Loading...
HomeMy WebLinkAboutSWRCB - Change Sheet #1 for Item 4 at December 19, 2017 Meeting Menchaca, Clarissa From: Bennett, Robin Sent: Tuesday, December 19, 2017 9:27 AM To: Menchaca, Clarissa Cc: Raevsky, Cathy; Gosselin, Paul Subject: FW: CHANGE SHEET#1 FOR ITEM 4 (MS4) - DECEMBER 19, 2017 BOARD MEETING Attachments: 121917-4-cs#1.pdf Importance: High Forwarding SWRCB December 19, 2017; agenda change sheet#1 for Item 4, Small Municipal Separate Storm Sewer Systems Storm Water clischarges...- From: lyris@swrcbl8.waterboards.ca.gov [ma!Ito:lyris@swrcbl8.waterboards.ca.gov]I Sent: Monday, December 18, 2017 6:26 PM To: Bennett, Robin <RBennett@buttecountynet> Subject: CHANGE SHEET#1 FOR ITEM 4(IMS4)- [DECEMBER 191, 2017 BOARD MEETING This is a message from the State Water Resources Control Board Attached is Change Sheet#1 for Item 4 at the December 19, 2017 Board Meeting. You are currently subscribed to regs_general as: rbennett@biuftecountV.net. To unsubscribe click here: leave-6591062- 5085298.f8efclfel463a520fef6bdOdcldlbOf4@swrcbl8.waterboards.ca.gov I 12/19/17 BD MEETING—ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) CHANGE SHEET#1 FOR THE ADOPTION HEARING OF AN ORDER AMENDING THE GENERAL PERMIT FOR STORM WATER DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS The following proposed changes are shown in underline [blue and strikeout [red]. Previous proposed revisions are shown in underline/strikeout [black]. Highlighting was removed for readability. FRONT PAGE This Order amends Order 2013-0001-DWQ and becomes effective duly 1; 2013January 1, on: 2019 ORDER The proposed revisions below mostly correct formatting errors in the draft released on December 7, 2017, or change the Effective Date (i.e., January 1, 2019) of the Boards Order to amend Order 2013-0001-DWQ. On page 5 of the revised Order, the following changes are proposed: E Z a:Attachment G contains a list of TMDL-specific, BMP-based water quality based effluent limitations (WQBELs) and other permit requirements, applicable to identified permittees, consistent with the assumptions and requirements of the al2plicable wasteload allocations of the TMDLs. E.15.b a. ,[...] Permittees shall comply f...] On page 6 of the revised Order, the following changes are proposed: 14Q Prior to the deadline to attain the final wasteload allocation,_a permittee is deemed in compliance with the requirement in Section C.1 to reduce the discharge of pollutants to achieve anplicable TMDL wasteload allocations if the permittee is timely implementing all BMP-based WQBELs and other requirements specified in Attachment G for that TMDL. The permittee may alternatively make a demonstration in accordance with section E.15.a.2 ii . below. 23(ii) On or after the deadline to attain the final wasteload allocation, a permittee is deemed in compliance with the requirement in Section C.1 to reduce the discharge of pollutants to achieve applicable TMDL wasteload allocations if the permittee meets one or more of the criteria in subsections(aj-& below. For purposes of this section only, the wasteload allocations specified in the applicable TMDLs (as fisted identified in the Fact Sheet) are incorporated by reference. (a) Receiving water monitoring and analysis f...l (b) Receiving water monitoring does not demonstrate f...] (c) Where the wasteload allocation is expressed as a concentration f...l (d) Where a mass-based wasteload has been allocated to an individual f...l 1 12/19/17 BD MEETING—ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) On page 7 of the revised Order, the following changes are proposed: fie) Where a wasteload allocation is expressed as the number of allowable f...l �f) The permittee demonstrates,_in a manner approved by the Regional f...l fig) The_permittee demonstrates the attainment of the wasteload f...l 3) iii Pursuant to Section D a permittee deemed in compliance with Section C.1 in accordance with subsections 1).and 2) of this section is also deemed in compliance with the Section_D_requirement to not cause or contribute to an exceedance of water aualitx standards for the specific pollutants and water bodies addressed. €4E.15.b. In some cases, Attachment G includes dates [...] On Page 8 of the revised Order, the following changes are proposed: 1)Q If the Regional Water Board Executive Officer makes a determination Where a final deadline to attain a wasteload allocation is past-and-the permittee has not demonstrated_compliance as specified in Section E.15.a.