HomeMy WebLinkAbout19-049WHEREAS, Senate Bill 1(SB 1ithe Road Repair and Accountability Act ofI017(Chapter 5, Statutes of2Q17);was
passedbwLhe Legislature and Signed into law bythe Governor in April 2017 in orderto addressthe significant multi-modail
transportation funding shortfaNsstatewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of Butte County
are aware of the projects proposed for funding in our community and which projects have been completed each fiscal
year; and
WHEREAS, Butte County must adopt bmresolution alist ofall projects proposed to receive funding from the Road
Maintenance and Rehabilitation Account/RK1RAi created by SB 1, which nmust include a description, the location of each,
proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement;
and
WHEREAS, Butte County, will receive an estimated $5.91 million in RIVIRA funding in Fiscal Year 2019-20 from SB
MW
WHEREAS, this is the third year in which Butte County is receiving SB 1funding and will enable the County to
continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging
bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible
without SDI ;and
WHEREAS, Butte County used aPavement Management System tedevelop the SB1project list to ensure revenues
are being used on the most high-priority and cost-effective projects that also meet the communities priorities for
transportation investment; and
WHEREAS, the funding from SB 1 will help the County to maintain and rehabilitate its approximately 1,3010 miles
of roads, 500 bridges throughout the County this year and into the future; and
WHERAS the 2018 California Statewide Local Streets and Roads Need!s Assessment found the County's streets
and roads are iman°aL'hsktopoor" condition and this revenue will help msincrease the overall quality mfthe road system
and over the next decade will bring streets and roads into e"good tofair" condition; and
WHEREAS, the SB I project list and overall investment in our local streets and roads infrastructure with a focus
on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge techno|ngy,
materials and practices, will have significant positive co -benefits statewide.
NOW, THEREFORE, BE IT RESOLVED AND ORDERED by the Board of Supervisors of the County of Butte, State of
California, as follows:
1. The foregoing recitals are true and correct.
2. The fiscal year 2019-20 list of new projects planned to be funded in part with Road Maintenance and Rehabilitation
Account revenues are as listed on Exhibit A to this resolution.
3. The fiscal year 2019-20 list of previously proposed and adopted projects that may utilize Road Maintenance and
Rehabilitation Account revenues in their delivery are as listed on Exhibit B to this resolution. With the relisting of
these projects in the adopted fiscal year 2019-20 resolution, Butte County is reaffirming to the public and the
State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
PASSED AND ADOPTED by the Butte County Board of Supervisors this 9th day of April, 2019, by the following vote:
AYES: Supervisors Connelly, Lucero, Ritter, Teeter, and Chair Lambert
NOES: None
ABSENT: None
Steve Lamb Chair
Butte County Board of Supervisors
Shari McCracken, Chief Administrative Officer
and Clerk of the Board of Supervisors
By:
D e —puj
Exhibit A
County of Butte
Road Maintenance and Rehabilitation Account
New Project List
for
Fiscal Year 2019-2020
Road Name project Descr(ptian l IiMRA rwnng PtoJed Cost -
'y dl'
..............
Ophir Road
Structural Overlay
Lincoln Blvd.
Lower Wynadotte Rd.
$ 1,500,000.00
$
1,500,000.00
25 YRS
3rd Qtr 2019
Upper Centerville Road
Reconstruction Strom Damage
Repairs
3 Miles South of Nimshew Rd.
$ 1,000,000.00
$
4,000,000.00
30 YRS
3rd Qtr 2020
Dark Canyon Road
Reconstruction Strom Damage
Repairs
2.5 Miles Southeast of Big Bend Road
$ 1,500,000.00
$
5,000,000.00
30 YRS
3rd Qtr 2020
Monte Vista/Lower Wyandotte
Class 11 Bike Facilities
Lincoln Blvd.
Lower Wynadotte Rd.
$ 900,000.00
$
1,500,00.00
25 YRS
3rd Qtr 2021
Autrey Lane
Curb/Gutter and Sidewalk
Las Plumas Ave.
Monte Vista Ave.
$ 800,000.00
$
1,200,000.00
25 YRS
3rd Qtr 2021
Monte Vista Avenue
Curb/Gutter and Sidewalk
Autry Ln.
