Loading...
HomeMy WebLinkAboutFERC - Notice of Application Accepted for Filing, Soliciting Comments, Motions to Intervene, and Protests - Project No. 2100-185 » ter 0 o m m z -4 m W z 0 3 0 m ca Ol 0 C C: 0 < 0 > -M Z O'Z 0 0 C-) -n (D U) C: Z c: z > rT 01 co CD T W (3) rn > �u 0 Z Cf) C/) 0 -n M to cD 13 fJY Cc > rn ly, UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION California Department of Water Resources Project No.2100-185 NOTICE OF APPLICATION ACCEPTED FOR FILING,SOLICITING COMMENTS, MOTIONS TO INTERVENE,AND PROTESTS (February 13,2018) Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for license amendment b. Project No.: 2100-185 c. Dates Filed: January 29 and February 13,2018 d. Applicant: California Department of Water Resources e. Name of Project: Feather River Project f. Location: The project is located on the Feather River in Butte County, California,and occupies lands of the United States administered by the U.S.Forest Service and the US Bureau of Land Management. g. Filed Pursuant to: Federal Power Act, 16 USC 791 a-825r. h. Applicant Contact: Mr.Ted Craddock,California Department of Water Resources, 1416 Ninth Street,PO Box 942836,Sacramento, CA 94236-0001,(916)502-2067 i. FERC Contact: Mr.John Aedo,(415)369-3335, 'ot hn•acdo@fere e:ov j. Deadline for filing comments,motions to intervene,and protests is 30 days from the issuance date of this notice by the Commission(March 15,2018). All documents may he filed electronically via the Internet. See; 18 CFR 385.2001(a)(1)(iii)Ind the instructions on the Commission's web site at httP://www.fcre.aov/docs-filin�kWin .as . If unable to be filed.electronically, Project No,2100-185 les should be documents may be paper.filed. To Paper file,an original and seven cop Federal Energy Regulatory Commission,888 First 6,d00 NE, mailed to.Secretary, Commenters can submit brief comm m a P Washington,DC 20426• using the eComment system characters,without prior registration, our name and contact htt :Ilwww.ferc.Rovldocs-tour comrnentsnt as You must include y information at the end of y comments,mations,or please include the project number(P-2100-185)on any recommendations filed. nest: California Department of Water Re license to enhance k: Description of Rey approval for an amendment to its current project requests Commission app at Oroville Dam to prevent erosion,se The licensee also nests Commission ate the existing emergency spillway these enhancements into its pro}ect leo pct transmission line connecting the Hyatt approval to relocate a portion le a project powerp spillway to similar dimensions as the ,ant Switchyard and tile he Orov'tlle main sp'iversion Dam Powerhouse. In addition, e licensee proposes to recons various protective or mitigative measures original design. Finally,the licensee proposes these activities. The above to minimize impacts to the resources during 2017 failure of the main spillway ro posed as a result of the February spillway. The Commission activities are being.P P the use of the emergency P and extensive eroson caused by comments, will be analyzing the environmental effects of�ailureo Consequently,any nOwn as the bases of the spillwaycts of the response and recovery phases should concern only the celiCenSing are not motions to intervene,or p comments relating P l response and recovery efforts. Any d subsequent analysis. within the scope of this public notice an 1, Locations of the Application'. A copy Of the application is available for inspection and callin (202)502-8371. This film;may reproduction at the Commission's 0426co�yrence Rgoom•located at 888 First street, NE,Room 2A,Washino the last three digits in the docket also be viewedon Erste " website at h °h docket number excluding vww fere.Dov ocs filinRlefilin 11so register online at number field to access the document. You may call 1-966-208- hit 866 208" or other pending Projects. For assistance,2 8659 A copy is lut :lhvww.ferc.eovldacs 15linQlesubscri Uon.as t°be notified email of new filings and issuances related to th P h above. 3676 or e-mail FERCOnIineSu ort@ferc. ov for TT}' call 67 also available for inspection and re roduction at the address in item( ) Cn. ission's mailing list should so Individuals desiring to be included on the Comm indicate by writing to the Secretary of the Commission. Anyone may submit comments,a n. Comments,Qin accordance with the requirements of Rules Practice rotests,or Motions to Intervene: nY protest,or a motion to intervene Project No.2100.185 and Procedure, 18 GFR 385.210,.211,. -3 - lake,the Commission will consider all protests or other comments n determining the appropriate action to Who fele a motion to intervene in accordance with the Co Party to the proceeding. mints filed,but only those received on or before�hespecified pec Fi Iamonts,protests,or mot onstto[interRene must be comment date for the may become a 0. Fiji and Service of Responsive Documents: particular application. Ietters the title `COMMENTS pROTE All filings must(1)bear in all capital applicable;(2)set forth in the heading rhe nam,or 11e of MOTION T of the application to which the filingr O INTERVENE"as telephone number of the eSPonds; applicant and the protect number the requirements of 18 C person r (3)furnish the name,address,and P o)l ting or intervning;and(4)otherwise Co. I intervene,or Protests mustsetForthOtheiryrough 385,2005. requirements of 18 All comments, p Y with CFR 4.34 Y basis and otherwise comply i relate to project works which(are the subject of the license amendment. r protests w�[h the otions to intervene,or protests should obtain copies of the application directly From the a motion to imervene must be served u aero may upon each represel representative of the aoFany protest pr the particular application. If an intervener teles co Commission relating to the merits of an issue that may or documents�with the Particular particular resource agency they mast also serve a c ay affect the responsibilities of a agency. A copy of all other filings COPY of the document on that resource by proof of service on all Persons listed in the I to his sl application must 6e accompanied this proceeding,in accordance with Ie CFR 4.34 b prepared by the Commission in O and 18 CFR 385.2010. Kimberly D.Bose, Secretary.