HomeMy WebLinkAbout17-100 �r
r
/
�r., i �;. .., r . r r r,.,,r✓ i. i i / . 1. ✓ /
�,��rr/�� r Orr ��„ � /�/. /.. I„ I. /, ,li /✓/✓✓//.✓��,i�✓r✓
r�fr� l o �/;i� i / r Vii/ / �,, / � ,,/ /� / / f/✓ r
/ 1 ✓/lr,, ' / , ,,,,., �, ., %l.,,,, ., ,,. ,,. ✓ /.e /i „i /, � ,, i a% / / -.i6,;,/i 11,.r r,/✓1,
r ✓ ✓�/�, r // 1 ,rr r / r, %, r a / ✓✓%,✓✓ r r r -0
,,, ,, ./ ,, , ,/ r , , ✓, /, it, /, ✓
/ / / i it ,,, i I / i ✓ / / r i // r / i
/ ✓ r. ,,� ✓ ,✓ ,. r , ,i ,// ✓ ✓ /�... J r� i✓ ,it �/i✓.
r 1, // „ � /� r � / /� ✓//,/ // r /�, ,
/ ✓ s / �, i �, / �, 1/ /�� i � �
/.. r✓ r.,v. /ir e ,.i /..i l..a.✓. r ,✓ r /,/ / J ✓6 r,/!,/ ,/. l /ori
✓/ �i
,/.. �i r/ r,l � .1, /. ,y/, � r. ,r 1. ,i,. r �. ,.✓. /, /
/ / i, l ✓ „. �,
�, J �r /. / / ,r / . ✓. / � it„/ r%✓ ,1., / r
r .,. . i J // ✓ ,r. ire,. / r.. � �✓/ r.
r ,.�„ "i//✓„✓�� ,,,//r.,/,,,.. ,/,.ice .,✓ri,..Jii✓� �,r.c/. ✓f/ / �/ � i r
u�������✓�i�.a�,/i v ..✓,a / /,(i ir./,��//r .I%/U�c„/L„iu/�o✓✓%r1�(/✓�/ti.,..,/„�.,if//,t�/r/r.rl,�✓/�i l�//✓%//icr�f/../l „/%/l��✓
Resolution No. 17-100
-' f RESOLUTION AMENDING THE MASTER FEE SCHEDULE
FOR SERVICES PROVIDED BY THE COUNTY OF BUTTE FOR THE PUBLIC WORKS DEPARTMENT
WHEREAS, the Board of Supervisors established the Butte County Master Fee Schedule by
Resolution on March 24, 2009 and has amended the Fee Schedule overtime; and
WHEREAS, pursuant to the provisions of the California Constitution and the laws of the State of
California,the County of Butte is authorized to adopt and implement fees for services, provided however,
that such fees do not exceed the estimated reasonable cost of providing such service; and
WHEREAS,the County of Butte recently concluded a comprehensive study of the costs of providing
various government services entitled, "Cost Recovery Study Report of Findings” pirepared by MGT
Consulting Group, dated May 2017; and
WHEREAS,the County strives to increase and maintain clarity,consistency,and transparency of the
fee process; a,nd
WHEREAS, the fee revisions were based on the cost of service projections for fiscal year 2016-17
and are directly related to the cost necessary to provide each service; and
WHEREAS, a public hearing was noticed ten days prior to the date of this Resolution to allow
consideration of the proposed fee adjustments prior to adoption of this Resolution; and
WHEREAS, the Board of Supervisors desires to adjust current fees and implement new fees for
various government services provided by the County of Butte as set forth in the above mentioned study..
NOW, THEREFORE, BE IT RESOLVED that the Board, of Supervisors of the County of Butte adopts
fees as delineated in Exhibit A,and amends the Butte County Master Fee Schedule to reflect the changes;
and
BE IT FURTHER RESOLVED all fee adjustments shall become effective September 1, 2017..
PASSED AND ADOPTED by the Butte County Board of Supervisors this 13”'day of lune, 2017 by the
following vote:
AYES:Supervisors Kirk, Lambert,Teeter, and Chair Connelly
NOES:Supervisor Wahl
ABSENT: None
NOT VOTING;: None
Bill Connelly,Chair
Butte County Board of Supervisors
ATTEST:
Pawl Hahn, Chief Administrative Officer
and Clerk of the Bo rd of Supervisors
By � .