Western Property line of
Las Plumas High School
$ 100,0()0.00
$
300,ODO.00
25 YRS
3rd Qtr 2021
Neal Road
Emergency Road Repairs
4.9 Miles north east of SR99
Paradise Town Limit
$ 100,000.00
$
100,000.00
I0YR5
3rd Qtr 2015
Baldwin Avenue (Palermo)
Curb/Gutter and Sidewalk
Linicoln Blvd.
Hewitt Ave.
$ 500,000.00
S
2,000,DDO.00
25 YRS
3rd Qtr 2022
Cohasset Rd.
Chip Sea[
Chico City Limits
End of Pavement
$ 446,ODO.00
$
446,000.00
7 YRS
3rd Qtr 2019
Rock Creek Rd.
Chip Seal
Cohasset Rd. (Lower)
Cohasset Rd, JUpper)
$ 18,6DO.00
$
18,600.00
7 YRS
3rd Qtr 2019
Rock Creek Dr.
Chip Seal
Rock Creek Rd.
End of County Roadway
$ 1,100.00
$
I,I00,00
7 YRS
3rd Qtr 2019
Sycamore Valley Rd
Chip Seal
Rock Creek Rd.
End of County Roadway
$ 17,200.00
$
17,200.00
7 YRS
3rdqtr2019
Vilas Rd.
Chip Seal
Cohasset Rd.
End of Pavement
$ 51,500.00
$
51,500.00
7 YRS
3rd Qtr 2019
Harvey Rd.
JChip Seal
Vilas Rd.
End of Pavement
1 $ 10,300.00
$
10,300.00
7 YRS
3rd Qtr 2019
Oro Quincy Hwy
Chip Seal
Foreman Creek Rd.
Encina Grande Rd.
$ 78,351.66
$
78,351.66
7 YRS
3rd Qtr 2019
Lincoln Blvd
Chip Seal
Palermo Rd.
Ophir Rd.
$ 73,077.11
$
73,077.11
7 YRS
3rd Qtr 2019
Exhibit A Page 1 of 1
Exhibit 8
County of Butte
Road Maintenance and Rehabilitation Account
Previously Proposed Project List
for
Fiscal Year 2019-2020
qg "Tj .Load am r,1100 fARMII�D?11t�' I M IEAFR C par. -,,'��'MFISTFUCT On
r& 111-000MIT6, I .......... ... .....
Hagen Lane
Reconstruction
Railroad Tracks Dayton Road
$
2,000,00.00
$
2,000,000.00
30 YRS
3rd Qtr 2019
New Skyway
Structural Overlay
Paradise Town Limit Coutolenc Road
$
590,000.00
$
590,000-00
25 YRS
2nd Qtr 2021
Foothill Blvd.
Structural Overlay
Oro Bangor Hwy. Pinedale Ave.
$
1,000,00.00
1,000,000.00
25 YRS
2nd Qtr 2020
Centerville Road
Reconstruction Storm Damage
Repairs
0.5 Miles North east of Honey Run Road
Intersection
$
300,000.00
2,250,000.00
30 YRS
3rd Qtr 2019
Oro Quincy Hwy
Reconstruction Storm Damage
Repairs
Site I in Mt. House and Site 2 is 0,75 miles
North east of Site I.
$
5001000.GO
$
3,000,000.00
30 YRS
1st Qtr 2019
Skyway
Safety Improvement Median
Guardrail
5.5 Miles East of the Intersection of Skyway
and Honey Run Road.
$
2SO,000.00
$
250,000.00
30 YRS
2nd Qtr. 2020
Bidwell Avenue
Storm Damage Repairs (Design and
Permitting)
Three Sites Between W. Sacramento St. On
the West and Oak Lawn Ave. on the East.
$
33,000.00
$
600,000.00
20 YRS
2nd Qtr. 2020
Las Plu mas Avenue
Reconstruction
Lower Wyandotte
Las Plumas Way Rd.
$
1,800,000.00
$
2,800,000.00
30 YRS
3rd Qtr. 2020
Achilles Ct
Slurry Seal
ADRIAN OR END
2,700.00
$
2,700.00
5YRS.
