Loading...
HomeMy WebLinkAbout91-094r+p~ _* ~- ~~ ~~ BOARD OF SUPERVISORS .m _ _~ ~~~ :' : '4: COUNTY. OF Bl1TTE, STATE OF CALIFORNIA '~~ Q~ ``-~ ~~ Resolution No. 91-94 A RESOLUTION REVISING GATE FEES PURSUANT TO TAE CONTRACT FOR THE OPERATION AND MAINTENANCE OF HEAL ROAD SANITARY LANDFILL IN BUTTE COUNTY WHEREAS, Neal Road Landfill Company (Contractor) and County of Butte entered into an agreement for operation and maintenance of Neal Road Sanitary Landfill on May 15, 1978; and WAEREAS, Section 12 of the contract provides for a change in cost of doing business whereby the compensation to the contractor shall be increased or decreased in a percentage amount equal to two-thirds (2/3) of the net percentage change in the consumer price index by either raising gate fees or by other compen- sation; NOW, L~EREFORE, BE IT RESOLVED by the Butte County Board of Supervisors that the gate fees for the operation and maintenance of the Neal Road Sanitary Landfill are established as set forth in Exhibit "A" attached hereto. BE IT FURTHER RESOLVED that this resolution shall be effective on September 1, 1991. PASSED AND ADOPTED by the Board of Supervisors of the County of Butte, State of California, this 6th day of August 1991 by the following vote: AYES: Supervisors McInturf, Houx, McLaughlin, Fulton and Chair Dolan NOES: None ABSENT: None NOT VOTING: None ~ Chai~, $oa~ of Supervisors County of Butte, State of California ATTEST: William Rando Chief Adminis't tYa`v~ Officer and C e k of the Board By: Clerk/Deputy PROPOSED GATE FEE SCHEDULE (Effective 911191) ALL FEES INCLUDE A BUTTE COUNTY SURCHARGE FOR REGULATORY EXPENSES NON COMMERCIAL HAULERS Passenger Car, Station Wagons, Pickups, Trailers (two wheel}, and Panel Trucks Each S 4.90 Picku s with loads above cab Each 810.20 Flat Bed Trucks less than 1 ton (no sides) Each 8 8.90 Flat Bed Trucks less than l ton Cwith sideboards) Each 513.45 One-ton Trucks, Fnur-wheel Trailers Each 81f.80 One and erne-half ton Trucks Each 827.50 3-axle Trucks with Trailers and Semis CU YD 5 1.20 (822.20 min.} Vans (less than one ton> Each $ll, 10 Trailers (twn-wheels, 3 1/2 CY and up) Each 811.10 Trailers (three-axle and 5th wheel) CU YD 8 1.20 C817.85 min.} COMMERCIAL HAULERS Packer Trucks (all nom acted loads) CU YD 8 2.15 Brn Boxes and Bins (uncom acted} CIF YD S 1. i5 One-tnn Trucks CU YD 8 1.15 Septage Trucks (includes 812.75/1000 gal. Butte County surcharge) 1,000 Gal 519.35 Drop Boxes and Bins {Bernnlition} CU YD 5 2.85 DEMOLITION*, STUMPS**, WIRE ANB TIRES Pickups and Trailers (two-wheel, more than one-half load, ICY Each 816.80 Flat Beds less than 1 ton { no sides} CU YD 5 2.85 { 813.45 min. ) Flat Beds less than 1 tan (with sideboards) CU YD 5 2.85 (817.85 rnin.> One-tan Trucks, Four-wheel Trailers CU YD 8 2.85 {526.75 min.) Trailers (three-axle and 5th wheel) CU YD 5 2.85 (526.75 min.) One and one-half tan Trucks CU YD 8 2.85 (840.00 min.) Semi Trucks and Three-axle Trucks CU YB 8 2,85 C855.50 min.) Tires (All sines up to & innludina 900-20) Each 5 1.50 Tires { All sizes Pram 14.00-24 to 11.00-24)1 Each 8 3.50 Tires (All sizes lar er than 11.00-24) CU YD 813.45 *Additianal fee for mattresses, bed springs, washers, dryers, couches, stoves, refrigerators, large pieces of carpet, and other hard-to handle bulky items - 85.90 - per item **Additional fee for stumps 24 " ar larger - 82.20 Minimum Special handling that requires immediate cover for security ar other reasons as required by the customers 894.50 Minimum Hours of Operation-6:30 A. M. to 5:00 P. M. Daily(No admittance after 4: 9S P. M. } Holidays Closed - New Years, Easter, 4th of ~Iuly, Thanksgiving and Christmas EXHIBIT "A"