HomeMy WebLinkAboutNotice of petitions from State Water Resources Control Bd State Water Resources Control Board
Division of Water Rights
1001 1 Street,14th Floor Sacramento,California 95814♦916.341.5300
Linda S.Adams P.O.Box 2000 a Sacramento,California 95812-2000 Arnold Schwarzenegger
Seeretaryfor Fax: 916.341.5400 ♦ www.Nvaterboards.ca.gov/waterrights Governor
Environmental Protection
NOTICE OF PETITIONS FOR EXTENSION OF TIME FOR
DEPARTMENT OF WATER RESOUCES STATE WATER PROJECT WATER RIGHT PERMITS
16477, 16478, 16479, 16480, 1648'1, 16482
(APPLICATIONS 5629, 5630, 14443, 14444, 14445A, 17512)
COUNTIES: Alameda, Butte, Contra STREAM SYSTEMS: Feather River, Sacramento
Costa, Los Angeles, Merced, River, Sacramento-San Joaquin
Riverside, Sacramento, San Delta Channels, Old River, San
Bernardino, Solana and Joaquin River
Stanislaus
The California Department of Water Resources (DWR), c/o Erick D. Soderlund;1416 Ninth Street,
Sacramento, CA 95818, has petitioned for time extensions for the State Water Project water right permits
listed above. DWR has requested a five-year time extension to complete beneficial use of water under its
water right permits. Summaries of the subject permits follow:
Summary of Permit 16477 (Application 5629)
Source: Feather River tributary to Sacramento River
Point of Oroville Dam within NW%of NW Y4 of Section 1, T19N, R4E, MDB&M
Diversion:
Points of 1. Thermalito Diversion Dam within SW%of.SE%of Sectidn 5, T19N, R4E, MDB&M
Diversion and 2. Feather River Fish Hatchery Dam within SW%of NE %of Section 8,T19N, R4E, MDB&M
Rediversion:
Points of 1. Thermalito Forebay Dam within NW%of SW 1/4 of Section 10, T19N, RK, MDB&M
Rediversion: 2. Thermalito Afterba Dam within SW%of SE %of Section 33, T19N, R3E, MDB&M
Amount and Direct Diversion: 7,600 cubic feet per second (cfs)from January 1 through December 31 of
Season each year
Storage: 380,000 acre-feet annually(afa)to be collected from September 1 of each year to July
31 of the succeeding year
Purposes of Power; Incidental Recreational and Fish and Wildlife Enharicement
Use:
Places of Hydopolver generation at the following:
Use: 1. Oroville Dam Powerplant located within the NW 1/4 of NW'/of Section 1, T19N, R4E,
MDB&M
2. Thermalito Forebay Dam Powerplant within NW Y4 of SW Y4 of Section 10, T19N, R3E,
MDB&M
3. Thermalito Diversion Dam Powerplant within SE '/4 of SE Y4 of Section 5, T19N, R4E,
MDB&M
Incidental Recreational and Fish and Wildlife Enhancement: located at various project facilities
associated with Oroville Dam and Reservoir and the Feather River below Oroville Dam, as
shown on Map No. 1878-1, Revised December 1964.