(ii). above, the permittee may seek a time schedule order pursuant to Water Code section 13300 from the Regional Water Board. f...l A request to the applicable Regional Water Board for a time schedule order shall include the following information: �a) Any available data demonstrating the current quality fib) A description and chronology of structural controls and f...1 �c) Justification of_the_need for additional time to achieve the requirements; fid) The specific actions the Permittee will take in order to meet f...l fie) A demonstration that the time schedule requested is as f...l On Page 9 of the revised Order, the following changes are proposed: 24ii It_is_not the intention of the State Water Board or the Regional Water Boards to bring an enforcement action for non-attainment of the wasteload allocation where: ka) A permittee is in compliance with a time schedule order's f...l fib) A permittee has in good faith requested a time schedule order f...l �c) A_Regional Water Board has initiated proceedings to revise f...1 i✓.1�E 15 c C3 The 1]!�] Ral_IAlater.Reards are diFeGted to rovnew [...]The State Water Board r���. May additienally revise this Orderf...1 On Page 10 of the revised Order, the following changes are proposed: E.15.d.The Permittee shall complete and report[...] 4-)a A description of BMPs implemented, including types, number, and locations 2-) ii All supplemental information and reports required under[...] 3- iii An assessment of the effectiveness of implemented BMPs [...] 4} ivI All monitoring data, including a statistical analysis of the data [...] 5)Lyj Based on results of the effectiveness assessment and monitoring[...] 2 12/19/17 BD MEETING— ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) On Page 7 9 of the revised Order, the following changes are proposed: 1=-5 0 F.5.i.1}_ [...] Attachment G contains a list of TMDL-specific[...] Permi#ees shall Permittees shall comply with the requirement in Section C.1.16 Feaworempmt to reduce the discharge of pollutants [...] a-}Q Prior to the deadline to attain the final wasteload allocation, a permittee is deemed in compliance with the requirement in Section C.1 to reduce the dischatqeof pollutants to achieve applicable TMDL wasteload allocations, if the permittee is timely implementing all BMP-based WQBELs and other requirements specified in Attachment G for that TMDL. The permittee may alternatively make a demonstration in accordance with section F.5.i.1j�)(ii) below. b) ii On or after the deadline to attain the final wasteload allocation, a permittee is deemed in compliance with the requirement in Section CA to reduce the discharge of pollutants to achieve applicable TMDL. wasteload allocations if the permittee meets one or more of the criteria in subsections+)-v+i-}(a)-(g) below. For purposes of this section only, the wasteload allocations specified in the applicable TMDLs_(as4iste4 identified in the Fact Sheet) are incorporated by reference. On page 12 of the revised Order, the following changes are proposed: i)(a) Receiving water monitorinq and analysis b_ the permittee +�Lb) Receiving water monitoring does not demonstrate attainment 4Lcj Where the wasteload allocation is expressed as a concentration [...] iv}j�j Where a mass-based wasteload has been allocated to an individual r...l -?Lej Where a wasteload allocation is expressed as the number of v4M The permittee demonstrates, in a manner approved by the Regional [...] v4)& The permittee demonstrates the attainment of the wasteload r...l On page 13 of the revised Order, the following changes are proposed: s} iii Pursuant to Section D, a permittee deemed in compliance with r...l ��nno roevir.�rn.�nfn are -an Ie nmmpn Re nt of thio Ord or €.W.2F.5.i.2.} In some cases, dates are giv Attachment G includes dates that fall outside[...] a-}fi L If the Regional Water Board Executive Officer makes a determination f...l Where a final deadline to attain a wasteload allocation is past and the permittee has not demonstrated compliance as specified in Section F.5.i.1}.bii above, the permittee may seek a time schedule order pursuant to Water Code section 13300 from the Regional Water Board. r...l On page 14 of the revised Order, the following changes are proposed: A request to the applicable Regional Water Board for a time schedule order shall include the following information: i}I Any available data demonstrating the currentquality, the MS4_f...I ii)LbI A description and chronology of structural controls and source [..-1 44Lgj Justification of the need for additional time to achieve the re uirements- iv}tM The specific actions the Permittee will take in order to meet the TMDL r...1 3 12/19/17 BD MEETING— ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) v} I A_demonstration that the time schedule requested is as short C...1 -b-) ii It is not the intention of the State Water Board or the Regional Water Boards to bring an enforcement action for non-attainment of the wasteload allocation where: 4Laj A permittee is in compliance with a time schedule order's implementation r...l i4ttbl A permittee has in good faith requested a time schedule order from r...1 ii)Lcj A Regional Water Board has initiated proceedings to revise the .. On page 15 of the revised Order, the following changes are proposed. 1=5 4 2 F.5.1.3.4 The Regmenal VVateF l3GaFds aFe diFeGted to Feym ...]The State Water Board may fly revise this Order[...] F.5.i.4.