March 24, 2010
Jon Yego, Chief
Floodway Protection Section
Division of Flood Management
Central Valley Flood Protection Board
3310 El Camino Ave., Rm. LL40
Sacramento, CA 95821
RE: Application to Remove Two Berms Near Proposed Sacramento-Bidwell State Park
Mr. Yego,
On March 23, 2010,the County learned that the California Department of Parks and Recreation
(CDPR) sent an application to the Central Valley Flood Protection Board (CVFPB) for the project
as described below:
Description: To restore a 43-acre parcel (Singh Unit) by removing two existing berms and
nonnative vegetation and planting riparian vegetation and native grasses within the designated
floodway (River Mile 194) of the left (east bank of the Sacramento River
Location: The project is located west of Chico and south of Sacramento Avenue. Section 2,
T21N, RI YY, MDB&M(Sacramento River, Butte County)
Letters from CVFPB sent to adjacent property owners, dated March 9, 2010, gave them 20 days to
protest the project or the matter may be approved on the CVFPB's consent agenda.
The area in question pertains to the proposed Sacramento-Bidwell State Park. Butte County has
previously sent a letter of opposition to this project and sent a delegation to Sacramento to oppose
it. The County also sent a lengthy response to the State's Environmental Impact Report on the
project. Nonetheless, neither CDPR nor CVFPB notified the County on the application by CDPR.
The deadline to comment of the application was March 29, 2010. However, the County found out
about the application on March 23, 2010. The County's engineer needs time to study the
application to analyze any environmental impacts and/or the flooding impacts to Butte County.
Therefore,the Butte County Board of Supervisors requests an extension of the comment period of
no less than 30 days.
Sincerely,
IV
•L
Bill Connelly, Chair
Butte County Board of Supervisors
cc: Butte County Board of Supervisors
Stuart Edell,Deputy Director, Butte County Public Works Department
Enclosure
STATE OP CAUPORNlAM THE MOM=A*EmoY GUV9RNOR
Cr:NiRAI.VAL11Y KOOD I OR-C ION BOARD
8810 W OUTIM Aft.Rm.LL40 �r
SAWAMEWO,CA
MO FA4-4M FAX;(1145)b'?4.OQ12
PZ1rr3:(MO) 'Y4,M PAfG{ i8}3r4 aez I
NEAR g%k M U w� .
John Nock
4033 Ord Ferry Road
Chico.Caiffornis 90928
This toter is to inform you that the Central Valley Flood i rQWctlon Board has mceived
an 901*lic stip a mnc*mlrig vM*3 40 be performed at a property adjacent to yours.The
rel has received an application from Caltfornia Department of Pada and Recreation
for a project as described below.
Description! To restore a 4&acre parcel (Singh Unix)by rernovift two eW tir*barrns
and norrm*e vagetadon and planting riparian vegetation and native
9MZfts vuithih the designated ftoodway(Fiver Mile 1 i4)offhe left(east)
bank of the Saorernento River.
Location: The project is iaeatad west t>f Chia and wuM of Sacmmento Avenue.
See lbM 2,721N. R11N.Tolyl&fit
(SaMn*n4to River, Su#t County)
If you have any comn-o is on the p-jert Mat relate to flood oonW issues,piaose
forward them to em Central Vatlay Ftdpd ProtBetion Board et 3310 El Camino Avenue,
Ronal LL401 Sacramento, Callfbmia,95821,within twenty days from find elate of this
laf#er,
If you wish to pretest this applicakton,You Must no"the Board In Wig,With the ward
l ROE=S'In'd'ia auWaot One,within tww9v days ftem the date of#iia letter. Prate*
must lrlclude:
(1)The naM address,and telephone nwlntw of the protestant;
(2)A char segment of tM ptotestant's obje cts:;anal
(3)An ovitirsstlon of how the protestant will be adversely of so Wd by the proposed
proj�t.
Pr atmu must ba b9#W solely upon fkW control ootrc erna or,where the Board is acting
06 lead agency under OF-QA.en ronmental awc urns,
Since,lanuery 1,200ao Board has been required to hold an evidallt`iary hearing for
any rmtlar that requires the issuance of a permit. If you do not p#+otest.this application
within#+Nealy d.ws fmm tate date of tl3ls laftr.you vvill have waN*d your sight to
par6cipaba in the hefting 68 4 protestant incWtng the rsght#o present stria rebut
evidence,a though you may still comment as e member of to Public, If there are no
p G%StMts to this appiic:ativn,the Board may place the Item on its consent calendar and :
act based on ft staff report and any evldetoce that wets submttW to 50ard staff.
Pieaw reftr to application number 18676 Bd when communirdng With this offloe, For
krftr hTbrmaWn,c or t d me et Petersen of any stO at(64 6)5744XW.
• Sirn�r�y,
zl -cy—ego�' chief
FkcdwaY ProtedHon SectiaA
Division of Flood Managmerd