HomeMy WebLinkAbout18-053 J i
l
i
l
1
i, /✓ i � �,.,, i/ ✓ ✓, , l✓hlr 1,✓/ i/// io ✓/ /i✓ h ✓✓✓//� , 1 ,, //r ,� / �,1// ✓/
✓ / lfll r ,,, „ t✓,, /�r,,, 11/ , rr,:/,,, i✓1✓�, ,/,,,i,r�,✓ ,i i,✓� ✓/ /✓ // ✓✓ ✓ �l/,✓ ✓�i/o,����� ✓�/ l
i✓ �,�' i l''4 I✓�,,; r 1 ,�l4j�r�l������ �� � ��,' '%��l' ' ` �i� � ,� � fd✓U�'�� ,, � �i/ %l������ G,
sir v ,i /.,/� l � i �, % ✓- r t / lr � 1 ��l��l ��;1 j. �
�,^ GYryrr.* . i�/h ��ir / � �, ii �� 1 � Jf, A r � '/ /r, '/ �YiF� ��� ✓ 11
� %,,, / / r o��, � x �J f',G��i arra, ✓ � 1 � / /, �1 ✓ rl
, / v0// e/ i ✓e✓ �, 1, / 1,� I iJ% � �l ,i,/ /',/ i 1 � � '�, 1
f n ;.U,,i„rli,: r ;� �Jfl /i/'i ri�✓ /` e,f. 1. ✓ ✓1�,,� J , ✓/✓ � �' / J/ l ,� / / ��; , ,✓ f,, ,l 9
< i % a �� ��f/i^, i; ,r�� r/, f✓ 1,;� f � rl✓1;�, ✓✓ 1, � f(/i ;�!I��,�/���i ✓1 /�✓�J��� !f u
i � fi/! ,d�.,,/l�/i✓ ' �, 11 f .�r�� l � � . .✓ � / r ,� �, � ��,YN��� l
l. f r 1,�i,/�J.,. � ✓ �, � %'- � e �% ,.!� „I ,� l < / /,,1 � ✓,i.,, r r�
I � a' ✓ B
1
f ✓ � r 1 r rr, � �
,a��III,I i„G���.ii ; ,� .ir/fi„✓i/i .� ,/�,I,,,L/✓✓l�ll,,fi,,,l �L�ai�����// c.r..��
Resolution f11cM. 18-053
RESOLUTION AMEDNING THE MASTER FEE SCHEDULE FOR SERVICES PROVIDED BY THE COUNTY OF BUTTE FOR
PUBLIC WORKS—WASTE MANAGEMENT DIVISION
WHEREAS, the Board of Supervisors established Neal Road Landfill gate foes for septage on April 22, 20018 by
ordinance and were established in the Butte County Master Fee Schedule by resolution on March 24, 2009 and has
amended the Fee Schedule overtime ; and
WHEREAS, pursuant to the provisions of the California Constitution and the laws of the State of California, the
County of Butte is authorized to adopt and implement fees for services, provided however,that such fees do not exceed
the estimated reasonable cost of providing such service; and
WHEREAS, the County strives to increase and maintain clarity, consistency, and transparency of the fee process;
and
WHEREAS, the [department of Public Works, Waste Management Division requests to amend fees in the Peal
Road Recycling and Waste Facility Gate Fees section;and
WHEREAS, a public hearing was noticed ten days prior to the date of this resolution to allow consideration of the
proposed fee adjustments prior to adoption of this resolution; and
WHEREAS, non-land use related fees shall be effective at least 30 days after date of adoption; and
WHEREAS,the Board of Supervisors desires to adjust current fees.
NOW,THEREFORE, BE IT RESOLVED that the Board of Supervisors of the County of Butte adopts fees as delineated
in Exhibit A,for Neal Road Recycling and Waste Facility Gate Fees, and amends the Butte County Master Fee Schedule to
reflect the changes. Fee adjustments shall become effective April 27, 2018.