�The Permittee shall complete and have available a report that includes the status j...] a-)Q A description of BMPs implemented, including types, number, and locations b) ii All supplemental information and reports required under the specific TMDL implementation re uirements in Attachment G On page 16 of the revised Order, the following changes are proposed: c,) iii An assessment of the effectiveness of implemented BMPs in j...] d4fjyj All monitoring data, including a statistical analysis of the data to assess progress towards attainment of wasteload allocations within the TMDLs' specified timeframes e) vj Based on results of the effectiveness assessment and monitoring, a description of the additional BMPs that will be implemented to attain wasteload allocations within the TMDLs/specified timeframes FACT SHEET The following revisions reflect the proposed new Effective Date (i.e., January 1, 2019) of the Boards Order to amend Order 2013-0001-DWQ. On Page 55: Attachment G incorporates the final attainmenteGmekiwe deadlines for each TMDL: some TMDL attainment deadlines are now past. In these instances the associated wasteload allocations are effective�y-on the effective date of the Order, i.e. Jud January 1, 20199. r...I The State Water Board delayed the effective date of the Order to 4gly Janua 1 2019 s�x meRft one year following adoption, to allow permittees j...] On Page 59: Attachment G of this Order requires the City to develop a plan +„ GQR491andlep oFeyent im lement this plan no later than July January 1, 20197. r...1 4 12/19/17 BD MEETING- ITEM#4 CHANGE SHEET#1 (CIRCULATED 12/18/17) On Page 102: "Wasteload Allocations (WLA): The Federal Correctional Institution Terminal Island, Community Corrections Management Long Beach, and California State University Dominguez Hills, are assigned the following (receiving water) wasteload allocations:[...]" ATTACHMENT G The following revisions reflect the proposed new Effective Date (i.e., January 1, 2019) of the Boards Order to amend Order 2013-0001-DWQ. Page 2, Shasta River Watershed, Temperature & Dissolved Oxygen TMDL The City of Yreka developed a Plan to minimize, [...] No later than of the Phase 11 Small AACA General Pe—it 10N1�-01$January 1, 2019, the City of Yreka shall begin implementing the Plan. Page 3, Napa River, Sediment TMDL B. Implementation of Sediment Load Allocations ILAs} i. To attain the shared load allocation of 27,000 metric tons/year, [...] Specifically, to reduce road-related erosion and protect stream-riparian habitat conditions, the . ..)al Napa County shall by September 30 7n17j- �I- 2-04-4January 1, 2019: • Develo B fLJorrl flo4o nno ,four frnm �rinr,tinn rlo�e] Defies )e '2Jul 1 p..p..i'�crr�.vcw-c�. vrn..��.u--r�o,-nTrcrvpz,-vr-rcrctx..�Qcocrrtacr-c, 20198 submit a schedule [...] Page 4-5, Sonoma Creek Sediment TMDL B. Implementation of Sediment Load Allocations I. To attain the shared load allocation of 2,100 tons/year, [...]To reduce road- related erosion and protect stream-riparian habitat conditions, the municipalities shall implement b d- Janua 1 2019 the followin actions: • OevelepB esemlaer,-�vJul 1 2019 submit a f...t Page 6, Napa River Pathogens TMDL Requirements for Implementing the NapayiyeF PAID o^c TMDL Meeie1pa4#e-,-The Phase 11 entities identified in this TMDL section shall implement the following action e#eGt0ye irr,rnedjn4_1 . ,July 1,2111 January 1, 2019, 5 12/19/17 BD MEETING—ITEM #4 CHANGE SHEET#1 (CIRCULATED 12118117) Page 7-8, Sonoma Creek Pathogens TMDL Requirements for Implementing the SOnOMa GFeek Pathege MDL-Wa-atwlead Afleca#lews The Phase ll entities identified in this TMDL section MuRiGipa4ties shall implement the following actions, of erti ,,�by July , 291 gJanuary 1, 2019., within 18 months of ne-.rw i+ adeptieR= Page 9, Tomales Bay Pathogens TMDL Requirements for Implementing the Temales Bay Pathe..nTMDL Wastelead dens The Phase II entities identified in this TMDL section M4Ra r,ipa,„�shall implement the following actions. by I,�I�, ,y --20�January 1, 2019:, within l Q Fnen+ho of r.orw.i+ Page 10, Richardson Bay Pathogens TMDL Requirements for Implementing the TMDL Wastelead AI lesatler+s The Phase II entities identified in this TMDL section iGi�s shall implement the following actions, WeGtiye ;.,,mediately by July ..,_.2g-'lgJanuary 1, 2019:, within 18 FRenthn of r.ormi+ Page 14-16, Morro Bay and Chorro and Los Osos Creeks Pathogens TMDL sisiensReguirements for Implementing the TMDL B X January 1 2019, the Phase II entities identified in this TMDL section[...] 9. If the approved TMDL does not explicitly[...] Where TMDL attainmenteaffig anf?e schedules have passed, but Wasteload Allocations have not been achieved b adepti„n,nono�oJanuary 1, 20197, the MS4 shall f...1 At least one interim target and date must occur during the first-five years terim of this gFdeFcommencingon Bec�mbe� BJanuary 1, 20187. [...] .A.11 afln-r.afiens- shall -he aGhieved by November 19, 204 3. The 19, 2043, nn.-7 are effen+iaa immorlin}oh. By Iiltf January 1, 20198, the permittees shall demonstrate_attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. 