Wastewater Manual—Part 1 Process Adopted Karol~ 16, 2016 Part one ** Page 7 NOW:NtF.,AUNl b. the LEA may allow the certified designer to install and initi- ate observation of monitoring, wells after November, on a case-by-case basis, provided there is reasonable likelihood that maximum groundwater elevations may stilll be observed' during the remainder of the groundwater observation period. C. Snow pack influenced areas may require observation through the entire spring snowmelt, . Collection of (Rainfall Data a, Observation data shall be collected by the certified designer at least every two weeks during the monitoring period„ b. ,additional readings shall be taken by the certified designer within 2 days following a significant rain, such as when there has been 1 or more inches of rainfall within a 4-hour period; C. Daily observations by the certified designer may be neces- sary during elevated groundwater periods to identify maxi- mum groundwater levels; d. Confirmatory observations will be made periodically by the L.D . .. Monitoring Well Diesign a. Monitoring, well depth should be equal to or greater than the required depth to groundwater necessary for project approv- al. The usual depth is eight ( ) feet. For larger flow systems, deeper wells may be required to assess ground water mounding. b. Monitoring well design should generally be as shown i'n this diagram. Holes will be constructed using an auger and fl- inch diameter pipe shall be used, However, approval of al- ternate designs will be considered on a case-by-case basis by LEA staff. Removable Cape Mounded sod w 112 inches of sealing material,i.o. bentonke or soil and cement mixture P "° 4-inch �nlid,rC Readings reported as depth 1 i to water below natural gradew- ys1/4 -incPt perforated pipe crewel VY s a m a-12 inches i� Ora-Site Wastewater(Manual-•Part 1 —Process Adopted March 16, 2010 Part One** Page 8 RU60C OWN c. Monitoring wellls must be staked and flagged so that they can be readily located by LEA staff. 7. Certification Criteria a. Rainfall Data Source Unless the certified designer justifies another source of rain- fall data acceptable to the LEA, the following site will be used for tracking daily and monthly rainfall and for determin- ing average rainfall: htt // .cimis.water.ca. ov/ci is/info.is Plate: The California Irrigation Management Information System (CIMIS) is a program in the Office of Water Use Efficiency (OWUE), California Department of Water Resources (DWR) that manages a network of over 120 automated weather stations in the state of California. CIMIS was developed in 1982 by the California Department of water Resource and the University of California at Davis to assist California's irrigators manage their water resources efficiently. b. Minimum Rainfall for Certification (1) Minimum rainfall shall be 80% of average for the ob- servation months of (November through April for sites where, based on geographical location, absence of restrictive layer, and absence of visual evidence of seasonal watertable, there appears to be 36 inches or more of effective soil. (2) Minimum rainfall shall be 90% of average for the ob- servation months of (November through April for sites where, based on geographical Vocation, presence of a restrictive layer, or visual evidence of seasonal wa- tertable, there may be less than 36 inches of effective soil. (3) Low Rainfall Years (i) Lower rainfall) years will normally not be cer- tifed. However, during multiple years of low rainfall), a secondary data source may be con- sidered. After completion of at least one groundwater observation period (normally (No- vember through April) that does not reach the average rainfall requirement for certification, an applicant may submit, for consideration by the Regional Board and the LEA, a complete groundwater report prepared by a certified en- gineering geologist or by a certified hydrogeol- ogist. (ii) The report should contain supporting data for groundwater elevation conclusions and include l/ On-Site Wastewater Manual—Part 1 ® Process Adopted March 16, 2010 Part One ** Maga 9 b"tiltiC NIY,Ml9'g4 an analysis of expected maximum groundwater elevations for the proposed dispersal site. El- ements of the report will include: 'Topographical and geographical charac- teristics of the site, including slope of the land, that could affect surface and sub- surface drainage characteristics; Soil classification and hydraulic conduc- tivity of the soil; Presence of restrictive layers in the soil profile; Presence of visual indication of season- al groundwater (e.g. soil mottling) within the soil profile, Historical rainfall patterns and relation- ship to groundwater monitoring observa- tions; and Depth of observed groundwater in rela- tionship to minimum soil depth require- ments and proposed depth of trenches. (iii) The Regional Board„ in consultation with the LEA, must approve groundwater reports in or- der to determine that groundwater monitoring requirements have been met. . Determination of Maximum Seasonal Watertable Elevation a. Maximum seasonal watertable is the highest level of groundwater determined to be the char°acte i tic level for the groundwater monitoring well, based on a series of ob- servations recorded by the certified designer and verified, b representative quality control observations of the LEA. To assure consistent correlation of of LEA and certified designer measurements, the certified designer will notify the LEA within 24 hours of observing high seasonal watertable in monitoring wells. b. Seasonal groundwater levels are known to temporarily spike in some monitoring wells after periods of heavy rainfall. This will, be allowed to occur in, a limited manner (within tolerance limits) without affecting the groundwater level determined to be the characteristic level for the monitoring well, provided the following conditions are met: (1) The groundwater level spikes must not occur at any time above the depth proposed for the dispersal field (with the exception as noted in the table, below, and /d r�/l/y rr rlrr�1 / 9f (r p On- ire Wastewater Mareual—Part 1 —Process , Adopted Parch 16, 2010 ,,,, Part One** Page 10 (2) The number of days in which the groundwater is above the characteristic level must not exceed that which is shown on the following table: Tolerance for Groundwater Exceed- Rainfall as%'o of Average An- ing Characteristic Level nual Rainfall ( days within 30 day period) ......... ._.... _....._.. .......... ......_._. < 5% dope 5%+ Slope 80% _ 110% 2 __._.__.�._._._.._w....__.._ 110% - <130% 7 2. 130% <200% 14 2. t*a Special Exception: Groundwater may rise to a level above the pro- posed bottom of the dispersal field for up to 2 days. C. Groundwater monitoring results will be determined to, be un- satisfactory when the characteristic level of the seasonal watertable does not meet minimum Butte County soil depth requirements. F. Percolation Testing Percolation tests may be performed by a Certified Installer, Certified De- signer, or Certified Operation and Maintenance Specialist to provide addi- tional on appropriate effluent application rate during the site evaluation process at the discretion of either the LEA or the designing certified de- signer and when soil conditions warrant. 'tilU'hen percolation tests are uti- lized the following requirements will apply: 1. Test hole preparation requirements a. Unless otherwise indicated by the LEA, there shall be a min- imum of 6 percolation test holes when the disposal area and replacement area are in the same proximity as determined by the LEA; 6 percolation test holes may be required when separate areas are chosen for primary and replacement sys- tems. Additional test holes may be required by the LEA to completely identify a suitable area. b. Percolation test holes shall be 6 inches in diameter. c. Unless otherwise approved by the LEA, the test hole bottom depth shall be deeper than the proposed drainfield trench bottom depth and within the most restrictive strata of useable soil beneath the dispersal field. d. The percolation test hole sidewall in the test section should be roughened to remove any smearing or compaction caused by the hole excavation process. All loose soil shall be removed and 2 inches of pea gravel or other material ap- proved by the LEA shall be placed i'n the bottom of the hole. On-Site Wastewater Manual—Part 1 — Process Adopted Marche 16, 2010 t Part one** Page 11 e, In order to prevent silting of the bottom of the hole and side- all gave-in, a 1-inch side° all gravel pack shall be used. The gravel pack shall be perforated plastic pipe in 12 inch (or longer) sections 2, presoak requirement The hole shall be filled with clean water to a minimum depth of 12 inches above the base of the hole. The presoak shall be maintained for a minimum of 4 holurs. . Test measurement requirements a. Percolation tests shall be measured to the nearest 1/8-inch from a fixed point. b. The percolation test shall begin within 4 hours following completion of the presoak. Adjust the water level to 6 inches over the pea gravel bottom and begin the test. This may re- quire adding or removing water to adjust the level. C. Readings shall be taken at 0-minute intervals. Refill as necessary to maintain 6 inches of water over the pea gravel bottom at each intervall. Readings shall be taken until two consecutive readings do not vary by more than ten percent per reading, with a minimum of 3 readings. The last 30 mi- nute interval is used to compute the percolation rate. If 4 inches or more of water seeps from the hole during the 30, minute interval, readings may be taken at 10 minute inter- val's. Readings shall be taken until 2 consecutive readings do not vary by more than ten percent per reading with a min- imum of 3 readings. The last 10 minute interval is used to compute the percolation rate.. 4. Test rate determination a. The following correction factor shall be used to determine the corrected percolation rate: Hole [diameter Gravel Lack Thicknessorrection Factor K 1.59 alculation....- Standard percolation value (minutes per inch) = Test percolation value (minutes per iinc ) X (correction factor) Example: A six ( ) inch hole is used with a one (1) inch gravel pack. The test percolation value is 25 mpi. 25 mpi (1.59) = 40 mp The mean percolation rate calculated from all test hole results ac- cepted by the LEA shall be the final percolation rate (design per- colation rate) assigned for sizing the system. On-Site Wastewater Manual—Part 1 —Process Adopted March 16, 2010 Bert one*'* Page 12 G. Slopes 15%-30% The site evaluator for parcels with slopes between 15% and 30% shall observe and note any evidence of slope instabilities in the proposed dispersal field area, including such indicators as tension cracks on hillsides, old scarps or headwalls, hummocky terrain, debris deposits below open slopes or in channels, scoured streat channels or gullies, and tilted or cured tree trunks. H. Suspected dope Instability The site evaluator shall identify and note areas of known or suspected slope in- stabilities that are within 50 feet of the proposed primary or repair dispersal field area. Chapter 2. Construction Permit A. Application 1. Construction Permit applications will only be accepted when deter- mined by the LEA to be complete, including the following infor- mation: a. All portions of application form completed and legible b. Complete system design attached, including i site plan C. Payment of all applicable fees 2. The LEA will refer to the Department of Public Works, any site where it is noted by the applicant that more than one acre of soil disturbance and/or more than 1,000 cubic yards of grading will take place. B. System Design 1. LEA design forms must be used to facilitate efficient design review 2. All required drawings and sketches must be included . This portion of the design requires three items that show sufficient detail to allow the design to be reviewed and the system to be in- stalled. Checklists are included for each drawing and all applicable items in the checklist must be shown. Plot plans, design details, and cross-sections may be combined on one or more design sheets, provided there is sufficient detail and clarity to specify com- ponents, dimensions, spacing, and setbacks as outlined in the de- sign checklists. a. Scaled Plot Plan This drawing shows the placement of the septic system/ in relationship to the overall development plan for the property. The phot plan must match the building permit plot plan (the same sketch is accepted by the building department for their On-Site Wastewater Manual— Part 1 ® F Process Adopted Mara, 1 , 2010 Fart one** Fuge 13 application), and should verify that the system can be in- stalled in conformance with setbacks and site limitations. b. Scaled Layout Sketch Detail This item shows the detail of the drainfield layout and details of the system design. The layout detail is intended to be a close-up of the portion of the plot plan where the septic sys- tem is located. C, Cross-Section Detail This item shows the depth from original grade of the septic system components. The cross-section is intended to be used both as a guide for system construction and as verifica- tion that vertical separation and component depths meet code. . Design forms must be signed and dated by the contractor for standard gravity systems or by the certified designer for pressure distribution or supplemental treatment systems. . Special design analysis will be performed by the certified designer for on-site wastewater systems with design flogs exceeding 1,500 gallons per day. The analysis will, include: a. ,analysis of the potential localizing waste loading effects in- cluding, at a rninimurn, groundwater ,Hounding, and nitrogen loading; b. Minimum criteria fo evaluation of the results of the analysis; and C. Incorporation of system design measures to address the findings of the analysis. . .any proposed on-site wastewater primary or repair system within an ,area of Environmental Concern designated as such due to spe- cial status species populations or habitat shall be surveyed by a qualified biologist. If the site contains a population of specials status species or habitat critical to the survival of a special status species, then either an alternative site will be identified, or the biologist will identify on- and off-site mitigation that is acceptable to County and to the California Fish and Game, 7. Any proposed on-site wastewater primary or repair system within an area of Environmental Concern designated as such due to wet- lands, riparian habitat, wetlands, or oak woodlands shall be sur- veyed by a qualified biologist. if the site contains one or more of these habitat types, then either an alternative site will be identified, or the biologist will identify on and off site mitigation that is ac- ceptable to County and to the California Fish and Came. ["Mitigation may include construction of replacement woodlands, replanting de- graded reparian habitat on- or off-site, replanting oak trees, pay- i fii,/irr ij,i1 9OR/�%1 /rll On-Site Wastewater Manual—Part 1 — Process Adopted March 15, 2010 Part one*" Page 1 WIIB'dY4:YNENlb'f Y1 ment to the State Oak 'Woodlands Conservation Fund, orh other measures approved by the County and State. 3. Any proposed on-site wastewater primary or repair system within an Area of Environmental Concern designated as such due to an adoptedHCPINCCP shall be surveyed by a qualified biologist to identify on and off site mitigation that is acceptable to County and to the California Fish and game. Mitigation may include avoidance of especially critical habitat, planting of replacement woodlands, re- planting degraded reparian habitat on- or off-site, replanting oak trees, or other measures approved by the County and State. C. Design Stakeout A Construction Permit application will not be considered complete unless the designer has first staked out and ribboned the primary and replace- ment drainfield areas. This will alert homeowners of these critical devel- opmental features so that building and excavation activities can be con- trolled appropriately. This will also allow the LEA to confirm the adequacy of designs prior to installation of systems. C. Notification, Inspection, and Final Approval 1. The installer must contact the LFA and system designer to make arrangements for an inspection of the system construction.. The system must then be left open for a maximum of two working days, allowing the installation to be inspected by the designer and the LFA. Z The installer will leave a signed as-built drawing at the site in a sealed, zip lock plastic bag. The LFA will use the checklist on the as-built form for their inspection and approve or deny cover of the system based on the LEA's assessment of the installation. 3. The system installation will be verified as complete and within cur- rent code, and will be given final approval by the LEA, when all the following actions have taken place: a. An as-built drawing signed by both the installer and the LEA is attached to the construction permit. b. The certified designer (if one was used) verifies that the sys- tem was constructed in substantial conformance with the de- sign. C. The "Installation" box at the bottom of the Construction Per- mit application is marked "Approved" and signed by the LEA.. d. If an Operating Permit is required: (1) The certified designer has provided the homeowner with a system Operation, Monitoring, andMainte- nance Manual as described in Park 4 of this Manual. On-Site Wastewater Manual—Part I — ProcessAdopted Parch 15„ 2010 Part One "* Fags 1 ( ) The homeowner has recorded the ongoing need for an Operating Permit on the property deed. ( ) An Operating Permit has been issued as described in Chapter 3 of this mart. E. System Repairs, Replacement, Modifications, Expansions, and Septic Tank Destruction. 1. When Construction Permit Required a. Construction Permits are required to repair or significantly modify existing on-site wastewater systems, or to, destroy a septic tank. However, these permits are not required for servicing or (replacing installed mechanical or electrical parts of the systems, including: (1) Float switches ( ) Pumps ( ) Electrical boxes ( ) Sanitary tees in the septic tanks ( ) Minor structural corrections to the tank ( ) Repair/replacement of the distribution box, or re- pair/replacement of the sewer line from the tank to the distribution box. b. Other than replacement of septic tank inlet and outlet T's or replacement of septic tank access lids, LEA Notification and Flan Review must take place BEFORE the service is per- formed. . When Elements of Site Evaluation Requiredi Unless sufficient site information is available to the LFA,, supple- mental site information, such as soil analysis data, will typically be required for on-site wastewater system expansion, relocation, re- pair or replacement. . Special Considerations for System Repairs a. A failing system must be repaired as soon as reasonably possible. b. if an immediiate repair cannot be accomplished, the LFA may allover a delay in making the repair. In this case, an en- forcement order will be issued and the LEA, will specify tem- porary measures required to eliminate any immediate public health hazard or pollution of ground or surface waters. EW"'A" r ,h Ori-Site Wastewater Manual®Part 1 ®Process Adopted lurch 16, 2010 Fart One** Page 16 r,W0VC 0r,AVH Chapter 3. Operating Permit A. Issuance Operating Permits will be issued by the LEA automatically for all new pressure distribution and supplemental treatment systems, upon their cer- tification of completion and, thereafter, upon receipt of a complete applica- tion for Operation Permit Renewal. R. Valid Operating Permits Required Valid Operating Permits will be required by the LEA for verifying the ade- quacy of pressure distribution and supplemental treatment systems at their point-of-sale. C. Required Information Operating Permit applications and Operating Permit Renewal app'licati'ons will include„ at a minimum, the following information: 1. Owner name, address, and telephone number 2. Assessor's Parcel Number 0. Traklt number . Wastewater system description and as-built drawing 5. General description of O&M program 6'. Specific O&M frequency based on system type 7. Date of permit expiration D. Cleveland Hills Alquest-Priolo Earthquake Fault Zone Operating Permits shall require, for wastewater systems located i within the Cleveland Hills Alquest-Priolo Earthquake Fault Zone, inspection in the event of an earthquake centered on the Cleveland Hills Fault resulting in appreciable surface fault displacement. Any damage to or deficiencies noted in the wastewater system during this inspection shall be corrected immediately. E. Richter Magnitude of 5.0 and Above Operating Permits shall require, in the event of an earthquake centered within 25 miles of the County with Richter Magnitude of 5.0 and above, post-seismic inspection. Any damage to or deficiencies noted in the wastewater system during this inspection shall be corrected immediately. Chapter 4. Testing Septic Taroks to Assure Watertight Construction A. Septic Tanks in Use at Time of Testing 1. Dwelling occupied %i On-Site Wastewater Manual—Part 1 Process Adopted March 16, 2010 Part one ** Page 17 NLk RIYc".M6 hA;vuw a. If the water level is at the invert of the outlet °'T," then return after 24 hours to recheck the level. If there has been no measurable drop of the (liquid volume in the tank,, then the tank has passed the inspection, b. If the water (level is slightly below the invert of the outlet "T", then the tank may be leaking at the penetration (knack-out) for the outlet. All penetrations should be excavated and sealed with Quickrete or equivalent. ,after cement cure's, fill to the invert of the outlet tee and return after 24 hours to re- check the level. if there has been no measurable drop of the liquid volume of the tank, then the tank has passed the in- spection. C. If the operating level is substantially below the invert of the outlet "T" or at the tank's seam (for clamshell tanks), then the tank should be cleaned, and, its integrity evaluated. 