Extension of Through December 31, 2015
Time:
BOARD OF SUpERV.50RS
California Environmental Protection Agent ROVILLE,CALIFORNIA
��Recycled Paper
Notice of Petitions for Time Extension for State Water Project Water Right Permits 2
California Department of Water Resources
Summary of Permit 16478(Application 5630
Source: Feather River tributary to Sacramento River
Point of Oroville Dam within NW '/4 of NW%of Section 1, T19N, R4E, MDB&M
Diversion:
Points of 1. Thermalito Diversion Dam within SW%of SE%of'Section 5, T19N, R4E, MDB&M
Diversion and 2. Feather River Fish Hatchery Dam within SW Y4 of NE %of Section 8, T19N, R4E, MDB&M
Rediversion: 3. Delta Water Facilities within SW'/4 of NE %of Section 22, T6N, R4E, MDB&M
4. California Aqueduct Intake within NW%of NE%of projected Section 24, T1S, R3E,
MDB&M
5. Clifton Court Forebay within NW %of SE'/of projected Section 20, TIS, R4E, MDB&M
6. Tracy Pumping Plant within SW'/4 of SW %of projected Section 31, T1 S. R4E, MDB&M
Points of 1. Thermalito Forebay Dam within NW 1/4 of SW Y4 of Section 10, T19N, R3E, MDB&M
Rediversion: 2. Thermalito Afterbay Dam within SW%of SE %of Section 33, T19N, R3E, MDB&M
3. North Bay Aqueduct Intake within NW'/4 of SE %of projected Section 20, T5N, R2E,
MDB&M
4. Del Valle Dam within NE %of SW%of projected Section 3, T4S, R2E, MDB&M
5, San Luis Forebay Dam within NE Y4 of SW%of Section 1,T1 OS, R8E, MDB&M
6. San Luis Dam within SW%of SE Y4 of projected Section 15, T1 OS, R8E, MDB&M
7. Cedar Springs Dam within S'/of NE Y4 of Section 32, T3N, R4W, SBB&M
8: Pyramid Dam within SW%of NW%of Section 2, T6N, R18W, SBB&M
9. Perris Dam within N '/of SE %of Section 4, T4S, R3W, SBB&M
10. Castaic Dam within N '/z of SW%of Section 18,T5N, R16W, SBB&M
Amount and Direct Diversion: 1,400 cfs from January 1 through December 31 of each year
Season Storage: 380,000 afa to be collected from September 1 of each year to July 31 of the
succeeding year
Purposes of Irrigation, Domestic, Municipal, Industrial, Salinity Control, Recreational, Fish and Wildlife
Use: Enhancement, and Incidental Hydropower Generation
Places of 9,546,000 net acres within a gross area of 29,402,000 acres within the Service Area of the
Use: State Water Project as shown on Map Nos. 1878-1, 1878-2, and 1878-3, revised December
1964; 4,015 acres within Oak Flat Water District as shown on map dated January 2009; 466
net acres within a gross area of 2,300 acres within Diablo Grande Project as show on'map
titled, "Western Hill Water District"
Incidental Hydropower Generation at the following powerplants:
1. San Luis located within the NE %of NE %a of projected Section 15, T10S, R8E, MDB&M
2. San Luis Obispo located within the SW%of NE %of Section 5,T31 S, R13E, MDB&M
3. Cottonwood located within the SE%of SE %of projected Section 32, T9N, R17W, SBB&M
4. Pyramid located within the SE%of NE %4 of Section 21, T7N, R18W, SBB&M
5. Castaic located within the NE Y4 of SE Y4 of Section 22, T6N, R17W, SBB&M
6. Devil Canyon#1 located within the SW%of NW'/of Section 32, T2N, R4W, SBB&M
7. Devil Canyon#2 located within the SW%of SW%of projected Section 6, T1 N, R4W,
SBB&M
8, Del Valle located within the SW%of NW'/4 of projected Section 3, T4S, R2E, MDB&M
9. Mohave Siphon located within the NE Y4 of NE%of Section 32, T3N, R4W, SBB&M
Extension of Through December 31, 2015
Time:
1
Notice of Petitions for Time Extension for State Water Project Water Right Permits 3
California Department of Water Resources
Summary of Permit 16479 (Application 14443)
Source: 1. Feather River tributary to Sacramento River
2. Sacramento-San Joaquin Delta Channels tributa to Suisun Ba
Point of Oroville Dam within NW %of NW%of Section 1, T19N, R4E, MDB&M
Diversion:
Points of 1. Thermalito Diversion Dam within SW 1/4 of SE %of Section 5, T1 9N, R4E, MDB&M
Diversion and 2. Feather River Fish Hatchery Dam within SW%4 of NE %of Section 8, T1 9N, R4E, MDB&M
Rediversion: 3. Delta Water Facilities within SW%of NE %of Section 22, T6N, R4E, MDB&M
4. California Aqueduct intake within NW%of NE Y4 of projected Section 24, T1 S, R3E, MDB&M
5. Clifton Court Forebay within NW '/of SE%of projected Section 20, TIS, R4E, MDB&M