Deputy
EXHIBIT A
-- Recommended Changes to the Master Fee Schedule --
Recommended deletions are formatted with sem#text
Recommended additions are formatted with underline text
Notes included in Exhibit'A' for explanatory purposes and that won't be
included in the Master Fee Schedule are (in parentheses and italicized)
BU H E COUNTY
PUBLIC WORKS
Master Fee schedule
Recommended
AEtivi (P'c,e=Grscrr anon Add fedi Fee Fee Notes
PUBLIC WORKS r
A. f4ing Deveioament Aoolication Fees
1. Application for Certificate of Merger into Singfe (F'fw) $386.00 $445.00
Parcel
2. Legal Lot Determination/Certificate of (P loam) $750.00 $889.00
Compliance
3. Lot Line Adjustment (1fo evly Fiat) $163.00 $445.00 Re"ooF-%r 4-$469-depesit-lett
4. Parcel Map )ilow rdryv-.r,Ffrat)' $163.00 $741.00 Per-hOUF.4-hour-mini. FffiJFW
Pre4smirraFy SuHdiais�en $4:68.00 fer-heu,
ReueFsierf-to,AE-weage X163�a { {euF v�# $ rt-Frfauw�axttm
Revised- p �0 f2F hot+r-vee"-"��^� �,= vaaty*ec+r Fraaaatraat�
subdivisien Mae(I 40 $500.00 P r4oE
S. Subdivision Map4G+4ets-j: fl?o¢rr°dy) $163.00 $148.00 Per hour,with$1,500.00 deposit.
VaraWefAVP94eat4esa
6. Utility Company Encroachment Permit:
a.Application processing (r cn)r $88.00 $105.00
b. Construction Inspection Uftw lyN $88.00 $105.00 Per hour with$300 deposit.
7. Encroachment Permit (d=ram) $176.00 $296.00
8.. Transportation Permit-Single Trip Per Vehicle (F10t) $16.00 $16.00 *STATE FEE:Authorized per Section 671.1 of Streets and
Highways Code.Fee set by California Department of
Transportation
9. Transportation Permit-Extended Period Per rot) $90.00 $90.00 *'STATE FEE:,Authorized per section 671.1 of Streets and
Vehicle Highways Code.Fee set by California Department of
Transportation
10. Permanent Road Division Zone Creation (trdrrs IV) $153.00 $148.00 Per hour,with$600.00 deposit.
Application Review
11.. (F0t) New
12.. (Hourlµ) New '
13. i'Ho arty) New Per®hQu1-wlth_a 7 hQgL M0Jrn m d pa..sitt
14. Fxtet filtry q ime liar FilirsP_Maa (rPot) New
15. (d-roo0y) New Per hour.with a 3 hour minimum deoasit.
16. Land (HouH,y) New QB Par haur.wikh a 7 ho rr minimum rleC�bsit.4 hn�r r�ra�si .
Unceliatian or F ac m nt x hang
17. (Hourly) New Per hon with a 3 haur minimum deposit,0 hoa maximum.
New CantraEts.Rices=_ions.Am na dments.Nan-
RenewaPs.Consistence R'gviews
18. Mining and Reclamation (d°ow l'y) New Per.b rr.iuith a 3 brut minimum dew5d.6 hoar ma,;imm9L
19, Site Deeelooment Permit (How ly) New Per boor.with a 1 hour minimum deoasit. 2 hover maximum.
20, 5pec(f c PJAp (f-Pouffy) New Per hour.with a 7 hour minimum deposit.
21. Zoning Qrdinance Amendment (P ftaurd'y) New Per hour.with a 7_haur minimum daqW.
B. Checking Fees
1. Assessment District Construction Inspection Fd ea rrGy) $163.00 $148.00 Per hour,with deposit of 6%of construction costs.
2. Assessment District Construction Plan Checking 8caur°fly) $163.00 $148.00 Per hour,with deposit of$700.00.
3. Checking Temporary Leach Trench for Storm (FOt Hourly) $489,00 $148.00 Per but,with a_2 haur minimum deoasit,
Drainage
4. Conceptual Drainage Phan Review (P clur'ly) $163.00 $148,00 Per hour,with deposit,of .
depesit$700.00.
5.. Erosion Control Plan Review (Nourtyy) $163.00 $148.00 Etc WILE,Wlb A
maximum.Pet-#ae. FnWsaufn fee$81.50. ,heUFm
rraiaiFAUrsa end 2 troeF ximurrr
6. Final Parcel Map (Houlty) $163.00 $148.00 Per hour,with$1,100.00deposit,
Z Final'Subdivision Map (Nour d'ye) $163.00 $148.00 Per hour,with$1,800.00 deposit.
