Loading...
HomeMy WebLinkAboutFAI CF Fire Pump Report CSA 137 12_2019 (2) Durham ': Pump PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#137 Durham Dayton Industrial Partners CUSTOMER NAME: Butte County Fire Dept. DATE: 12/12/19 Motor Mfg: US motors HP: 100 Meter#: 1005520819 RPM 1775 Volts 460 Phase 3 Rated Amps: 120 TM 80 Yes No Serial# TO7T059ROOSR-12 PG &E Acct. # Other: Panel Mfg: Delta NEMA Size: 3 Type: X/L n P/W Other: Pump Mfg: Serial#: Non-Running Checks: Pump Model Manufacturer Lubricant Levels -Service and Change if Necessary Oiler Unit and/or Packing Electrical Leads & Connections- Repair and Tighten as Necessary Incoming Idle Voltage: W/I Acceptable Limits Unacceptable Fuses- Replace if Necessary Replaced Size: 150A MCP Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Excessive or Unusual Noise Ok Excessive or Unusual Vibration Ok Control Devices: H.O.A. Start Switch Time Clock Frost Start Time Delay Other: Pressure Switch Amperage: Expected: 120.5 Actual: Li: 115 L2: 112.8 L3: 126.7 Average: 118.2 Overload Underload Even Load Bowl Adiustment: [7Yes nNo Comments: Slightly uneven load, similar to previous inspection. GPS: 39°38'41.08"N 121°43'18.99"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\137 Durham Dayton Ind Partn\137 Reports Durham Pump PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#137 Durham Dayton Industrial Partners CUSTOMER NAME: Butte County fire Dept DATE: 12/12/19 Motor Mfg: Franklin HP: 3 Meter#: RPM 3450 Volts 460 Phase 3 Rated Amps: 4.8 TM 80 Yes No Serial# PG &E Acct. # Other: Panel Mfg: IEC NEMA Size: ? Type: X/L P/W Other: Pump Mfg: SUB Serial#: Non-Running Checks: Pump Model Manufacturer na Lubricant Levels- Service and Change if Necessary Discharge na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: W/I Acceptable Limits Unacceptable Fuses - Replace if Necessary Replaced Size: TSR1OR Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: O's to ground Excessive or Unusual Noise Ok/see comments Pressure tank: OK Excessive or Unusual Vibration Ok/see comments Tank condition: good Control Devices: H.O.A. Start Switch Time Clock Frost Start Time Delay Other: Amperage: Expected: 4.8 Pressure setting: Actual: L1: 6 L2: 4.8 L3: 4.5 Average: 5.1 Overload Underload Even Load Bowl Adjustment: N/A Yes No Comments: GPS: The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\137 Durham Dayton Ind Partn\137 Reports