2. Dwelling Unoccupied a. Bring the water level up to the invert of the outlet tee and re- turn after 24 hours to recheck the level. If there has been no measurable drop of the liquid volume of the tank, then the tank has passed the inspection. B. New Construction or Tank Replacement 1. All new tanks must be certified by the manufacturer to be water- tight, allowing no more than 1% liquid volume loss over a 24 hour period. Z All tanks must be tested after installation to be watertight by the fol- lowing process: a. Install risers b. Install and cap inlet and outlet fittings C. 24 hour pre-soak for concrete tanks d. Fill tank 2 inches into the riser, and no higher e. Return after 24 hours. If there has been no measurable drop of the liquid vollure of the tank, then the tank has passed the inspection. Chapter 6. Implementation of Certification Requirements A. Installers 1. The LEA will develop and maintain an informational packet and an open-book take-home exam that covers the essential elements of our local ordinance and manual related to system installation; � rah j On-Site Wastewater Manual—Part 1 — Process Adopted March 16, 2010 Part one** Page 18 2. The person in, charge at any job site must have taken and passed the examination; 3. The LEA will, not distinguish between certification to install standard gravity systems from certification to install pressure distribution or supplemental treatment systems; 4. The LEA recognizes that many manufacturers and distributors of proprietary products have their own certification requirements for installation of their products, but will leave enforcement of that mat- ter between the certified designer, certified installer, and product distributor or manufacturer; . The LEA will provide two local meetings or educational sessions each year for certified professionals and attendance of these ses- sions will meet the continuing education requirements for certified installers; On-Site Wastewater Manual—Part 2—Materials Adopted March 16, 2010- Updated August 24, 2010 Part Two ** Mage 1 iM4m r�Fg,nuxi� Part T'wo: Materials Chapter1. Building Sewer................................................................................ ......... ....... Chapter2. Septic Tank............................................ .................................................. ......... 2. Chapter3, Fittings...... ........... ................ ................ ........... ...___.......... ...... Chapter 4. Distribution Box...... .................................... .................................. ................... 5 Chapter5. Diversion Valve.................................................................... ......... ................... 6 Chapter 6. Dosing and Pump Tanks............. ................... ................... ................... ......... 6 Chapter 7. Pumps, Controls, andAlarms..............._.................___............._..............____ 7 Chapter6. Pipe ........... ......................................................................................................... 5 Chapter9. Drainreck...................... ........................................................................... ......... 9 Chapter10. Barrier Material .......................................... ....................................................... Chapter 11. Bundled Synthetic Aggregate...... .............................. ......... ............................ 9 Chapter 112. Single-Pass Sand Filter and Mound System (Filter Material................... ........... 9 Chapter 13. Containment Vessel for Intermittent Sand Filter................... ......... .......... ........11 Chapter 14. Observation, Port Design............. .............................. ......... .............................12 On-Site wastewater Manual Part 2—Materials Adopted March 16, 20110- Updated August 24, 2010 Part Two** Page 2 Part Two: Materials Chapter I. uildinig Sewer The building sewer must be constructed with materials in conformance to build- ing sewer standards identified in the Uniform Plumbing Code. The building sew- er pipe must have a minimum diameter of three (3) inches. Chapter 2. Septic Tarek A. General criteria: Septic tanks must: 1. Be constructed of precast reinforced concrete or other material ap- proved by the LEA. 'V1t"ood and metal tanks are prohibited. Oast-in- place, and fiberglass may be considered on a case-by-case basis provided there is adequate engineering justification and provided they meet the requirements outlined in this Manual. Polyethylene and polypropylene tanks that meet the International Association of Plumbing and Mechanical Officials (IAPMO) standard IAPMO/ANI Z1000 (standard for design, material, performance testing, and marking) are approved by the LEA, unless otherwise noted. 2. Have the manufacturer's name and tank capacity in gallons perma- nently displayed on the uppermost portion of the tank. If the tank is constructed of fiberglass, polyethylene, or polypropylene then the model', number must also be displayed. . Be protected against flotation under high ground water conditions. . Be approved by the International Association of Plumbing andMe- chanical Officials (IAPMO), or meet IAPMO minimum standards as demonstrated to the LEA by a certification program equivalent to that provided by I'APiVIO with the following program elements: a. Evaluation and certification by an engineering firm, approved by the LEA, with expertise and experience related to septic tank design and construction, to verify substantial equivalen- cy with IAPMO standards and compliance with the require- ments of this Manual as pertaining to: (1) Structural design of the tank, ( ) Quality of materials used in construction of the tank; (3) Acceptable construction methods and practices; (4) Quality control and quality assurance plan proposed by the manufacturer; b. Unannounced inspection of manufacturer's facilities and ob- servation of construction methodology by a qualified third party approved by the LEA to assure compliance with the items listed above; On-Site Wastewater Manual—Palm 2—Materials ,adopted March 16, 2010- Updated August 24, 2010 Part Two** Page 3 an � C. Reciprocity: (1) A certification program of tanks by another oversight agency in a manner substantially equivalent to that which is outlined in this Manual may be accepted by reciprocity; (2) Reports generated from unannounced inspections conducted by a quallified independent third party on behalf of another oversight agency may be accepted by the LEA provided the certification requirements of the other oversight agency are substantially equiva- lent to that which is specified in this Manual. d. All associated costs shall be borne by the manufacturer re- questing the alternative certification process. 5. Be accompanied by a. Manufacturer's Guarantee for a minimum pe- riod of one year and be installed in strict accordance with: the manu- facturer's instructions. Be constructed and installed so as to be watertight. Septic tanks for neve construction must be verified as watertight through manu- facturer certification and insitu testing. Testing methods are de- scribed in Dart 1 of this Manual. Configuration 1. The tank must be designed to ensure removal of settleable solids. To accomplish this, the tank must provider a. Liquid volume as specified in (Part 3 of this Manual. This is to allow sufficient retention time for treatment and sufficient sludge storage space to prevent the discharge of sludge or scum into the drainfield. b. Inlet and outlet sanitary "T"s to prevent the discharge of sludge or scum in the effluent.. C. Venting provisions to allow for the escape of accumulated methane and hydrogen sulfide gases. d. Inlet sanitary "T" must be extended to penetrate at least 12 inches into the liquid from the inlet flow line. If the sub.- merged scum depth is expected to be greater than 12 inch- es, the inlet fixture should be extended into the liquid two inches bellow the expected lowest scum depth. . Septic tanks must have a minimum of two compartments. Installa- tion of multiple single compartment tanks in a series is not accepta- ble, unless approved by the LEA prior to installation. The first com- partment must have a liquid capacity of two-thirds (2/ ) of the total required liquid capacity, as measured from the invert of the outlet fitting. 6� On-Site Wastewater Manual—Part 2—Materials Adopted. Larch 16, 2010- Updated August 24, 2010 Part Two ** Page 4 3. Each compartment must have access provided by a manhole hav- ing not less than eighteen (18) inches across its shortest dimension unless otherwise approved by the LEA. 44. At least ten (16) percent of the inside volume of the tank must be above liquid level to provide scum storage. C. Structural Integrity All treatment units and tanks, regardless of material or method of con- struction shall: 1. Be designed and constructed to withstand all potential lateral earth pressures under saturated soil conditions with the tank empty. 2. Pass Top Load = 306 psf (the tank shall be capable of supporting long-term unsaturated soil loading in addition to the lateral hydro- static load.) 3. Pass Lateral Load = 62,6 pcf (the tank shall be capable of with- standing long term hydrostatic loading with the water table main- tained at ground surface.) 41. Have a minimum live load at the surface of 3010 pounds per square foot with twelve (1 ) inches of cover unless heavier loads are ex- pected. For heavier loads, (i.e. vehicles), proof of traffic rating is re- quired. 6. Successfully withstand an above ground static hydraulic test if the tank is 2,666 gallons or smaller. . Precast concrete tanks must have a minimum wall, compartment and bottom thickness of three (3) inches, and must be adequately reinforced. The top must be at least four (4) inches thick. . Tanks must be built such that all construction joints are sealed wa- tertight and bonded together in a structurally sufficient manner to prevent separation as certified by the manufacturer's registered en- gineer. D. Risers 1. Each compartment must be provided with a concrete (or other ma- terial approved by the LEA) watertight riser, extending to the fin- ishedgrade or above, with a minimum inside horizontal measure- ment equal to or greater than the access manhole. 2. All joints must be properly sealed with a sealant and/or an interlock- ing mechanism approved by the LEA. Cement grout sealing alone is not an acceptable method of sealing joints. . Surface water must be diverted away from the riser cover by creat- ing a sloping surface away from the riser, or extending the riser two (2) inches above finished grade. Ori-Sits Wastewater Manual—Part 2—Materials Adopted March 16, 2010- Updated August 24, 2010 Part Two ** Page 6 4. The cover must be securely fastened with stainless steel or other corrosion resistant fasteners to make the riser vandal, tamper, and child resistant. No cover may exceed seventy-five (7 ) pounds. . Risers must have a minimum inside horizontal diameter of twenty- four( 4) inches. Chapter 3. Fittings A. The inlet and outlet fittings must be of Schedule 40 IVC, Schedule 4 ABS, or other materials approved by the LEA, with a minimurn diameter of three (3) inches. B. All fittings must be secured with a sealant approved by the LEA and must be constructed so as to be watertight. Tank fitting locations must be properly engineered to ensure the structural integrity of the tank. C. The inlet fitting must be a sanitary "T" with minimum pipe diameter not less than the connecting building sewer or lens than three ( ) inches. It must extend at least four (4) inches above and twelve (12) inches below the liq-. uid level. D. The outlet fitting must be a sanitary "T" with minimum pipe diameter no less than the connecting influent sewer pipe and not less than four (4) inches in order to accommodate an effluent filter. The outlet fitting must extend at least four (4) inches above liquid level„ and below liquid level a distance approximately equal to the flow level through the baffle separat- ing the two compartments of the tank. The diameter of the vertical leg ex- tending below the liquid level) must not be less in size than the building surer nor less than four (4) inches- E. An effluent filter is recommended prior to discharge of the effluent to the effluent sewer. It must be commercially designed and manufactured„ in- tended for effluent filtration, and be readily accessible for inspection and cleaning. F. The invert of the inlet fitting must not be less than one (1) inch and prefer- ably three (3) inches above the invert of the outlet fitting. G. Sanitary "T"s must be accessible and directly below the manhole access riser. H. Baffles must be a three (3) inch or larger diameter "T" fitting or baffle slot (with the same opening area as the fitting) that is located in the shared compartment wall, using the same material specifications as required for the outlet fitting. The invert of the M"T"° fitting or baffle slot must be located approximately at fifty (50) percent of the liquid depth. There must be a minimum two-inch vent opening in the baffle above the liquid level. The baffle must be constructed of the same material as the tank and extend a minimum of four (4) inches above the liquid level. Chapter 4. Distribution Box Oa-site Wastewater Manual—hart 2—Materials Adapted March 16, 2010- updated August 24, 2010 Part Two** Mage 6 A. Distribution boxes must be constructed of concrete or other materials ac- ceptable to the LEA. B3 Distribution boxes must be designed to accommodate the necessary dis- tribution, laterals and expected flows. The top, walls, and bottom of con- crete distribution boxes must be at least one and one-half (1-1/2) inches thick. C. Distribution boxes must be installed for equal distribution to the drainfield trenches. D, Each distribution box must be provided with a sump extending at least one (1) inch below the invert of the outlets. E. For initial use of a manufacturer°s distribution box design proposed for use in Butte County, or when a revised box design is proposed for sumer the commercial manufacturer of the prefabricated box must provide the LEA with written documentation that the box design, materials and construction comply with all requirements of the uniform 'Plumbing Code. F. All distribution boxes must be installed level on LEA-approved bedding material and as described in 'Part 3 of this Manual. Chapter 5. Diversion 'halve A. Diversion valves must be constructed of durable material and be of a de- sign approved by the LEA. They must be corrosion resistant, watertight, and designed to accommodate the inlet and outlet pipes. E. Each diversion valve must have a positive stop. C. For initial use of a manufacturer's diversion valve design proposed for use in Butte County, or when a revised valve design is proposed for same, the commercial manufacturer of the prefabricated valves must provide the LEA with written documentation verifying that the valve design, materials and construction comply with all requirements of the Uniform Plumbing Code. Chapter S. Dosing and Pump Tanks A. The tank may be: 1. The second compartment of a two compartment septic tank provid- ed: a. The septic tank is a minimum of 1,5010 gallons; b. The wall separating the two compartments of the tank is equipped with a properly placed .sanitary "T„ to prevent the discharge of sludge or scum into the second compartment that is utilized as the pump chamber, or with a flow-through port. If a sanitary "T" is utilized, the tank must have an ac- cess lid over the °T" to allow servicing; On-Sita,Wastewater Manual— Part 2^Materials Adopted March 16, 2010 - Updated August 24, 2010 t Part Two *" Page 7 C. The walll separating the two compartments has the structural integrity to allow the first compartment to remain full while the second compartment is empty. . A, separate tank meeting the requirements specified in this manual. 1 . Each dosing tank employing one (1) or more pumps must have a liquid capacity sufficient to deliver the design dose, and have a minimum addi- tional capacity of one day's design flow between the high level alarm and the tank's "soffit" (inner ceiling). Each dosing tarok must be marked on the uppermost surface with the liq- uid capacity and manufacturer's business name, or a number assigned by the LEAS. When a revised tank design is proposed, the manufacturer of the tank must provide the LEA with written documentation that the tank design, ma- terials and construction comply with all requirements of the Uniform Plumbing Code. The manufacturer must provide a set of plans and speci- fications prepared by a registered professional engineer for each tank de- sign and a set reflecting any subsequent revisions, The appropriate fee must accompany pllans. E, Any pump tank transporting effluent or solids to a septic tank must have its own penetration into the tank with a -inch minimum diameter sanitary "T." Because effluent entering the septic tanks should not do so under pres- sure that could cause turbulence in the septic tank, the pressure line from the dosing/pump tank needs to connect to the larger, diameter pipe at least 10 feet before entering the septic tank. Chapter 7. Pumps, Controls, and Alarms Electrical components used in systems must comply with the uniform Electrical Code, and the following provisions: Motors must be continuous-duty, with overload protection. B. Pumps must have durable impellers of bronze, cast iron, or other materi- als approved by the LEA.. C. Submersible pumps must be provided with an easy, readily accessible means of electrical and plumbing disconnect, and a noncorrosive lifting device as a means of removal for servicing. D. Pumps must be automatically controlled with mechanical switches de- signed for use with pumps and control panels. E. Pumps must have automatically resetting audible and visual high water level alarm with manual silence switch that is located in or near the build- ing served by the pump. Only the audible alarm may be user cancelable. The electrical box for the pump and alarm system must not be located in an environment that may damage the components. �y Ori:.Site Wastewater Manual--Part 2—Materials Adopted March 16, 2010- updated August 24, 2010 Part Two ** Page 8 F. Wiring must be of proper construction and gauge and permanently fixed to a supporting structure under permit from the local Administrative Authority. G. The pump and alarm must be connected to separate circuits. H. There must be a non•-resettable digital pump cycle counter in the electrical box. I. There must be a manual override switch in the electrical box to facilitate dosing control during inspections. Chapter 8. Pipe A. All pipe throughout the wastewater system must be clearly labeled and in- stalled so that the labeling can be readily identified by LFA inspectors. La- beling, consisting of durable ink, must cover at least 50% of the length of the pipe. Labeling may consist of a solid line, fetters, or a combination of the two. Intervals between markings must not exceed 12 inches. S. Schedule 40 ABS must be used from the house to the septic tank Schedule 40, ABS or SDR 35 (ASTIVI D 3034) must be used as follows: 1, From the septic tank to the distribution box (if applicable) 2. From the distribution box outlet for a minimum of 5 feet 3. From the septic tank to the pump chamber (if applicable) D. Gravity Distribution (leachline) Dispersal 1. One of the following grades of 4-inch perforated pipe must be used: a. SDR 35 (ASTIVI D 3534) 4-inch diameter b. Triple Wall ASTIVI F310 2. travelless chambers, may be used provided the products meet JAPIVIO standard PS- , 3. The pipe described in subsection D,1. of this section must have 2 rows of holes spaced 120 degrees apart and 60 degrees on either side of a centerline. The holes of each row must not be more than 5 inches on-center and must have a minimum diameter of one-half inch. E. Pressure transport pipe, pressure distribution manifolds, and pressure dis- tribution laterals (piping and fittings), must meet the most current require- ments for schedule 40 PVC pressure pipe as identified in ASTIVI Specifica- tions D-1735, or other material approved by the LPA. All pressure distri- bution laterals and all pressure transport and manifold piping must be ad- equately sized for the design flow. F. Curtain drain pipe must meet the requirements specified in the anual for gravity drainfield pipe. Other types of pipe may be approved by the LEA, provided it can be demonstrated that the selected pipe has the structural strength for the application proposed. WOn-Site Wastewater, Manual —Part 2—Materials Adopted March 16, 2010 Updated august 24, 2010 Part Two** Page 9 Chapter 9. Drainrock A. Gravel used for drainrock must be % inch to 21/2 inches in diameter. Uni- formlly graded material is recommended to maximize pore space. Drain- rock must be clear, washed, non-deteriorating gravel, with the percent by Freight passing the U.S. No. 200 sieve no greater than 01.5%. Alternatives to drainrock, as described in this Chapter, may be accepted on a case-by- case basis. B. travelless systems are allowed provided the requirements for such sys- tems as described in Part Three of this Manual are followed, Chapter 10. Barrier Material A. Untreated building paper or two, inches of compacted straw may be used for standard gravity systems. B. Filter fabric must be used for non-standard systems and must meet or ex- ceed the specifications described in the following table: Pro ertIke uirement Test Method Drab Strength _...,.....33 Ibs. __. ASTM b4632 Puncture Strength 25 Ibs. _......_ _. ASTM D4833m.._.