``-~ ~~ Resolution No. 91-94
A RESOLUTION REVISING GATE FEES PURSUANT TO TAE CONTRACT FOR THE OPERATION
AND MAINTENANCE OF HEAL ROAD SANITARY LANDFILL IN BUTTE COUNTY
WHEREAS, Neal Road Landfill Company (Contractor) and County of Butte
entered into an agreement for operation and maintenance of Neal Road Sanitary
Landfill on May 15, 1978; and
WAEREAS, Section 12 of the contract provides for a change in cost of
doing business whereby the compensation to the contractor shall be increased or
decreased in a percentage amount equal to two-thirds (2/3) of the net percentage
change in the consumer price index by either raising gate fees or by other compen-
sation;
NOW, L~EREFORE, BE IT RESOLVED by the Butte County Board of Supervisors
that the gate fees for the operation and maintenance of the Neal Road Sanitary
Landfill are established as set forth in Exhibit "A" attached hereto.
BE IT FURTHER RESOLVED that this resolution shall be effective on
September 1, 1991.
PASSED AND ADOPTED by the Board of Supervisors of the County of Butte,
State of California, this 6th day of August 1991 by the
following vote:
AYES: Supervisors McInturf, Houx, McLaughlin, Fulton and Chair Dolan
NOES: None
ABSENT: None
NOT VOTING: None ~
Chai~, $oa~ of Supervisors
County of Butte, State of California
ATTEST: William Rando Chief Adminis't tYa`v~
Officer and C e k of the Board
By:
Clerk/Deputy
PROPOSED
GATE FEE SCHEDULE
(Effective 911191)
ALL FEES INCLUDE A
BUTTE COUNTY SURCHARGE FOR REGULATORY EXPENSES
NON COMMERCIAL HAULERS
Passenger Car, Station Wagons, Pickups,
Trailers (two wheel}, and Panel Trucks Each S 4.90
Picku s with loads above cab Each 810.20
Flat Bed Trucks less than 1 ton (no sides) Each 8 8.90
Flat Bed Trucks less than l ton
Cwith sideboards)
Each
513.45
One-ton Trucks, Fnur-wheel Trailers Each 81f.80
One and erne-half ton Trucks Each 827.50
3-axle Trucks with Trailers and Semis CU YD 5 1.20 (822.20 min.}
Vans (less than one ton> Each $ll, 10
Trailers (twn-wheels, 3 1/2 CY and up) Each 811.10
Trailers (three-axle and 5th wheel) CU YD 8 1.20 C817.85 min.}
COMMERCIAL HAULERS
Packer Trucks (all nom acted loads) CU YD 8 2.15
Brn Boxes and Bins (uncom acted} CIF YD S 1. i5
One-tnn Trucks CU YD 8 1.15
Septage Trucks (includes 812.75/1000 gal.
Butte County surcharge) 1,000 Gal 519.35
Drop Boxes and Bins {Bernnlition} CU YD 5 2.85
DEMOLITION*, STUMPS**, WIRE ANB TIRES
Pickups and Trailers (two-wheel, more than
one-half load, ICY Each 816.80
Flat Beds less than 1 ton { no sides} CU YD 5 2.85 { 813.45 min. )
Flat Beds less than 1 tan (with sideboards) CU YD 5 2.85 (817.85 rnin.>
One-tan Trucks, Four-wheel Trailers CU YD 8 2.85 {526.75 min.)
Trailers (three-axle and 5th wheel) CU YD 5 2.85 (526.75 min.)
One and one-half tan Trucks CU YD 8 2.85 (840.00 min.)
Semi Trucks and Three-axle Trucks CU YB 8 2,85 C855.50 min.)
Tires (All sines up to & innludina 900-20) Each 5 1.50
Tires { All sizes Pram 14.00-24 to 11.00-24)1 Each 8 3.50
Tires (All sizes lar er than 11.00-24) CU YD 813.45
*Additianal fee for mattresses, bed springs, washers, dryers, couches, stoves,
refrigerators, large pieces of carpet, and other hard-to handle bulky items -
85.90 - per item
**Additional fee for stumps 24 " ar larger - 82.20 Minimum
Special handling that requires immediate cover for security ar other reasons as
required by the customers 894.50 Minimum
Hours of Operation-6:30 A. M. to 5:00 P. M. Daily(No admittance after 4: 9S P. M. }
Holidays Closed - New Years, Easter, 4th of ~Iuly, Thanksgiving and Christmas
EXHIBIT "A"