Loading...
HomeMy WebLinkAboutFAI CF Fire Pump Report CSA 158 12_2019Durham -i'. PUMP PUMP CHECK REPORT 2313 Durham -Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#158 Ishi Valley CUSTOMER NAME: Butte County Fire Dept. DATE: 12/12/19 Motor Mfg: Franklin HP: 25 Meter #: 1006908237 RPM 3450 Volts 240 Phase 3 Rated Amps: 75 TM 80E—]Yes F]No Serial # PG &E Acct. # Other: Panel Mfg: Furnas NEMA Size: 3 Type: ❑ X/L ❑ PAN Other: Discharge Mfg: Steel 6" Serial#: Non -Running Checks: Pump Model Manufacturer na FILubricant Levels - Service and Change if Necessary na Oiler Unit and/or Packing ❑ Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: 11W/I Acceptable Limits Unacceptable ❑ Fuses - Replace if Necessary FIReplaced Size: TR90R Perform General Clean -Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Excessive or Unusual Noise 1-10k Excessive or Unusual Vibration F]Ok Control Devices: ❑X H.O.A. ❑X Start Switch Time Clock Frost Start Time Delay Other: Pressure Switch Amperage: Expected: 65 Actual: L1: 68 L2: 75.1 L3: 61.2 Average: 68.1 Overload Underload Even Load Bowl Adjustment: N/A Yes No Comments: Slightly overloaded with uneven load but within service factor Gate is falling apart, needs to be repaired or replaced. GPS: 39048'32.57"N 121053'38.30"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. SAPump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's\158 Ishi Valley\158 Reports Durham til'. Pump 2313 Durham -Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#158 Ishi Valley CUSTOMER NAME: Butte County Fire Dept. PUMP CHECK REPORT DATE: 12/12/19 Motor Mfg: Franklin HP: 1 Meter #: 1006908237 RPM 3450 Volts 240 Phase 1 Rated Amps: 9.8 TM 80E—]Yes F—,]No Serial # PG &E Acct. # Other: Panel Mfg: Franklin control box NEMA Size: Type: F—]X/L F—] P/W Date code Discharge Mfg: 1 1/4 Serial#: Non -Running Checks: Tank Model WX-302 Manufacturer Well -X -Trot na FILubricant Levels - Service and Change if Necessary na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: DWI Acceptable Limits Unacceptable F]Fuses - Replace if Necessary ❑ Replaced Size: N/A Perform General Clean -Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Less than 1 Meg Q's to ground Excessive or Unusual Noise ❑ Ok Excessive or Unusual Vibration F]Ok Control Devices: ❑ H.O.A. Start Switch Time Clock Frost Start Time Delay Other: Pres. Sw. 30-50 Amperage: Expected: Actual: Red: 0.8 Yellow: 11.6 Black: 10.3 Average: 7.567 Overload Underload FlEven Load Bowl Adjustment: N/A Yes F—] No Comments: GPS: 39°48'32.57"N 121°53'38.30"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. SAPump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's\158 Ishi Valley\158 Reports