Loading...
HomeMy WebLinkAbout80-161WfIEREAS, the Building Division of the Department of Public Works is charged with the enforcemen~ ot buil.ding codes and other related health and safety code items; and WHEREAS, it is necessary to charge fees to cover the costs to this Division's operations; and WHEREAS, Chapters 26, 26B, 27 and 28 of the Butte County Code were amended to provide tor fees to be established by Board resolution, which amendments are effective on August 8, 1980; and WIiEREAS, this resolution wi11 replace Resolution No. 79-210 relating to fees for mobile homes. NOW, Z'HEREFORE, BE IT RESOLVED.by the Sutte County Board ot Supervisors that the following fee schedule is established for the Building Division of the Department of Public Works to charge and collect for services: - 1. Building Permit Fees A fee slzall be paid for each building in accordance with the following table: BUILDTNG PERMTT FEES TOTAZ VALUATIOl~I FEES $1. 00 to $1, 000. E}0 $1,001.00 to $2,000.00 $2,001.0o to $25,ooo.ao $25,00~..0o to $50,000.00 $5a,oo~.oo ~o $loo,ooo.oo $10.00 ~20.00 $20.00 for the first $2,000.00 p1.us $4.00 for each additional $1,000.00 or fraction thereof to and including $25,aoo.oa $112.00 for the first $25,000.00 plus $3.00 for each. additional $1,000.00 or traction thereof to and inc~uding $50,000.00 $187.00 for the first $50,000.00 plus $2.00 for each additional $1,000.00 A RESOLUTION ESTABLISHING FEES TO BE CHARGED BY THE BUILDING DIVISION OF THE DEPARTMENT OF PUBLIC WORKS FOR BUILDING, PLUMBTNG, MECHANICAL, ELECTRICAL AND MOBILE HOME_PERMITS or fraction thereof to and including $100,000.00 $100,001.00 to $500,OQ0.00 $28•7•00..tor...t~e.first $100,000.00 plus $1.50 for each additional $1,000.00 ox ~raction thereof to and including $50~,000.00 $500,001.00 and up $877.00 for the first $500,000.00 plus $1.00 for each additional $I,000.00 or fraction thereof. The de~ermination of value or valuation for the purpose of es~ablishing ~ees shall be made by the Building Official. ~'his valuation shall be the total value of all construction wozk for which the per~it is issued as well as a11 f~nsih work, painting, roofing, electrical, plumbing, heating, air cond~tioning, and any other permanent work or permanent equipment. The bui~d~ng permit fees for factory-built housing shall be computed in the same manner as for regular b.uilding. ~anstruction except that the fee sha11 be one-halt (1/2) of the build~ng permit ~ee ~etermined by the above table. 2. 1'lumbing Permit Fees A fee shall be paid ~o~ each plumbing permit at the time of fil.ing an application in accordance with the following table: PLUMBZ~iG P~RMIT FEES For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection thereof) . . . . . . . . . . . . . . . . . . . . . $2.00 For each building sewer . . . . . . . . . . . . . $5.00 Rainwater systems - per drain . . . . . . . . . . $5.00 For each water heater and/or vent . . . . . . . . $5.00 For each gas piping sqstem of one (1) ~o five , (5} outlets . . . . . . . . . . . . . . . . . . . $5.00 For each gas piping system of six (6) or moxe, per outlet . . . . . . . . . . . . . . . . . . . . $0:50 For each industrial waste pretreatment ineer- ceptor, including its trap and vent, excepting kitchen type grease interceptors funcrioning as fixture traps . . . . . . . . . . . . . . . . . $5.00 For instal~ation, alteration, or repair of water piping and/or water treating equipment . . . . . . $5.00 For repair or alteration af drainage or vent piping . . . . . . . . . . . . . . . . . . . . . . $5.00 For each lawn sprinkler system or any one meter including backflow pro~Cection devices therefor ..$5.00 For ~cracuum breakers oz backflow prorecti~cre devices on tanks, vats, etc. or for installatiott on unprotected piumbing fixtures including necessary water piping - one (1) to five (5) ...$5.00 2. Over five (5) , each . . . . . . . . . . . . . . . $0. 50 3. EleCtric Permit Fees A fee shalJ. be paid for each electric permit at the time of fiiing an application i~n accordance with the following table: ELECTRIC PE~tMI~ ~'EES A. Services: 600 volts or less, 100 am.peres or less ....$ 5.fl0 ~ach additional ~.00 amperes or fraction thereo~ . . . . . . . . . . . . . . . . . . . $ 2.50 Ovez 600 volts, 100 amperes or less .....