HomeMy WebLinkAbout18-067 i
r
I
1 r(
r
( r
/ o J
r
r
/ WI
� r r
r / rr 7
nr,/r�.,- �,.,! .,.. ,,..r,. �F ,,/r. // f. .r-- ,i ,l/i.;// /r. r /: //I / ./rr,r„/r,r✓ .,,r r, r / r /. /i //..r,
r!i,,,o,�.1lj' / r ,,,, ,_,i r / rir //„ i,,. ,, ,/✓%ii /r „/ r, ic. r / ,<r r r / r !/ //,/lr,/„
/�/�llfr ���! .,r,,,l / ,r. % 4f. +4 ✓�/ ,.. �,.. r i,-; r„ r r ,,: :,, '-r /, r / r//1�///
r/r/� -r �1, /1 f ,,,,x ;.„ � �// ✓/ 1�,,, � ,/r ,. r ,.rr. �, „r,i ,,.,,. ,,. r ,,,, ,. ,.. r r i:�� / /rFG:;
,., �..� rir.�ll ..,. „.,, ,i,, ri //,a/ ,, // / .: L / ,i,/. ,,.,, o, r / � ,,. .., / ,/1 r,-.„ / „ a // (i. ✓i /// / r/i rl/i„
ri
r
i
A
., r r r r r /, e /r r l i , t e, r / �/ l/, r ,✓, r r
r/ r
,,,rr.�,/,/✓%/„ ,,. :.,.. r /..:. IG�!/., ,r.. //pip/ „/ ,�,,e r o .r //i r r,/ ,r./ r.,, I r,,,.. ,. i, /r .. . r /.r// rr
'r Resolution No. 18-067
A RESOLUTION OF THE BUTTE COUNTY BOARD OF SUPERVISORS ADOPTING AN EIR ADDENDUM TO THE GENERAL
PLAN 2030 FINAL ENVIRONMENTAL IMPACT REPORT AND SUPPLEMENTAL FINAL ENVIRONMENTAL IMPACT REPORT
FOR AMENDMENT TO BUTTE COUNTY CODE CHAPTER 24(ZONING ORDINANCE)
FOR THE BUTTE CREEK CANYON OVERLAY ZONE
WHEREAS, the Butte County 2030 Update process was initiated by action of the Board of Supervisors,
including the adoption of Resolution No. 06-085 on May 23, 2006, which created the Butte County General
Plan Citizens Advisory Committee and set in motion a process of hoUding public workshops and meetings
regarding the County's General Plan 2030 Update; and
WHEREAS, on October 2.6, 2010, Butte County adopted a new General Plan (General Plan 2030),
including a new General Plan Land Use Map (Resolution No. 10-152);.. and
WHEREAS, Butte County initiated an update to the Butte County Zoning Ordinance ("Zoning Ordinance
Update"), being a part of the overall Butte County General Plan 2030 project directed by the Board of
Supervisors also referred to as "Meeting Series #8", which involved a comprehensive update to the existing
Butte County Zoning Oirdinance; and
WHEREAS, on September 27, 2012, the Planning Commission made recommendations to the Board of
Supervisors and on November 6, 2012,. the Board of Supervisors adopted the Zoning Ordinance Update under
Ordinance No. 4050; and
WHEREAS, the General Plan 2030 FEIR (SCH #2008002062) was certified on October 26, 2010 by the
Butte County Board of Supervisors (Resolution No. 10-150) and the Supplemental FEIR (SCH #2012022050)
was certified on November 6, 2012 (Resolution No. 12-123); and
WHEREAS, the County complied with the requirements of the California Environmental Quality Act,
Public Resources Code sections 21000-21178.1 (CEQA) in approving the FEIR and SFEIR; and
WHEREAS, the Butte County General Plan 2030 contains action items directing the completion of
further tasks as well as amendment to the Zoning Ordinance; and
WHEREAS, the Butte Creek Canyon Overlay Zone was developed under direction of Genera) Plan 2030
Conservation Element Action Item COS-A6.2, which states "Work with Butte Creek Canyon residents and local
groups toward adopting a planning strategy for a Butte Creek Canyon overlay. The purpose of the planning
strategy is to facilitate the protection and preservation of the historical and ecological foundation of Butte
Creek Canyon, including the survival of salmon, steelhead and other sensitive plants and animals such as the
East Tehama Deer Herd, preservation of historical sites and ecological preserves, and the optimum balance
of recreation and residential use"; and
WHEREAS, the County has determined that the proposed amendment adding the Butte Creek Canyon
Overlay Zone to the Z o n i n g Ord i n a n c e does not meet the criteria for preparing a subsequent or supplemental EIR.