6 12/19117 BD MEETING—ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) Page 16-17, Watsonville Slough Pathogen TMDL EffeGfive By ju January 1, 20198, the Phase II entities identified in this TMDL section[...] 9. If the approved TMDL does not explicitly[...] Where TMDL attainment schedules have passed, but Wasteload Allocations have not been achieved by FHaFd Date date of January 1, 20197, the MS4 shall r...l At least one interim target and _term of this n�ao� no T ate must occur during e ive years ears commencingon 3January 1, 20197. [...] ORB WeFG FW— -rh*eyed by Navembw 19, are e#est+ve Ady January 1, 20198, the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.511.b. of this Order. Pages 18-20, Pajaro River, et al, Fecal Coliform TMDL ReguirementsProWsions for Implementing the TMDL Gffon+'%ie4 mmg46- @!yBy dj�yJanua,ry 1, 20198, Within „no yeaF of adoption of this QFder the Phase II entities identified in this TMDL sectionr...1 9. If the approved TMDL does not explicitly[...] At least one interim target and date must occur during the first-five years tem of this C44ernommenc ng on 9ecem ier-3January 1, 20197. [...] Pages 21-23, Morro Bay, Sediment TMDL ReguirementsProvisions for Implementing the TMDL Cffen+i,.e imme�rlir+��,.gy JutyJanuary 1, 20198,Tthe County of San Luis Obispo shall implement practices [...] &9. If the approved TMDL does not explicitly [...]At least one interim target and date must occur during the first five-years commencing on13eF09d --'b—,'DerembeF 3January 1, 2019244T whichever is sooner. [...] Pages 23-25, San Lorenzo River, Sediment TMDL ReguirementsPFGVisieAS for Implementing the TMDL Cffon+i,•o immardin+ola•gyJuN January 1, 20198, Tthe Phase II entities identified in this TMDL section[...] 8-9. If the approved TMDL does not explicitly [...]At least one interim target and date-must occur during the first five-years commencing on January 1, 2019244-7, whichever is sooner. [...] Pages 27-29, San Luis Obispo Creek, Pathogen TMDL Re uirg_ ements1 r-e s for Implementing the TMDL [...l Cf+an+iva immodia+ol..gy J41yjanuary 1, 20198, the Phase II entities identified in this TMDL section[...] 7 12119117 BD MEETING —ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) 4-9. if the approved TMDL does not explicitly [...]Where TMDL attainment e schedules have passed, but Wasteload Allocations have not been achieved by FHaFd Da of er-gJanuary 1. 20191-7, the MS4 shall consult with the Regional Water Board to establish dates to meet new interim targets and to achieve wasteload allocations. At least one interim target and date must occur during the first five-years torn^ of this order commencing onetee;3January 1, 201192447. [...] By JulyJanuary.1, 20198, the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.1 5.a.2. or F.5.i.1.b. of this Order. Pages 29-30, San Luis Obispo Creek, Nitrate-Nitrogen TMDL ReguirementsRFevisions for Implementing the TMDL By 4g-ly January 1, 20199,-T-the Phase 11 entities identified in this TMDL section[...] Fefer-enGe is,�T-he aur-allesateRsare therefere e#es i e-i iiatol Bid lyJanuary 1, 20198, the permittees shall demonstrate attainment of the TMDL WLA_as_specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 30-32, Corralitos and Salsipuedes Creeks, Fecal Coliform TMDL _Reg uirementsPr^• s for Implementing the TMDL Cffen+i.re immediately rv.edia+ehr gyJay January 1, 20199, ithin one hear ef_adeptiep Af thir. ..rrinr, the County of Santa Cruz and the City of Watsonville (hereafter referred to in this TMDL section as MS4) shall each develep, submit, and beginimplement a Wasteload Allocation Attainment Program that identifies the actions they will take to attain their wasteload allocations. B rlenemher �Janua 1 20194-8 the Santa rr�.vurrrvuiz Cruz County Fairgrounds (hereafter referred to in this TMDL section as"the MS4")shall develop, submit, and begin implementation of a Wasteload Allocation Attainment _Program that identifies the actions they will take to attain their waste load allocations. The Wasteload Allocation Attainment Programs shall include: [...] 8:9. If the approved TMDL does not explicitly[...]At least one interim target and date must occur during the first five-yearseeried-GF-by commencing onDesember�January 1. 20192447-, whichever is sooner. [...] Pages 32-34, Lower Salinas River Watershed, Fecal Coliform TMDL ReguirementsPro for Implementing the TMDL Effe i re immediately By Ju4y January 1, 20199, uVithin one year of adoption „f thic QF69F�the County of Monterey hereafter referred to in this TMDL section as "the MS4")[...] 9. If the approved TMDL does not explicitly [...]At least one interim target and date must occur during the first five-years ommencin on Qese iber-3Janua 1 201924.4-7. 12/19/17 BD MEETING—ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118/17) Pages 34-36, San Lorenzo River Estuary, et al, Pathogens TMDL 1FevisiemReguirements for Implementing the TMDL E#an+,. a '-FnF ed;ate! By January 1, 20199, By 'uRe 3g 2013, the Phase 11 entities identified in this TMDL section[...] 