__ Trapezoid Tear 25 Ibs. ttS_. ASTM D4533 Apparent opsening ACLS<0.297 mm,or>If Cb Standard Sieve ASTM D4751 Size >#50 US Standard Sieve Permeability 0.4 cm/sec for Soil Types 1,2 ASTM D4491 0.304 cm/sec for S-R Tvpes>2 1 Examples of filter fabrics meeting this specification include:Mirafi 140 NSL. Chapter 11. Bundled EPS Synthetic Aggregate A. As substitute for pipe, drainrock, and barrier material, Bundled Expanded Polystyrene (FPS) Synthetic aggregate meeting IAPMO standard IGC 270 may be used for wastewater dispersal. Units are cylindrically shaped; hav- ing a seamless external permeable netting that contains PPS synthetic aggregate. A geotexti'le is pre-inserted between the EPS synthetic aggre- gate and netting as a barrier material to overlying soil. At least one bun- dled FPS synthetic aggregate unit in the configuration shall include an in- ternal -inch pipe. The internal pipe shall comply with ASTM F40 , . Bundled FPS synthetic aggregate shall be H-10 rated. Units may contain a plastic pipe for longitudinal conveyance of water. C. PPS synthetic aggregate participles shall be relatively uniform in shape and size, The aggregate particle size may range frorn 0.0 inches to 2.0 inches along any axis. FPS synthetic aggregate must provide a minimum porosity of 0%. Chapter 12. Single—Pass Sand, Filter and Mound System Filter Material Ali filter materials used in single-pass sand filters and mound systems must fall within the limits of the specifications shorn in the following graph for the amounts of material On-Site Wastewater Manual—Fart 2—Materials Adopted March 16, 2010- Updated august 24, 2010 Part Two ** Page 10 muuiw qupyu+'.ati; retained/passing (by weight). This specification) closely follows the A TIVI -133 con- crete sand specification. The material must also have a uniformeity coefficient of 4 or less. The uniformity coeffi- cient is calculated by dividing D60 (the size of screen opening where 60 percent of a sample passes and', 40 percent is retained) by 110 (the size of screen opening. where 10 percent of a sample passes and 00 percent is retained). For sands with a 1010 less than 0.3 mm, the designer should consider a loading of no greater than 1.0 gallon/square foot-day„ and specify frequent dosing. A sieve analysis, (donee in accordance with A TNF D 136 for dry product, or ASTIVII -117 for wet product), of the material is required prior to transport to the construction site. A report of the sieve analysis and on-site analysis results must be available for the LEA prior to system approval and for inclusion in the system's permanent file. Grain size Distribution '6" #4 #a #16 920 #30#40 #56 #100 4200 1001%. � I Y I I I I 1 7M. � I 9 4 I 8 600% Ca I n 6 � tis I I d I Y i 40 I q I 6a'* I Y Y I I I q 4 1 r6� 1 6v. iLL #1016. , pCV.oC� too 0.10 6.01 grain diameter imnmi On-Site Wastewater Manual–Part 2–Materials Adopted March 16, 2010. - Updated August 24, 2010 Fart Two "* Page 11 Chapter 13. Containment Vessel for Intermittent Sand (Filter A. Lind Pit when o sand filter is constructed in an excavated pit the follow- ing criteria are to be met. 1. Unsupported polyvinyl chloride (PVC) shall have the following properties: Property Teat Method (a)Thickness ASTM 01593 30 mel Fara 9.1.3 minimum (b) Specific Gravity(Miniirnum) ASTM 0792 Mlethcsd A (c) M9inimum Tensile Properties ASTM 0662 eaoh direction) (A) Breaking Factor Method A or B 69 ounds/inch width) inch vide ( ) Elongation at Break Method A or B 360 ercent) (c) Modulus (force)at 100%, Elongation (pounds/inch Method A or B 27 width)._ (d)Tear Resistance (pounds ASTM 01004 8 T inimum) Die e) Lover Temperature ._ASTM 01790 -20°F (f) Dimensional Stability(each ASTM D12014 direction, percent change 212°F, 15 min. 5 maximum) Water Extraction ASTM 01239 -0,35% max. (g)-- ..... . . ..... .. ...... (h)Volatile Loss0.7°1 max. ASTM 01203 Method A (i) desistance to Soil Burial (percent change maximum in original ASTM 03063 value) A Breaking Factor _. _5 B) Elongation at Break _._ -20 (B) Modulus at 100°1� ±10 Elongation— (j) Bonded Seam Strength (factory ASTM 03063 55.2 seam, breaking factor ppi width)...._..__ (k) Hydrostatic Resistance ASTM 0751 62 Method A B. Concrete Containment Vessel; to be designed and/or approved by a qua ll ified professional engineer if the following conditions are not met. 1. above ground tank a. Wails (1) At lust 6 inches thick ( ) 4 feet or less in height �1 On-Site Wastewater Manual—Part 2—Materials Adopted March 16, 2010- Updated August 24, 2010 Part Two** Page 12 (3) Rebar reinforcement: 3l3 finch diameter rebar can 2- foot centers horizontally and vertically, with continu- ous lengths wrapped around the corners. b. Floor (1) At least 3 112 inches thick (2) Reinforced with steel mesh (CRSl standard 6-1010) to prevent cracking and to maintain water-tightness C. Tank is to be designed, constructed, and sealed) to be water- tight. 2. Below ground tank Any below ground concrete tank must be watertight. The design of any such tank is to be approved by a qualified professional engi- neer and meet the specifications of this Manual. Chapter 14. Observation Port Design Observation Part "" �"„"„77777-7777 77 �v^ J�" " dr ,r""'� ,�° e rr; " �rdo " wv � � �ier amoi :�:�77 » a mmmmm „ m”m mm SI. —4 PE Pipe 12 % mg, � � rr »„"" »"v� r" �" �' r" r" ,"" a" � ^"" "� �» �," ho m mu, ,�" .r" „r"'' � � !on N.8' ✓" r* «" »�" „,r r,«.m,"r of r" ro .o,„,.e” ,µr"'""» ap. m m m m mm m... Ir m irw - m im m m m�mmm m in no�m�mmm;s�m mm mm mm mm m m mw.m m -aim mm mm mid mm�;mm mm mm ppm m ` .4.404".6m.m mm k�m mm mm m mi mmmmmmmmmimmm Hmmimm�amm �m m mm iw m � on m' mmm,is mm�^m mmmmmm mmmmmmmmmw�mmm'mmmm�mm mwe mmm mmmm � m mmm�mm mm �' m mm mm's mm m mmm'm m m mm m m m mm m�m m mm mi mim mm mm mm m m m mmm mom m m�xw mmmmm mmmmmmmmmmmmonmmmmmmm m m mmmmm„gym„ "ammm "°mmmmimmmm�mm'mimmaamm,mmmm,mmmmmmmwmmmmm mm muammmmmm mmmm mm mm�'mm imm mm. imm mm mm.. mm all ��mmmmm�mm�mmmmmmmmimmym�mmNmmmmmmmmmmim"""�mmmmm'm'mmm'mmimmmm�..,m�mmmmm�� �mmw�mm�„�"�"" .� "mm�°mmmmm'mmreiaa®mmmummmmmmmm mmm��� „,m��mmmmm �aimmm �m�mmm�m�m��wmmmimmm������" mmmmmmm�wmmmmmmmm�m�mmm�mmmm�mm��. J%1fOn-Site Wastewater Manual—Part 3—System Requirements Adopted March 16, 2010—Updated.august 24, 2010 and December 11, 2012 Part`three** Fuge 1 Part Three: System Requirements General Design Requirements 2 Chapter 1. General Requirements 2 Chapter 2. Location and Setbacks 7 Chapter 3. Design Flows 7 Chapter 4. Installation Chapter 5. Septic Tants Destrucfion 11 Requirements for Dispersal Components 1 Chapter 6. Standard Gravity Systems 12 Chapter 7. Cheep Trench Systems 1 Chapter 3. Pressurized Distribution Systems 13 Chapter' . Subsurface Grip Irrigation 19 Requirements for Supplemental Treatment Components 2.1 Chapter 1 . Supplemental Treatment Systems 21 Chapter 11. Proprietary Systems 23 Chapter 12. Single-Fuss Sand Filters 23 Alternative Design Options 31 Chapter' 14. Engineered Fill 31 Chapter 16. Off-Site Sewage Easements 34 Chapter 17. Ikon-Standard Ion-Supplemental Treatment Systems 34 Chapter 13. Graywater Reuse 40 Wastewater System Repairs 42 Chapter 19. Requirements for the Repair/Replacement of Failing Systems 42 On-Site Wastewater Manual—Part 3—System Requirements Adapted Larch 16, 2010— Updated August 24, 2010 and December 11, 2012 Part"three** Page 2 Part Three: System Requirements General i t Chapter 1. General Requirements These general requirements apply to all onsite wastewater systems, unless oth- erwise specified within this Manual. A. Wastewater Strength 1. Domestic strength wastewater, for the purpose of this Manual, is wastewater with the following characteristics: a. Total suspended solids less than or equal to 300 ppm b. Five-day Biochemical) Oxygen Demand less than 300 ppm C. Total Nitrogen as Nitrogen less than or equal to 70 ppm d. Grease and oil less than 100 ppm Wastewater from non-residential sources or high strength wastewater from residential sources must receive pretreatment suf- ficient to lever the waste strength to the level of that commonly found in domestic residential septic tank effluent before discharge into a standard gravity or supplemental treatment wastewater sys- tem. 3. The Central Valley Regional dater Quality Control Board will be notified by the LFA whenever the LFA approves a pretreatment system or methodology for high strength wastewater. B. Table 1 provides minimum vertical separation and application rate re- quirements based on the USDA soil texture classification system. Soil textural classification should be considered the primary data source for system sizing. C. Seasonal groundwater monitoring will be required by the LFA for on-site wastewater systems with a design flow of 1,500 gpd or greater whenever sail coloration (redoximorphilc features) indicates the seasonal groundwa- ter level may be elevated to within six inches of the required vertical sepa- ration, or where other factors, including but not limited to soil maps, histor- ical observations„ vegetation, or topography indicate that elevated sea- sonal groundwater may be present. For on-site wastewater systems with a design flow of less than 1,500 gpd, seasonal groundwater monitoring may be required by the LFA for the conditions described above. Further infor- mation about seasonal groundwater monitoring is found in Part 1 of this Manual. D. )Figure 1 provides application rates based on percolation test results. Per- colation testing should be considered a source of supplemental infor- mation for system sizing. On-Site Wastewater Manual:®turf 3—System Requirements Adopted March 16, 2010— Updated August 24, 2010 and December 11, 2012 Part Three** Page 3 E. Soils that percolate at a rate of 1-5 mpi require pressure distribution and are not to be permitted by the LEA unless there is demonstration of ade- quate filtration capacity by utilizing design features including, but not lim- ited to: 1. Use of supplemental treatment systems, including the single-pass sand filter; 2. Use of pressure distribution or subsurface drip irrigation for disper- sal, . Deduction in application rate of wastewater to the dispersal field, beyond that which is specified in the Manual-, . Increase in vertical separation, beyond that which is specified in the l' anualr and 5. Increase in 'horizontal setback distances to wells and/or surface wa- ter to that which is specified in this Manual. F. When shrug by soil group and more than one soil group is encountered within a soil profile, drainfield trench sizing must be based on the most re- striictive soil group encountered within 05 inches from the bottom of the drainfield trench for on-site wastewater systems with a design flow of 1,500 gpd or greater. For on-site wastewater systems with a design flow of less than 1,500 gpd, drainfield trench sizing must be based on the most restrictive soil group encountered within 15 inches from the bottom of the drainfield trench. When calculating the required lineal feet of the dispersal field, only the trench bottom area may be considered. Fl, The LEA may allow up to a 25% reduction in drainfield sizing based on in- clusion of a portion of the trench sidewall area for determining absorptive area when pressurized distribution is utilized. The percent of reduction would be based on the formula used in the Manual of Septic lank Prac- tice, ,An additional 25% reduction in drainfield sizing may be allowed when supplemental treatment is utilized, the combined reduction shall be no more than 50%. the base from which the reduction would be made is the size of the system calculated from trench bottom only utilizing the applica- tion rates associated with soil classifications in Table One in this Chapter. I. Deserve ,Area. dA reserve area with suitable site conditions for a new dis- persal system installation must be set aside. The reserve area must be: 1. Equal to 100 percent of the capacity required for a replacement dispersal system 2. Totally separate from the initial dispersal system area, . ,Able to meet all/ current design requirements for the type of re- placement system proposed', including soil depth, soil type, slope restrictions, and setbacks, etc. On-Site Wastewater Manual—Part 3—System Requirements ,Adapted March 16, 2010—Updated,August 24, 2010 and December 11, 2012 Part Three** Page 4 4. Fully protected to prevent damage to soil and any adverse impact on the immediate surroundings that may affect the installation of the replacement dispersal system or its function J Systems must be designed to disperse effluent to subsurface soils in a manner that provides unsaturated zone treatment and aerobic decomposi- tion of the effluent. The base of the dispersal system must be designed and installed at the shallowest practicable depth at or below the original elevation of the soil surface to maximize elements critical to effective treatment of effluent in the soil. Elements critical to effective treatment in- clude oxygen transfer, biological treatment, and vegetative uptake of nu- trients. K. The minimum liquid capacity of any .septic tank installed must be 1500 gal- lons for up to a 4 bedroom residence and an additional 200 gallons for each bedroom thereafter. L. Where the site evaluation reveals the probable existence of slope instabili- ties within 50 feet of the primary or repair dispersal field areas, the LECA will require a Professional Engineer or Registered Civil Engineer inspect the site and recommend mitigation measures to prevent slope instabilities form impacting the on-site wastewater system. ,such measures may in- clude, but are not limited to, the following: 1. Altering the proposed system location to avoid steep slopes and/or slope instabilities; . Establishing specified recommended setbacks from identified slope instabilities or from steep slopes; and 3. Incorporating wastewater system design measures to minimize the creation of localized saturated flog conditions, such as pressure distribution or subsurface drip irrigation instead of gravity flow. K For on-site wastewater systems with design flows exceeding 1,500 gallons per day, the LEA, will require the certified designer to include a special de- sign analysis and design features to assure the prevention of localized im- pacts to water quality or public health. The analysis and design features must include- 1. Analysis of the potential localized waste loading effects including, at a minimum, groundwater mounding and nitrogen loading; 2. Minimum criteria for evaluation of the results of the analysis; and 3. Incorporation of the system design measures to address the find- ings of the analysis. N. For on-site wastewater systems located within a 100-year flood zone, the LEA will require the certified designer to include a special design analysis and design features to prevent caused by inundation with water. The anal- ysis, and design features must include includes: On-Site Wastewater ���1��� �_ yet Requirements Adopted March 16, 2010— Updated August 24, 201.0 and December 11, 2012 Part Three ** Page 5 N__ rt5 1. Protection of supplemental treatment, pressure distribution, and subsurface drip irrigation components; and 2, Prevention of discharge of wastewater into flooded dispersal areas from pumps or dosing siphons where the distribution piping is fess than 12 inches below ground surface. Table 1. Soil Depth and Application Rate Requirements ;�,p} Ilctib� �lrtrnum 'ertical:Separ"atlon 01 . t9SDlekutiplemntal� tenta .. _. reat .' 'Group,, p��t �ur��.,,A85 Sero t' "#t8 r 312006 a AB 885��'2'006 ". lt6r) . Course sand Prohibited ----- ......... .......... Course to medium sand A 1.2 Special requirements as outlined in this Cha ter a l Fine sand, loamy sand 3 S 1.1 to 0.8 Sandy loam, loam, sandy clayloam C <0.8 to 0.5 2 ft for creation of new parcels Silt loam D <0.6 to 0.4 1.5 ft for existing parcels ft (For existing parcels with a mininiurn of 1 ft of native effective sail,fill may Clay loam, silty clay loam, sandys be used at a 1:1.5 ratio to attain the Clay 1,2 E <0A to 0.1 1.5 ft vertical separation,when disin- fection is utilized in addition to sup_ pl'ernental treatment.) Percolation tests required'... 2 Clays must be non-expansive 3 Subject to percolation test in addition to soil textural determination if 05% or more (by volume) coarse fragments (defined as > 2 mm size) I'i�ii1;1 iii 1p 11 NN111`11 wlm-lI9i1ni 1111111 ww,lll iIw111 `Ii 1M ��11 111 I1I-Y ill 11'1111:11 ip-1,Iii 14. tiiu ui ii oon1Ii ua'u 1H.Ii Ni 11111 ii Ii'u Ali ai itii'i 1111 11 it:ii it'iit i:'iiti-tooi ii I1w ei eni 1iIrci i' ICIIIi1IUl1111111.11111111I1�,I11111111�1II IIIII�IIIINII ll ll�lll I.11"Iw111111'111111�I�IIIIiI 1111,NII 1N!111111N111111111lIN 111 AI 919 aIN 1111 Nf I Il I1 1111111 If 1111 N All 11 IN 111111111 y 91illiliii:aiiIllii99'iii 911iii:ii1IN,leiill11INIItIAIONI tlia�l"eil-iINlNiililiiti1lllllAIfINI'll 111If111111'-11110 toI1IIItoNII.NIN.$,11IIN'IIIll IisI'm Nft1N OR1.'III IIN1811ION INfIIN1N111'11N1- 11IIIIIFlII111111111TII111,11111III 11111:1111GII11111I.111ill 11I11IIl1I111III11II11III11111 1111111ITIl IA1111�111I11"I 111111.111111ll 1I111AINI,IIINI"111111'111 IIN IIIA al Il`II111I11,11111; I I A MI.4 II No MINI'..l 11 toll..I/.11 .1f f IL LE 1111 VIF1 tl 4• ^91Atl1N41 'w lR if 1.u A 41 II 1f.IN Y.I. 1.I IY.Yp}9,. pl f1114,4A.A lAA dp 1..'1[11' '^ ., le 1'..411- 9$- ,i I!'.I' !ft"7991iuiiii it iii ii i I A VINNI ii VIAlr,i/i Nn lRii oNi ilp 41111 Ili lM1„-1ifip it i'!wi INf " I,1.111.11111.0.o1..01..I.I if lll:.1.to.19Ill 4191119.4101r1f AA.11 A9,.Y-AAI^ I-II,Ip 1If „��.f IN I' 111 11 9 11 1 11 11 NI1 61117,1111 411 9 1111 111 flI MN 11 7 711111 11 1 1 s 1111;111 It 119 I1IJIN I1111 IIS,N119I I I.AI I.N A1I.1 No WIN IOI911.Y4.I Y"NI Y41 BN IM I.II/N'op 11.AA yl.91 p4/'{.I.N .1]II If,,.14�11YINf N1.,111.1I,If II NI.IN..111,.,II.I IIIII 1.1 If NIAINIIN.p Ifd AB BAR 4W)#4f,.A .If of iii 1.49.,I,YI , IG111;II 111111111111111;1111111;11111 II NI Ifi iLI.1111111;11;INl 1111fiN AN NH 111111119X1 ' w FIN I I N I. N w n 1':1N N IW YIAI ilIt 1Y1M11111'ii hill lu iY;i li nlYlu it�f:Hi 11111 a 111:111.'1 :o III 1x1111 gg91e 1 1 11 11 1 11 9 11 71 fI1119111 YNN 11 1! 1 9 11 11 ISN NI I11IN"1111 911Ill All 00 M-1l IIN 111111 As I:I9 1N N 911�:,I1I$11'; , 11 I.I f I I I I Ix.,IN I.1111.GTI 1 I I I I I �.♦911N.X 1.9 A1I.,4 pf-Ado A.f 01,14 III. ,AA o91, 91111111 N 1111 N1fi11111911R11111191111 BI NII ON 11 R N l$I111 Y9R I I N N I I!"" "II NNS IRS NN#BN7 ! ItoI f I11 N 11 I 11111 1111 I iN 11f1N I is II IRS sI VN I"WI I9I IN IN II 1$119 N 1111' "Np s1NII1111 Np1. �I�, ??111 611 1 41 11 91 111111 9111111 1 NN 11111 fill I ON 11 IN I Aalll 111 INy 11 NW 111 1111111 111114 4•w I!II IIN .1o1„1u 1�1f11111111.Y01 p11�111 f Y N Il I'pI IN.i.IN l 11 1 •11:111 w; 1111111111111 fN 111111111117111111111 NI N19RN11NRN,II 1111 I IIN 111''- N11N 111 11'19111 N1111sfi1N91 II fN1191IINN 11 1 19 1 1 9 11 119 s1 tlN 11119 IaN 1111991 MI1 s 11U ill IAIII NN7 .91. I I Ni to11. 1P1411p I.IY "1 .,P1194p 1 �, iI�IIII1lIIl. IgIl1IIlNI111"IIIIDII�II"IIIINIIIIIVIIIIIIIIIaI NIIIIiI'IIILIC� ,LA.MYA MI411 1X1IIIIfIN I.I I6 AI I.I I.1 Y411991/9.AI tlp NII i"', ;J E .1f.f4'U■U9 NI Af I1Ik Ap Fd 11P1'A.A fIU If,.ANfI IN, 1N 11"'1110 I II! .Y;N14Io l;JNY - '111111 II 1fi117111 1911111NIIIf 11 I1N kNfR 119 11-9 1191 1 19 11 1 91 9N NN9 9$N1I91N1911N1- I 01,11II III I II I Il 1I1ll I I'll ll Ill II 11.1111111111 11111111111111 :11111I I'II I1 I II I; 'II1 I14 fill NN: III1Ili NN$191191 N It 111 A N 111 IN 111 N 111.11111111 ?III Y9p1 'fol V9 f1 N. X 40 of 441 plop '1911.111.1 N1 f I14A II.I IIN II NN fI. XI N I qq((.9 o I..Y IY tl Y X N N..p 1 Y N 9 L I fop 1.11 1.'1 11 1.1 11 1 I I A I.1,of 1 11 ,5 1 I Y I I 111 1 Iq1 IIN 9191 NI° 111 NM lINN11 NN,NMN11'IS IMMk198941 N'IVIV 111 N1,9 It :II If 11°NI"1111I'll A. IID.191.41411 'a fl 1.11X11.11,A.16N 111 I.9 f1I.9 III ofI1.11119 M1f„ ,4 1NIIjf11 11111.11 I I IIt111I1 1,I11I1llII1Il111111I1111(I1111111111'IINI111 11 1 wIIlIllll '44.111 0114 f . I. 4 ....p 141 !11 fI.I .41IIp , f,N1I7f11111 ILf41MNlI1p.II,N 1X919 41fMI419Mp711111419111I11 'II 140 1U#1191;1'.- 1% iilIN1"1111111, �1Ir91,IINIOfitJOIllritI iOIIwili11ILI,=1111'111 11 NI1�IiW]IIIt 111 N!Ykll11 N1' � ;11111'1 1fINf,I171NJk 111@111911 II9.s1111111I NII II 111,1114 I11fI I 111H]111111 11111"FBIIF11111111,IIfI11111111111II11IIIlI1 IA1111J11NIININ 1 J1 N1 V81111 'I It 11111 LAIN#11111,19 11 1 11 1 1&114,11114111 UN 11fa.0 .1111 'loll I I1111 11 ' = i 1f..IYY.1 N;tl., 111 Y.IAtl9G..1.10911'44(1191.Y11.f 144'.,A 911',114.9' .ln 11,11,11.4'..A,11tl 11.X91.49 AN 'Nof1.I14I1,two 411 YI 494411XM.IA'Y11Y.Y 1101ll;p.1fI1149' Ii f4.01,1.,'1 I. '14Y I.I,;IIif fINoN of IN f.IX1N.f19N AN IM ofY III I'.11.4 ,of Nli A 901.11Fn11 No ,1 NII IN 111 NIN 1,itI11N111.1IN 111(1111111191ill 111111111 Ill N If s$9 X111 I II '11111 N1'#I4 11111'i9..Ib p1„ ;f off.1 of Gf l,N . 11"41 I.911,g1,Y..Al1.IAI44."A1..111 ,1..11'-0IUAIq 4, A. 9q 1'.19 I1� �4 LIA.1t.,11'1,1A9.1 1111 I•,4 111.1 f 11411.to 1I I It N44 ,.11,1.11 )1.111,1 WII-I-. 111'9!1111 ffi ,Ns.1911sf111sN#RI1I'tsIll INTI'llIIILL AItIItIN�N1? "1 I N1119;N 1 NI 116111 I1`II°FI I.IF 1 II 111 IFI I FIlf lul ?FII FII 11111111"l l I11 I&111111. 111'11 Il r 1111 l I I fill 1 T1 ;11111 sl' %fit 1!1!H!1lI1I11'9 111'11 I f1I II 1111 IN'I 11'1111 f; 11,1.1911:1 iffIli''I Ip.If 1.1 f'/I, ,1'111 I...I 1A 1.19.111 ,1 I4 I IN 1.111 A 1.11..11 Vo 11111 ,.Tp Y/ 41 1.1419711,1 �Xl� A'Ib?.Ill l b;f olf-I I1 f If off flof,U'.41NIl 1q 1'.119'914Yu'u.1''.Y'Nt,YyJ OpPJIM 11911?. 1 11811111";NN Is IN 111798 9 9`1 4R 111 I M 111 11111,;7 111 IN s,fil 191,I4IVI NN 11;,1 11111 11I1I,1,I N1 11111 N1'#, 'r' I.1f 1"1.91 qe 111.f411tl1,AX.A 1111 N.YN,1.N 9d11V 1,.IN 4'111 1. 'k NI"1'/1'4441111 111111!II1111II1111I11111IIIill 1Ill 111III 11111111111lHI'llIIll 11.111If, .11 it ld111111I'll.l: f" �. 191 NI U11 N1 N N 111711!N IS I111s 11N 11 11111111 if 11111111 N 1111 Y11 N I I 1 111 IN1 NN 111 VIN Ii SII 9. 1 91 11 6 11 1 NI 11111711!41111111 Y 91!111111111 @17 NN1111 N171111N9N1 ""It 9.111111 IN1111111Nd' .�..,.... NIA,14�.. 111.0,„ ....,,.. 1119111119111111941119114119111,11,1!1:111,I1.1111NI1f 1111k 1111119,1 Ni 111f N 111114 111 N1IN IIllIN I„ " 4 , 11119119I1t NI 11191 p1,kf11lIIN NSM194p�111111�11119 NN 9RI NNI IU}11 gMIVllI!#R 111 X111 NN;�„n B1'N11 N11N! 111111:111111111I1I1��111�I1111111,II1111,1F11;l,ICI1F1Ff It 11411111111.I11�I111�'1II:II�ILL111I'N; 111 i ?iii wi ll IN 1111,111 ill fill; inllpl:ii vT ii pyi9ll.ilNo Mni iea eli rein yi Il 111 AN IN ii;i it 41. 11.I1 . oIf'1 .1111111 ..11 4 A.1 ON 1.141 I.4 A No 1 0 1 1f.If No 11 11 o 114 IA.I'Y IN 1' .f.111.1,41"f 1101.M.11.1 A.191141 No o N.I I.1..of I P.'4p.f.fl, too p.N 111 JA n.pX 1IYA 4Nf 'I "ill;1; 11111'11 N1 f1111111111111I1'II II N11991814N F,1Is1191 1!11111!11111 It No I1 V6.11111 l"9 I IY.111911 NY 411.A9 N.GIN.,.11'1,11 Ytl./NOY Y1 X14."141I.11A Y'A.;41 of f .I a I.NA.G1 to 1NoItIAII'll,it '1IIN�NifApiNiilllANI. lNi1lNNN111�NN1Nli11N1N'`1'1111IN 1a4M,,"i'NN11111N1NN'Naei 11L111I1111itIIdg1111111I"1ifIIIIIIII111limI'II111ILlIlll11,1111IIII ;I'll 111111111I'll 119 U11 1111411111 NC11 UU 1111117 Nall-11191'11 I�LYI111111111111#14111N."! 991119;9911,1N 911 D191.1191, 'f1.411..1fIN1!4.'114.11f1,11.�WIA'VW,N.IA1'1.f I=I A11.It X 11 I.IIN 691 N1'14I"1.1p }9 I..1I 4,1M'Yn49'f '41.X14.411 '"141 1411.1NAp.9AIkNAMNN.#,144.191,1.IIf INpo.9114,11f.Y4 .1N1Gilio.44/'49'91. 