3rd Qtr. 2019
Adrian Or
Slurry Seal
END ANDOVER DR
$
14,500.00
$
14,500.00
5YRS.
3rd Qtr, 2019
Arthur Ct
Slurry Seal
END PUEBLO DR
$
2,400.00
$
2,400.00
5YRS.
3rd Qtr. 2019
Athens Way
Slurry Seal
END S PARK DR
$
3,000.00
$
3,000.00
5YRS.
3rd Qtr. 2019
Auroa Ct
Slurry Seal
END S PARK DR
$
1,400.00
$
1,400,00
5YRS.
3rd Qtr. 2019
Babson Ct
Slurry Seal
END WOODBURY DR
$
11900.00
$
11900-00
5YRS.
3rd Qtr. 2019
Bremer Ct
Slurry Seal
Tracy Ranch Rd End
$
2,100.00
$
2,100.00
5YRS.
3rd Qtr. 2019
Bronx Ct
Slurry Seal
END FERGUSON OR
$
1,400.00
S
1,400.00
5YRS.
3rd Qtr. 2019
Carver Dr
Slurry Seal
W PARK DR PONDEROSA WY
$
7,600.00
$
7,600=
5YRS.
3rd Qtr. 2019
Cascade Or
Slurry Seal
CARVER DR PONDEROSA WY
$
9,100.00
$
9,100.00
5YRS.
3rd Qtr. 2019
Chestnut Cir
Slurry Seal
PONDEROSA WY PONDEROSA WY
$
6,600.00
$
6,600.00
5YRS.
3rd Qtr. 2019
Colby Ct
Slurry Seal
END S PARK DR
$
1,200.00
$
1,200.00
5YRS.
3rd Qtr. 2019
Compton Or
Slurry Seal
FERGUSON DR END
$
600-00
$
600.00
5YRS.
3rd Qtr. 2019
Compton Or
Slurry Seal
END PONDEROSA WAY
$
600.00
$
600.00
5YRS.
3rd Qtr. 2019
Concord Ct
Slurry Seat
END ADRIAN DR
$
1,200,00
$
1,200.00
5YRS.
3rd Qtr. 2019
Coppel Ct
Slurry Seal
END PUEBLO DR
$
1,800.00
$
1,800.00
5YRS.
3rd Qtr. 2019
Curtis Ct
Slurry Seat
FERGUSON DR END
1
$
I'SGO.00
5YRS.
3rd Qtr, 2019
q
IDade Ct
Slurry Seal
PONDEROSA WY I END
$
1,900.00
1,900.00
5YRS.
3rd Qtr. 2019
Exhibit B Page 1 of 3
Exhibit B
County of Butte
Road Maintenance and Rehabilitation Account
Previously Proposed Project List
for
Fiscal Year 2U19-2O2O
David Ct
Slurry Sea]
END
WOODBURY DR
$
1,900.00
$ 1,900.00
5YRS.
3rd Qtr. 2019
Delta Ct
Slurry Seal
END
WICHITA OR
$
1,400.00
$ 1,400.00
SYRS.
3rd Qtr. 2019
Dimitri Ct
Slurry Seal
END
WICHITA DR
$
2,800,00
$ 2,800.00
5YRS.
3rd Qtf. 2019
Drexel Dr
SluM Seat
PONDEROSAWY
SKYWAY
$
9,100.00
$ 9,100.00
5YRS.
3rd Qtr. 2019
Drury Ct
Slu" Seal
END
FERGUSON DR
$
1,400.00
$ 1,400.00
5YRS.
3rd Qtr. 2019
Ed Ct
Slurry Seal
WOODBURY OR
END
$
1,500.00
$ 1,500.00
SYRS.
3rd Qtr. 2019
Einstoss Ct
Slurry Seal
END
WOODBURY DR
$
1,900.00
$ 1,900.00
SYRS.
3rd Qtr. 2019
Eureka Dr
Slurry Seal
S PARK DR
VENTURA DR
$
S,200.00
$ 5,200.00
5YRS
3rd Qtr. 2019
Ferguson Or
Slurry Seal
W PARK DR
W PARK DR
$
14,400.00
$ 14,400.00
5YRS,
3rd Qtr. 2019
Finch Ct
Slurry Seal
W PARK DR
END
$
2,000.00
$ 2,000.00
SYRS.