$25.00 Each addita.onal 100 amperes or fraction thereof . . . . . . . . . . . . . . . . . . . $ 1.00 B. ~or new constxuction, or additions to dwe~.ling occupancies : Sn addz.tion to services in Section A above, residenti.al occupancies and accessory bui].dings . . . . .. . . . . . . . . . . . . . $ 0.02 sq.ft, C. Non-residential occupancies, multi-outlet branch czrcuits . . . . . . . . . . . . . . . $ 2.50 each (NOTE: Branch circuit fees will cover the inspection of the outlets, fixtures, or appliances supplied by the circuit.) D. Power apparatus and single outlet circufts in non-residential occupancies: Rating in KW, KVA, oz HI' Over Sncludi.ng 0 1 each . . . . . $ I.00 1 3 each . . . . . $ 2.00 3 8 each . . . . . $ 3.OQ 8 15 each . . . . . $ 5.00 15 50 each . . . . . $10.00 50 150 each . . . . . $18.OQ 150 and up each . . . . . $25.00 E. Existing Occupancies: 1. Additions or relocations of outlets or fixtures supplied by an existing bxanch circui~ in any occupancy. Each outlet or fixture: First . . . . . . . . . . . . . . . . . . . $0.25 each Each additional over . . . . . . . . . . . $0.10 each 3. 2. Fixed.l'- vr stationary residential appliances or appliance outlets, each . . . . . . : . $2.00 NOTE: For power apparatus, see subdivision D. F. Signs, Qutline Lighting, and Marquees: ~ach branch czrcuit . . . . . . . . . . . . $5.00 Each additional branch circuit . . . . . . $2.00 G. Temporary service, including all equipment at one location: Each location not exceeding 100 amperes ..$10.00 Over 100 amperes, use regular fee scfiedule 4. Mechanical Permit Fees A fee shall be paid for each mechanical permi~ at the ~ime of filing an application in accordance with the following table: MECHANICAL PERMIT F~~S 1. For the installation or relocarion of each forced-air or gravity-type furnace or buxne~, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h ..$ 5.00 2. For the installation or relocation of each forced-a~.r or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h . . . . . . . . . . $ 7.50 3. ~or the installation or relocatiion of each floor furnace including vent . . . . . . . . . . $ 5.00 4. For the installation or relocation of each suspended heater, recessed wall heater or floor mounted unit heater . . . . . . . . . . . $ 5.00 5. For the instal.Zation, relocation or replace- ment of each appliance vent installed and not included in an appliance permit . . . . . . . . $ 3.00 b. For the repair of, alteration of, or addita.on to each heating appliance, refrigeration uni.~C, cooling unit, absorption unit, or each heati~ng, cooling, absoxption, or evaporative cooling system, including installation of controls regulated by this Code . . . . . . . . . . . . . $ 5.00 7. For the installation or relation of each boiler or compressor to and including three horsepower, or each absorption system to and includi.ng 100,000 Btu/h . . . . . . . . . . . . $ 5.0~ 8. For the installation or relocation of each boiler or compressor over three ':horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/h . . . . . . . . . . . . . . . . . $ 7.50 4. 9. For the installation or reloca~ion o~ each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorp- tion system over 500,000 Btu/h to and including 1,000,000 Btu/h . . . . . . . . . . . $10.00 10. For the installation or relocation of each boiler or compressor over 30 ho~sepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h . . . . . . . . . $15.00 ~1. For the installation or relocation of each boilez or refrigeration compressor over 50 horsepower, or each absorption system over 1, 750, 000 Btu/h . . . . . . . . . . . . . . . . . $25. 00 12. For each air handling unit to and inclv.ding 10,000 cubic ~ee~ per minute including ducts attached thereto . . . . . . . . . . . . . . . $ 3.00 NOTE: This fee shaZl not apply to an air handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this Code. 13. For each air handling unit over 10,000 cfm .. $ 5.00 i4. For each evaporative cooler other than portable type . . . . . . . . . . . . . . . . . $ 5.00 15. For each ventilation ~an connected to a single duct . . . . . . . . . . . . . . . . . . $ 2.00 16. For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit . . . . . . . . . $ 5.d0 17. For the installation o~ each residential hood which is served by mechanical exhaust, including the ducts for such hood ....... $ 3.00 18. For the ~.nstallation or relocation of each domestic type incinerator . . . . . . . . . . . $ 5.00 19. For the installation or reloca~ion of each commercial or industrial type incinerator ... $20.00 5. P1an Check Fees When a plan is required to be submitted by subsection (e) of Section 301 of the Uniform Building Code, a plan checking fee sha11 be paid at the time of sub- mitting the plans and specifications for checking. Plan checking fees shall be one-half (1/2) the building permit f~ees as se~ forth in ~tem ~~l above with a minimum plan check tee of $I0.000. P1an checking fees for identical buildings or structures previous~y plan checked and approved for conformance with the 1976 Uniform Building Code by the Building Department, State of California, or Tnternational Conference of Suilding Ofticials sha11 be $I0.00 Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee may be charged by the Suilding Official. P1an checking tees £or mobile home utilities and mobile home installation permits shall be $10.00. 5. 6. Addi~ional Approved Plans W1~ere an owner or contractor desires approval of an additional set o~ approved building plans, the fee for this service shall be $10.00. Fzl~ng Fees A fil~ng fee of $10.00 shall be paid ~or each permit a~ ~he time of application. 8. Transfer Fee A trans~er fee o~ $10.00 shall be paid for transfer- ring each permit from the original permittee to another person due to change in ownership or contractor. 9. Additional Inspection Fees A. For the inspection o£ any work for which no fee is herein prescribed, for the time consumed, $20.00 per hour within a minimum fee of $Z.50. B. A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which the inspection is called is not complete or when corrections called for are not made. This tee shali be for the time consumed, $20.00/hr. with $10.00 minimum fee. C. A pre-inspection fee may be assessed for each inspection made prior to the issuance of a permit to do work, to determine if the permit can be issued or to determine the extent of the work required. This fee shall be for the time consumed, $20.00/hr. with $7.50 minimum fee. ~0. Penalty Fees When work tor a which a permit is required by the Butte County Code is started or proceeded with grior to obtaining said permit, the permit fees specified in this resolution sha11 be tripled, but the payment of such triple fee sha11 not relieve any persons from fully complying with the requirements of the Butte County Code in the execution of the work, nor from other penal~ies prescribed therein. This penalty provision shall not apply to emergency work when it shall be proved to the satisfaction of the Building Official that such work was urgently necessary and that it was not practical to obtain a permit therefor before the co~encement of work. In all such cases, a permit must be obtained as soon as it is practical to do so, and if there be an unreasonable delay in obtaining such a pe~mit, a triple fee as herein provided shall be charged. 11. Requested Inspection Fee Where an owner desires an ~nspection of a building on which there is not an active building permit, ~or ~inancing or other purposes, the inspection fee shall be fifty dollars ($50.00) per building. This fee sha11 be paid prior to the inspection. This fee is to cover the cost of inspection and reZated administrative costs only. Any erection, construction, enlargement, alteration, repair, movemen~, improvement, removal, conversion, or demo~ition required as a result of the inspection wi11 require separate permit fees and inspections. 6. 12. Mobile homes and Mobile home Accessory Buildings T`h.e fees for mobile homes and mobile home accessory buildings sha11 be the same as se~ forth above £or buildings and in additzon, the following fees shall be paid: A. Electric permit - Flat rate of $15.d0 fvr the mobile home station. B. Plumbing permit -~'lat rate of $I0.00 for each gas piping, water piping, and build~.ng sewez ~or a mobile home station. C. Mobile home Installation. fee of $30.00. Z3. Excavation and Grading Fees Excavation and grading fees sha11 be as prescribed in Chapter 70 of the Unifo~m Building Code as adopted by the Butte County Code. BE IT FUR~HEIt RESQLVED that this resolution shall be effective o~ August 8, 1980. BE IT FURTHER RESOLVED that Resolution No. 79-210 is hereby rescinded, effective August 8, 1980 PASSED AND ADOPTED by tYte Butte County Board of Supervisors this 2~~ day o~ JulY T, 1980, by the tollowing vo~e: A'Y~S: Supervisors Dolan, Mose].ey, Wheeler, Winston and Chairman Lemke NOES: None ABSEN~': None NOT VOTING: None ~ ROBERT E. LEMKE, Chairman o t e Board of Supervisors ATTEST: CLA12~ A. NL~LSON, County Clerk/Recorder and ex-o~~a.cio Cler of the Soard By ~.