411;1 r ,I,Y1Ill NI II li its iA iINI I.NNI Il Iii lei jiiNto' iiiiiiili it p N1N NoN1171,I i1111s 11oN;I.I sull,v un i' ' 1� 1141 191 M1N IN N9I1I11I191'1 M1N 1191.1111111 I111'11B111 fol if lNl11N111B 1111184.111 14 1 110 1&N 111- u,,I ... .,,.. ,.,,,N.. ,..r,,.I ,., E ,11M N11gill I1111Ill 111111141iI1NVN!.;Hill,IN I1:91171 Ill L,I 91 I1911'I4I 1111.1 X41 Yl IN fit$1411!1$11" QUI' l[ 111111IIIIf1iili111iti111Ir�111111fIii 111111Ii111li 1111111 �iilililiii 1 11 4111 11 1 11,,11 11 1 119/1 11 11 1.111 111111 NMN 911111111111s11911111IIN,1I NN 111111'1911111 NId IV1, 11 IFl of IIl'4 A(...f.I I,/.I.1-b 191 I9I 144A1'A"I..1114 , 1.1.14;49 .pI .p 9 fo 1119.1 Wim. I It. 1.AfYI"4N1.4f..ItP 1.1NNBYp..Sof 1141.^f 11UOA 194 NI 1I..1141 HYC,1.91,1.111 I, I, 11 A'1 w O Il 1N 114 114 47 N 111.1 is I iN 111 i 11 NN NMI 1I 1111117 N IN..loll 117 1111 4%141 11,1171 91 1f 1 98111 19191 1!!1111.1✓I 1 4111.1 1.,91It If4.1111 aIN.9,WA /,11M IM I.9NNI�pIW N.1141'X A6N. N • A4111p.0 IAA f of of".1o7 YA..f14I19J. ..X19,I I of 4.N 4.1,111,,.1114 Y,-A4 fA 4.,I I111 NN NNN.N..N.111. a ,1IM11111111 1111119 1111 f1I11191111U 111 11 114 111 111.17419 11 NI I IN NN='11;N119Y111 f1 It N 1111 V1N 11 r 111'IIIIIII111111IIlilI1111111111.1111"1111111111'IIFIIFIIII111111II1:N1I11N1II1111'NI1111III1111 wr 1181111/LIl"11111,1 II I ILII I II 11111/1/1 I1 N N I11 I111N NSI1N 111 fl, All 11No A.711 fill 111IN111fV p'NNo N.1.f4.44'AAIt114..IAil 19X.„Y...II1.1 p.IN 1.',,N II✓p.4.41 filed.,11 11A 114X01 d1. A I.11...1111� :coo"NIN:.,II I NI AI M I.1.I N, .111 111 I.r 1x 9 N,.;4 rIp.N YI a'9NN..=r1'iW lal.114"101.,1 l., oolw. l.:Cn/,: ,1111111N99N 91 NN119'11tl1111111t1N-99;IMN s1IB IM'N 111 M11tlN 1191X11;!11111 IN 1 if I I1,IN 111111,11:11N Iof111114.1.10 LAf11�I1A11I111.1904AL XIII 0141. fI.Ar1A 91110'11 I.,4,11 F1.A,41,1,1X,11 ��11111��1�11111111�11I�I�11111��1�11II��I�Ill�ill[�11111��1111�`111�N���ll�l`�1111�1'��1,�11111��1� 9 1111 1 11 1 11,11 9i 119 11 111111fit11 !1 If1I'1 IVI AI'141 9111 'I to N IL I$11111 11,1,$11 I1'U 11 9 911; ' Nl.A .10 11 Y 11:1:111 o .11.p 4p I I9 II}.,U1 MA 1►. . AI # 491 fill I.IN1.11 4 f,',f 11.YIN 1'x111. 11.1 IN,I II If I4. 1.IM f 1.Il 9f N A N 141.1.1 I ottHII II d.4Il. Ill 111;1 111119INf 11.111114111;N1N8111N1111,N1N,111111111111✓s�M911'a.Il 11111111 11,111Nf111111111 V11111: I-II I1 I'll I II 11111 I1 I1 I Il 11 III 1111 Il,1111111 1111111;`7-11111 IN I II 11,111"11111111 II Il 111 It I II l l I ;!'11 11 1 14.11 11 11 1 1l N 1 1141 11 1111'1 111'111 I1 1111'1 11.19 114$111 M;16'1N 1 11 1811 9 M I N I V 1f 111 11 I I °I I. 118.4'1 p fp .Lp .1p 1IY 911. f, f. A .111'4 .,III 14,.fI1.1 tl'1.111p.4II0.1I1 IYI I.II Y,119 4 1, N YA . 81 I 1A, . , .N 1.111 R/ .'11 LI 11. . .1.1,1'11 '1401!11141,' ,Y.. .'X194 Ill .41.114 f.I if p.Io , f .F 1114 III Ifl tN 1111.141 oI 111111N441A 4119, N N 41 f 1911 N 181141'Ill;X11'9;111 I Ml 11 N I I I114 .'w.%Kr.,"-fIIIIII I11117ILN1I 11111111;1111-N17I 411 I9 II W11'Ar 11If 4.641$9#of to fu N.141,.AAA AXAr°' A1A'nM 1f 1.4111 I..II;N 9.of oval A 94t.1It..NIWI111gNAApAIH1U'- I44Af 115 tl4A Stlp 1.;+ I .A'YN'tl1. , .11111 Y➢1 1P ll�f.11.111111 1111. N N11N11$191Il1111111111ON119111N1.11NIlNf Ike 1111,14111.1111'1;191!1 11 I;,Itst 191!111 N111 II 7=114 U' �1,1M 11111 111 1411 � ;d 1111111fi111I#11I111f611171K P1?N111 CN pC#1819I1111I 11 1 11 41 1 1 1 1111, ";,: `iirtli(�i11% i1;I111Nr�rill id i�4 I% lu�off i r,lM4KrM i> 111- ' ,a r',lirvi A,I ra-1liMdilp;M%N111 ' i t l J � I On-Site Wastewater Manual—Part 3—System Requirements Adopted march 16, 2010— Updated August 24, 2010 and December 11 2012 Fart Three** Page 7 Chapter 2. Location and Setbacks The setbacks shown in the following tele will apply to al'I on-site wastewater sys- tems, unless otherw,ise specified in this Manual. Minimum Horizontal Separation From Disposal From Septic Tank, Distance Required From: "ieid ATU, or tined Sand Miter 4r"'`telts' Public well 1010' 100' Private well 100, 50' Other wells excludimonitoringwell mm 100" .......... ......_.._. 50' Surface waters' Reservoirs or lakes 200' 50' Year-Round. Springs, Streams, Creeks, or Ponds 100, 50, Intermittent streams,drainage-swales _. ... 50' S@' Curtain drains--Vertical/Curtain drains Up gradient of system 20' 20' Down gradierlLof system _..- 50' ?'S' Cuts manmade in excess of 2.5 feet (top of down? 4 X heigWof the bank, 20, slope rut)or escarpments' __to a maximum of 50 Property lines, foundation lines of any structure including garages, out-buildings, in-ground swim 5" 51 pools,water line S4 5 Easernents6 Public access easement 20' 20' Other easement Clear Clear Table Footnotes If a setback is not specifiedin this Tattle,the most recently Board of Supervisors-adopted Uniform Plumbing Code set- back will be applied. 1 Additional setback may be required from dispersal field for community or larger wastewater systems 2 Setbacks from streams and creeks must be measured from bank drop-off or mean yearly high water mark; reservoirs and lakes are differentiated from ponds by being greater than 1 acre-feet in size; landscape ponds less than 5,000 gallons are exempt from these setbacks. 3 The height (in feet) of the cut or escarpment as measured from the toe of the cut or vertically to the projection of the natural ground slope. 4 The LEA encourages the placement of septic tanks and other treatment units as close as feasible to the minimum separation from the building foundation in order to minimize possible clogging of the building sewer. 5 unless otherwise approved by the LEA crossing of water lines and effluent sewer lines is prohibited. 6 A system may be installed underneath overhead power lines or cross other utilities(e g.,canals)providing all of the fdllowing conditions are met: a. Written authorization is received from the utility company operating and maintaining the utility affected or for which the easement or restriction was granted; b. The LEA. determines that the encroachment is necessary and there is no other viable area in which to install the system;and G. All construction modifications required by the L,EA, and the affected utility company(is) are instituted to carry out the purposes of this Manual. Chapter 3. Design Flow A. Projected daily sewage flow from single family residences must be calcu- lated at 246 gpd for 2 bedrooms, 360 gpd for 6 bedrooms, and 60 gpd for each additional bedroom. On-Site Wastewater Manual--Bart 3—system Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012 [Fart Three** Page 8 5f�VurMi;21D B. Projected daily flows for other than single-family dwellings shall be esti- mated using the following table unless, on a case-by-case basis, the LEA approves metered water use data, or other supporting data in lieu of the estimated sewage flows set forth in the table. However, in no case shall' a system be designed fair a flow of less than 100 gpd. Existing data may be used, provided the following specifications are met: 1. The design flow may be calculated by actual potable water meter readings, or facility wastewater influent or effluent meter readings if water records are from billing records of the service provider or from water meters certified to be within 2% by the water purveyor or, in the case of wastewater metering, the meter read values are certified as "correct" by a certified designer. 2. The average daily flows shall be adjusted for peak flow days as fol- lows: a. If the water meter records are recorded on a daily basis, the highest ten day flows can be averaged and used for the de- sign flow. b. If the water meter records are recorded on a weekly basis, the design flow shall be calculated by dividing the number of days the facility was in use into the highest weekly flow, and multiplying by 1.2 C. If the water meter records are recorded on a monthly basis, the design flow shall be calculated by dividing the number of days the facility was in use into the highest monthly flow, and multiplying by 1.5. d. If the water meter records are recorded on a quarterly basis, the design flow shall be calculated by dividing the number of days the facility was in use into the highest quarterly flow and multiplying by 2.0 Design Plows Type of Business or Facility Minimum Flow (Gallons per Day) Bathhouses and swimmm paois 10(per person) Barbershoplsalon 100(per chair) Camps (4 persons per campsite,wherem-applicable) -with central comfort stations 35(per person) -with flush toilets,no showers 25(per person) -construction camps(semi-permanent) 50(per person) -day camps(no meals served) 15(per person) resort cars(nishi and daa )with limited plumbing 50(per person) Churches m -with kitchen 15(per seat) -without kitchen Country ciubs __.................. -per resident member 100 add Ber nonresident member present 25 l / /r%s%/r// fjf //r'I' ,ryD� On-Site Wastewater G9f1al®P —Systemeq�llPel'771eB1t Adopted March 16, 2010—Updated August 24, 2010 end December 11., 2012 Part Three " Page 9 01.10" Minimum Flow Type of Business or Facilityr (Gallons perDay) add per eniployee _ 15(per 8 hour shift) Department store with public bathrooms 400 Dentist office -per wet chair 200 -add per non-wet chair 50 ....... . ....._..m _.._ _... ......m..... _. Factories -with shower facilities,no food service or industrial wastes 85(per person,per shift) -without shower facilities„no food service or industrial wastes 1 (per persaan,per shaft Hospitals 250_(per bed space) Hotels or motels -with private baths 100(per room) -without private baths _._....__ 80(per room)_ Inst tufl"ons other than hospitals _...__....__.. 125(per bed) Laundries self-service washingcha _ananes ... 500(per machine)._ ._.._._ Limited agricuitural building 100(per buildiQ ) Mobile home parks 250(aer space) ..,- _...._... ---- Parks public picnic areas -with toilet wastes only 5(per person) with bathhouses,showers and flush toilets 1t7(per person) Restaurants -with multi-use utensils 50(per seat) -with single service utensils 25(per seat) -wraith bars and/or cocktail Ip angems50(per seat) Residential tructures -Second dwelling,condominium,multi-farnily(duplex,triplex,etc.) -Same as for full single family residence -Guesthouse _ ----- _Same a for additional bedroom Retail stores -for customer -Use comparable flows from similar busi- nesses and population -add for each employee 15( er 8-hr shift) Shopping center .....m.... _._.........m ...... 2(?er parking spaced ... Schools _boarding 100(per persona) -day(without gyms,cafeterias or showers) 15(per person) -day(with gyms,cafeterias and showers) 25(per person) -day(with cafeteria rra_g lrn_or showers) 20 er erson) Sei'rlce stations 500 for 1'°pump set 800 for each add n I Swimming_p921s and bathhouses 10(per person) Theaters -movie 5(per seat) -drive-in _. _... _ 20(per car,space)...._ Recreational vehicle parks -without individual water and sewer hookups 50(per space) wtlth individual water server hookups 100(per s ace) Chapter 4. Installation A. Septic tanks must be installed on a level, stable base of either pea-gravel or send. B. Septic tanks located) in high groundwater areas must be accompanied with engineered anti-buoyancy calculations to prevent flotation. C. e 111 septic tanks must be installed with watertight risers extending to fin- ished grade, with surrounding grading to facilitate drainage away from the riser. On-Sete wastewater Manual— Part 3®System Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 10 G. Septic tanks must be installed in a location that provides access for servic- ing and pumping. E. Systems will not be installed when moist or wet conditions cause trench sidewall or bottom area degradation of soil structure and porosity (which frequently appears as smearing and compaction). F, Each drainfield trench will have distribution piping that is centered horizon- tally in the trench. G. Grainfield trenches must be installed on contour. H. Prior to backfilling the trench, the drain rock must be covered with filter fabric, a minimum of 2 inches of compacted straw oir with untreated build- ing paper. I. Backfill must be carefully placed to prevent damage to the system. J. Backfill must be native soil free of large stones, frozen clumps of earth, masonry, stumps, waste construction materials, or other materials that could damage the system. All distribution boxes must be bedded on Level pea gravel or sand base. L. Observation ports, of a design approved by the LEA, must be installed at the end of each drainfield trench. Adequate erosion control measures must be utilized at all times in con- formance with applicable county regulations and per the consultant's de- sign. N. Slope of Lines 1. Tightline From House Maintain 1/6 to 1/4 inch drop per running foot (1% to 2% slope). Use two 45 degree fittings and a cleanout when a step-down is necessary. Locate step-down as close to house and as far from septic tank as possible to avoid unnecessary turbulence in septic tank. 2. Tightline From Septic Tank Maintain minimum of 6 inch drop per 100 feet (0.5% slope) to perfo- rated drain lateral. 3. Perforated Lateral Level each lateral; maximum allowed tolerance will be ± 1 inch. Place an end cap on each lateral. Notate each section of lateral pipe so holes are at 5:00 and 7:00 position . Whenever a trench excavation could act as a conduit for groundwater movement between system components, the trench must be back-filled with a minimum of 5 lineal) feet of sufficiently restrictive material, such as clay„ to prevent the flow. n- ite eat r Manual—Part ®SystemRequirements Adopted march 16, 2010—Updated August 24, 2010 and December 11, 2012 Nw2 Fart Three** Page 11 Chapter 5. Septic Tarek Destruction X Application 1. The application for a Destruction (Permit may be obtained through. the LEA (Butte County Environmental Health). The completed ap- plication needs to be submitted along with the required fee and a scaled site plan ind,ieati q the location of the existing septic tank(s) and current or known future structures. B. Issuance 1. The Destruction 'Permit will be issued along with a Declaration of (Destruction form to be returned after find inspection. The LEA strongly recommends that all work be performed by a Licensed Contractor, although some work may be done by do-it-yourself property owners with prior LEA authorization. All work must meet LEA and Building Division requirements and pass inspection. . obtaining the permit gives the LEA oversight of the abandonment process to ensure that all structural requirements are met and that the Declaration of Septic Tank Destruction is submitted at the time of inspection. C. Process `I, The septic tank must be pumped and certified empty by a Certified eptage pumper. . if the tank is to be destroyed in place and is greater than A from any existing or future proposed structures, the person performing the work must ensure that the bottom of the tank is broken such that it is unable to hold water, and then filled with self-compacting soil, sand, or pea gravel. Should the person performing the work choose to fill the empty tank with -sack slurry, breaking the bottom of the tank is not required. Should the person performing the work choose to remove the tank, the excavation must be backfilled with clean self-compacting soil, sand, or pea-gravel. . If the tank is less than ' from any existing or future proposed struc- tures, a two-sack slurry mixture must be used to fill) the tanks other- wise„ a Professional EngMeer must certify the destruction method- ology utilized. 4. Arrangements for 'inspection of the system destruction must be made with the LEA. In some iinstances, the Licensed Contractor may be able to submit electronic documentation of the destruction process in place of an on-site inspection. . The person performing the work must submit the Declaratiion of Destruction form provided'. Im On-Site Wastewater Manual— Part —System Requirements Adopted March 16, 2010— Updated August 24, 2010 and December 11, 2012 Part Three**Page 12 Requirements for Dispersal Components Chapter 6. Standard Gravity Systems Standard gravity systems are on-site wastewater systems consisting of a septic tank and a gravity distribution drainfield. Standard systems, as used in this Man- ual, include those that utilize shallow trench depth, standard trench depth, or deep trench depth gravity drainfiields. (Dote: Deep trench drainfields requiring pressurized rather than gravity distribution may be found under other applicable requirements of this Manual.) A. Site Requirements 1. Soils in the primary and replacement drainfield area will allows a ver- tical separation of 36 inches to be maintained. 2. The site has not been filled or the soil has not been modified in a way that would adversely affect functioning of the system. 3. The site will not be on an unstable landform, where operation of the system may be adversely affected. 4. The site of the drainfield and replacement areas must not be cov- ered by asphalt or concrete unless site constraints allows no other feasible alternative. 5. The site of the drainfield and replacement areas must not be sub- ject to the activity associated with vehicular traffic, corrals, pens, arenas or other concentrations of livestock, or other activity which would adversely affect the soil or integrity of the system. 6. The slope of the ground in the drainfield and replacement areas will not exceed 30% for a standard gravity system. When the slope of the ground exceeds 30%, the requirements of Chapter 16 of this Manual for Steep Slope Systems will apply. B. Drainfield Excavation Requirements 1. Drainfield trenches must be constructed in accordance with the fol- lowing standards, unless otherwise specified: a. Length maximum: 100 feet b. Bottom width minimum: 12 inches C. Bottom width maximum: 36 inches for drainfield trenches; wider excavations may be considered by the LEA on a case- by-case basis d. Depth: 12-36 inches (1) 6-13 inches for Shallow Trench (2) 1 -36 inches for Standard Trench ( ) >36 inches is not considered a standard system. Re- fer to Chapter 6 of this Fart of the Manual. On-Site Wastewater Manual—Fart 3—system Requirements Adopted March 16, 2010—updated august 24, 2010 and December 11, 2012 Fart Three** Page 13 Minimum distance of undisturbed soil between drainfield trenches (inner sidewall-to-inner sidewall) must be 6 feet. 6. There must be a minimum of 12 inches of backfill' over the drain rook. 4. Drain rock will extend the full wldth and length of the drainfield trench. There must be at least 6 inches of drain rook under the dis- tribution pipe and at least 2 inches over the distribution pipe. 6. A soil barrier must be placed on top of the drain rook to exclude fines from the drain rock. The barrier will consist of filter fabric meeting the minimum specifications outlined in this Manual, straw„ or untreated build ng paper. 6. Inspection ports must be installed at the end of each drainfield trench as follows: a. Each inspection port must extend to the finished grade. b. The ground surrounding the inspection port must be graded so that surface water does not accumulate adjacent to the port. C. The inspection port must be capped to prevent vandalism and tampering. d. lnspection ports must have a minimum diameter of four (4) inches. C. Distribution 1. Level Sites a. for two or more laterals use a distribution box. b. Tie in the ends of the laterals to create a closed loop system when site conditions allow.. C. Level distribution boxes with water to assure even flow. Flow equalization devices are recommended. . Sloped Sites a. Use a distributions boar at the uppermost lateral and ti'ghtline from the distribution box to the beginning of the down slope laterals D. Shallow Trench Systems When the drainfield trench (measured at down slope sidewall) is excavat- ed less than 24 inches into the original grade, the Following additional re- quirements, will apply: 1. Soil used for cover must be the same Soil Group (identified in Chapter 1 of this part of the Manual) as that which was excavated for the trench or a Soil Group that has a higher rate of percolation that that which has been excavated. On-Site Wastewater Manual—Part 3—System Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 14 2. The drainfield area will have the vegetation removed and must be scarified, parallel to contours„ no deeper than 2 inches at the time of construction. 3. Soil cap will extend a minimum of 5 feet beyond the exterior trench sidewall' on the upslope side and 10 feet elsewhere. . The site must be contoured and landscaped in accordance with the approved construction plan and permit requirements in order to shed water, control erosion and to prevent surface drainage onto the system. 5. The site must be protected from the activity of vehicular traffic, cor- rals, horse arenas, stables, or other activities that could damage the system or the integrity of the soil. E. Pump Systems When a pump is utilized to enable gravity drainfield trenches upslope of the structure to be served, the following additional requirements will apply: 1. The pump chamber, pump tank, and/or dosing tank must meet the requirements specified) in Part Two of this /Manual. 2. The pump intake must be provided with a screen.. 3. The pump tank (or second compartment of the septic tank) will have capacity sufficient to deliver the design dose and have a min- imum additional storage capacity above the high level alarm of one- half the daily design flow so that, in the case of pump failure or power outage the tank has the capacity to accept a limited amount of wastewater from the residence or commercial establishment. . Each tank must be installed on a stable level base, generally con- sisting of 3 inches of pea gravel or sand. . Each pump tank must be provided with a watertight riser extending to the ground surface or above, with a minimum inside horizontal measurement equal to or greater than the tank access manhole. Provision must be made for securely fastening the manhole cover. B. Pump tanks in high groundwater areas must be weighted or provid- ed with an anti-buoyancy device to prevent flotation as per the manufacturer's recommendation and as required in Part 2 of this manual.. 