Loading...
HomeMy WebLinkAboutFERC to F&G 6-4-09 FEDERAL ENERGY REGULATORY COMMISSION 2 WASHNOTON.D.C.20426 June 4,2009 which we show on page 332 of the draft EA. OFFICE OF ENERGY PROJECTS Project No.803-087—California In your April 27,2009 letter,you also request a copy of the electronic spreadsheet or DeSabla-Centerville Hydroelectric computer software used in Commission staffs economic analysis. As we've said at the May 18,2009 meeting,it is not the Commission's practice to provide staffs computer models or Pacific Gas and Electric Co. working papers from a NEPA analysis as these are not part of the public record in a proceeding. Sandra Morey,Regional Manager California Department of Fish and Game If you have any questions,please contact Tim Looney at 202-502.6096. North Central Region Sincerely, 1701 Nimbus Road,Suite A Rancho Cordova,CA 95670-4599 Reference: Response to Request for Additional Information Timothy J.Welch Dear Ms.Morey: Chief Hydro West Branch 2 On May 18,2009,Commission staffheld an agency meeting to discuss both the basis for the U.S.Forest Service's modified 4(e)conditions for the DeSabla-Centerville Hydroelectric Project and the remaining inconsistencies of the a`genniec'tl)M Enclosure: Schedule A 0� recommendations. In addition,responding to the California Fish and Game's April 27,2009 "11td letter,Commission staff clarified how it analyzes the economics of hydroelectric projects, cc: MaryLisa Lynch OSS and in particular,how we calculated the annual cost of a fish screen at Hendricks Dam in the California Department of Fish and Game �p^® Ups draft Environmental Assessment(draft EA). 1701 Nimbus Road,Suite A �°1s� �U�SO Rancho Cordova,CA 95670-4599 �/Qo a'9 rQS With respect to project economics,we explained that Commission staff prepares an economic analysis of projects over a 30-year period based on the current value of electric Robert W.Hughes,P.E. power,keeping with Commission policy as described in the Commission's Mead decision.' California Department offish and Game We also noted that our economic analysis takes into account federal,state,and local taxes; 1701 Nimbus Road,Suite A ON depreciation;insurance;and interest during construction. Rancho Cordova,CA 95670-4599 In Attachment A,we show how the taxes,depreciation,insurance,and interest during Service List construction add to the annual cost thatyou calculate for a fish screen at Hendricks Dam in Public Files your April 27,2009 letter. Starting with your estimated annual cost of$340,200,these added costs increase the annual cost by$249,600,giving a total annual cost of S589,800, which we show on page 332 of the draft EA. See 72 FERC¶61,027(July 13,1995). c—v_. `