Loading...
HomeMy WebLinkAbout15-076 ijilif)444 1646 dliq'OP le` '1417 ir I (i c; I ty 1,114,1 ir 41101 44(1?frill'i'107(771,(7100 Wilf fl,./'''''yy,,,,friffp fyl orpitr414., , 2,,,, 004,,,,j„, fr , , ,,,,,p. /i,,,,,,, , 6„,,( ,,, /it 9 ,A) d I ,J I, ,k) 31 Id/J ,(^14711 / ( , ,'fj/ 7,011,1/111111/ (0, ,'Id' ,ifr./rs,o,/,,,4 4/,/ ,f4;10 114 1141 gi,',1 ,41,,,c 4, II el 1#1#,(1 0d11, 1, J 14 v ir I P/ 0 1(1 / 'f 0 / iri I' 01:1 1 't 110'I 11%oi 1 0'NI 10,,,),:04 i Of)//ii(.1'0 pi r I dd.114 4 0 111#110 1 I 4 154114 ',;^ i'.,:/,,A Al,:r 4//1/ t 01,,T1 t,) ill,1,(111;ff%'7 i(61,1,I 11))fjP ligiV i fdi,ij fl II '11)1. 117?1' re 1 P/,,)p I I, r0 140,I4,4 Yll,Y/4,"#;4:111!'", 04 fij ft'17,, ellif, 1 ,/,,,IT y k',,'„) 4,(4,(4 ii,4 tiii 4,"mg 1,1,0%*,i,"4„.iwrrili tr(, / iivel'fill Arlf101111Wri PC!7/ 14y tily;(1 ,7 iipt„ pi olr,,, ,':,,, ,/;44,0, ive.,,(i p,Tr'to,, ,1, vi ,i'i,i'1,1,, 4, ' I/.:IT,1,1+,,,/,',4'b /, #1147,i7 04 V/'"))/ki II*)4 I , '14 I,IM1 111 i hi 1.4,7/ ,,,,,10(,„ejffi,,/,i RESOLUTION REGARDING NON-RESPONSIBILITY OF NICHELINI GENERAL ENGINEERING CONTRACTORS, INC. WHEREAS, public works projects are generally awarded to the lowest responsible bidder in a competitive solicitation; and WHEREAS, Public Contract Code section I103 defines a responsible bidder as one who "has demonstrated the attribute of trustworthiness,as well as quality,fitness,capadty,andexperiencetmsatisfaciori|yperformthepub|icvvorkscontract"; and WHEREAS, a public agency may determine whether a bidder is responsible or not, and this determination may be based on poor performance from a previous contract; and WHEREAS, a body with authority to grant public works contracts is vested with great discretion in determining whether a bidder is responsible; and WHEREAS, the Public Works Department (the "Department") recently opened bids for the Module 5 Phase A Excavation County Project No. 757-7515-01 (the "Current Project") at the Neal Road Recycling & Waste Facility (the "Facility") and Nichelini General Engineering Contractors, Inc. ("Nichelini") was the low bidder on the Current Project; and WHEREAS, on May 19, 2015, the Butte County Board of Supervisors (the "Board") held a hearing regarding whether Nichelini is a responsible bidder; and WHEREAS, both the Department and Nichelini had the opportunity to present documentary evidence and verbal testimony to the Board on the matter; and WHEREAS, based on Nichelini's poor performance, as more particularly set forth in the staff report on this matter and the exhibits thereto, on the recent Modules 1 and 3 Temporary Cover Project at the Facility, the Department recommends that the Board make a finding that Nichelini is not a responsible bidder, reject its bid on that basis and award the contract for the Current Project to the lowest responsive and responsible bidder. NOW,THEREFORE, BE IT RESOLVED that: 1. Based on the written and oral evidence presented at the May 19, 2015 hearing, the Board hereby finds that Nichelini is not a responsible bidder at this time and for the next three years. PASSED AND ADOPTED by the Butte County Board of Supervisors this day of May 19, 2015, by the following vote: AYES: Supervisors Connelly, Kirk and Lambert NOES: Supervisors WahI and Teeter ABSENT: None NOT VOTING: None r--�� Doug Teeter, Chair Board of Supervisors ATTEST: Paul Hahn, Chief Administrative Officer and Clerk of the Board of Supervisors 8y: �///~~~ / --- ~ � � / ^ ^ � 4rP4tY