Loading...
HomeMy WebLinkAboutLetter from Jon Yego 3-24-10 •}�pusat•••• �• SUBOARD OF SUPERVISORS BILL CONNELLY,CHAIR 7 First District ADMINISTRATION CENTER JANE DOLAN 25 COUNTY CENTER DRIVE-OROVILLE,CALIFORNIA 95965 Second District "••••■*•' TELEPHONE:(530)538-7224 MAUREEN KIRK Third District STEVE LAMBERT Fourth District KIM K.YAMAGUCHI Fifth District March 24, 2010 Jon Yego, Chief Floodway Protection Section Division of Flood Management Central Valley Flood Protection Board 3310 El Camino Ave., Rm. LL40 Sacramento, CA 95821 RE: Application to Remove Two Berms Near Proposed Sacramento-Bidwell State Park Mr. Yego, On March 23, 2010,the County learned that the California Department of Parks and Recreation (CDPR) sent an application to the Central Valley Flood Protection Board (CVFPB) for the project as described below: Description: To restore a 43-acre parcel (Singh Unit) by removing two existing berms and nonnative vegetation and planting riparian vegetation and native grasses within the designated floodway (River Mile 194) of the left (east bank of the Sacramento River Location: The project is located west of Chico and south of Sacramento Avenue. Section 2, T21N, RI YY, MDB&M(Sacramento River, Butte County) Letters from CVFPB sent to adjacent property owners, dated March 9, 2010, gave them 20 days to protest the project or the matter may be approved on the CVFPB's consent agenda. The area in question pertains to the proposed Sacramento-Bidwell State Park. Butte County has previously sent a letter of opposition to this project and sent a delegation to Sacramento to oppose it. The County also sent a lengthy response to the State's Environmental Impact Report on the project. Nonetheless, neither CDPR nor CVFPB notified the County on the application by CDPR. The deadline to comment of the application was March 29, 2010. However, the County found out about the application on March 23, 2010. The County's engineer needs time to study the application to analyze any environmental impacts and/or the flooding impacts to Butte County. Therefore,the Butte County Board of Supervisors requests an extension of the comment period of no less than 30 days. Sincerely, IV •L Bill Connelly, Chair Butte County Board of Supervisors cc: Butte County Board of Supervisors Stuart Edell,Deputy Director, Butte County Public Works Department Enclosure STATE OP CAUPORNlAM THE MOM=A*EmoY GUV9RNOR Cr:NiRAI.VAL11Y KOOD I OR-C ION BOARD 8810 W OUTIM Aft.Rm.LL40 �r SAWAMEWO,CA MO FA4-4M FAX;(1145)b'?4.OQ12 PZ1rr3:(MO) 'Y4,M PAfG{ i8}3r4 aez I NEAR g%k M U w� . John Nock 4033 Ord Ferry Road Chico.Caiffornis 90928 This toter is to inform you that the Central Valley Flood i rQWctlon Board has mceived an 901*lic stip a mnc*mlrig vM*3 40 be performed at a property adjacent to yours.The rel has received an application from Caltfornia Department of Pada and Recreation for a project as described below. Description! To restore a 4&acre parcel (Singh Unix)by rernovift two eW tir*barrns and norrm*e vagetadon and planting riparian vegetation and native 9MZfts vuithih the designated ftoodway(Fiver Mile 1 i4)offhe left(east) bank of the Saorernento River. Location: The project is iaeatad west t>f Chia and wuM of Sacmmento Avenue. See lbM 2,721N. R11N.Tolyl&fit (SaMn*n4to River, Su#t County) If you have any comn-o is on the p-jert Mat relate to flood oonW issues,piaose forward them to em Central Vatlay Ftdpd ProtBetion Board et 3310 El Camino Avenue, Ronal LL401 Sacramento, Callfbmia,95821,within twenty days from find elate of this laf#er, If you wish to pretest this applicakton,You Must no"the Board In Wig,With the ward l ROE=S'In'd'ia auWaot One,within tww9v days ftem the date of#iia letter. Prate* must lrlclude: (1)The naM address,and telephone nwlntw of the protestant; (2)A char segment of tM ptotestant's obje cts:;anal (3)An ovitirsstlon of how the protestant will be adversely of so Wd by the proposed proj�t. Pr atmu must ba b9#W solely upon fkW control ootrc erna or,where the Board is acting 06 lead agency under OF-QA.en ronmental awc urns, Since,lanuery 1,200ao Board has been required to hold an evidallt`iary hearing for any rmtlar that requires the issuance of a permit. If you do not p#+otest.this application within#+Nealy d.ws fmm tate date of tl3ls laftr.you vvill have waN*d your sight to par6cipaba in the hefting 68 4 protestant incWtng the rsght#o present stria rebut evidence,a though you may still comment as e member of to Public, If there are no p G%StMts to this appiic:ativn,the Board may place the Item on its consent calendar and : act based on ft staff report and any evldetoce that wets submttW to 50ard staff. Pieaw reftr to application number 18676 Bd when communirdng With this offloe, For krftr hTbrmaWn,c or t d me et Petersen of any stO at(64 6)5744XW. • Sirn�r�y, zl -cy—ego�' chief FkcdwaY ProtedHon SectiaA Division of Flood Managmerd t