Loading...
HomeMy WebLinkAbout20-035WHEREAS, Senate Bill 1(SB 1)1,the Road Repair and Accountability Act of2017(Chapter SiStatutes ofZ817)was passed bvthe Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of Butte County are aware of the projects propmsed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, Butte, County must adopt by resolution a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description, the location of each, proposed project, a proposed schedule for the project's conmp|edom, and the estimated useful life of the improvement; and WHEREAS, Butte County, will receive a,nd estimated $6.19 million in RMRA fuinding in Fiscal Year 2020-21 from SB 1; and WHEREAS, this isthe forth year in which Butte County is receiving SB Ifunding and will enable the County to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access, and mobility options for the traveling public that would not have otherwise been possible without S81; and WHEREAS, Butte County used aPavement Management System todevelop the SB 1 project list toensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS, the funding from SB1will help the County nomaintain and rehabilitate its approximately ]~300nnHes of roads, 5010 bridges throughout the, County this year and into the future; and WHERAS, the 2010 California Statewide Local Streets and Roads Needs Assessment found the County's streets and roads are inan°at'risktopoor" condition and this revenue will help usincrease the overall quality ofthe road system amdmverthenextdecadem/iHbrimgstreetsamdnoadsimtoa°gnVdtVfeir"cnndition;end WHEREAS, the SQ 1proiect list and overall investment imour local streets and roads infrastructure with afocus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge techno|mgy, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, BE IT RESOLVED AND ORDERED by the Board of Supervisors of the County of Butte, State of California, as fo I liows: 1. The foregoing recitals are true and correct. 2. The fiscal year 2020-21 list of new projects planned to be funded in part with Road Maintenance and Rehabilitation Account revenues are as listed on Exhibit A to this resolution. 3. The fiscal year 2019-20 list of previously proposed and adopted projects that may utilize Road Maintenance and Rehabilitation Account revenues in their delivery are as listed on Exhibit B to this resolution. With the relisting of these projects in the adopted fiscal year 2020-21 resolution, Butte County is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: 3M PASSED AND ADOPTED by the Butte County Board of Supervisors this 24'h day of March, 2020, by the following AYES: Supervisors Connelly, Lucero, Ritter, Teeter, and Chair Lambert NOES: None ABSENT: None Shari McCracken, Chief Administrative Officer and Clerk of the Board of Supervisors Deputy'` — Steve Lambert, jVa r Butte County Board of Supervisors a" 0 P: 3 7 0 0 u Qcv o � � 0 0 .fl o � o o W � p w � .� o � � Ci � ^o � w" ^o 0 W ............... a �d pi s r! cc,; P. P. P. P. P. 4#Y UD 44 ki Exhibit C County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Upper Centerville Culvert Replacements (Storm Damage) Location: 3 miles south of Nimshew Road Total Cost: $110,000 S131 Funds: $11,000 Completion Date: March 2019 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Upper Centerville Culvert Replacements (Storm Damage) Location: 3 miles south of Nimshew Road Total Cost: $110,000 S131 Funds: $11,000 Completion Date: March 2019 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Cohasset Digouts Location: Various locations over 10 miles of Cohasset Road Total Cost: $100,000 S131 Funds: $100,000 Completion Date: November 2019 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Off -System Guardrails (Concow Road) Location: Various locations over eight miles of Concow Road Total Cost: $400,000 S131 Funds: $40,000 Completion Date: December 2018 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Ophir Road — Full Depth Reclamation (FDR) Rehabilitation Location: Ophir Road between Lincoln Blvd. and Lower Wyandotte Road Total Cost: $1,100,000 SB1 Funds: $1,100,000 Completion Date: November 2019 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Oro Quincy Hwy— Reconstruction Storm Damage Repairs Location: Oro Quincy Hwy—Approximately 1 mile north of Mt. House Total Cost: $2,350,000 S131 Funds: $285,000 Completion Date: September 2019 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Skyway— Metal Beam Guard Rail (MBGR) Replacement (Camp Fire) Location: Skyway — Various locations Total Cost: $ 885,000 SB1 Funds: $ 105,000 Completion Date: March 2019 Exhibit C (Cont.) County of Butte Road Maintenance and Rehabilitation Account Completed Projects Project: Upper Centerville Road — Reconstruction Storm Damage Repairs Location: 3 mile south of Nimshew Road Total Cost: $ 800,000 S131 Funds: $ 80,000 Completion Date: September 2019