7. Specialized Use of Pump with Pump Basin specialized purpose for use of a pump and pump basin is to ad- dress the issue of plumbing elevation for a portion of a residence, or a remote bathroom for outbuildings, being too low in elevation relative to the septic tank to allow gravity flow to the septic tank. In these cases, On-Site Wastewater Manual® dart 3_System Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 15 a. A pump basin with pump may be utilized when any toiletbe- ing serviced, in the case of residential application„ is not the sole toilet utilized by the residence. b. A solids handling pump, rather than a grinder pump, must be used and must pump directly into the septic tank with a 4 inch penetration 10 ft from the tank inlet.. E, Gravelless Chamber and Bundled Expanded Polystyrene (EPS) Synthetic Aggregate Systems 1. With 1010% olf the area required for a gravel-filled drainfield estab- lished and dedicated (for initial and replacement fields) reduced- size gravelless chamber bundled EPS synthetic aggregate drain- fields may be designed and installed. Z System design„ layout, and installation must be donee in a manner easily facilitating the installation of additional gravelless chamber or bundled EPS synthetic aggregate drainfield if future conditions ne- cessitate such action. . Except for those serving seasonal dwellings, the drainfield size us- ing gravelless chambers or bundled EPS synthetic aggregate prod- ucts may be reduced by 0%, provided no additional sizing reduc- tions (such as would otherwise be allowed for use of pressurized distribution or supplemental treatment) are utilized in the design of the drainfield system. 4. Wastewater from residential sources must receive pre-treatment at least equal to that provided in a conventional two-compartment septic tank, before discharge to a gravelless drainfield.. S. I rainfields using gravelless distribution products must be installed according to the manufacturer's instructions, in a manner that is consistent with these standards and with state and local rules, Chapter 7. Deep Trench Systems When, the drainfield trench is excavateddeeper than 36 inches into the finished grade, the following additional requirements will apply: A. The trench will be filled with an approved medium to course sand to within 4 inches of the finished grade so 'that wastewater from the pipe and gravel dispersal system will discharge over the sand bedding iin the deep trench. E. The system will be sized based on the texture and/or percolation rate of the receiving soil at the bottom of the trench. C. if the trench is deeper than 48 inches beneath the finished grade, pressur- ized distribution over the sand will) be required. On-Site Wastewater Manual l—Part 3—System Requirements eats Adopted) March 16, 2010 updated August 24, 2010 and December 11, 2012 Part.Three** Page 16 D. Minimum distance of undisturbed soil between drainfield trenches (inner sidewall-to-inner sidewall) within a deep trench drainfield must be 2 times the depth of the trench, up to 19 feet, except in the case of a steep slope system as otherwise described in this Manual. Chapter 8. Pressurized Distribution Systems A. Pipe, 'halves, and Fittings 1. All pressure distribution pipes and fittings, including transport lines, manifolds, laterals and fittings, must be adequately sized for the design flow. 2. Pressure transport piping must be uniformly supported along the trench bottom, and at the discretion of the LEA, it must be bedded in sand or other material approved by the LEA. 3. The ends of lateral piping will have 99 degree long sweeps and ball valves or threaded caps housed in valve boxes that accommodate threaded plugs or caps. 4. All joints in the pressure distribution manifold, lateral piping, transport pipe, must meet ASTM Specification D-1785. 5. A gate valve or ball valve must be placed on the pressure transport pipe inside or outside of the pump riser, in or near the dosing tank. 5. A check valve must be placed between the pump and the gate valve, when required. A check valve is not required if the pump has an internal check valve. All check valves and gate valves must be in an accessible and protected location for maintenance and repair. 7. An anti-siphon valve must be placed between the pump and leach field when the leach field is dawn slope of the pump. 3. All valves must be placed in boxes accessible for maintenance from the surface. B. [dosing Tanks 1. The pump chamber, pump tank, and/or dosing tank must meet the requirements specified in Dart Two of this Manual. 2. Duplex alternating pumps may be required by the LEA for some in- stallation (e.g. large systems approved for commercial facilities). 3. The dose volume must be sufficient to fully pressurize the Mines, as- suringi equal distribution through the system. The dose volume must be sufficient to refill any part of the pressure distribution sys- tem (including supply line and lateral lines) that has been designed to drain following a dose (for example, where necessary to prevent freezing in cold weather), and then deliver sufficient additional vol- ume to disperse the daily design flow in an appropriate number of doses per day. Dirainfield performance is enhanced when the daily On-site Wastewater Manual—Part 3—System Requirements Adopted Perch 16, 21110—Updated,august 24, 2010 and December 111, 2612 Fart Three *, Mage 17 flow is dispersed in smaller, more frequent doses throughout the day. In most applications, between 12 and 24 doses per day per zone, is appropriate, although a number outside of that range may be appropriate in some cases where it is not practical to design the system to deliver twelve or more doses, or where it is otherwise undesirable to design the system within that range of doses. C. Dispersal Trenches or Beds 1. The top of the drain rock must be covered with filter fabric, straw or untreated building paper. . A minimum of 12 inches of backfill is required over the filter rnateriW within the drainfield trench. D. 'Hydraulic Design 1. Orifices will have a minimum diameter of 103 inch and be evenly spaced at a distance between 2 and 6 feet. Orifices larger than 113 inch shall) be evaluated on a case by case basis due to design con- straints related to dose volume, effluent quality, and dispersal field size. 2. There must be a minimum 2 foot head at the orifice farthest from the manifold and no more than 10% head variation within a drain- field trench. . The effect of back drainage of the pressure distribution system must be evaluated for its impact upon the dosing tank and system operation. E. Installation 1. All orifices of pressure distribution laterals must be covered with ori- fice shields to prevent soil washout. 2. Lateral piping must be laid in the horizontal center of the trench and level to within 2 inches in 100 feet.. 3. Inspection ports must be placed at the end of the pressure distribu- tion lateral within the drainfield trench. . Each dosing tank must be installed on a stable level base. 6. Each dosing tank must be provided risers as described in Part 2 of this Manual. 6. Closing tanks located in high groundwater areas must be weighted or provided with an anti-buoyancy device to prevent flotation as per the manufacturer's recommendation and as required in Fart 2 of this manual. '. Sloping Sites 1. Ball or gate valves or flow, restrictors must be installed on each pressure distribution lateral to facilitate regulation of flog within each lateral. ( On-Site Wastewater Manual—Part 3—System Requirements Adopted Larch 16, 2010 Updated August 24, 2010 and December 11, 2012 Part Three** Page 1'6 2. The LEA will inspect the pressure distribution system for verification of hydraulic head over the pressure distribution laterals ("squirt height test"). a. Water and a source of generated electricity must be availa- ble for this inspection. b. Photographic documentation of the pressure test may be ac- cepted by the LER. on a case-by-case basis. c. Where site conditions preclude the entire drainfield being left open for the pressure test, the LEA may allow a portion of the trenches to be covered prior to the test and observe the pressurized flow at the distal end of each lateral. G. Shallow Pressure Drainfields Utilizing Small Diameter Chambers Pressure distribution systems may be installed within shallow, small diam- eter chambers constructed from plastic irrigation pipe. These systems must meet the following criteria: 1. Dispersal is preceded by supplemental treatment certified by NSP'IAN,SI to achieve DOD and TSS reduction to 10 mg/1 each (mean). 2. The chambers must have an adequate footing to support the soil cover and all normal activity. 3. The plastic pipe or chamber must be minimum 12-inches in diame- ter and be rated Schedule 40 or H-15�. 4. The LEA may allow trenches on minimum 3-foo�t centers maintain- ing at least 2 feet of uindisturbed soil between parallel trench side- walls. 5. The distribution piping will use 1I8-inch diameter orifices. 6. Each line must be equipped with a minimum -inch diameter in- spection port. 7. The system must be installed so that the trench depth will be 1 -12 inches beneath the original ground surface. 8. Effluent must be micro-dosed to the dispersal field at least 18 times in each 24-hour period. On-Site wastewater Manual— Part 3—System Requirements Adopted Parch 16, 2010— Updated August 24, 2010 and December 11, 2012 Pert Three Page 10 Min 4" Inspectior, r, s f" . ate."• .., Nntive Backfill _..._ Ghe S Plug eait �r'" TyFit Half NZ 45a EII, or '.`:5weep Mth I /B" O6ficcrr:°A r,;ptiada:, acted 12"u Typ. End Vicw Side View Sl,"cjlk),N Gravelless, Trend-i DekjH_ 21LOH GMf�rc�uvc,INesl rrc ru ch IT c; c:aiG Nn 'SuflnNo Scak," Chapter 9. Subsurface Drip Irrigation Subsurface Drip Irrigation is a method of dispersing wastewater uniformly over a large area by using numerous emitters installed at a shallow depth and very small doses. A. Supplemental treatment is required prier to dispersal utilizing subsurface drip irrigation. B. Minimum depth of drip line must be 6 inches. C. Subsurface drip dispersal systems must be designed„ installed and man- aged to provide even distribution and unsaturated subsurface flow. D. All subsurface drip dispersal system materials must be warranted by the manufacturer for use with wastewater and resistant to clogging from sol- ids, bacterial slime and roots. E. Fittings used to john drip lime to the distribution and flush manifolds must be in accordance with the manufacturer's recommendations. F. All emitters in the drip tubing installed on sloping sites must be pressure compensating. G, The subsurface drip dispersal system must be designedin the configura- tion that would minimize the flowing of effluent to the lowest area of the field when the pump shuts off or when the flow depressurizes. . A minimum velocity of 0.5 ft/sec or greater velocity if recommended by the manufacturer for field flushing of the laterals is required. I. All subsurface drip dispersal systems must be designed with a dosing con- troller with automatic field flushing, for zone alternating, for dose frequen- cy„ for dose volume and for flushing of the filters. J. All subsurface drip dispersal systems must be designed with a bypass line to facilitate field flushing. All subsurface drip dispersal systems must be designed with filters to re- move articles 100 microns or larger. t On-Site Wastewater Manual® Part 3®System Requirements Adopted March 16, 2010- Updated august 24, 2010 and December 11, 2012 Fart"three** Page 20 L_ All subsurface drip dispersal systems must be designed with air relief valves placed at the highest point on both supply and return manifolds. M. All the drip dispersal systems must be designed to accept flows that have residential-like wastewater quality. N. Sizing criteria must be based application rates shown in Mable One of this Manual for design flowers 1,500 gpd or less. Where the design flow ex- ceeds 1,500 gpd that following application rates shall apply: Soil Texture Soil Structure Application Rate (gpd.lft2) Coarse sand or coarser 1.6 Loamy coarse sand Not applicable 1.4 Sand 1.2 Loamy sand Weak to strong 1.2 Massive 0.7 Fine sand Moderate to strong 0.9 Massive or weak 0.6 Loamy fine sand Moderate to strong 0.9 Massive or weak 0.6 Very fine sand 0.6 Loamy very fine sand Not applicable 0.6 Moderate to strong 0.9 Sandy loam Weak, weak platy 0.6 Massive 0.5 Moderate to strong 0.8 Loam Weak, weak platy 0.6 Massive 0.5 Moderate to strong 0.8 Silt loam Weak, weak platy 0.3 Massive 0.2 Moderate to strong 0.6 Sandy clay loam Weak,weak platy 0.3 Massive 0.9 Moderate to strong 0.6 Clay loam Weak, weak platy 0.3 Massive 0.0 Moderate to strong 0.6 Silty clay loam Weak, weak platy .03 Massive 0.0 Sandy clay Moderate to strong 0.3 Massive to weak 0.0 Clay Moderate to strong 0.3 Massive to weak 0.0 Silty clay Moderate to strong 1 0.3 On-Site Wastewater Manual® Part 3—system Requirements Adopted March 16, 2010—updated,August 24, 2010 and December 11, 2012 Dart Three** Page 21 Soil Texture Soil Structure Application state (gpd/ft2) Massive to weak 0.0 OAll subsurface drip dispersal systems must be installed by certified install- ers with specific training in the installation of subsurface drip dispersal sys- tems. Proof of the specified training by way of certification or a letter from an approved trainer is required. P. Installation of the subsurface drip dispersal system must be per the manu- facturer's instructions. Requirements for Supplemental Treatment Chapter 10,. Supplemental Treatment Systems Supplemental treatment systems are on-site wastewater systems that provide a specified level of treatment prior to dispersal into the drainfield. A. Supplemental Treatment Components 1. Supplemental treatment components must be designed to meet the 'following BOD and TSS concentrations and, where nitrogen is iden- tified in the RWQCB basin plan as a water quality concern, the 'fol- lowing nitrogen effluent concentration:. a. 30-day average BOD concentration will not exceed 30 milli- grams per liter (m /L), or alternately, a carbonaceous BOD ( OD) in excess of 25 m /L b. 0-clay average TSS concentration will not exceed 30 m /L C. 30-day average TN concentration will not exceed 10 mg/L as nitrogen 2. Testing to comply with these performance levels musk be conduct- ed based on effluent analysis with the following minimurn detection limits: Parameter Detection Limit SOD 2 mg/l_ TSS 5 m /L Total Nitrogen 11 mg/L B. Disinfection Components 1. Add-on components performing disinfection must be designed ko achieve an effluent total coliform bacteria concentration, at the 95th percentile, of not greater than the following: On-site Wastewater Manual—'Part 3—System Requirement Adapted March 16, 2010-.. Updated August 24, 2010 and December 11, 2012 Part Three** Page 22 a. 16 MPN per 100 ml prior to discharge into the dispersal field where the soils exhibit percolation rates of 1-10 minutes per inch or where the soil' texture is sand„ or b. 1,666 MIEN per 166 ml prior to discharge into the dispersal field where the soils exhibit percolation rates greater than 16 minutes per inch or consist of a soil texture other than sand. 2. Testing of supplemental treatment components that perform disin- fection must be evaluated quarterly based on analysis of total coli- form, with a minimum detection limit of 2.2 MPN. Such systems must be maintained to comply with the performance requirements at all times. 3. When supplemental treatment is required followed by disinfection in order to meet reduced vertical separation requirements for existing parcels, the supplemental treatment system utilized will typically be a single-pass sand filter. When supplemental treatment system other than a single-pass sand filter is utilized preceding disinfection, the testing frequency for compliance with effluent quality limits will be increased from quarterly to monthly for the first year of opera- tion, or longer if needed to verify reliable treatment, C. Where feasible, as determined by the LFA., supplemental treatment com- ponents must be equipped with a telemetric alarm that notifies the owner and O&M Specialist in the event of system malfunction. D. All supplemental treatment systems must be followed by pressurized diis- tribution or subsurface drip irrigation for dispersal, except for where seep- age pits are utilized. E. All supplemental treatment systems must be designedby certified' design- ers and installed by certified installers with specific training in the installa- tion of the type of system utilized. Proof of the specified training by way of certification or a letter from an approved trainer is required. F. All supplemental treatment systems must maintain a current Operating Permit and be periodically inspected and monitored by a certified Opera- tion and Maintenance Specialist as required in the On-Site Wastewater Ordinance and Part 4 of this Manual. G. Supplemental Treatment Systems in (Lieu of Standard Systems 1. When a drainfield site is utilized that meets the criteria described above, nothing will preclude the applicant from opting to use a sup- plemental treatment system in lieu of a standard system. 2. When siting an on-site wastewater system, the drainfield must be located, whenever possible, on that portion of the parcel with a min- imum vertical separation of 36 inches, Soil Groups B, C, or D, and a percolation rate (when performed) of 6-66 minutes per inch . On-Site Wastewater s&ewate" lCaf ^ Part q—System Requirements Adopted lurch 16, 2010— updated August 2.4, 2010 and December 11, 2012 Bart Three** Fuge 23 Chapter 11. Proprietary Systems . A proprietary supplemental treatment system provides treatment of wastewater by exposing the effluent to a contact medium under diverse environmental conditions in a self-contained enclosure. 1 . Proprietary supplemental treatment systems must be designed to meet the level of treatment specified in Chapter 9 of this Manual. C. All proprietary supplemental treatment systems must be designed by certi- fied designers and installed by certified installers with specific training in the installation of the type of system utilized. Proof of the specified training by way of certification or letter from an approved trainer is required. D. All owners of proprietary treatment systems must maintain current Operat- ing hermits and be periodically inspected and monitored by certified Op- eration and Maintenance Specialist. E. Where feasible, as determined by the LEA, supplemental treatment com- ponents must be equipped with telemetric alarms that notify the owner and M Specialist in the event of system malfunction. F. All proprietary supplemental treatment systems must meet NSF/,ANSI (Na- tional Sanitation Foundation/ American National Standards Institute), Standard 45. . NSF approved proprietary components may not be used independently. Proprietary components may be used as part of the overall wastewater treatment system as tested and approved by NSF. N. Manufacturers of proprietary systems must provide for the initial two years of serve and maintenance. la Manufacturers of proprietary systems must provide homeowners with Op- eration and Maintenance Manuals. J. When proprietary supplemental treatment is required followed by disinfec- tion in order to meet reduced vertical separation requirements for existing parcels, testing for compliance with effluent quality limits will be required for the first year of operation„ or longer if needed to, verify reliable treat- ment. K. Manufacturer of proprietary systems must provide the LECA at least every 'two years with a list of O&M providers and installers certified by the manu- facturer to provide those services. Chapter 12. Single-Pass Sand Filters Influent Wastewater Strength 1. Single-pass sand filters are designed for treating residential strength wastewater. The wastewater applied to the single-pass sand filter must not be higher in strength than 220 mg/l BODS or 145 mg/l TSS)l. Lower wastewater strengths, without increased On-Site Wastewater Manual--Part 3—systema Requirements Adopted (March 16, 2010— updated August 24, 2010 and December 11, 2012 Part Three** Page 24 flow rates are preferable for assuring long terra operation of a sin- gle-pass sand filter system. High strength wastewater shall require pretreatment in order to reduce its strength prior to introduction into a single-pass sand filter and the soil dispersal component. I . Daily Wastewater Flow - Design Estimates The minimum wastewater design flow shall be as specified in Chapter 3 of this part of the Manual, C. Locational Requirements 1. The minimum setback requirements for closed bottom single-pass sandfilters will be the same as those for septic tanks. 2. The minimum setback requirements for open bottom single-pass sandfilters will be the same as those for a standard gravity drain'- field or leach bed. D. Design Standard's 1. Filter media rust meet the specifications outlined in Dart 2 of this Manual. 2. Filter l=ied Sizing a. The loading rate to the sand filter must not exceed 1.0 gal- Ion/day/square foot, using appropriate daily wastewater flow design estimates. b. The media depth must be a minimum of 24 inches. . The filter bed is contained either in a flexible membrane lined exca- vation as specified in Part 1 of this Manual, or in another contain- ment vessel approved by the LEA.. 4. Wastewater Distribution a. Pressure distribution is required within the sandfilter and pressure distribution of subsurface drip irrigation is required for dispersal of sandfilter-treated effluent and must comply with the requirements specified in Chapters 7 and 3 of this Manual. b. The wastewater must be applied to the layer of drain rock atop the filter media as specified in Chapters 7, or 'sprayed upward against the top of gravelless chambers. E. Timed dosing system is required and the dosing frequency or dose vol- ume is dependent on the media specification used with the sand filter. To assure that appropriate dose volumes are delivered to the sand filter, the timer must be set to dose a minimum of 12 times daily. F'. Installation 1. Containment must be structurally sound and have sufficient geo- metric and dimensional integrity to protect the liner. On-Site Wastewater Manual P _System Requirements Adopted Larch 16, 2010— Updated august 24, 2010 and December 11, 2012 Part Three** Page 25 41111 fl,nrq.3"a . In order to prevent differential settling when the sand filter is putin- to service, the filter media must have a uniform density throughout. . A geotextile filter fabric must be placed on top of the gravel bed„ 4. The cover must consist of no more than one foot of soil. The cover soil must be capable of maintainingvegetative growth awhile not im- pedi'ng the passage of air (sandy loam or coarser) and be con- toured and landscaped in accordance with the approved construc- tion plan and permit requirements in order to shed water, control erosion and to prevent surface drainage onto the sand filter. plant cover must be shallow root vegetation as generally described in the system design and operation and maintenance manual. 