HomeMy WebLinkAboutFAI CF Fire Pump Report 12_2019Durhamily . PUMP
2313 Durham -Dayton Hwy.
Durham, CA 95938 530.891.4821
PUMP CHECK REPORT
CSA #128 - Wildflower Estates
CUSTOMER NAME: Butte County Fire Dept. DATE:
12/13/2019
Motor Mfg: Franklin HP: 25 Meter #: 1006873268
RPM 3450 Volts 240 Phase 3
Rated Amps: 60
TM80E—]YesF—]No Serial#
N/A
PG &E Acct. # Other:
Panel Mfg: Furnas NEMA Size: 3
Type: E]X/L P/W Other:
Pump Mfg: 25 HP Sub Serial#:
Non -Running Checks: Pump Model Manufacturer
Franklin
na F]Lubricant Levels - Service and Change if Necessary Discharge
na Oiler Unit and/or Packing
Electrical Leads & Connections - Repair and Tighten as Necessary
Incoming Idle Voltage: 11W/I Acceptable Limits
Unacceptable
Fuses - Replace if Necessary Replaced Size:
100 Amp
Perform General Clean -Up of Electrical Panel and Motor
Running Checks: Motor winding resistance:
Q's to ground
Excessive or Unusual Noise F]Ok/see comments Pressure tank:
OK
Excessive or Unusual Vibration F]Ok/see comments Tank condition:
Good
Control Devices: FIH.O.A. Start Switch
Time Clock
Frost Start Time Delay Other:
Amperage: Expected: 67 Pressure setting:
PRESS SWITCH
Actual: L1 66.8 L2 72 L3 67.3
Average: 68.7
Overload Underload
ElEven Load
Bowl Adiustment: N/A E]Yes E]No
Comments:
GPS:
The above readings reflect the site and pump conditions at the time of inspection.
This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system.
SAPump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's\128 Wildflower Est\128 Reports
Durhami, . PUMP
2313 Durham -Dayton Hwy.
Durham, CA 95938 530.891.4821
PUMP CHECK REPORT
CSA #128 - Wildflower Estates
CUSTOMER NAME: Butte Countv Fire De
DATE: 12/13/2019
Motor Mfg: Sta-Rite HP: 1 Meter #: 14R432
RPM 3450 Volts 240 Phase 3
Rated Amps:
TM 80E—] Yes F—]No Serial#
PG &E Acct. # Other:
Panel Mfg: NEMA Size:
Type: F—]X/L ❑ P/W Other: Date Code:
10/90
Pump Mfg: Sta-Rite Serial#:
Non -Running Checks: Pump Model Type
na FILubricant Levels - Service and Change if Necessary
na F]Oiler Unit and/or Packing
F]Electrical Leads & Connections - Repair and Tighten as Necessary
Incoming Idle Voltage: F]W/I Acceptable Limits
Unacceptable
na F]Fuses - Replace if Necessary ❑ Replaced Size:
20 Amp Breaker
Perform General Clean -Up of Electrical Panel and Motor
Running Checks: Motor winding resistance:
❑ Excessive or Unusual Noise F]Ok/see comments Pressure tank:
Air-E-Tainer AT -266
Excessive or Unusual Vibration F-10k/see comments Tank condition:
Good
Control Devices: ❑ H.O.A. Start Switch
Time Clock
Frost Start Time Delay Other:
PRESS. SWITCH
Amperage: Expected: 9.8 Pressure setting:
Actual: B 8 y 8.8 R 0.06
Average: 9.6
Overload Underload
Even Load
Bowl Adjustment: N/A Yes FINo
Comments:
GPS:
The above readings reflect the site and pump conditions at the time of inspection.
This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system.
SAPump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's\128 Wildflower Est\128 Reports