Loading...
HomeMy WebLinkAboutT22N_R3E_13-020CORNER RECORD Agencylndex 722N. '23C. Document Number I .Z -20 City of PARADISE County of BUTTE , California Brief Legal Description LOT 29 OF THE WHISPERING PINES SUBD. UNIT #3 38 MAPS 98 CORNERTYPE ❑ Government Corner ❑ Control ❑ Meander ❑X Property ❑ Rancho ❑ Other Date of Survey N. Elevation COORDINATES (Optional) E. Units ❑ Metric ❑X U.S. Survey Foot Horizontal Datum Zone Epoch Date July 30, 2019 Vertical Datum Complies with Public Resources Code §§8801-8819 ❑ Complies with Public Resources Code §§8890-8902 PLS Act Ref.: 0 8765(d) ❑ 8771 ❑ 8773 ❑ Other: Corner/ ❑ Left as found Monument: Found and tagged ❑ Established ❑X Reestablished Rebuilt Referenced ❑ Pre -Construction ❑ Post -Construction Narrative of corner identified and monument as found, set, reset, replaced, or removed: O✓ See sheet #2 for description(s): 2 MONUMENTS OF THE SOUTH LINE OF LOT 29 WHERE MISSING, REESTABLISHED WITH 18" REBAR WITH 1 1/2" ALUM. CAP MARKED DOMINICK LS 5110. SURVEYOR'S STATEMENT This Comer Record was prepared by me or under my direction in conformance with the Professional Land Signed on / P.L.S. eFl}.££. No. 5// 0 COUNTY SURVEYOR'S STATEMENT This Corner Record was received 14. 2614 and examined and filed /' Signedd /y�,6�Q� � P.L.S. or R.C.E. No. 90 716 Title 4�_144 41y/JGta,,D P— County Surveyor's Comment DO46\, r�. O � LS5110 j�\JNN0 SUAY\ p O� WILLIAM H. SAIDGNELL * No. d' 9r FOR CAL�F� BPELSG-2016 Page 10f2 ': -Zo LOT 31 �1 000//�^` LOT 28 10' P.U.E. H LOT 30 1 S89031'14"W(R) 'r 143.04' 142.93'(R) / 20' BUILDING SETBACK LINE L=68.04'(R) R=50.00'(R) \ D=77"57'58"(R) \\ \j � 1 g9 34' ''� 13"75�28'25E�Ri I /r/N�5o2822 I � � I LOT 24 I II I i WHISPERING PINES SUBD. UNIT NO. 3 LEGEND O SET 5/8" REBAR W/1 1/2" ALUM. CAP MKD. "DOMINICK-L.S. 5110" O FOUND 3/4" IRON PIPE L.S. 2843 PER 38 MAPS 39 (R) RECORD DATA PER 38 MAPS 98 LOT 29 g3.12' �1 —��52a82' LOT 23 LS5110 /i/S/19 1"=50' DOMINICK'S CIVIL ENGINEERING AND SURVEYING P.O. BOX 1216 RED BLUFF, CA. 96080 530-529-3560 AUGUST 2019 BPELSG-2018 Page 2o/2