5. Two observation and monitoring ports must be installed in the sand filter. One observation and monitoring port must be installed to the interface between the bottom of the drai'nrock and the top of the media. A second observation and monitoring port must be installed to the bottom of the under drain. The pumpwvell may be used as the second observation port. Liner patches, repairs and seams shall have the same physical properties as the parent material. ?. Site considerations and preparation: a. The supporting surface slopes and foundation to accept the liner shall be stable and structurally sound including appro- priate compaction. particular attention shall be paid to the potential of sink hole development and differential settle- ment. b. Soil stabilizers such as cementations or chemical binding agents shall not adversely affect the membrane, cementa- tions and chernical binding agents may be potentially C, every effort shallbe made to minimize the strain (or elonga- tion) anywhere in the fleibile membrane liner. . Construction and installation: a. For contained-design sand filter, grade the bottom of the ex- cavation to provide a sloping liner surface, from the outer edge of the filter toward the point of under drain collection. Slope shall equal 8 inches fall overall or one inch of fall per foot of run, whichever is the greatest. b. Sides of the excavation shall be smooth, free of possible puncture points. C. Boots shall be bedded in sand and installed in accordance with manufacturer's specifications. d. Liner placement 1 i syr%I�IOi�r�%L�j(l�(Yaii1r;.... - On-Site Wastewater Manual—Part 3®System Requirements Adapted March 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 26 SA!+ttoY,mnp,&trtw (1) Liners shall be installed in accordance with manufac- turer's specifications, including those for: (i) Temperature, precipitation (li) Sand bedding (iii) Sealant type and procedure for use (iv) Liner size (v) Transport, handling, and storage (vi) Deployment of panels (vii) Anchoring of liner edges (viii) Field seaming when necessary (ix) Field repairs (2) A site inspection shall be carried out by the LFA or by the certified designer and the installer prior to liner in- stallation to verify surface conditions and adherence to manufacturer's and designer°'s specifications (3) Completed liner installations shall be visually checked for punctures, rips, tears and seam discontinuities be- fore placement of any backfill. At this time the install- er shall also manually check all factory and field seams with an appropriate tool. In lieu of, or in addi- tion to, manual checking of seams by the installer, ei- ther of the following tests may be performed; (i) Wet Test: The lined, basin shall be flooded with water to within 6 'inches of the bottom of the liner after inlets and outlets have been plugged. There shall not be any loss of water in a 24-hour test period'. (n) Air Lance Test: Check all bonded seams using a minimum 50 PSI (gauge) air supply directed through a 3115 inch (typical) nozzle held not more than 2 inches from the seam edge and directed at the seam edge. Riffles indicate un- bonded areas within the seam, or other unde- sirable seam construction. (iii) If the boot may be submerged in a seasonal high water table, performance testing of the sand filter/boot for leakage must be conducted by blocking the outlet pipe, and flooding the liner with a sufficient depth of water to sub- merge the boot seams. There shall not be any loss of water in a 24-hour test period. Ori-Sits a tewater Manual— Part 3—System Requirements Adopted March 16, 2010— Updated August 24, 2010 and December 11„ 2012 Part Three#* Page 27 . System Drawings Monirr�rlmg Port "- 12'Sandy toama m toarrdy sand Chapter 13, Mound Systems — GerWtHefilterfabric A Influent Wastewater Strength "Grahnrock(or Graveness Chambers) w1hdistribution p a �. Mound systema are de- 24"'Sand e-24^'Sand Media signed for treating resi- dential strength wastewater. The .� rrrsrr°rrrirr nrrrrr wastewater applied to 3" Pea Graveltlrerneathfilter media the mound system must Slotted erN,7eVoiared'plpeImbedded Ingravel, not be higher in strength than 220 mgdl BO)D5 or 145 mg/I TSS). Lower wastewater strengths, without increased flow rates are preferable for assuring long term operation of a mound system. High-strength wastewater shall require pretreatment in order to reduce its strength prior to in- troduction into a mound system. S. Daily Wastewater Flow .. IDesiign Estimates The minimum wastewater design flow shall be as specified in Chapter 6 of this Part of the Manual. Locational Requirements The minimum setback requirements for mound systems will be the same as those for a standard gravity drinfield or leach bed. D. Design Standards 1. Media Specifications. Filter media must meet the requirements out- lined in Fart 2 of this Manual. 2. Minimum Effective Soil Depth An minimum of 18 inches of undisturbed, unsaturated, original soil as measured from the original ground surface is required for placement of a mound after all clearing, leveling and other site dis- turbance during lot development is complete. 3, Media Specifications. a. Filter media rr�TamnrTT must meet the " � "� eaNra FILTER specifications �ii outlined in Part PUMP cr,amdra 2 of this Manu- ..... b. In order to pre- vent re vent differential --.____ .. _ settling when ORAMMILD Ori-Site Wastewater Manual—Part 3—System Requirements Adopted March 16, 2010— updated August 24, 2010 and December 11, 2011:2 Part Three**Page 28 the mound is put into service, the filter media must have a uniform density throughout. . Application Rates. a. The application rate for the mound infiltration area (gravel bed) must not exceed 1.0 gpolft2. b. The application rate for basal area will be based on soil) type. . Minimum Closing Frequency Timed dosing system is required. The dosing frequency or dose volume is dependent on the media specification used as the filter material. To assure that appropriate dose volumes are delivered to the mound system, the timer must be set to dose a minimum of 12 times daily. E. Installation (Unless otherwise specified in this Manual, mound systems shall be in- stalled following the procedures and specifications delineated in the Mound" System Manual, in its current final draft form or as hereafter adopted and updated by the State ''Fater Resources Control Board. Cop- ies of the Mound System Manual will maintained and provided by the LES.. 1. Cap and Topsoil Depth a. The cover soil must be capable of maintaining vegetative growth while not impeding the passage of air (sandy loam or coarser) and be contoured and landscaped in accordance with the approved construction plan and permit requirements in order to shed water, control erosion and to prevent sur- face drainage onto the sand filter. b. The final settled depth of the cap and topsoil should be no less than 12 inches above the center and inches above the outer edge of the bed. Additional depth of topsoil may be needed during final construction activities to assure that the minimum depths are achieved following natural settling of the soil. C, The mound must not be left without a vegetative cover or al- lowed to be covered with weeds. Mowed turf grass and turf sod are the best vegetative covers for mounds. F. Mound Placement 1. On sloping sites, the mound' must be aligned with its longest di- mension parallel to the site contours so as not to concentrate the effluent into a small area as it moves laterally down slope. 2, The mound must not be aligned, by design or construction, perpen- dicular to the contours. Ori-Site Wastewater Manual-•Part 3-System, uirement ,Adopted March 16, 2010- Updated,august 24, 2010 and December 11, 2012 Pert Three** Page 2 On all sites the infiltration bed must be as long and narrow as pos- sible to limit the linear loading rate of effluent to assure that all the effluent infiltrates into the natural soil before it reaches the toe of the filter media. if the site does not permit the design of a "long and narrow" mound along the contours of the site, other on-site sewage treatment and dispersal technology must be selected. Mound systems are only suitable for sites where all of the design and siting criteria can be satisfactorily met. 5. Two or moire beds on the same downhill plane. Effluent Dispersal within Mound. method providing uniform distribution with tired dosing throughout the bed in the filter media is required, either through use of pressure distribu- tion as specified in Chapter 10 of this, part of the Manual„ or through use of subsurface drip irrigation, as specified in Chapter 10 of this pert of the Manual. l-I. Monitoring and Observation Forts Each mound should have a rnunimum of two monitoring and observation ports, one placed in the infiltration bed down to the gravel-sand, and one down slope from the bed l down to the sand-native soil interface. Unless otherwise specified in this Manual, down gradient observation and moni- toring ports shall be installed as specified in the Mound System Manual (State Water Resources Control Board) in its current final draft or as here- after adopted and updated by the State Water Resources Control Board. I. Protection of mound system placement area The designer will be responsible for the adequacy of, and the installer's substantial compliance with, the installer's construction plan. The con-- structioln plan must include provisions addressing: 1 Type of excavation equipment that will:: be used . Routes of ingress and egress of construction vehicles to assure maximum protection of the mound placement area . Means to assure that the area reserved for system replacement is not disturbed during the mound construction process including as necessary, instructions for erecting a temporary construction fence to protect the primary and reserve mound areas and adjacent area dawn slope of the mound placement area . Method to assure that soil moisture content is sufficient to allow construction of the mound without soil compaction or smearing 5. Method for (preparing the native soil-fiiter material interface . Method for removing native vegetation I System Drawings On-Site Wastewater Manual— Para 3—System Requirements Adopted March 16, 2010— Updated August 24, 2010 and December 11, 2012 Fart Three** Page 30 Gap Approved Synthetic Filter Fabric or Geotextile Topsoil Fill Matenal r Plow ed Area + Highly or Excessively Permeable So Water Table or Creviced Bedrock Cap Approved Synthet£cFilter Fabric or Geotextile Topsoil �rrr f/�f�rff Fill Material ... �,r/"E"�fr'1�4 A✓ r✓fr'r'r,!f'.+.✓�,,ff,frfi,;�,.�' Prepared"Soil On-Site Wastewater Manual—Part 3--Systern Requirements Adopted lurch 16, 2010®Updated august 24„ 2010 and December 11, 2012 Part Three Paye 31 Cap,,,, Fil'I' aterial �n \Plowed area Septic"rank Pump chamber I sand Alternative Design Options Chapter 14. Engineered Fill A. P're-Treatment Wastewater discharged into engineered fill will have supplemental treat- ment meeting the effluent specifications specified iin this Manual. B. Site/Fill Evaluation 1. primary and replacement area will be analyzed by a California reg- istered civil engineer to assure that breakout of wastewater will not occur outside the boundaries of the disposal area. 2. Site preparation and placement of fill must be under the direct su- pervision of a California registered professional geologist, engineer, or nationally certified soul scientist. 3. Engineered fill shall be evaluated for winter groundwater when site conditions or previous groundwater monitoiring results indicate the seasonal groundwater level) may be less than two feet from orlginal grade. 4. Engineered fill shall be evaluated after stabilization by the LEA and supervisiing engineer, geologist, or soil scientist for adequate per- meability and percolation. . At least 3 percolation tests shall be performed on the consolidated fill soil after placement. .. A minimum of two sieve analyses shalll be conducted prior to placement to test for oversize material. C. Dative Receiving Soil On-Site Wastewater Manual—Part yt£I71 R [allitl°er71nts Adopted Mlarch 16, 2010—Updated August 24, 2010 and December 11, 2012 Pert Three** Page 02 1. (Native soil depth shall be a minimum of 12 inches (after removal of the organic top soil layer) in all areas of the proposed drainfield and repair area. 2. If the liimiting layer consists of material coarser than sand, or frac tared material, the system designer shall demonstrate that there willl be no saturated soil conditions formed at the soil/limiting layer inter- face due to capillary forces in, the soil. Fill Material 1. Fill shall compensate for the lack of in-place soil at a 1.5 to 1 ratio so that a one foot deficiency in soil column depth shall require one and one half feet of fill. A minimum of 12 inches of compensating fill shall be required'. 2. Fill will be engineered to the specifications of loamy sand with no more than 15% fines. At least 75% of fill material shall pass the 2mm sieve. Any sieve analysis falling outside of a loamy sand specification shall be cause for rejection of all fill material. 3. Engineered fill, after stabilization, must have a percolation rate be- tween 5 and 50 mpi. . All organic material and material l over 1" in diameter shall be re- moved from fill. E. Dispersal 1. Pretreated effluent application rate shall be applied by drip irrigation at a maximum application rate of 0.2 gallons/square foot/day. 2. The drip line layout design shall be reviewed by the approved sub- surface drip system manufacturer's factory trained designer. 3. The emitters will be placed at the top of the compensating fill layer, with an additional minimum 12 inches of cover material over the emitters. F. Construction 1. The slope in the area to be filled shall be no more than 20% slope. For slopes greater than 20%, a slope stability analysis by aCalifor- nia registered geotechnical engineer shall be provided. 2. The organic top soil layer shall be removed from the native soil. Grubbed, native soil shall be worked with a chisel or shank plow with crawler or tracked equipment (no rubber tired vehicles allowed) to scarify the top 4". All stumps and roots in excess of la" diameter shall be removed from the native soil. 3. If fill soil must be transported to the fill site over long distances, care shall be taken to prevent excessive segregation of soil separates. 4. Fill shall be placed as dry as possible and when its moisture con- tent will not cause excessive compaction. ' On-Site Wastewater Manual Fart 3—System Requirement Adopted March 16, 2010—Updated,august 24, 2010 and December 11., 2012 Fart Three** mage 33 I MW. 5. An initial fill sail lift of 6" shall be blended into the scarified native soil. Subsequent lifts of fill shall be no greater than ". The top 2 to 6 inches of each subsequent lift shall be scarified prier -to addition of subsequent lifts. 6. after placement, soil shall be consolidated by a means chosen b the design engineer (e. , light compaction by tracked equipment, by allowing the soil to consolidate naturally over a rainy season, or by watering with at least the estimated pore volume of the fill). 7. Side slopes of any soil "mound" shall be a 3 to 1 slope. For low transmissivity soils a certified design consultant may design shal- lower slopes. The side slopes shall begin 46 inches from any dis- persal lune. 6. After fill is placed and approved, system shall be crowned with a loam or sandy loam soil type to create a final cap. The bed cap shall be seeded with shallow rooted grass. Seeded areas shall be watered as necessary to establish and maintain vegetation over the life of the unit. g. "Toes" of built areas shall remain accessible and visiible with no vegetation taller than two inches high. 16. Each system shall be provided with one up gradient and two down gradient shallow monitoring wells finished into the limiting layer. Chapter 15. Curtain Drains A. A curtain drain may be required to intercept and/or drain water from a dis- peirsal area. It shall be required to demonstrate 'that the site can be de- watered prior to issuiing a permit. S. Curtain drains are considered an integral part of the onsite wastewater system and will meet the minimum setback requirements to drainfield and repair areas and to the septic tank as set forth in this manual. However, curtain drains do not need to meet setback requirements to property lines, streams, lakes, ponds or other surface water bodies provided the designer certifies that the curtain drain will not pick up wastewater,. C. The curtain drain will consist of a trench a minimum of 12 inches wide dug to a depth of at least 6 inches into a limiting impermeable layer. There must be a minimum of 6 inches of pea gravel in the bottom of the trench on which a 4 inch perforated pipe is placed. D. The curtain drain trench must be filled with drain rock. prior to backfilling the trench, the drain rock must be enveloped and covered with filter fabric. E. The trench must be situated so that captured water drains by gravity flow out of outlet pipes. Trench bottornrs will maintain a minimum of 11% slope throughout the drainage trench. In areas where the outlet pipe will be sub- ject to damage, the pipe must be adequately protected. On-Site Wastewater Manual—Part 3—system Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 34 F. In the event that the discharge outflow from a curtain drain will impact a neighboring property, the trench outlet from a curtain drain will only dis- charge into a drainage channelor other conveyance designed for the transport of water, unless otherwise approved by the LEA. Chapter 1 ie Sewage Easements P;. When a system cannot be located on the lot or parcel to be served, an off- site easement may be considered. B. Off-site easements may not be considered as an option for creating new lots or parcels, except when utilized for placement of and/or connection to a community wastewater system. C. Whenever a system crosses a property line separating properties under different ownership, a recorded easement and/or covenant against con- flicting uses must be provided. For properties under common ownership a recorded deed restriction must be provided. D, Exhibits and legal descriptions of easements and deed restrictions must be prepared by a licensed land surveyor. Unless otherwise indicated by the LEA, a licensed surveyor will flag or otherwise delineate the easement area for field inspection. Chapter 17. Non-Standard on- up Ile ental Treatment Systems Non-standard non-suppllemental treatment systems are onsite wastewater sys- tems designed to address specific site and/or generation considerations. Exam- ples include: steep slope systems, commercial systems, holding tanks, seepage pits„ vault privies, and portable toilets. A. Steep dope Systems When the site's ground slope in the drainfield area exceeds 30%, the fol- lowing additional requirements and restrictions will apply: 1. A certified designer will design the system. .. Steep slope systems are not permitted for creating lots and parcels. 3. Steep slope systems for existing parcels may only be developed in conformance with the county General Plan, zoning restrictions, rec- orded restrictions and notes on the subdivision or parcel map, and any other applicable county requirements. 4. For purposes of determining effective soil depth and vertical sepa- ration, the depth of limiting layer beneath the bottom of the trench must be measured from the upslope side of the drainfield trench bottom 6. The maximum trench width shall not exceed 24 inches. . The certified designer will provide a report verifying slope stability prepared by a geotechnical engineer. On-Site Wastewater Manual— Part 3 System Requirements Adopted larch 10, 2010—Updated August 24, 2010 and December 11, 2012 Part Three**(Page 30 7. The wastewater system must utilize pressurized or subsurface drip dispersal. Non-Residential Systems 1. A certified designer will design the system. 2. (High strength waste must be pretreated to domestic waste strength as described in, Chapter 1 of this part of the Manual prior to is- charge to the treatment and dispersal system. . For projected daily sewage flows up to 1,500 gallons, the septic tank will have a liquid capacity equal to at least one and a half days sewage flow, or 1,500 gallons, whichever is greater. C. Non-Discharging Wastewater Systems 1. Holding l Tanks holding tank is a watertight container designed to receive and store wastewater for disposed at another location. When a holding tank is proposed, the following requirements will apply. a. The site cannot be approved for the installation of a standard system or supplemental treatment system. b, leo area-wide public serer system is legally and physically available. C. The tank will serve only non-residential and non-commercial, limited use applications, such as a (limited agricultural build- ings and recreational facilities. d. The cumulative dailly design sewage shall not exceed 150 gallons per day. e. The tank meets the specifications and is tested for water tightness as specified in Dart 2 of this Manual.. f. The owner of the property will record a deed restriction agreeing to be served by a public surer system when con- nection its feasible and described in the Onsite Wastewater Ordinance. g. The owner will provide the LEA with: (1) A copy of a contract with a LEA certified septic tank pumper that shows the tank must be pumped at regu- lar intervals or as needed to prevent use of greater than seventy-five (7 ) percent of the tank's capacity. The contents of the tank must be disposed of at an approved septage receiving facility, in an approved' manner; and (2) A record of pumping dates and amounts pumped must be maintained by the property owner and made available to the LES, upon request.. On-Site Wastewater Manual-- Part 3—System Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012 Fart Three"* Page 36 h. A holding tank must be designed and installed under the in- spection and approval of a certified designer. i. Each tank will have a minimum liquid capacity of fifteen hun- dred (1,500) gallons. J_ Holding tanks will not be used as a method for sewage dis- posall for creatiing hots and parcels. k. An Operating Permit will be required. 