4-.9. If the approved TMDL does not explicitly [...]At least one interim target and date must occur during the first five-years geriod- comrnencing on 9eGe;:Rber-3January 1, 2019244:7. [...] Pages 36-38, Soquel Lagoon, Soquel Creek and Noble Gulch, Pathogens TMDL PFOMOSieflsReauirements for Implementing the TMDL C#nn+,ve ;mmediatelyBy Juty January 1, 20198, '!" june 30 2013, the Phase li entities identified in this TMDL section[...] 9-.9. If the approved TMDL does not explicitly [...]At least one interim target and date must occur during the first five-years commencin on Deeember-3Janua 1 201941-7. [...] Pages 39-41, Aptos Creek, Valencia Creek and Trout Gulch, Pathogens TMDL PswisiGnsReauirements for Implementing the TMDL arfh.a km.Y, iato'„By 4gly January 1, 20198, By dune 30, 2G4-3—, the County of Santa Cruz (hereafter referred to in this TMDL section as"the MS4") [...] 8:9. If the approved TMDL does not explicitly[...]At least one interim tar et and date must occur during the first five-years pff424:ff:�Wommencina on egembe 3January 1, 2019244-7. I...] Pages 41-42, Santa Maria River Watershed, Fecal Indicator Bacteria TMDL Requirements for Implementing the TMDL By Iy January 1, 20198, the Phase II entities identified in this TMDL section (hereafter referred to in this TMDL_section _as"the_MS4")[...1 9. The MS4 shall establish interim targets [...] At least one interim target and date must occur during the first five-years peFied 9F b commencing on QeoerA6.ar_-3JanuarV 1, 20192117, whichever is sooner. Page 43-44, Lower Santa Maria River Watershed and Tributaries to Oso Flaco Lake, Nitrogen Compounds and Orthophosphate TMDL Re uirements for Implementing the TMDL By [Hard I'lnte• fnur mnnFhn frnm .,dnr,t,nr., �January 1, 20198, the Phase 11 entities identified in this TMDL section (hereafter referred to in this TMDL section as"the MS4") j...l Pages 45-46, Lower Salinas River and Reclamation Canal Basin and the Moro Cojo Slough Subwatershed, Nitrogen Compounds and Orthophosphate TMDL Requirements for Implementing the TMDL B u Janua 1 20198 the County of Monterey (hereafter referred to in this TMDL section as"the MS41 f...l 9 12119117 BD MEETING—ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) Pages 46-48, Santa Maria River Watershed, Toxicity and Pesticides TMDL Re uirements for Implementing the TMDL B Janua 1 20198 the Phase II entities identified in this TMDL section hereafter referred to in this TMDL section as"the MS4" Page 49-50, Santa Monica Bay Beaches, Bacteria TMDL Requirements for Implementing the TMDL: I...] 1. Enter in a cooperative agreement with Phase I MS4 Permittees Such notification shall be provided by January 1, 20198, and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalizedq nn it amendmer#s by Besember-3Jul 1 20194-8 and shall be submitted to the Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). L..1 The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval b ber-3Jul 1 20194-8. [...l Anrll 1 —g2j2!2 ff 3,LBy J�January 1, 20198, the permittees shall demonstrate attainment of the summer period Dry Weather WLA as specified in Section E.1 5.a.2. or_F.5.i.1.b. of this Order. November 1, 2009 (to aGhieve dry +her,.a telead alle Gatiens dt irinq the Wi per�nrl f em Npu T1.1aF+ �-.—By 464Y January 1, 20198, the permittees shall demonstrate attainment of the winter period Dry Weather WLA as specified in Section_E.15.a.2. or i=.5.i.1.b. of this Order. r...1 Pages 51-52, Los Angeles River, Nitrogen and Related Effects TMDL Requirements for Implementina the TMDL: I. •] 1. Enter in a cooperative agreement with Phase I MS4 Permittees, Such notification shall be provided b Janua 1 20198 and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized its by Oecember-BJuly 1, 20194$, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...l The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer a royal b eeemiier-3Jul 1 2019-1-8. 10 12/19/17 BD MEETING —ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) 23 2004 Tho .g Ilnnn}innn are}heFefeFe eff'nn}iye imme..di..}e.i.. y li.l.r ry 20198, the anus permittees shall demonstrate attainment of the TMDL WLA as specified in Section E • 15.a.2. or F.5.i.1.b. of this Order. Pages 52-53, Los Angeles Harbor, Bacteria TMDL ,, Requirements orImplementing the TMDL: I 1. Enter in a cooperative agreement with Phase I MS4 Permittees, f...I Such notification shall be Provided b January 1, 20198, and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized wothiR one Yew of adogtoeR-Of these peRmOt _bv ®eser-rber-3July 1, 20194-8, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization, or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...) The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by [HaFd DAte: 12 menthe.frnm adep}innl )eGemhei-July 1, 20194-8, 1. •1 The wastele-ad- in the FaGt Sheet of this Qpdpp ;;i;p iReeFpeFated 10, 2041L•T-he_ellenn}innc are+herefore e#eGtmye immerli.}elB rLl rrl I►.