8. Lot Line Adjustment(by map,deed,or plata (Howe yy) $163.00 $148,00 Per hour.with a 3 hour minimum deposit. 8 haur maximum.
Per-9aetaF-nr+nissau...�^-...�46�IaeUr-r�r"sra-and-8-�e�F-rr+aa:
Pub Works Master Fee Schedule,2 of 4
BUTTE COUNTY
PUBLIC WORKS
Master Fee Schedlule
Recommended
Activity (ree Descry tion Ado ted Fee Fee Notes
9, Private Road Inspection (Howiy) $163-00 $148.00
Umaximum,PeF-how-,+Affw'mufft4ee-$326.GG.2 h_
1A-hoar-thew...
10. Record of Survey (Hmnly) $163,00 $148,00 Per hour,with$800.00 deposit.
11. Subdivision and Site Improvement and Grading- (i forldy) $16100 $148.00 Per hour,with deposit of greaw-of$700.00-ef4-.,5%-e4-
Construction Phin Checking
12. Subdivision and Site Improvement and Grading- dr Hr �Y) $163.00 $148.00, Per hour,with deposit of 3%of construction costs.
Construction Inspection
13. Waiver Application by Deed (Houdr ') $163,00 $148.00 Per hour,with$1,100 deposit.10 hour maximum.
C. Reviewing Fees
1. Administrative User Permit (Fhv) $163-00 $148.00
Admiriistrafiye-Verj� ce $iI33.00
2. Planned Unit Deveicipment fftnt Hor'Oyj $815,00 5148.00 Ee_Lb=
3. Rezone (r,'W Hom Vy) $244,00 $148.00
4. Use Permit- (flat) $244.00 5741.00
5. (Flat) New
6. Variance(Miap&gpgjp - 'gW (Orpl) $244.00 $148.00
7. {Firer) New V_1LQ Flat fee based on 112 hour
& New
D. Miscellaneous Fees
1. County Service Area(CSA)Formation (Hourly) $163,00 $148.00 Per hour,with$1,000 deposit.10 hour maximum.
2. Flood and Drainage Letters/Public Report of Sods (Houdy) $163.00 $148.00
Letters
3. Parcel Clearance (dOudy) $163.00 $148.00 Pec bQm with a LIZ hour minimuclo d
Mai ... ....... ....fee ef$8!.50.1/2 heuf�
4. Pre-Appfication Meeting(Non-PUD) (Flw)' $450.00 $371.00 Per meeting.
5, Right-of-Way Abandonment $163.00 $148.00 Per hour,with$1,200 deposit.!Q houf-max4mum-
6, Road Bonding Clharge(any bond processing fee) (FkO->Hourly) $570,00 $148,00 Per hour a 2 hour minimurndeoosit.
7. Road Renaming for Existing Named Roads (Fln t.>W10urfy) $1,200.00 $148,00 Err huir.with 0
8. Research Letter (I k)utly) $163,00 $148.00 Per hour;,with_a I hour minimum
9, Right PLWAYARP'W" (Acroot C'cs New
E. jjMLscale Coo iQ
ntvwid-
Em
R Sign and Hardware Fees
1. Street Sign(s):
a. Land Use Division Administrative,Production, $71.00 $84.00 Per hour..with a 2 hour minimum deaasit.
and/or Instaliation Time
b. Pass-through Cost of Materiois Actual Cost Actual Cost
2, Centerline Monument Can plus Brass Cap:
a. Land Use Division,Administrative,Production, $81.50 $74.00
and/or installation Time
b. Pass-through Cost of Materials Actual Cost Actual Cost
Pub,Works Mosier Fee Schedule,3 or 4
BUTTE COUNTY
PUBLIC WORKS
Master Fee Schedule
Recommended
Activity (Fee Descri tion) Ado ted Fee Fee Notes
WORKSPUBLIC
G. Divisional Hourly Rate for Services Provided by:
1. $88.00 $105.00
Engineering Division of the Public Works
Department
2. HOYFIV ABIE FeF SeFYEies PFGVided by the Land $163.00 $148.00
Development Division of the Public Works
Department
3. ......,:r Rate feF SeFviees PFOVided by the TFRWJE $71.00 $84.00
mel Road Maintenance Division of the Public
Works Department
4. HGUFIY Rate f8F SefViEes Pfevided by the $74.00 $88.00
Maintenance/Fleet Division ofthe Public Works
Department
*Fee set by State or Federal legislation.The Master Fee Schedule will be updated to reflect any mandatoryfee amendments established by future State or Federal legislation.
Pub Works Master Fee Schedule,4 of 4