1. All installations will meet the following: (1) Be located and designed to facilitate visual inspection and removal of contents by pumping (2) Be equipped with both an audible and visual alarm, transmitted to an appropriate off site location for re- mote notification or placed in another location ac- ceptable to the LEA, to indicate when the tank is sev- enty-five (7 ) percent full. Only the audible alarm will be user cancelable ( ) have no overflow vent at an elevation lower than the overflow level of the lowest fixture served 2. Vault Privies A vault privy is a structure used for disposal of human waste with- out the aid of water. It consists of a shelter built above a subsur- face vault into which human waste falls. The vault privy has no wa- ter connection. When a vault privy is proposed, the following re- quirements will apply: a. The vault privy will only serve non-residential and non- commercial, limited use applications, such as primitive type picnic grounds, campsites, camps and recreation areas where septic tank and leach field systems are not practicable as determined by the LEA. Approval to permit vault privies will be considered by the LPA on a case-by-case basis. b. The vault must be constructed in substantial compliance with the specifications for septic tanks and tested for water tight- ness as described in Part 2 of this Manual. C, 'fault privies shall not be sited in a floodway, and must be maintained to prevent health hazards and pollution of public waters. d. An Operating Permit will be required. e. The privy vault will not be allowed to become filled with ex- creta to a point within two (2) feet of the ground surface. f. The excreta in the vault must be pumped out by a certified septage pumper as necessary to fuilfil'I these requirements. On-Site Wastewater Manual-•Part 3.e.System Requirement Adopted March 16, 2010-- Updated August 24, 2010 and December 11, 2012 Fart Three"' Page 37 . The privy must be maintained in a sanitary condition and in good repair, h. No water-carried sewerage may to be placed in vault privies. Contents of vault privies will not be discharged into storm sewers, on the surface of the ground or into public waters. i. Structures must be free of hazardous surface features, such as exposed nail points, splinters, sharp edges, and rough or broken boards, and will provide privacy and protection from the elements. ). wilding ventilation must be equally divided between the bot- tom and top halves of the room. All vents must be screened with sixteen (1 6) mesh screen of durable material. k.. Buildings must be fly and rodent resistant, and will have self- closing doors with an inside latch. 1. `faults must be vented to the outside atmosphere by a flue or vent stack having a minimum inside diameter of four (4) inches. M. Interior floors, walls, ceilings, partitions, and doors must be finished with readily cleanable impervious material resistant to wastes, cleansers and chemicals, Floors and risers must be constructed of impervious material and in a manner that will prevent entry of vermin. n. The seat opening must be covered with attached, open-front toilet seats with lids, both of which can be, raised to allow use as a urinal. o. A toilet tissue holder must be provided for each seat. P. Holding chambers must be watertight and constructed of re- inforced concrete, plastic, fiberglass, metal, or other material of acceptable durability and corrosion resistance, approved by the LEA, and designed to facilitate the removal of the wastes. q. Vents must be sized to equal in area to a minimum of three (3), square feet. r. A minimum clear space of twenty-four (24) inches between multiple unit Installations and a clear space of twelve (12) inches from the seat opening to the side building wall in sin- gle and multiple units. . Portable Toilets portable toilet is any self-contained chemical toilet facility that is housed within a portable toiilet shelter. The portable toilet has no direct water connection. On-silts Wastewater Manual--Part 3—System Requirements Adopted March 16, 2010—updated August 24, 2010 and December 11, 2012 Part Three** Page 38 IW a. Portable toilets are intended to serve nen-residential, limited use applications, such as primitive type picnic grounds, campsites, special events, and temporary construction sites where septic tank and leach field' systems are not practicable as determined by the LEA. Portable toilets will not be used for residential or commercial applications. b. An Operating Permit will not be required for temporary use of portable toilets. C. Portable toilets must be maintained to prevent health haz- ards and pollution of protected waters. d. No water-carried sewage may to be placed in portable toi- lets. e. Contents of portable toilets will not be discharged into storm sewers, on the surface of the ground or into protected wa_ tern. f. The requirements lasted for vault privies, H through Q will all- so lso apply to portable toilets and are hereby incorporated by reference. g. Portable toilets will have toilet bowls constructed of stainless steel, plastic, fiberglass, or ceramic or of other material ap- proved by the LEA. h. Waste passages will have smooth surfaces and be free of obstructions, recesses or cross braces that would restrict or interfere with flow of blackwater. i. Biocides and oxidants must be added to waste detention chambers at rates and intervals recommended by the manu- facturer. j, Chambers and receptacles will provide a minimum storage capacity of 50 gallons per seat. k. Portable toilet shelters wvill.- (1) Misplay the business name of the licensed sewage disposal service that is responsible for servicing them. ( ) Provide screened ventilation to the outside atmos- phere having a minimum area of one square foot per seat. (3) Provide a minimum floor space outside of the riser of square feet per seat. ( ) Provide separate compartments with doors and part- tions or walls of sufficient height to ensure privacy in multiple unit shelters except that separate compart- ments are not required for urinals. !ii r fr/ On-Site Wastewater Manual—PartSystem Requirements Adopted Burch 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 3 D. Seepage Fits A seepage pit is a drilled or dug cobble or gravel filled excavation installed to allow disposal of effluent from a septic tank or other on-site wastewater treatment unit. When a seepage pit is proposed, the following require- ments will apply; II. Seepage pits will not be used: a, to create lots and parcels; or b. when connection to a public seer is feasible as described in the Onsite Wastewater Ordinance; or C. when the site meets the requirements for other system types described in this Manual, . Seepage pits must be a minimum of thirty-sic (36) inches in di me- te r. . The seepage pit must be filled up to the concrete collar with cob- bles that are a minimum of three ( ) inches in diameter in any di- mension or with other drain rock approved by the LEA. The cob- bles or drain rock must to be washed clean so as to be free of de- bris and dirt. 4. A system with multiple pits must be designed so each pit within the system receives equal quantities of sewage flow via distribution boxes. 6. Seepage pit header pipe inlets, risers, and collars must be water- tight. 6. .A minimum distance equal to twelve (1 2) feet of undisturbed soiil will separate two or more seepage pits from each other. . Requirements When Seepage Pit is Utilized for New Construction a. At least one test boring to groundwater or ten (10) feet bele the proposed design depth of the pits must be made in the lowest area of the proposed disposal area to evaluate soils. ,additional test pits may be required at the discretion of the LEAS to determine the suitability of the site for onsite sewage disposal. b. Seasonal groundwater monitoring must be required to as- sure a vertical separation of 16 feet on a year-round basis. C. Supplemental treatment will be required prior to discharge into seepage pit. d. Seepage pits may be used only to service a single-family residence. e. 'The, depth of the seepage pit must be at a minimum of fifteen (16) feet and a maximum of thirty-five (36) feet bellow the ground surface. On-Site Wastewater Manual Part 3—System Requirements Adopted larch 16, 2010—Updated August 24, 2010 and December 11, 2012 Part Three** Page 40 f. Effective snail type for discharge from the pit must be limited to sand or loamy send, with or without gravel. g. An acceptable test baring will have a cumulative minimum 8- foot column of effective sail h. There must be a minimum excavation of one pit per bed- room. i. The seepage pit system must be designed by a certified de- signer. 8. Requirements When Seepage Pit is Utilized for System Repair a. The ILEA may allow exceptions to the requirement for sup- plemental treatment of wastewater prior to, discharge into seepage pits when one of the following two circumstances apply: (1) When alll the following safety factors that minimize po- tential public health and water quality impacts of dis- charging wastewater into seepage pits apply to the system repair: (i) The parcel with the failing system is serviced by a public water system; (ii) A setback of 200 feet is maintained between the seepage pit and any surrounding well; and (iii) Vertical separation to anticipated groundwater is increased by 0%. (2) When the owner of the system being repaired de- clares a financial hardship and records a declaration on the property deed stating that the onsite wastewater system has been repaired in a manner that is nonconforming to the requirements of this Manual and acknowledging that supplemental treat- ment will be required at the time of property transfer. Chapter 18. Graywater Reuse A. adoption by Reference. The provisions for graywater systems specified in the 2007 Uniform Plumbing Code, California Code of Regulations, Title 24, Part 5, Chapter 16A, Part 1 (Craywater Standards) are hereby adopted by reference and incorporated herein as minimum standards for graywater systems, unless otherwise noted in the Section. Cote: Kitchen wastewater must be excluded from graywater systems and discharged into an approved wastewater system. On-Site Wastewater Manual—Part 3®System Requirements Adopted March 16, 2010-- Updated August 24, 2010 and December 11, 2012 t Part Three** Page 41 B. No graywater system shall be approved, designed, constructed, or main- tained except for residences that are owner occupied. C. No person shall construct or maintain a graywater system unless the resk deuce is served by a non-failing oin-site wastewater, system verified by the LEA. D. LEA Review 1. Graywater systems designed to reuse only laundry waste require prior plan review and approval by the LEA. Unless otherwise authorized by the LEA, all other graywater sys- tems require a Construction Permit. Review of the Construction Permit will include: a. Soil evaluation or percolation testing as described in Dart One of this Manual' b, Design review C. Inspection of construction. . Except for rernovall of solids from a septic tank by a certified pumper, no person shall service or replace an approved graywater system's components without first notifying the LEA, so that parcel files can be updated, trends in equipment reliability can be tracked, and so that the person can be advised of any technical updates relevant to service that will be provided. On-Site wastewater Manual—Dart 3—System Requirements Im Adopted March 16, 2010—Updated August 24, 2010 and December 11„ 2012 Part Three** Page 42 Wastewater System Repairs Chapter 19. Requirements for the Repair/Replacement of Failing Systems When on-site wastewater system repairs are made, the system must be brought into compliance with the previsions specified in the neve On-Site 'Wastewater Systems Ordi- nance and On-Site 'Wastewater Manual "...to the maximum extent feasible." The following guidance outlines how this requirement is to be interpreted; however the H Director may consider exceptions based on unique circumstances. A. Any on-site wastewater system that has been permitted by this office will not be required to upgrade to current standards as long as the system does not fail, re- sulting in backup of sewage into the structure being served or surfacing sewage. S. Septic Tank 1. Upgrade to current tank capacity standards' will be required when either: a. The existing tank is significantly undersized, substandard in con- struction, or located with inadequate setbacks to prevent mainte- nance; or b. The existing tank is found to be leaking. 2. Existing septic tanks will be considered significantly undersized and must be brought up to current standards when the tank volume is less than the minimum volume shown in the following table: 'dumber of Sed- Minimum Tank rooms Volume allons 1 750 2-4 1,0:00 51,250 _.......... ......................................._.. 1,500 . Mobile Home park Community Systems: When determining whether a septic tank needs to be upgraded, based on volume considerations, the following design factors need to be considered by staff: a. Actual and potential daily wastewater volume: m Design flow (250 pd/mobile home) • Number of bedrooms • Occupancy 1. Current standards require a 1.,500 gallon septic tank for up to a 4-bedroom residence and an additional 200 gallons for each bedracrn thereafter. On-Site Wastewater Manual— Dart 3—System Requirements Adapted March 16, 2010— Updated August 24, 2010 and December 11, 2012. "art Three** Page 43 )P Ohl i r,w. b. Generally, two mobile home units are the most that can be allowed to be served by a single 1,040 gallon septic tank. 4. Wooden, leaking, or deteriorating tanks willl need to be replaced due to concerns about structural integrity, substandard construction, and potential leakage. Note: Wooden tanks identified through routine septic purnping will be considered substandard and require replacing with an approved tank as specified in the On-Site Wastewater Manual. . The LEA will not authorize installation of a wooden cover on a septic tank due to the inability of the replacement lid to be watertight and have the needed structural integrity to be safe. On a case-by.-case basis, the LEA may consider approval of an engineered concrete top replacement for a concrete septic tank, provided the tank is not located in an area with high seasonal groundwater. 4. Leaking clamshell septic tanks may be sealed rather than replaced, pro- vided: a. The work is performed by a Certified Installer; b. The Certified Installer notifies the LEA as provided in theOn-Site Wastewater Ordinance; c. The Certified Installer completes and submits to the LES,an s-Built on the form provided by the LES, that verifies that the 24-hour leak test was performed and the tank did not leak.; and 7, Septic tank leak testing will be required for all septic system repairs, ex- cept this requirement may be waived by the LFA for existing septic tanks serviing occupied dwellings when the following conditions are met: a. The tank is pumped and observed to be in good structural condi- tion; and b. The tank is not located in an area with high wvatertable. Test Hole Analysis Soil test holes will be required for determining dispersal field size and depth ex- cept when soil records in the files are sufficiently detailed and complete for de• termining optimal dispersal field size and depth. In order to meet this require- ment, soil log data must be from a location in proximity to the proposed dispersal field and recorded in sufficient detail' to determine application rate and depth to a restrictive layer, if present. D. Guidance for Requiring a Certified Designer 1. Some parcels requiring wastewater system repair have one or more site constraints making design of the replacement system challenging and more complex. Site constraints could be duce to parcel size, location of ex- On-Site wastewater Manual—Part System Requirements Adopted March 16, 2010—Updated August 24, 2010 and December 11, 2012. Part Three** Page 44 0104101.0140)", isting structures,, landscaping features, and site characteristics requiring setbacks. 2. When the LEA believes site constraints are of such a serious nature as to require the use of a Certified Designer, the property owner will select a Certified Designer to assist with evaluating the site and designing the re- placement wastewater system. 3. Unless an exemption is granted by the Environmental Wealth Director or Land U'se Manager, the LEA will REQUIRE use of a Certified [designer when BOTH of the following site constraints apply; a. Insufficient useable drainfielld area is available for dispersal field sized on the basis of trench bottom area only; and b. No additional area is available for future repair after placement of current repair. . When parcels have only ONE of the two site, constraints listed above, but also have one or both of the following additional site constraints: (i.) Less than 12 inches of vertical separation (distance between dispersal field bot- tom and restrictive layer or seasonal water table) for dispersal field; or (ii.) Receiving soil identified as a Class A, E„ (or undesignated)„ the LEA will meet with the property owner and the Certified Installer to: . Explain to the homeowner the risk and potential cost of future re- pairs; and b. RECOMMEND that the homeowner utilize the services of aCerti- fied [designer to design the repair system. E. Insufficient Useable Drainfield area When there is insufficient useable area on a parcel to repair a system using bot- tom area only for drainfield sizing, the LEA may consider one of the following al- ternatives: 1. Determining required bottom area using percolation testing; 2. Increasing trench width; . Use of a bed instead of trenches; 4, Use of pressurized distribution for a 25% sizing reduction; 5. Use of supplemental treatment and pressurized distribution for a 50% siz- ing reduction; or . Use of sidewall area using the calculations specified in the Manual ofSep- tic Tank Practice. E. The LEA may require additional design features when there is evidence that a wastewater system sized on the basis of the number of bedrooms alone would Ori-Site Wastewater Manual®Part. System Requirements ,adopted March 16, 2010—updated August 24, 2010 and December 11, 2012 Fart Three**Mage 46 be undersized and subject to premature failure. The following table shows the maximum occupancy for a residence when the design flow is based solely on the number of bedrooms; plumb=Bed- Maximum Design Flow rupancy (based on 50 poloccu pant 2 4 2410 3- 6360 _..._ .... ...... _ 4 __...m._....__.._._.__ _.... . ....._.._ 430 O. Use of a Bed in Lieu of Trenches 1. Definition of a "Bed System dispersal system is designated a "bed" system or a "seepage bed" when the excavation width exceeds 35 inches. Bed systems may be a viable option for system design when site con- straints do not allow placement of a conventional trench system meeting current sizing requirements. 2. Special distribution considerations: To assure that the entire bottom area of the bed will be utilized for dispersei, that treatment by the receiving soil will be maximized, and that localized groundwater mounding will be mini- mized, bed systems may be required by the LFA to utilize pressurized dis- tribution. 3. Special sizing considerations for bed systems wider than 4 ft: Dispersal systems are sized based on the anticipated quantity of wastewater (design flow) and the capacity of the receiving soil to disperse the wastewater (ap- plication rate). Only the bottom area of the dispersal field is used for its sizing. From time to time, however, the design flow may be exceeded for short periods of time. Under such conditions of peak loading, trench side- wall dispersal provides an additional safety factor for conventional trench systems. Because bed systems have limited sidewall area in relationship to bottom area, bed systems wider than 4 ft need to be increased in size by 50%. if pressurized distribution is utilized the size will only need to be increased by 25% (based on a 50% increase per the UCP, minus the 25% credit for the use of pressurized distribution). 4, Special construction considerations: a. Beds should be constructed only when the soil is sufficiently dry so that it will not seal or compact during installation b. No excavation equipment, including tracked vehicles, should be used inside of the bed //Jrl���YL. OR On-Site wastewater Manual—Part 3—System Requirements Adapted March 16, 2010— Updated August 24, 2010 and December 11, 2012. Dart.Three** Page 46 WIN III 11m, 1,1110"'11 H Equal Distribution 1. equal distribution by appropriate placement of "T"s and distribution boxes will be required within the dispersal field, 2. When site conditions do not allow equal distribution using gravity disper- sal, pressurized distribution will be required. 1. Pump and Pressure Distribution Gravity systems will be required to utilize pumps and pressurized distribution as follows: 1. Utilization of an Effluent Pump: An effluent pump is required when the depth of the plumbing without its use would result in either: a. Effluent discharged less than 12 inches above a restrictive layer such as hardpan or a seasonal watertable (as evidenced by mott- ling or presence of groundwater) and use of the pump would signif- icantly increase the vertical separation, or b. The bottom of the dispersal field being deeper than 5 ft below fin- ished grade. 