HomeMy WebLinkAboutFERC to F&G 6-4-09 FEDERAL ENERGY REGULATORY COMMISSION 2
WASHNOTON.D.C.20426
June 4,2009
which we show on page 332 of the draft EA.
OFFICE OF ENERGY PROJECTS
Project No.803-087—California In your April 27,2009 letter,you also request a copy of the electronic spreadsheet or
DeSabla-Centerville Hydroelectric computer software used in Commission staffs economic analysis. As we've said at the May
18,2009 meeting,it is not the Commission's practice to provide staffs computer models or
Pacific Gas and Electric Co. working papers from a NEPA analysis as these are not part of the public record in a
proceeding.
Sandra Morey,Regional Manager
California Department of Fish and Game If you have any questions,please contact Tim Looney at 202-502.6096.
North Central Region Sincerely,
1701 Nimbus Road,Suite A
Rancho Cordova,CA 95670-4599
Reference: Response to Request for Additional Information Timothy J.Welch
Dear Ms.Morey: Chief
Hydro West Branch 2
On May 18,2009,Commission staffheld an agency meeting to discuss both the basis
for the U.S.Forest Service's modified 4(e)conditions for the DeSabla-Centerville
Hydroelectric Project and the remaining inconsistencies of the a`genniec'tl)M Enclosure: Schedule A 0�
recommendations. In addition,responding to the California Fish and Game's April 27,2009 "11td
letter,Commission staff clarified how it analyzes the economics of hydroelectric projects, cc: MaryLisa Lynch OSS
and in particular,how we calculated the annual cost of a fish screen at Hendricks Dam in the California Department of Fish and Game �p^® Ups
draft Environmental Assessment(draft EA). 1701 Nimbus Road,Suite A �°1s� �U�SO
Rancho Cordova,CA 95670-4599 �/Qo a'9 rQS
With respect to project economics,we explained that Commission staff prepares an
economic analysis of projects over a 30-year period based on the current value of electric Robert W.Hughes,P.E.
power,keeping with Commission policy as described in the Commission's Mead decision.' California Department offish and Game
We also noted that our economic analysis takes into account federal,state,and local taxes; 1701 Nimbus Road,Suite A ON
depreciation;insurance;and interest during construction. Rancho Cordova,CA 95670-4599
In Attachment A,we show how the taxes,depreciation,insurance,and interest during Service List
construction add to the annual cost thatyou calculate for a fish screen at Hendricks Dam in Public Files
your April 27,2009 letter. Starting with your estimated annual cost of$340,200,these
added costs increase the annual cost by$249,600,giving a total annual cost of S589,800,
which we show on page 332 of the draft EA.
See 72 FERC¶61,027(July 13,1995).