Loading...
HomeMy WebLinkAboutFERC - Finiding of Effect Under Section 106 - Project No. 2100-000 - Proposed Work Platform and Access Ramp Project No.2100-000 -2- FEDERAL ENERGY REGULATORY COMMISSION On August 29,2017,the Commission issue WASHINGTON,D.C.20426 agency's finding of no adverse effect for the repai Your November 31a letter encloses an October 20, a preliminary finding of no adverse effect to histol OFFICE OF ENERGY PROJECTS construction work needed to install the RCC work Project No.2100-000—California Stipulation II of the PA,the report was prepared b Project River 00-000leeCali Project Secretary of the Interior's Professional Qualificati FeatheCalifornia Department Hydroelectric Water Resources There are two historic properties that could be dir Oroville Dam and the proposed Oroville Division historic district. The Oroville Dam is rccommend December 1,2017 ODSWP. Based on a review of background resee survey conducted by an archaeologist meeting the Mr.Ted Craddock Qualifications Standards for Archeology,you con Project Manager result in an adverse effect or substantial adverse c California Department of Water Resources or contributing elements to the Oroville Dam or( P.O.Box 942836 that the proposed work would not alter,directly o Sacramento,CA 94236-0001 the ODSWP or Oroville Dam in a manner that wJ properties. Subject: Finding of Effect under Section lob After reviewing your letter and report,we Dear Mr.Craddock: effect to historic properties within the area of din installing a RCC work platform and dirt access n We are in receipt of your November 3,2017 letter regarding a preliminary finding of effect on historic properties for a proposed work platform and access ramp that are If you have any questions concerning this needed to continue repair work at the base of the existing Oroville Dam flood control (202)502-8949. outlet(FCO)spillway,which is part of the Feather River Hydroelectric Project(FERC Project No.2100). Specifically,your agency needs to build a roller compacted concrete Sincere (RCC)working platform at the base of the FCO spillway,as well as excavate an area of the hillside on the west side of the FCO spillway to install a dirt access ramp for construction equipment. By letter dated March 31,2017,we designated your agency as our non-federal representative for conducting consultation with the California State Thoma Historic Preservation Officer(California SHPO)for emergency activities associated with Chief, repairs to Oroville Dam and appurtenant facilities. Divisir and C As stated in your November 31 letter,the Commission and California SHPO on July 5,2017,executed a Programmatic Agreement(PA)for managing historic properties during the emergency and permanent recovery period at and near the Oroville Dam for Commission staff also held a teleconfer facilities damaged during severe storms in February 2017. As described in Stipulation I of the PA,the Undertaking will include various single and multi-phased repairs to the on November 8,2017 to discuss the applicabilit gated FCO spillway,emergency spillway,and other project features. Pursuant to the dentates at the base of the FCO spillway. Si Stipulation IV of the PA,we are responsible for making findings of effect to historic (stripping and recasting)include materials being properties arising from the undertaking and your office is responsible for preparing would result in minor aesthetic or physical chap related technical documents,including those that support effect recommendations. the call with your conclusion that the work is cc concerning the overall repairs to the FCO spillµ Project No.2100-0001 Cc: .haliamae Polanco State Historic P'reservatio California Office ot'l-lisio 1725 23111 Street,Suite IOi Sacramento,CA 45810 Alessandro Amag,lio Environmental Officer Federal Emergency Maana l 10000 Goethe Road Sacramento,CA 95827 Tcri'roye Branch Director Environmental and flistori Federal Emergency Maanat 1.0000 Goethe Road Sacramento,CFe 45827