2. Utilization of Pressurized Distribution: Whenever a pump is required for a system repair, as specified in Subsection a, above; a. Staff will explain the benefits of usiing pressurized distribution; b. Pressure distribution will only be required when a pump is needed as specified in Subsection 1.a. of this section, and when equal dis- tribution utilizing gravity dispersal is not feasible due to site con- straints. J. Supplemental Treatment Wastewater systems will be required to utilize supplemental treatment when one of the following conditions has occurred and an alternate remedy is unavailable: 1 The site is located in a designated Area of Environmental Concern and supplemental treatment is specified as a mitigation-, or 2. Effluent dispersal is into a soil that is seasonally inundated by groundwater (Le., 01 vertical separation); or . Available area for the dispersal field is significantly undersized based on the daily design flow and application rate of the receiving soil; or 4. The dispersal field will be excavated closer than 50 ft to a down gradient (unlined) surface water or closer than 25 ft to an up-gradient (unlined) sur- face water; or 5. Wastewater strength is significantly greater than domestic strength. On-Site Wastewater Manual—Pert —System Requirements Adopted March 16, 2010—u'pdated August 24, 2010 and December 11, 2012 Part Three** Page 47 10W, 41111N�u . Requirements Pertaining to Minor Repairs requiring LEA Notification and P''lan Review under Section 19- D.2. ofOn-Site Wastewater Ordinance: 1. In general„ a minor wastewater system modification or repair that does not require completion of a Site Assessment or soil) evaluation, or involves re- placement of no more than 10 ft of drainpipe due to crushing or root intru- sion does not require a full Construction Permit. 2. leo on-site wastewater system components can be serviced or repaired without notifying the LEA for plan review. . Other than replacement of septic tank inlet and outlet T's or replacement of septic tank lids, LEA Notification and Flan review must take placeBE- FORE the service is performed. 4. LEA staff will make plan review a high priority activity, typically performed by a simple telephone call to the LEA and conversation with an inspector. Photographs sent via email may, at the LEA's discretion, be accepted in lieu of an actual site inspection, When a site inspection is not waived by the LEA, an inspection by' the LEA will be performed whenever possible while the Installer is on site perform- ing the component replacement or modification and no later than one working day from the date of notification and plan review or else the in- staller is authorized to complete the work and cover the system. L. Whenever, in the determination of the LEA, insufficient area will remain for sys- tem replacement in the event of failure of the current repair being permitted, the APP file will be clearly flagged with this information and Trakit will be flagged so that the information will be readily accessible by future property owners. On-Site Wastewater Manual—Part 4—OM&M Program Adopted March 16, 2010—Draft Update: August 24, 2010 Part Four** Page 1 Part Fours Operation, Monitoring, and Maintenance Chapter1. Applicability ......... .......................... ..............................................................................2 Chapter2. Administration...... ..................... ..................... .. .......... .................,............... .........2 A. Administrative Overview............. ...._............ ............... ............ ....... ....... ....... 2 B. Rales and Responsibilities......................................................................................................2 Chapter3. Program Elements...................................................................................................................4 A, Homeowner Education................ ......... .....,.... .........,...,,....4 B:. CSM&M Data Management........... ......... ............................................. .......... ......... .........5 C. CM&M Manual,.................. ........____........... ............ ..............._5 D. Operating Permit.....................................................................................................................5 E. Notice on Property Deed.........................................................................................................8 Chapter 4. Inspection Frequency and Maintenance Checks....................................................................7 A. Inspection, Frequency.................. ......... ........................................................ .....................7 B. System-Specific Requirements... ........ .............. C. Minimum Inspection Requi'rements.........................................................................................8 D. Supplemental Treatment Effluent Monitoring.........................................................................10 Chapter 5. Corrective Action. ..................... ......... ......... ......... ....................................................11 A. Notification of Non-Compliance... ........... .......... ................................................................11 B, Hearing..................................................................................................................................11 C. Extended Testing .............................. D. Restricted.or Prohibited Use ....... .......... ............................................................................11 On-Site Wastewater Manual-Part 4 -o Program Adopted Larch 16, 2010- Draft update: August 24, 2010 Part Four** Page 2 u Part iii: Operation, Monitoring, and Maintenance Chapter 1. Applicability A. The program will apply to new and repair on-site wastewater systems as specified in theOn-Site Wastewater Ordinance and this Manual. E. Owners of existing systems that do not include pressure distribution, sub- surface drip irrigation, or supplementali treatment will be encouraged to volluntarily opt into the program. Chapter 2. Administration A, Administrative Overview 1. The program will be administered county-wide by the LEA. 2. Any required OM&M inspections will be performed by certified Specialists. Ohl Specialists are individuals or corpora- tions who are certified c rtiFic tion of sveciaftts Specialist by the LEA. 4. The LEA may perform OM Butte ountype,:Wlst OM&M'i inspections for - nvir ental Selec ' quality assurance spur- ;Hash veys and investiga- Ren.Wlb ; Data Operating �a4� ternC�Mi�P er tions. Entry Analysis Permit The diagram shows the relationship be- N tween the parties in- volved in the program. B. boles and Responsibilities 1. LEA: a, Develop and administer the OM&M program in consultation with the Butte CountyOn-Site Wastewater Advisory Commit- tee. b. Establish a record keeping and reporting system to ensure that up-to-date records are kept of the location, ownership, site evaluation, design, and reports so that perfor- mance of the systems can be monitored. On-Sits Wastewater Manual— Part 4—OM&M Program Adopted March 16, 201 Q—Draft Update:August 24, 2010 Part Four** mage 3 C, Assure ongoing program quality control and quality assur- ance. d. Monitor and analyse the performance of on-site systems within the County by reviewing OM&M data in relationship to written performance standards. e. Inspect supplemental treatment systems located within the Cleveland Hills Alquist-Priolo Earthquake Fault Zone in the event of an earthquake centered on the Cleveland Hills Fault resulting in appreciable surface fault displacement, f. lnspect supplemental treatment systems in the event of an earthquake centered within 25 miles of Butte County with Richter Magnitude of 5.0 and above. g. Assure timely follow up and correction, including enforce- ment action, when problems are encountered with individual wastewater systems or with treatment and dispersal tech- nologies which are being monitored through this OM&M pro- gram. 2. System Owner a. System owner must use the on-site system in conformance with its design parameters b. Participates i'n the O &M program as outlined in this docu- ment C. Assures continued operation and maintenance of their on- site wastewater system consistent with the On-Site Wastewater Ordinance and this Manual d. Must report any system malfunctions resulting in surfacing sewage to the LEA within 24 hours of discovery e. Must contact an OM&M Specialist within 24 hours of discov- ering the following conditions that could indicate system mal- function requiring major system repair: (1) Persistent and excessive odor of sewage (2) Activation of the system audible and/or visual alarm (3) Wastewater backing up into the plumbing fixtures, toi- lets not flushing properly, or sink drains not function- ing f. Must obtain permits, procure services, and pay fees as may be necessary to correct deficiencies in on-site system identi- fied by the LEA or the OM&M Specialist . Certified Pumper a. Pump septic tank and inspect the tank for integrity, including baffles and "T's. Ori-Site Wastewater Manual®Part 4,m OM&M Program Adopted lurch 16, 2010—Draft update:August 24, 2010 t Part Pour** Page 4 b. Deport findings on a standardized form provided by the LEA and submit completed forms to the LEA on no less than monthly basis. C. Any malfunctions resulting in surfacing sewage imust be re- ported to the LEA within 24 hours of discovery. 4. Certified Designer a. For each system designed', develop and provide a system. owner's M' M Manual, as described in Chapter 3 of this Fart of the Manual. An electronic version of the MM Man- ual must be prodded to the LEA for review and for archival purposes. . Proprietary System Authorized Agent. a. Assure that instructions regarding OM&M of the system or device is provided to the LEA„ designer, and owner of the residence or facility b. Provide instructions in sufficient detail for maintenance to be achieved through certified OM&M specialists . Certified OM&M Specialist a. Meet and maintain the requirements for certification outlined in this program b. Provide all required maintenance and monitoring reports to the LEA within 30 days of service C, Deport to the LEA within 24 hours of discovery any system malfunctions resulting in surfacing sewage or in the judge- ment of the OM&M Specialist, will require major system re- pair . Notify the LEA of system maintenance activities as specified in theOn-Site Wastewater Ordinance. 7. Wastewater Advisory Committee Assist the LEA in the development, adoption, oversight, evaluation, and improvement of this OM&M program Chapter 3. Program Elements A. Homeowner Education The LEA will establish methods for increasing public understanding about the proper use and care of on-site systems. The program goal is to pro- vide system owners with the information they need to properly operate and maintain their systems. On-Site Wastewater Manual—Dart 4—OM&PSI Program Adopted March 16, 2010—Draft Update: August 24, 2010 Part Pour** Page 6 m S. C7M:&M Data Management The LEA will track the maintenance and performance of all systems in the OMI& idatabase. C. OM&M' Manual 1. For standard gravity systems, the LEA will provide an informational packet to new owners at the time of installation and at change of ownership. 2, For supplemental treatment systems, the certified designer will pro- vide the homeowner's with an OM&M Manual and provide an elec- tronic version to the LEA for archival purposes, a. The ail&Cut Manual will be supplemented and/or updated by the certified designer when a system is repaired. b. The manual will include the following elements, as applicable and available: (1) Diagrams of the system components (2), Accurate, fully dimensioned as-built of the system ( ) Explanation of general system function, operational expectations, owner responsibility, etc. (4) Routine maintenance schedule ( ) games and telephone numbers of the certified de- signer, certified' installer„ and certified a &M Special- ist ( ) List of proprietary system components, including manufacturer name and model number (7) Information on "troubleshooting" common operational) problems that might occur with that specific system D. Operating Permit 1. Requirements for Approval a. System installation has received Final Approval by the LEA as described in Part 1 of this Manual, , The OM&Cwt Manual has been provided by the system de- signer for supplemental treatment systems. C. System has an approved, fully dimensioned As-Built docu- ment and designer certification as described in Fart 1 of this Manual. d. For pressure distribution and supplemental treatment sys- tems, appropriate notice of Operating Permit requirements and a Licensing Agreement have been recorded on the Ori-Site Wastewater Manual Part 4—CTI Program Adopted March 16, 2010—Draft Update: August 24, 2010 Part Four** Page 6 property deed as described in Subsection E of this Fart of the Manual. . Operating Permit Renewal Frequency Operating permits, unless suspended or revoked by the LFA for non-compliance with the On-Site Wastewater Ordinance or Manual, shall be valid for a duration based on system type, as follows: a. Pressure Distribution: From issuance until the time of proper- ty transfer. b. Mound', or Single-Pass Sand Filter: From issuance for a peri- od of one year. C. Aerobic Treatment Unit or Packed Bed Filter: From issuance for a period of one year Renewal Procedures a. The LEA will notify the system owner of the need to renew their system"s operating permit. The notice will list certified OM&M Specialists that may be used by the homeowner for inspecting and maintaining the system. b. The LFA will renew the operating permit upon receipt of the appropriate fee and verification of compliance with OM& requirements. 4; SpecialInspections a. Operating permits will include a condition to allow inspect supplemental treatment systems located within the Cleve- land Hills Alquist-Friolo Earthquake Fault Zone in the event of an earthquake centered on the Cleveland Fulls Fault re- sulting in appreciable surface fault displacement. b. Operating permits will include a condition to allow inspect supplemental treatment systems in the event of an earth- quake centered within 25 miles of Butte County with Richter Magnitude of 5.0 and above. F. Notice on Property Deed Owners of systems utilizing pressurized distribution and/or supplemental treatment will record, with the property deed for the benefit of future own- ers and successors: 1. Notice of the requirement for an, Operating Permit. .. A, Licensing. ,agreement granting the LEA access to inspect the sys- tem after providing the property owner with prior notification. On-Site Wastewater Manual--Part 4—OM&M Program Adapted March 16, 2010—Draft Update:August 24, 2010 Dart Four** Page 7 & Referral) to Environmental Health for additional information regard- ing the system's operation, monitoring, and maintenance require- ments and estimated cost of maintenance and replacement. Chapter 4. Inspection Frequency and Maintenance Checks A. Inspection Frequency Inspection Interval Standard Pressure Mound or ATU or Disinfection (Following Initiation Gravity Sys- Gist.or Single-Pass Packed-Sed of System Use) tern Siphon Sand Filter Filter(1) Units First 6 weeks PL or om PL or Monthly OM (if no telemet } 6months after €0M 0M i'nitiati'on of use Annually......._.... _ 0M -As required by the manufacturer or PL or PL or NSF, but not less oM M thano ..... .. _.__.... _.:.__ ......_._.._.... CSM Every 2 years (Recommended Only) P'U or IN or Every 6 years 0M (Recommended Only) (1) Supplemental treatment systems, other than single-pass sand filters, used for treatment prior to disinfection must be monitored monthly for the first year of operation and longer if necessary to assure treatment require- ments are reliably met PL= Proprietary Crevice Licensee(also must be locally certified as OM&M Specialist) PU= Certified Pumper INS= Certified Installer HO= Homeowner OM= Certified Operation, Monitoring,and Maintenance Specialist B. System-Specific Requirements Complexity and frequency of inspection will be related to the complexity and maintenance requirements of the system components, and based up- on consideration of: 1. Recommendations of the Wastewater Advisory Committee Z Recommendations of the manufacturer . Industry standards of practice On-Site Wastewater Manual—Part 4--OM&M Program Adopted March 16, 2010 r Draft Update;August 24, 2010 Part Four** Page 6 C. Minimum Inspection Requirements 1. Septic Tank a. Scum and sludge measurements (pumped as needed) b. Indication of water intrusion C. Integrity of tank, including observation for: (1) Cracks or indications of structural deterioration ( ) Condition of inlet and outlet "T" ( ) Condition of lids (4) Indication of leaks in risers d. Condition of effluent filter, if present . Dump and Closing Chamber a. Scum and .sludge measurements, pumping as needed . Indication of water intrusion C, Integrity of tank, including observation for: (1) Cracks or indications of structural deterioration (2) Condition of inlet and outlet "T" (3) Condition of lids (4) Indication of Peaks in risers d. Condition of and correct operation of all floats e. Orderly wrap of float cords f. Condition of pump intake screen g. "verification of pump cycle h. Siphon sitter functioning, if applicable 3. Control panel in good) working order based on checking the follow- ing components: a. Timer and digital counter readings recorded by OM&M Spe- cialist during the inspection for future reference. dor control panels that record pump activity electrnically, it isnot neces- sary to record activity durng field inspection. . Pump cycle counter operation verified by the OM&M Spe- cialist in the field by manual operation of the pump. For con- trol panels that record pump activity electronically, counter operation can be verified remotely. C. ,audible and visual alarms functioning d. Run time appropriate, if demand dose e. Electrical box free from moisture and secure connections 4. Gravity Grainfield (Conventional or travelless), if applicable IN On-site Wastewater Manual—Part 4—O & Program Adopted March 96, 2010—Draft Update:Augiust 24, 2090 Part Four** Page g a. Depth of effluent ponding within trench b. Indication of effluent breakout or discharge to surface of the ground C. Upkeep and accessibility of observation ports d. Area verified as free from roads, structures, vehicular traffic, surface water drainage with down spouts properly diverted e. Results of hydraulic loading test, if test is needed . Pressure Distribution Drainfield a. Depth of effluent ponding within trench b. Indication of effluent breakout or discharge to surface of the ground C. Area verified as free from roads, structures, vehicular traffic, surface water drainage with down spouts properly diverted d. Upkeep and accessibility of observation ports e. Check for equal distribution by measuring distal end orifice residual pressure head f. Condition of orifices and verification of hydroflush if neces- sary & hound a. Excessive plonding of effluent b. Effluent breakout or discharge to surface of the ground C. Maintenance of area free from roads, structures, livestock, vehicular traffic, surface water drainage with down spouts properly diverted d. Upkeep and accessibility of observation ports e. Check for equal distribution by measuring distal end orifice residual pressure head f. Condition of orifices and verification of hydroflush if neces- sary 7. Single-Pass Sand' Filter a. Ponding of effluent over sand b. Effluent breakout or discharge to surface of the ground C, Area verified as free from roads, structures, vehicular traffic, surface water drainage with down spouts properly diverted d. Upkeep and accessibility of observation ports e. Check for equal distribution by measuring distal end orifice residual pressure head f. Condition of orifices and verification of hydroflush if neces- sary / O/F Orr- lte' ante ater Manual—Part 4—OM&M Program Adopted March 16, 2010—Draft Update: August 24, 2010 Part Four** Page 10 g, Within pump well, check for same items as listed under "Pump and Closing Chamber" . aerobic Treatment Units, lncluding lacked-Bed Filters Follow requiremr eats outlined by manufacturer and/or NSF. g. Add-On Disinfection Component Follow requirements outlined by manufacturer and/or NSF. D. Supplemental Treatment Effluent Monitoring 1. Any system that incorporates supplemental treatment shall be rnon- itored annually for performance in the following manner. a. T'rea'ted effluent and, where applicable, untreated influent will be samplled and tested at least annually for BOD, and TSS. Treated effluent and, where applicable, untreated influent of systems with Operating Permits requiring nitrogen reduction shall, in addition, be tested for Total Nitrogen. Treated efflu- ent of systems utilizing disinfection shall, in addition, be test- ed for total and fecal coliform. b. Where the OM&M Specialist has used field testing for pH, DO and turbidity in addition to the parameters identified above during six consecutive monitoring events over a three year period, and where a relationship between field testing measurements and OD/TSS has been established to the satisfaction of the LEA, the LEA may approve field testing in lieu of testing for BOCK and TSS for future routine mainte- nance events. c. Three years of effluent monitoring has shown the treatment system consistently meets the standards outlined in this Manual for SOCA and TSS, the LEA may approve field test- ing. d. When effluent quality monitoring results indicate that the supplemental treatment and/or add-on disinfection did/ not meet the minimum treatment levels specified in this Manual, a second sample will be 'taken within three months. If the follow up sampling results indicate that the supplemental treatment and/or add-on disinfection unit is not performing to the treatment levels specified in this Manual, the OM&M Specialist will inform the LES: and will take the corrective ac- tion necessary to achieve the treatment levels specified in this Manual. Correction of treatment problems will be verified by two consecutive compliant sample results within a three month period. . Use of supplemental treatment technologies for new and replace- ment systems may be restricted or prohibited where it has been de- Oro-Site Wastewater Manual—Part 4—C)M&M Program Adopted March 16, 2010—Draft Update: August 24, 2010 Part Pour** Page 11 iwf Ipl/:1�1w,4fylh��,kalu termined that a technology is not capable of consistently meeting treatment standards under field conditions. Chapter 5. Corrective Action Corrective action for non-compliance with treatment standards may include the following: A. Notification of Non-Compliance A Notification of Non-Compiliance with the treatment sent to the system's certified designer and system proprietor; B. bearing A hearing with the LEA and/or the Wastewater Advisory Committee; C. ExtendedTestings Extended field testing of the system until compliance can be verified; D, Restricted or Prohibited Use Restricted or prohibited use of the system for new and repair applications.