}e. Cffen+i.in In}nl 1,rl( , January 1, 20198, the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 53-54, Calleguas Creek Watershed, Toxicity TMDL Requirements for Implementing the TMDL: I. 'l 1. Enter in a cooperative agreement with Phase I MS4 Permittees, f...I Such notification_shall be provided by January 1, 20198, and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized„,,..,.,,.,.... amendme4#6 by npeGen4ber--3July 1_, 20194-9, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...l The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by FHaFd Qatei 122 mpepths free adeptoe Rl nese:nbe-r-July 1, 20194-8. 11 12119/17 BD MEETING -ITEM #4 CHANGE SHEET#1 (CIRCULATED 12118117) The aller-zatiwir,- the F=;-;Q-t Sheet 4- tbis Order are iAGGFp9Fat8d by 24 2099 Tha alksagfigens, oro theFefore effective immediate y Ry JuJanuaN 1, 2019d,_the. permittees shall demonstrate attainment of the TMDL WLA ass ecified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 54-55, Calleguas Creek, Organochlorine Pesticides, Polychlorinated Biphenyls, and Siltation TMDL Requirements for Implementing the TMDL: I...1 1. Enter in a cooperative agreement with Phase I MS4 Permittees, r...I Such notification shall be provided b Janua 1 20198 and shall identify the Phase I MS4 Permittees and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized withom one year of adoption ef these ppirmllot its by,Desembe-�3July 1, 20194-8, and shall-b_e submitted to the Los Angeles Regional Water Board Executive Officer_upon_finalization. or alternatively, 2. Propose a program plan for attaining_the_wasteload allocation(s). r...I The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by tHaFd Date: 12 months frem_acfop ieRMecember-' July 1, 20194-8. Pages 56-57, Calleguas Creek, Metals and Selenium TMDL Requirements for Implementing the TMDL: [...l 1. Enter in a cooperative agreement with Phase I MS4 Permittees Such notification shall be provided b Janua 1 20198 and shall identify the Phase I MS4 Permittees and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized • its by Oesernber-3July 1, 20194-8, and shall be submitted to the Regional Water Board Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...I The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval b er-gJul 1 2019 . Pages 57-58, Ballona Creek, Bacteria TMDL Requirements for Implementing the TMDL: I-] 1. Enter in a cooperative agreement with Phase I MS4 Permittees, f...1 Such notification shall be provided b Janua 1 20198 and shall identify the Phase I MS4 Permittees and the WMP or EWMP that the Permittee intends to-participate in. The cooperative agreement shall be finalized a mearr'rcndmrsepAs by Desember-3July 1, 2019-18, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively, 12 12/19/17 BD MEETING-ITEM#4 CHANGE SHEET#1 (CIRCULATED 12/18117) 2. Propose a program plan for attaining the wasteload allocation(s). f...I The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by mbeFZJuly 1, 20194-8. 1...] aGh'eved by APF01 27, B Ju Janua 1 20196 the permittees shall demonstrate[...] Pages 58-59, Santa Monica Bay, Marine Debris TMDL Requirements for Implementing the TMDL: By my January 1, 20196, the Department of Parks and Recreation (at Point Dume State Beach and Robert H. Meyer Memorial State Beach) f...1 shall be aGhmeyed bY MaFGh 20. 294-7-.By JgN January 1, 20196, the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 60-61, Los Angeles and Long Beach Harbors, Toxics and Metals TMDL Requirements for Implementing the TMDL: I...] 1. Enter in a cooperative agreement with Phase I MS4 Permittees, f...1 Such notification shall be provided by THaFd Dat":6 Months free; a deptkH; '6 1Y.January 1_,_20196, and shall identify, the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized w ith'R GR8 Yew Gf ade t*eR of there oFn,;t amo ;& by Desember-3July 1, 2019-1-8, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...l The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval b July 1 20194-8. Pages 61-62, Los Angeles River, Bacteria TMDL Requirements for Implementing the TMDL: I...] 1. Enter in a cooperative agreement with Phase I MS4 Permittees ... Such notification shall be provided by January 1, 20198, and shall identify the Phase I MS4 Permittee(s) and the WMP or_EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized amendments by 9eGepbef--3July 1, 20194-9, and shall be submitted to the Los Angeles Re ional Water Board Executive Officer upon finalization. or alternatively. 2. Propose a program plan for attaining the wasteload allocation(s). i...1 13 12/19/17 BD MEETING- ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) The Program Plan must be submitted for Los An eles Regional Water Board Executive Officer approval by July 1, 201949. Pages 64-65, Los Angeles River and Tributaries, Metals TMDL Requirements for Implementinq the TMDL: 1-1 1. Enter in a cooperative agreement with Phase I MS4 Permittees,_f...I Such notification shall be orovided b Janua 1 20198 and shall identify the Phase I MS4 Permittees and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized ,n^o ;ts by 0eGember-3july„1, 2019U, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively. 