under CEQA Guidelines Section 151.62; and
WHEREAS, an Addendum to the General Elan 2030 FOR and Supplemental FEIR has therefore been prepared
pursuant to CEQA Guidelines section 15,164 for the proposed Butte Creek Canyon Overlay Zone amendment; and
WHEREAS, the Butte County Planning Commission recommended to the Board of Supervisors the approval of
the EIR Addendum for the Butte Creek Canyon Overlay Zone amendment in accordance with the California Environmental
Quality Act (CEQA) at a public hearing held on November 9, 2017; and
WHEREAS, the Addendum provides analysis and cites substantial evidence that supports the County's
determination that the proposed Butte Creek Canyon Overlay Zone amendment does not meet the criteria
for preparing a subsequent or supplemental EIR under CEQA Guidelines section 15162 including:
1) The proposed Butte Creek Canyon Overlay Zone amendment would not cause a neva significant
impact or substantially increase the severity of a previously identified significant impact from the
General Plan EIR or Supplemental EIR (CEQA Guidelines section 15162[a][1]) that would require
major revisions to either EIR. All impacts would be nearly equivalent to the impacts previously
analyzed in the General Plan 2030 EIR and Supplemental EIR. Relatedly, the General Plan 2030 and
Zoning Ordinance amendment is not inconsistent with any of the General Plan 2030 policies intended
to mitigate environmental impacts.
2) The proposed Butte Creek Canyon Overlay Zone amendment is programmatic in nature and are
not changes in physical circumstances that would cause a new significant impact or substantially
increase the severity of a previously identified significant impact, and there have been no other
changes in the circumstances that meet this criterion.
3) As documented in Section 3.0 of the Addendum, there is no new information of substantial
importance (which was not known or could not have been known at the time of the General Plan 2030
adoption in October 2010, or General Plan 2030 amendment and Zoning Ordinance adoption in
November 2012), that identifies: a new significant impact (condition "A" under CEQA Guidelines
section 15162[a][3]); a substantial increase in the severity of a previously identified significant impact
(condition "B" CEQA Guidelines section 15162[a][3]); mitigation measures or alternatives
previously found infeasible that would now be feasible and would substantially reduce one or more
significant effects of the General Plan; or mitigation measures or alternatives which are
considerably different from those analyzed in the General) Plan 2030 EIR which would substantially
reduce one or more significant effects on the environment (conditions "C" and "d" CEQA Guidelines
section 15162[a][3)).
NOW, THEREFORE, BE IT RESOLVED that the Board of Supervisors hereby approves the EIR Addendum for the
General Plan 2030 FEIR and Supplemental FEIR prepared for the Butte Creek Canyon Overlay Zone amendment.
PASSED AND ADOPTED by the Butte County Board of Supervisors this 24' day of April, 2018, by the following
vote:
AYES: Supervisors Connelly, Kirk,Teeter, and Chair Lambert
NOES:Supervisor Wahl
ABSENT: None
NOT VOTING: None Steve Lamb ,Chair
Butte County Board of Supervisors
ATTEST:
Shari McCracken, Interim Chief Administrative Officer
and Clerk of the Board of Supervisors
By:
zg-
Deput