3rd Qtr. 2019
Fritz Ct
Slurry Seal
WOODBURY DR
END
$
1,500-00
$ 1,500.00
SYRS.
3rd Qtr. 2019
Glenda le Or
Slurry Seal
5 PARK DR
W PARK DR
$
8,300.00
$ 8,300.00
5YRS.
3rd Qtr. 2019
Hobart Ct
Slurry Seal
PON DEROSA WY
ENO
$
1,800.00
$ 1,800.00
5YRS.
3rd Qtr. 2019
Hood Ct
Slurry Seal
END
PONDEROSA WY
$
2,800.00
$ 2,800.00
SYRS.
3rd Qtr. 2019
Iona Ct
Slurry Seal
ANDOVER DR
END
$
1,700.00
$ 1,700.00
5YRS.
3rd Qtr. 2019
Janine Ct
Slurry Seal
END
WICHITA DR
$
2,100.00
$ 2,100,00
5YRS,
3rd Qtr, 2019
Jarvis Cir
Slurry Seal
PONDERCISAWY
PONDEROSAWY
$
7,300.00
$ 7,300,00
5YRS.
3rd Qtr. 2019
Jennifer Ct
Slurry Seal
END
WOODBURY DR
$
1,800.00
$ 1,800.00
SYRS.
3rd Qtr. 2019
Kingsdale Ct
Slurry Seal
END
CASCADE DR
$
1,700.00
$ 1,700.00
SYRS.
3rd Qtr. 2019
La Rosa Ct
Slurry Sea I
End
Tracy Ranch Rd
$
3,000.00
$ 3,GOO.00
SYRS.
37d Qtr. 2019
La Rosa Ct
Slurry Sea I
Tracy Ranch Rd
End
$
2,400.00
$ 2,400.00
SYRS.
3rd Qtr. 2019
Lander Ct
Slurry Sea I
WOODBURY DR
END
$
2,000.00
$ 2,000.00
SYRS.
3rd Qtr. 2019
Layton Ct
Slurry Sea I
WOODBURY DR
END
$
1,800.00
$ 1,800.00
SYR$.
3rd Qtr. 2019
Linda Lee Ct
slurry sea I
END
FERGUSON DR
$
1,600.00
$ 1,600.00
SYRS.
3rd Qtr. 2019
Lucas Ct
Slurry Seal
WOODBURY DR
END
$
1,600.00
$ 1,600,00
5YRS.
3rd Qtr. 2019
Marsh Ct
Slurry Sea I
Peterson Estates Dr
End
$
2,300.00
$ 21300,00
SYRS,
3rd Qtr. 2019
Metzger Ct
Slurry Sea I
End
Tracy Ranch Rd
$
2,700.00
$ 2,700.00
SYRS.
3rd Qtr. 2019
Mooz Ct
Islurry Seal
PUEBLO DR
END
$
11900-00
1,900.00
Qtr. 2019
Napa Ct
1SIurrV Seal
VENTURA DR
END
$
1,200.00
1,200.00
SYRS.
3rd Qtr. 2019
Oak Ridge Dr
ISlurry Seal
SKYWAY
END
$
6,400.00
6,400-00
5YRS,
3rd Qtr. 2019
Exhibit B
County of Butte
Road Maintenance and Rehabilitation Account
Previously Proposed Project List
for
Fiscal Year 2019-2020
Exhibit B Page 3 of 3
Olivet Dr
Slurry Seal
END
PONDEROSA WY
$
11800-00
$ 1,800-00
5YRS.
3rd Mr. 2019
Otis Ct
Slurry Seal
END
SHAW CIR
$
1,400.00
1,400.00
5YRS.
3rd Qtr. 2019
Pawn Ct
Slurry Seal
END
WOODBURY DR
$
1,800.00
1,800.00
SYRS.
3rd Qtr. 2019
Penn Ct
Slurry Seal
ENE)
CALVIN DR
$
1,200.00
$ 1,200.00
5YRS.
3rd Qtr. 2019
Peterson Estates Dr
Slurry Seal
Burdick Rd
Tracy Ranch Rd
$
4,200.00
5 4,200.00
SYRS.
