Loading...
HomeMy WebLinkAbout73-091_ __ _ ____ ___._.___---- c.~~ie. . ~7~-°f~' i 2 3 4, 5 6 7 8 9 10 11 I2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 RESOLUTTON 1`IOo 7~-A1 ' RESOLUTION AiT~]~ORIZING CHAIRMAN TO EXECUTE RIGHT OF WAY CERTIFICATION 1~70. 2 FAST AVENUE~ TOPTCS PAOJECT N0, EPS-T-3014(4) IT IS H~R~BX RESOLVED by the Board of Supervisors of the Gounty of Butte, State of California~ that Chairman of the Board is hereby authorized and directed to execute RighC of 'Way Certification I3.o. 2 dated _„ June 12. , 3.973, £or the East Avenue TOPICS Project No. EPS-~-3014(4) in the name of the County of Butte. Be it further resolved that the County of Sutte agrees to hold ~he State o€ California harmless from any liability which may result in the event the right of way is no~ cl.ear as certified. If the S~a~e is named in a damage suit, as a resul~ ofi the zight of way not being clear as certified, the County of Butte agrees that, at the request of the Seate~ it will assume ful.1 respon- sibility ~or the conduct of the defense or provide such assistance as the S~ate may requz.xe and wiZl pay any judgments issued agarnst the State and all costs in connection wi~h ~he defense. pASSED AND ADOPT&D by ~he Board of Supervisors o£ the County of Butte, State,of CaJ.i.~oznia, at ehe regular meeting thereof on the . l~th day o~ ,Tim a , 1973, by the following vote: AYES: $upervisor Cameron, Gilman, LaddJand Madigan N0~5: None ~5~~?~ Chairman N1cKillop a N0~ VO~ING : ~ o ne ' Chairman of th oard of Supervisors County o£ Sut e 5tate o~ California ATTESTa COLFNTY CL~RK and ex-officio C7.erk of the Board of upervisors By: ~X-~.~f ~l ' C1erk or deputy '~~- ~f 1 ~ 3 ~ 5 6 7 8 ! 9 1:0 '', ~ 11' L2 13 i4 ' 1:5 is 27 ', 18 I is 20 21. 22 23 24 I 2g I 26 II RIGHT OF WAY CERTIFICATION N0. 2 EAST AVENiIE TOPICS PR03ECT N0. EP6-T~3014(4) ~he County of Butte hereby certifies in connection with the right of way for TOPICS ProjecC No. EPS-T-3014(G~) that; All required right of way for construction o~ this project has now been acquired, covered by right of way contract, right o~ entry or order of immediate possession. I. STATUS OF RIGHT OF WAY ACQUISITION A. Tota1 number o€ parcels required 64 S. Parcels acquired outright None C. ~arcels covered by R/W contract 63 D. Paxce7.s covered by right of entry or order for immediate possession 1 ~I. STATUS OP Ag~'~CTEb RAILROAD FACILITIES None. TTI. ' DESIGNf~TED MATERTAZ SITES None. ~ • IV. DESIGNATED DISPOSA~L ,taRFAS None. V, S~ATLTS 0~' UTILITY RELOGATIONS Electric power and telephone facilities are presently within the 7.imits of this project. However, all utilities wi11 be reiocated pra.ox to com~encement of construction. VI. SCHEDTILE FOR R~MOVAT, OF OBSTRUCTIONS No buiidings with salvage or maxketable val.ue exist wikhin tlae ' right of way. UTI. ' UNAUTHORIZED Ei~ICROACHMENTS None. • l 2 3 4 5 6 7 8 9 10 11 12 13 14 15' 16 L~ 18 I9 20 21 22 23 24 25 26 VIII. COMPL7ANCE WTTH RELOCATION ADV~SORY ASS~STANCE AND PAYMENTS Comp~iance with the provisions o£ ~PM 51-1 was not required for this pzoject. The County of Butte agrees to hold the State of California harmless from any liability which ~ay resulti in the evenC Che right of waq is not clear as certified. If the State is named in a damage suiC~ as a resulC of Che righ~ of way not being clear as certified, the CounCy of BuCte agrees thaC~ a~ the request of the State, ~t will assume full responsibility for the conduct of the defense or provide such assistance as the State may require and wi11 pay any ~I judgments issued against the State and a11 costs in connection with the defense. ', ATTEST: Gounty Clerk and ex-officio Clerk of the Board of Supervisors By; ~~l ~i ~~~..C"v^-~- ' C1erk or Deputy Ctlairman, Bda of Supervisors Butte Count ~ State pf California natea: ~