PASSED AND ADOPTED by the Butte County Board of Supervisors this 27th day of March, 2018, by the following
vote:
AYES:Supervisors Connelly, Kirk,Teeter, and Chair Lambert
NOES. Supervisor Wahl
ABSENT. None
NOT VOTING: None
Steve Lambeair
Butte County Board l of Supervisors
ATTEST:
Shari McCracken, Interim Chief Administrative Officer
and Clerk of the Board of Supervisors
Dep
ExHIBIT A
RECOMMENDED CHANGES TO THE MASTER FEE SCHEDULE
Recommended changes to the Master Fee Schedule are highlighted in grey
Recommended deletions are formatted with stFikethFOUgh text
Recommended additions are formatted with underline text
BUTTE COUNTY Exhibit A
PUBLIC WORKS-NEAL ROAD RECYCLING AND WASTE FACILITY GATE FEES SCHEDULE March 27,2018
Master Fee Schedule
Activity Ado ted Fee Notes
NEAL ROAD RECYCLING AND WASTE FACILITY GATE FEES
A. Self Haul Vehicles
I. Minimum Charge per Vehicle,up to 540 lbs. $10.00 Per vehicle.
net weight MSW
2. Charge per Vehicle,541 to 1,027 lbs.net $19.00 Per vehicle.
weight MSW
3. Charge per Vehicle,1,028 to 1,514 lbs. net $28.00 Per vehicle.
weight MSW
4. Charge for All Other Vehicles,Over 1,515 lbs. $42.11 Per ton eff.1/1/16
net weight MSW
B. Commercial Haulers $42.11 Per ton.All loads,including construction and demolition
debris,bulky items(excluding tires,bailing wire and stumps)
eff. 1/1/16
C. Clean Fill Dirt $0.00 No charge.No contaminants,litter,yard waste,or C&D
debris.
D. Clean Asphalt or Concrete $0.00 No charge.No contaminants,rebar,litter,or C&D debris.
E. Bulky Items $6.00 Per item.Mattresses,box springs,furniture,carpet,
appliances. Appliances with Freon must be certified as Freon-
free.
1. Mattresses,Box Springs $9.00 Per item eff. 1/1/13
F. Freon Containing Units(Limit 2/Visit) $15.00 Per item,$30 per item after two.Refrigerators,freezers,air-
conditioning units,ice makers
G. Cathode Ray Tubes and Electronics:
1. Televisions and Computer Monitors $0.00 No Charge.
2. Other Small Electronic Waste(Dimensions not $0.00 No Charge.
exceeding 24"-VCRs,Microwaves,Stereos,
3. Other Large Electronic Waste(Dimensions over $0.24 Per pound.
24"-Copiers,Computer Servers,etc.)
H. Stumps
1. Less than 24"trunk diameter(Measured above $10.00 Per Stump.
the rootball)
2. Greater than 24"trunk diameter(Measured $30.00 Per ton,plus special handling fee.
above the rootball)
1. Tires
1. Up to 36"O.D. $2.00 Per tire,tires with rims charged double fee. Limit-9 tires per
vehicle unless accompanied by Waste Tire Manifest.
2. 36"to 48"O.D. $4.00 Per tire,tires with rims charged double fee.Limit-9 tires per
vehicle unless accompanied by Waste Tire Manifest.
3. 48"to 60"O.D. $13.00 Per tire,tires with rims charged double fee.Limit-9 tires per
vehicle unless accompanied by Waste Tire Manifest.
4. Over 60"or Large Loads $200.00 Per tire,tires with rims charged double fee. Limit-9 tires per
vehicle unless accompanied by Waste Tire Manifest.
5. Cut Tires(Split,sliced,or quartered) $200.00 Per tire,tires with rims charged double fee.Limit-9 tires per
vehicle unless accompanied by Waste Tire Manifest.
Page 61 of 66
BUTTE COUNTY Exhibit A
PUBLIC WORKS-NEAL ROAD RECYCLING AND WASTE FACILITY GATE FEES SCHEDULE March 27,2098
Master Fee Schedule
Activity Ado ted Fee I Notes
NEAL ROAD RECYCLING AND WASTE FACILITY GATE FEES
J. Septage $71.11 Perton.
K. Special Handling $60.00 Per load.Request by appointment. (NF-Asbestos,large
stumps or other loads requiring immediate cover or Landfill
Personnel assistance.)
L. Untarped Load Fee $8.11
M. Commercial Hauler Prohibited Waste Extraction $1.5.00 Per occurrence.
(and storage in their container)
N. Credit Application Fee-Administration $45.00 Per indivdual,$68.00 per corporation.
O. Flourescent Tubes
1. 0-32 Lineal Feet $0.00 No charge.
2. >32 Lineal Feet $0.16 Per lineal foot.
Fees effective December 1,2016
Page 62 of 66