2. Propose a program plan for attaining the wasteload allocation(s). f...t The Program Plan must be submitted for Los Angeles Re ional Water Board Executive Officer approval b e;44be july 1 20194-8. Pages 6566, Ballona Creek, Metals TMDL Requirements for Implementing the TMDL: I...I 1. Enter in a cooperative agreement with Phase I MS4 Permittees, f...l Such notification shall be provided by January 1, 20199, and shall identify the Phase I MS4 Permittees and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized aW,o t-s by OeseRibeF3July 1, 20194-8, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...1 The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval b r--3Ju ly 1 20194-8. I-] B 11. 2016 J41yJanua 1. 20198, the permittees shall demonstrate[...I Pages 66-67, San Gabriel River and Impaired Tributaries, Metals and Selenium TMDL Requirements for Implementing_the TMDL: [...I 1. Enter in a cooperative agreement with Phase I MS4 Permittees, [...] Such notification shall be provided by 40M January 1, 20198, and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized bV Decexber-3Jul 1 201948 and shall be submitted to the Los An eles Regional Water Board Executive Officer upon finalization. or alternatively, 14 12/19/17 BD MEETING-- ITEM 94 CHANGE SHEET#1 (CIRCULATED 12118117) 2. Propose a program plan for attaining the wasteload allocation(s). The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by Qe-G eT3July 1, 20194-8. Pages 67-68, San Gabriel River and Impaired Tributaries, Indicator Bacteria TMDL Requirements for Implementing the TMDL: [..•l 1. Enter in a cooperative agreement with Phase I MS4 Permittees Such notification shall be provided by 4gly January 1 20198 and shall identify the Phase 1 MS4 Permittees and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized by December-3J& 1, 20194-8, and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization_. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). f...1 The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by_Desenaber-3July 1,_20194-€3. Pages 68-69, Los Cerritos Channel, Metals TMDL Re uirements for Implementing the TMDL: [...I 1. Enter in a cooperative agreement with Phase I MS4 Permittees, f...1 Such notification shall be provided b Janua 1 20198 and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends_toparticipate in. The cooperative agreement shall be finalized amendments by PeGembef-3july 1 2019448 and shall be submitted to the Los Angeles Regional Water Board Executive Officer upon finalization. or alternatively, 2. Propose a program plan for attaining the wasteload allocation(s). r.. The Program Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval by er-3Juiy. 1-201 Pages 70-71, Ballona Creek Estuary, Toxic Pollutants TMDL Requirements for Implementing the TMDL: I...) 1. Enter ina cooperative agreement with Phase I MS4 Permittees, f...1 Such notification shall be provided by;Warms' Qate. A- Men+hr Uepn "dent;GRI J41y January 1, 20198, and shall identify the Phase I MS4 Permittee(s) and the WMP or EWMP that the Permittee intends to participate in. The cooperative agreement shall be finalized w;th;n one year of adept'an of these PeFWA amendments by Qege 3July 1, 20194-9, and shall be submitted to the Los_Angeles Regional Water Board Executive Officer upon finalization. or alternatively. 2. Propose a program plan for attaining the wasteload allocation(s). r...1 The Prop by Plan must be submitted for Los Angeles Regional Water Board Executive Officer approval ']Y rle+e. 1'2 mnn+hc frem adepti n] Decembe -3july 1, 201.7n4-8. 15 12/19/17 BD MEETING — ITEM #4 CHANGE SHEET#1 (CIRCULATED 12118117) Pages 71-72, Ballona Creel, Trash TMDL Requirements for Implementing the TMDL: [...] An alternative attainment approach to implementing either 1 a Full Capture System or 2) partial capture devices and the application of institutional controls must be submitted for approval by the Los Angeles Regional Water Board Executive Officer._By_;HaFd Date:1vear 49m adeotmen! July 1, 20194-8, MS4Pe_rmittees f...1 a a-g-hieved by September 20 7Q1 E The alienations are therefore effentive ;mp ediatelti .BV .Ly January 1, 20198, the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 72-73, Los Angeles River, Trash TMDL Requirements for Implementing the TMDL: [...] An alternative attainmentq2ffipEgffe approach to implementing either 1) a Full_Cap ture System or 2) partial capture devices and the application of institutional controls must be submitted for approval by the Los Angeles Regional Water Board Executive Officer. B frem adeptienl DeGemher 3July 1, 20194-8, MS4 Permittees [_] (09A of baselead dosGhgf@lgAj:ff:g to be ieYed by Se ntervm her 30 201 Q Tho a 11enat1nni.c_.ar.e th err.fere effnn i Y e inyP&K16-Aelyr-By.J�ty January 1, 20199, the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Page 