3rd Qtr. 2019
Pineland Cir
Slurry Seal
PONDEROSA WY
PONDEROSA WY
$
6,400.00
$ 6,400-00
5YRS-
3rd Qtr. 2019
Potomac Dr
Slurry Seal
SKYWAY
N D y
PONDEROSA WY
A
$
5,100.00
$ 5,100.00
SYRS.
3rd Qtr. 2019
Providence Ct
Slurry Seal
DREXEL DR
END
E
END
D
$
1,800.00
1,800.00
SYRS.
3rd Qtr. 2019
Puebla Dr
Slurry Seal
W PARK OR
LS DW
GLEND
L, DALE
GLENDALE DR
A I
$
8,400.00
$ 8,4130.00
SYRS.
3rd Qtr. 2019
Rim Rock Or
Slurry Seal
OAK RIDGE DR
A RIDGE DR
K
OAK RIDGE DR
$
6,000.00
$ 6,0130.00
SYRS.
3rd Qtr. 2019
Rutgers Ct
Slurry Seal
PONDEROSA WY
END
END
3,400.00
3,400.00
5YRS,
3rd Qtr, 2019
Salk Ct
slurry Seal
W PARK DR
END
END
$
1,700,00
1,700.00
5YRS.
3rd Qtr. 2019
Sarah Ann Ct
Slurry Seal
Tracy Ranch Rd
End
End
$
1,600.00
1,600.00
SYRS.
3rd Qtr. 2019
Scripps Ct
S PARK DR
END
$
3,100.00
3,100.00
SYRS.
3rd Qtr. 2019
Shaw Cir
_SlurrySeal
5 PARK DR
S PARK DR
$
9,500.00
9,500.00
5YRS.
3rd Qtr. 2019
Shoup Ct
_SlurrVSeal
Slurry Seal
W PARK DR
D
END
1,300.00
1,300.00
5YRS.
3rd Qtr. 2019
Simonson Ct
Slurry Seal
S PARK DR
END
3,200.00
3,200.00
5YRS,
3rd Qtr. 2019
Southwind Ct
SlurrySeal
End
Sunsup Ln
$
2,000.00
2,000.00
5YRS.
3rd Qtr. 2019
Southwind Ct
SlurrvSeal
Sunsup Ln
End
$
1,300.00
1,300.00
SYRS.
3rd Qtr. 2019
Sunsup Ln
SlurrySeal
Durham -Dayton Hwy
Southwind Ct
1,400.00
1,400.00
SYRS.
3rd Qtr. 2019
Tracy Ranch Rd
Slurry Seal
La Rosa Ct
Holland Ave
$
7,600,00
7,600.00
5YRS..
3rd Qtr. 2019
Tufts Ct
Slurry Seal
S PARK DR
END
$
1,600.00
11600-00
SYRS.
3rd Qtr. 2019
Tulsa Ct
Slurry Seal
SHAW CIR
END
$
3,400.00
3,400.00
SYRS.
3rd Qtr. 2019
Union Ct
Slurry Seal
S PARK DR
END
$
1,700.00
$ 1,700.00
SYRS.
3rd Qtr. 2019
Ventura Dr
SlurrySeal
S PARK OR
END
$
4,600.00
$ 4,600.00
5YRS.
3rd Qtr. 2019
Wake Ct
Slurry Seal
END
W PARK DR
$
1,600.00
$ 1,600.00
5YRS.
3rd Qtr. 2019
Wichita Dr
Slurry Seal
5 PARK DR
S PARK DR
$
91000-00
$ 91000-00
5YR5,
3rd Qtr. 2019
Woodbury Dr
Slurry Seal
W PARK OR
GLENDALE DR
$
8,900.00
$ 8,900.00
SYRS.
3rd Qtr. 2019
Woodpecker Rd
Slurry Seal
END
FERGUSON DR
2,000.00
$ 2,000.00
SYRS.
3rd Qtr. 2019
Wyack Ct
Slurry Seal
END
WICHITA DR
2,300.00
$ 1,300-00
5YR5.
3rd Qtr. 2019
Zuckerman Ct
Slurry Seal
S PARK DR
END
3,700.00 1
$ 3,700.001
SYRS.
J 3rd Qtr. 2019