6. Tracy Pumping Plant within SW'/4 of SW%of projected Section 31, T1 S, R4E, MDB&M
Points of 1. Thermalito Forebay Dam within NW'/of SW%of Section 10, T1 9N, R3E, MDB&M
Rediversion 2. Thermalito Afterbay Dam within SW'/4 of SE %of Section 33, T1 9N, R3E, MDB&M
3. North Bay Aqueduct Intake within NW%of 5E '/of projected Section 20, T5N, R2E, MDB&M
4. Del Valle Dam within NE %of SW%of projected Section 3, T4S, R2E, MDB&M
5. San Luis Forebay Dam within NE %of SW %4 of Section 1, TI OS, R8E, MDB&M
6. San Luis Dam within SW %of SE %of projected Section 15, T1 OS, R8E, MDB&M
7. Cedar Springs Dam within S '/of NE %of Section 32, T3N, R4W, SBB&M
8. Pyramid Dam within SW %4 of NW'/4 of Section 2, T6N, R18W, SBB&M
9. Perris Dam within N '/2 of SE '/of Section 4, T4S, R3W, SBB&M
10. Castaic Dam within N '/of SW %of Section 18, T5N, R16W, SBB&M
Amount and Oroville Dam:
Season: Direct Diversion: 1,360 cfs from January 1 through"December 31 of each year
Storage: 3,500,000 afa to be collected from September 1 of each year to July 31 of the
succeeding year
From Sacramento-San Joaquin Delta Channels:
Direct Diversion: 6,185 cfs from January 1 to December 31 of each year
Stora e: 42,100 afa to be collected from J an uary 1 to December 31 of each year
Purposes of Irrigation, Domestic, Municipal, Industrial, Salinity Control, Recreational, Fish and Wildlife
Use: Enhancement, and Incidental Hydropower Generation
Places of 9,546,000 net acres within a gross area of 29,402,000 acres within the Service Area of the State
Use: Water Project as shown on Map Nos. 1878-1, 1878.2, and 1878-3, revised December 1964;
4,015 acres within Oak Flat Water District as shown on map dated January 2009; 466 net acres
within a gross area of 2,300 acres within Diablo Grande Project as show on map titled, "Western
Hill Water District'
Incidental Hydropower Generation at the following powerplants:
1. San Luis located within.the NE%of NE %4 of pro1ected Section,.15, T1 OS, R8E, MDB&M
2. Sari Luis Obispo located within the SW'/4 of NE %of Section 5, T31 S, R1 3E, MDB&M
3. Cottonwood located within the SE %of SE %of projected Section 32, T9N, R17W, SBB&M
4. Pyramid located within the SE 114 of NE %of Section 21, T7N, R1 8W, SBB&M
5. Castaic located within the NE '/4 of SE %of Section 22, T6N, R17W, SBB&M
6. Devil Canyon 91 located within the SW%of NW %of Section 32, T2N, R4W, SBB&M
7. Devil Canyon##2 located within the SW%of SW %of projected Section 6, T1 N, R4W,
SBB&M
8. Del Valle located within the SW %of NW %of projected Section 3, T4S, R2E, MDB&M
9. Mohave Siphon located within the NE %of NE 1/4 of Section 32, T3N R4W, SBS&M
Extension of Through December 31, 2015
Time:
Notice of Petitions for Time Extension for State Water Project Water Right Permits 4
California Department of Water Resources
I
Summary of Permit 16480 (Application 14444
S1
Source: Feather River tributary to Sacramento River
Point of Oroville Dam within NW.'/4 of NW%of Section 1, T19N, R4E, MDB&M
Diversion:
Points of 1. Thermalito Diversion Dam within SW%4 of SE %of Section 5, T19N, R4E, MDB&M
Diversion and 2. Feather River Fish Hatchery Darn within SW %4 of NE %of Section 8, T19N, R4E, MDB&M
Rediversion:
Points of 1. Thermalito Forebay Darn within NW '/of SW'/4 of Section 10, T19N, R3E, MDB&M
Rediversion 2. Thermalito Afterba Dam within SW%of SE%of Section 33, T19N, R3E, MDB&M
Amount and Direct Diversion: 11,000 cfs from January 1 through December 31 of each year
Season: Storage: 3,500,000 afa to be collected from September 1 of each year to July 31 of the
succeeding year
Purposes of Power; Incidental Recreational and Fish and Wildlife Enhancement
Use:
Places of Hydopower generation at the following:
Use: 1. Oroville Dam Powerplant located within the NW%of NW%of Section 1, T19N, R4E,
MDB&M
2, Thermalito Forebay Dam Powerplant within NW%of SW Y4 of Section 10, T19N, R3E,
MDB&M
Incidental Recreational and Fish and Wildlife Enhancement: located at various project facilities
associated with Oroville Dam and Reservoir and the Feather River below Oroville Dam, as shown
on Map No. 1878-1 Revised December 1964.
