Loading...
HomeMy WebLinkAboutFAI CF Fire Pump Report 12_2019Durhamily . PUMP 2313 Durham -Dayton Hwy. Durham, CA 95938 530.891.4821 PUMP CHECK REPORT CSA #128 - Wildflower Estates CUSTOMER NAME: Butte County Fire Dept. DATE: 12/13/2019 Motor Mfg: Franklin HP: 25 Meter #: 1006873268 RPM 3450 Volts 240 Phase 3 Rated Amps: 60 TM80E—]YesF—]No Serial# N/A PG &E Acct. # Other: Panel Mfg: Furnas NEMA Size: 3 Type: E]X/L P/W Other: Pump Mfg: 25 HP Sub Serial#: Non -Running Checks: Pump Model Manufacturer Franklin na F]Lubricant Levels - Service and Change if Necessary Discharge na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: 11W/I Acceptable Limits Unacceptable Fuses - Replace if Necessary Replaced Size: 100 Amp Perform General Clean -Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Q's to ground Excessive or Unusual Noise F]Ok/see comments Pressure tank: OK Excessive or Unusual Vibration F]Ok/see comments Tank condition: Good Control Devices: FIH.O.A. Start Switch Time Clock Frost Start Time Delay Other: Amperage: Expected: 67 Pressure setting: PRESS SWITCH Actual: L1 66.8 L2 72 L3 67.3 Average: 68.7 Overload Underload ElEven Load Bowl Adiustment: N/A E]Yes E]No Comments: GPS: The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. SAPump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's\128 Wildflower Est\128 Reports Durhami, . PUMP 2313 Durham -Dayton Hwy. Durham, CA 95938 530.891.4821 PUMP CHECK REPORT CSA #128 - Wildflower Estates CUSTOMER NAME: Butte Countv Fire De DATE: 12/13/2019 Motor Mfg: Sta-Rite HP: 1 Meter #: 14R432 RPM 3450 Volts 240 Phase 3 Rated Amps: TM 80E—] Yes F—]No Serial# PG &E Acct. # Other: Panel Mfg: NEMA Size: Type: F—]X/L ❑ P/W Other: Date Code: 10/90 Pump Mfg: Sta-Rite Serial#: Non -Running Checks: Pump Model Type na FILubricant Levels - Service and Change if Necessary na F]Oiler Unit and/or Packing F]Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: F]W/I Acceptable Limits Unacceptable na F]Fuses - Replace if Necessary ❑ Replaced Size: 20 Amp Breaker Perform General Clean -Up of Electrical Panel and Motor Running Checks: Motor winding resistance: ❑ Excessive or Unusual Noise F]Ok/see comments Pressure tank: Air-E-Tainer AT -266 Excessive or Unusual Vibration F-10k/see comments Tank condition: Good Control Devices: ❑ H.O.A. Start Switch Time Clock Frost Start Time Delay Other: PRESS. SWITCH Amperage: Expected: 9.8 Pressure setting: Actual: B 8 y 8.8 R 0.06 Average: 9.6 Overload Underload Even Load Bowl Adjustment: N/A Yes FINo Comments: GPS: The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. SAPump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's\128 Wildflower Est\128 Reports