73, Ventura River Estuary, Trash TMDL Requirements for Implementing the TMDL: [• •] The imastelp-ad allerOatiens the Rap-t Sheet of this Order ;4rp 6, 2016. The ampe Aefffen-five By J41v January 1 20198 the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages74-77, San Joaquin River, Diazinon & Chlorpyrifos TMDL Provisions-Requirements for ilmplementing the mel PFOgfaMTMDL and Monitoring Requirements: The Phase II entities identified in this TMDL section hereinafter referred to as Permittees in this TMDL section) shall implement the following actions, effective immediately by JUN January 1 20198: 1.a. Conduct an assessment: By gea✓3July_ 1, 20204-9,the Permittees shall complete and submit to the Central Valley Regional Water Board Executive Officer [...I GOeGB 2010. rI Janua 1 20198 the permittees shall 16 12/19/17 BD MEETING— ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) demonstrate_ _attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. ,.,.,..__ Pages 77-81, Sacramento and San Joaquin Delta, Diazinon and Chlorpyrifos TMDL PFOViSen^6 mentS for Monitoring and+Implementing the r^^#�-e TMDL: �rsequ�re......._ The Phase II entities identified in this TMDL section (hereinafter referred to as Permittees in this TMDL section) shall_implement the following actions, effegfive by 4Wy January 1, 20198: 1.a. Conduct an assessment: BvTHaFd gate• Gnetwo , eaF from effeG iye date DnGember 'July 4G 4 �4�..Z-0 1 20204-9 the Permittees shall complete and submit to the Central Valley Regional Water Board Executive Officer [...] The wastelead alleGafians identified in the FaGt Sheet of this-0 wpr ;;PR aGhieve"By Ja uary 1 20198 the permittees shall demonstrate attainment of the TMDL WLA asspecified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 82-86, Sacramento and Feather Rivers, Diazinon and Chlorpyrifos TMDL "r-^• s-Requirements for Monitoring and Implementing the TMDL: The Phase II entities identified in this TMDL section (hereinafter referred to as Permittees in this TMDL section) shall_implement the following actions, effeetive O by 4g4y January 1, 20198: 1.a. Conduct an assessment: B BeGe-mbe"Jul 1, 20204-9,the Permittees shall complete and submit to the Central Valley Regional Water Board Executive Officer [...] BI-lonomhor 2- 1 , Janua 1 20198 the permittees shall demonstrate attainment of the TMDL WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 86-89, Lower San Joaquin River, San Joaquin River, Stockton Deep Water Ship Channel, Organic Enrichment and Low Dissolved Oxygen TMDL P risiews Reguirements for Implementing the GGRt"^' l2FGgfa TMDL: Monitoring Provisions: 1. By [HaFd Date; ane year from the e-.ffnntiye h,#el L January 1, 20201-9 "�eeRawai parmi#ees .mac iAan#ifiAd w0thin the {-len in nntinn !-`ritnri-. I ] .. [...] he-aG44ve"By DesernbeF3;-29 January 1 20198 the permittees shall demonstrate attainment of the TMDL_WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order. Pages 94-96, Clear Lake, Nutrients TMDL n..^.�-rvViSio -Requirements for Implementing the GGRtFQI PFGgfamLMDL: 17 12/19/17 BD MEETING —ITEM#4 CHANGE SHEET#1 (CIRCULATED 12118117) Monitorina Provisions: 1 By TFHaFd gate• 6 months from the effep-Am e datm- ber-3July 1, 20194-8, each Permittee shall incorporate individual monitoring f...1 [...] B JanuarV 1 20198 the permittees shall demonstrate attainment of the TMDL WLA asspecified in Section E.15.a.2. or F.5.0.b. of this_Order. ... Page 99, San Diego Creek, Upper and Lower Newport Bay, Organochlorine Compounds TMDL Requirements for Implementing the TMDL_ : 1. Per the Small MS4[._1 Therefore the Permittees must initiate consultation with Regional Water Board staff b Date; 1 men+h from effootiye dato,oM i,g February 1, 20198 to determine thef...1 2. As a result f...1 the Permittees shall submit their final TMDL Attainment g6MI + wce-Pian by _._nuq4st_February 1, 2020-1,9(...1 Pages 100-101, Middle Santa Ana River, Bacterial Indicator TMDL Requirements for Implementing the TMDL: I—] 1. Monitoring Program: B January 1 20198 submit for approval by the Regional Water Board [_] 2 By FHaFd Date- a moths from adeptie J-JWy January 1, 201.98, either a) develop a facility_ specific f...1 [...] The wastelead al!GGatienG identified On the PaGt Sheet of this Order aFe iRGGFPGFated by By 9esembeF 31,2015.44v January 1, 20198, the permittees shall demonstrate attainment of the Dry Weather WLA as specified in Section E.15.a.2. or F.5.i.1.b. of this Order.[...] Pages104-106, Twenty Beaches and Creeks in San Diego Region, Indicator Bacteria TMDL Requirements for Implementing_the Bacteria Proiect I —Twenty Beaches and Creeks TMDL I...] 2. B sen4bef-Jul 1 20194-8 monitor dischar es from their facilities F.. Pages 106-107, Los Penasquitos Lagoon, Sediment TMDL Requirements for Implementing the TMDL: I—] 1. Develop and implement f...IThe SWPPP must be updated b Jul 1 20194-8 with any additional BMPs 2, By March 1. 20194 monitor sediment discharges from their facilities r.. 18