RE'SOlufton N0. 97-139
RESOLUTION AUTHORIZING EXECUTION OF PROGRAM SUPPLEMENT NO. M005
TO ADMINISTERING AGENCY -STATE AGREEMENT NO. 03-5412
MODIFIED NOVEMBER 29, 1995
FOR FEDERAL-AID PROJECTS
STORM DAMAGE RESTORATION ON EAST GRIDLEY ROAD,
FROM HUTCHINS DRIVE TO 1,1 MILES EAST
PROJECT NO. ER-3222(004)
BE IT RESOLVED by the Board of Supervisors of the County of Butte, Statc of California, as
follows:
1. That said County approve Program Supplement No. M005 to Administering Agency-State
Agreement No. 03-5912, modified November 29, 1995, for Federal-Aid Projects in Butte County and the
Chair of the Board be authorized to execute said supplement an behalf of said County. Supplement No.
M005 provides far funding for reimbursement of construction costs for storm dvnage restoration on East
Gridley Road, from Hutchins Drive to i. l miles east, Project No. ER-3222 (004}.
2. That the Clerk of this Board be authorized to attach a certified copy of this Resolution to
Program Supplement No. M005.
PASSED AND ADOPTED by the Board of Supervisors of the County of Butte, State of
California, this 14th day of October , 1997, by the following vote:
AYES: Supervisors
NOES: None
ABSENT: Supervisor
NOT VOTING: None
Beeler, Houx, Josiassen and Chair Davis
Dolan
~~
. ~.- ~~~
i.. L< <C f ~~~.~_~ r ~ ~
Chair, Board of Supervisors
County of Butte, State of California
ATTEST:
John S. Blacklock, Chief Administrative
Officer and Clerk of the Board
By
ClerklDeputy
PF:OGRAM SUPPLEMENT 2~.,. M005
to
AGENCY-STATE AGREEMENT
FOR FEDERAL-AID PROJECTS NO. 03-5912
' :e: September 8, 1997
Locat..on: 03-BUT-O-CR
Project Number: ER-3222(004)
E.A. Number: 03-924873
This Program Supplement is hereby incorporated into the Agency-State
Agreement for Federal Aid which was entered into between the Agency and
the State on 05/30j97 and is subject to all the terms and
conditions thereof. This Program Supplement is adopted in accordance
with Article I of the aforementioned Master Agreement under authority
of Resolution No. q7-/3q approved by the Agency on nn/o~.- /d,/Qg~ (See
copy attached).
The Agency further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with the covenants or
remarks setforth an the following pages.
PROJECT TERMINI:
In Butte County on East Gridley Rd. from Hutchins Dr. east 1.1 mile -
DAF# RWB-BUTCO-010-0
TYPE OF WORK: EOjForce Acct. - RestorationjForce Acct.LENGTH: 0.2 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[ ] Preliminary Engineering [ ] Right-of-Way [X]FORCE ACCOUNT
[ ] Construction Engineering [X] Construction
Estimated Cost Federal Funds
$ 20550 09N $ 19817 $
$ 0
Matching Funds
Local OTHER OTHER
733 $ OI$ 0
Butte County
Fred C. Davis, Chair
Board of Supervisors
Date October 14, 1997
Attest
Caro Roach
Title Assistant Clerk of the Board
STATE OF CALIFORNIA
Departure of T sportation
f
By
Chie Office of Local Programs
Project Implementation
Date ~fl?` ~~
i hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance:
Accounting Officer
Date ~ ~!~ f~_ $ 19817.00
Chapters Statutes I Item ~ Year ~ Program ~HC) Fund Source ~ AMOUNT
282 1997 2660-101-890 97-98 20.30.010.650 C 225000 892-F 19817.00
Page 1 of 2
e3-~uT-o-cR
ER-3222(004)
SPECIAL COVENANTS OR REMARKS
1. The effective date of this agreement is 12J28J96
DATE: OE~.,i'~~~~J97
2. All maintenance, involving the physical condition and the
operation of the improvements, referred to in Article III
MAINTENANCE of the aforementioned Master Agreement will b~~ ~F,e
responsibility of the Local Agency and shall be performer
regular intervals or as required for efficient operation o: ~.~-ic'
completed improvements.
3 . The work eligible for Federal Reimbursement shall be perfo~-rx~~ ~:' ~Jy
the Local Agency either by using their own forces or by c:o~if_ ~-<. ~ ,
The Local Agency must be able to identify the costs incurr~zeA. .-.~,r
each federally approved damage site and be subject to an aY~c~. ~_ ~-
for verification.
4. The Local Agency agrees the payment of Federal funds will hie
limited to the amounts approved by the Federal Highway
Administration in the Federal-Aid Project Agreement (PR-2} Jt,~< ~.: ~ i.
Estimate, or its modification (PR-2A} or the FNM-76, and ac~~,>;_,~ :~
any increases in Local Agency Funds as shown on the Finance
Bid Letter ar its modification as prepared by the Office of. Y i
Programs.
5. Emergency repair work will be reimbursed at 1000 if complet~,~
within 180 days from the initial day of storm occurrence.
initial day of storm occurrence is December 28, 1996. Local
Agency records must clearly identify those costs incurred on or
after December 28, 1996. Incurred costs are defined as
disbursements made or in process for goods and services
delivered. Emergency repair work completed after June 25, ~.'-'.
will be funded at the federal-aid reimbursement ratio of 88.'~
Restoration work, including preliminary engineering, will ~~:
reimbursed at an 88.530 ratio. The Local Agency will be
responsible for the matching requirement.
6. In executing this Program Supplemental Agreement, Local
Agency hereby reaffirms the "Nondiscrimination Assurances"
contained in the aforementioned Master Agreement for
Federal-Aid Program.
7. Whenever the local agency uses a consultant on a cost plus ~-+.~~,
the local agency is required to submit a post audit repor~~. ~, r~~
ing the allowability of cost payments for each individual °,~,: ~+.1--
tant or sub-contractor incurring over $25,000 on the projr~~.;~.
The audit report must state the applicable cost principles u.~.~.i_li-
zed by the auditor in determining allowable costs as refere~.9.~:>d in
CFR 49, part 18, Subpart C - 22, Allowable Costs.
Page ? ~? ~ 2