Extension of Through December 31, 2015
Time:
Summa of Permit 16481 (Application 14445A
Sources: 1. Italian Slough tributary to Old River
2. Sacramento-San Joaquin Delta Channels tributary to Suisun Ba
Point of Delta Water Facilities within SW Y4 of NE%of Section 22, T6N, R4E, MDB&M
Diversion:
Points of 1. California Aqueduct Intake within NW Y4 of NE '/4 of projected Section 24, T1S, R3E, MDB&M
Diversion and 2. Clifton Court Forebay within NW Y4 of SE %of projected Section 20, T1 S, R4E, MDB&M
Rediversion: 3. Tracy Pumping Plant within SW%of SW'/4 of projected Section 31,_T1 S R4E, MDB&M
Points of 1. Del Valle Dam within NE'%of SW 1/4 of projected Section 3, T4S, R2E, MDB&M
Rediversion 2. San Luis Forebay Dam within NE'/4 of SW%of Section 1, T10S, R8E, MDB&M
3. San Luis Dam within SW'/4 of SE '/4 of projected Section 15,T1 OS, R8E, MDB&M
4. Cedar Springs Dam within S "/x of NE%of Section 32, T3N, R4W, SBB&M
5. Pyramid Dam within SW Y4 of NW %of Section 2, T6N, R1 8W, SBB&M
6. Perris Dam within N %of SE %of Section 4, T4S, R3W, SBB&M
7. Castaic Dam within N '/z of SW%of Section 18, T5N, R1 6W, SBB&M
Amounts and Direct Diversion: 2,115 cfs from January 1 through December 31 of each year
Season: Storage;44,000 afa collected from January 1 through December 31 of each year
Purposes of Irrigation, Domestic, Municipal, Industrial, Salinity Control, Recreational, Fish and Wildlife
Use: Enhancement, and Incidental Hydropower Generation
Places of 9,546,000 net acres within a gross area of 29,402,000 acres within the Service Area of the State
Use: Water Project as shown on Map Nos. 1878-1, 1878-2, and 1878-3, revised December 1964;
4,015 acres within Oak Flat Water District as shown on map dated January 2009; 466 net acres
within a gross area of 2,300 acres within Diablo Grande Project as show on map titled, "Western
Hill Water District"
Notice of Petitions for Time Extension for State Water Project Water Right Permits 5
California Department of Water Resources
Incidental Hydropower Generation at the following powerplants:
1. San Luis located within the NE'4 of NE %of projected Section 15, T10S, R8E, MDB&M
2. San Luis Obispo located within the SW%of NE %of Section 5, T31 S, R1 3E, MDB&M
3. Cottonwood located within the SE%of SE '/4 of projected Section 32, T9N, R17W, SBB&M
4. Pyramid located within the SE %of NE %of Section 21, T7N, R1 8W, SBB&M
5. Castaic located within the NE%of SE %of Section 22, T6N, R17W, SBB&M
6. Devil Canyon#1 located within the SW'/4 of NW%of Section 32, T2 N, R4W, SBB&M
7. Devil Canyon#2 located within the SW'/4 of SW%of projected Section 6, TIN, R4W,
SBB&M
8. Del Valle located within the SW%of NW Yi of projected Section 3, T4S, R2E, MDB&M
9. Mohave Siphon located within the NE Y4 of NE '4 of Section 32, T3N, R4W, SBB&M
Extension of Through December 31, 2015
Time:
Summary of Permit 16482 (Application 17512
Source: 1. Italian Slough tributary to Old River
2. Sacramento-San Joaquin Delta Channels tributary to Suisun Bay
3. San Luis Creek tributary to San Joaquin River
Point of Delta Water Facilities within SW%of NE 1/4 of Section 22, T6N, R4E, MDB&M
Diversion:
Points of 1. California Aqueduct intake within NW Y4 of NE '4 of projected Section 24, T1 S, R3E, MDB&M
Diversion and 2. Clifton Court Forebay within NW%of SE'/4 of projected Section 20, TIS, R4E, MDB&M
Rediversion: 3. Tracy Pumping Plant within SW%of SW 14 of projected Section 31, T1 S, R4E, MDB&M
4. San Luis Dam within SW'/4 of SE %of projected Section 15, T10S, R8E, MDB&M
Points of I. Del Valle Dam within NE%of SW%of projected Section 3, T4S, R2E, MDB&M
Rediversion 2. San Luis Forebay Dam within NE%of SW%4 of Section 1, T10S, R8E, MDB&M
3. Cedar Springs Dam within S '/z of NE %of Section 32, T3N, R4W, SBB&M
4.. Pyramid Dam within SW%4 of NW %4 of Section 2, T6N, R18W, SBB&M
5. Perris Dam within N "/z of SE %4 of Section 4, T4S, R3W, SBB&M
6. Castaic Dam within N %of SW%of Section 18 T5N, R1 6W, SBB&M
Amounts and Storage: 1,100,000 afa to be collected from January I to December 31 of each year
Season:
'Purposes of Irrigation, Domestic, Municipal, Industrial, Salinity Control, Recreational, Fish and Wildlife
Use: Enhancement, and Incidental Hydropower Generation
Places of 9,546,000 net acres within a gross area of 29,402,000 acres within the Service Area of the State
Use: Water Project as shown on Map,Nos. 1878-1, 1878-2, and 1878-3, revised December 1964;
4,015 acres within Oak Flat Water District as shown on map dated January 2009;'466 net.acres
within a gross area of 2,300 acres within Diablo Grande Project as show on map titled, "Western
Hill Water District"
Incidental Hydropower Generation at the following powerplants:
I. San Luis located within the NE %of NE %of projected Section 15, T10S, R8E, MDB&M
2. San Luis Obispo located within the SW'4 of NE%of Section 5,T31 S, R1 3E, MDB&M
3. Cottonwood located within the SE %of SE Y4 of projected Section 32, T9N, R17W, SBB&M
4. Pyramid located within the SE %of NE %of Section 21, T7N, R1 8W, SBB&M
5. Castaic located within the NE%of SE %of Section 22, T6N, R17W, SBB&M
6. Devil Canyon #1 located within the SW%of the NW %of Section 32, T2N, R4W, SBB&M
7. Devil Canyon#2 located within the SW'4 of SW'4 of projected Section 6, T1 n, R4W,
SBB&M
8. Del Valle located within the SW %of NW %of projected Section 3, T4S, R2E, MDB&M
9. Mohave Siphon located within the NE %of NE '4 of Section 32, T3N, R4W, SBB&M
Extension of -Through_December_31,201.5
Time: •
Notice of Petitions for Time Extension for State Water Project Water Right Permits 6
California Department of Water Resources
.Project description and documents, including the petitions, procedures for protesting and protest forms
are available at: hftp://www.waterboards.ca.gov/waterrights/. The contact person for this matter is Kate
Gaffney at(916).341-5360, or by e-mail at kgaffneyaawaterboards.ca.gov.
Protests most be received by the Division of Water Rights by 4:30 p.m. on September 20,2010.
A copy of the protest must also be sent to DWR at the address above.
Date of Notice: August 19,2010