HomeMy WebLinkAboutADM20-0050 ODW SWPPP October 2019 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) OLD DURHAM WOOD INC. WDID No._______________ BUTTE COUNTY, CALIFORNIA Prepared for Old Durham Wood Inc. Prepared by VESTRA Resources Inc. 5300 Aviation Drive Redding, California 96002 OCTOBER 2019 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) OLD DURHAM WOOD INC. WDID No. ______________ BUTTE COUNTY, CALIFORNIA Prepared for Old Durham Wood, Inc. 1156 Oroville Chico Highway Durham, California 95938 Prepared by VESTRA Resources Inc. 5300 Aviation Drive Redding, California 96002 71730 OCTOBER 2019 i TABLE OF CONTENTS SECTION 1.0 INTRODUCTION .......................................................................................................................... 1 1.1 Site Summary ................................................................................................................. 1 1.2 SIC Codes ......................................................................................................................... 2 1.3 Purpose of the SWPPP ................................................................................................. 3 1.4 Authority and Applicability........................................................................................ 3 1.5 Implementation Schedule/Revisions ...................................................................... 3 2.0 PLANNING AND ORGANIZATION ........................................................................................... 5 2.1 Pollution Prevention Team................................................................................................. 5 2.2 Facility Operating Hours ........................................................................................... 5 2.3 Protocol on Public Access to the SWPPP............................................................ 5 2.4 Certification of the SWPPP ...................................................................................... 5 3.0 SITE INFORMATION .................................................................................................................. 6 3.1 Facility Description ................................................................................................................ 6 3.2 Areas of Industrial Activity ................................................................................................. 6 3.3 Materials Handling .................................................................................................................. 7 3.4 Storm Drainage System ............................................................................................... 8 3.5 Impervious Areas ........................................................................................................... 8 3.6 Potential Areas of Soil Erosion ................................................................................. 8 4.0 SOURCE IDENTIFICATION ....................................................................................................... 9 4.1 Industrial Activities ...................................................................................................... 9 4.2 Material Handling and Storage Areas ..................................................................... 9 4.3 Dust- and Particulate-Generating Activities ........................................................ 9 4.4 Non-Stormwater Discharges ...................................................................................... 9 4.5 Fuel and Oil Containment Area and Maintenance Area ............................... 9 4.6 Potential Spill Locations ........................................................................................... 9 4.7 Spills of Significant Materials ................................................................................. 9 5.0 POTENTIAL POLLUTANTS ..................................................................................................... 10 5.1 Significant Materials that May Come in Contact with Surface Water ....... 10 5.2 Types of Potential Pollutants by Source ................................................................................. 10 5.3 Existing Data on Quality of Stormwater from the Site .................................. 10 6.0 STEPS TO REDUCE POLLUTION FROM STORMWATER RUNOFF ................................. 12 6.1 Stormwater Management Controls ....................................................................... 12 6.2 Structural BMPs ........................................................................................................... 14 6.3 Proposed Additional BMPs ........................................................................................ 15 7.0 MONITORING PLAN ................................................................................................................. 16 7.1 Checking BMP Implementation .............................................................................................. 16 7.2 Effluent/Stormwater Monitoring (Discharge) ................................................................ 16 7.3 Sampling Procedures ................................................................................................................... 16 ii 7.4 Inspections ........................................................................................................................................ 19 7.5 Reporting ........................................................................................................................................... 19 7.6 Recordkeeping ................................................................................................................................ 20 TABLES 5-1 Significant Materials that May Come in Contact with Surface Water by Source Area .. 10 5-2 2019 Sample Results ................................................................................................................ 11 6-1 Potential Pollution Sources and Corresponding BMPs...................................................... 15 7-1 Parameter Test Methods and NAL Values .......................................................................... 16 7-2 Monitoring and Sampling Requirements .............................................................................. 17 7-3 Sample Bottles and Methods .................................................................................................. 18 FIGURES 1 General Site Location 2 Site Layout/Drainage and BMPs APPENDICES A Standard Industry Best Management Practices B Inspection/Training Forms C EPA Industrial Stormwater Monitoring and Sampling Guide D Probe Information October 2019 Page 1 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 1.0 INTRODUCTION 1.1 Site Summary Old Durham Wood, Inc. (ODW), is a wood-processing facility that converts orchard wood into chips for biomass, lumber, firewood, and fines. The site has historically also received greenwaste from the City of Chico, Butte County, Paradise, and Sacramento Municipal. The wood fines generated and greenwaste received have historically been combined and composted onsite. The site is currently covered under General Waste Discharge Requirements for Composting Operations (Order WQ 2015-0121 DWQ) or CGO. The CGO requires ODW to retain onsite all stormwater which contacts the compost. This has proved difficult for ODW, and ODW has made the management decision to no longer compost onsite during the winter months. Any composting that is undertaken will be conducted during the summer (dry season). Any residual compost onsite will be covered prior to winter. Therefore, stormwater from the site may be discharged under the General Permit for Stormwater Discharges Associated with Industrial Activity (Order 2014-0057-DWQ) or IGP. The general site location is shown on Figure 1. The site is divided into specific areas for chipping and grinding of wood material, milling, and firewood packaging and storage. Site layout is shown on Figure 2. Stormwater discharging from the site has historically entered Hamlin Slough just south of the facility. Previously, the site was not regulated under the IGP as both firewood and chipping and grinding are not covered SIC codes. ODW had until October 2022 to retain all stormwater from composting operations. Some discharge occurred during the 2019 winter season. Based on the sampling conducted in 2018 and 2019, the discharge from the facility most resembles discharges from other wood processing facilities. Following discussions with the Regional Water Board, it was determined that the use of the IGP for the facility was appropriate based on wood- processing activities conducted onsite, although not specifically addressed by SIC code. In response to the need to retain all stormwater onsite, ODW purchased the additional property to the site to use for water retention; however, due to the large cost for wetlands mitigation, the pond costs became prohibitive. Instead, ODW intends to use the historical rice fields as a biofilter to filter stormwater from the site prior to discharge to Hamlin Slough. The piping system is currently being installed, the rice checks repaired, and additional boxes installed to better control the direction and flow of water through the checks. The final discharge point for the filter system will be determined following the check repairs now ongoing. An approximate discharge location is shown on Figure 2. This will be the only proposed discharge point for the facility. All stormwater from the site will be pumped through the filter system. Facility information is summarized below. October 2019 Page 2 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc FACILITY INFORMATION Name of Facility Old Durham Wood, Inc. Type of Facility Wood processing including, wood storage, chipping, grinding, firewood production. Location of Facility 1156 Oroville Chico Highway Durham, California 95938 (also see Figure 1 “General Site Location”) Facility Owner/Operator Old Durham Wood, Inc. Randy McLaughlin 8616 Durnel Drive Durham, California 95938 (530) 342-7381 SWPPP Contact Same as above SWPPP Copies are Located at Old Durham Wood, Inc., offices 1156 Oroville Chico Highway Durham, California 96938 1.2 SIC Codes 40 CFR §122.26(b) (14) defines “stormwater discharge associated with industrial activity” and describes the types of facilities subject to permitting (primarily by Standard Industrial Classification (SIC) code). This General Permit provides regulatory coverage for facilities with the industrial activities described in the permit where the covered industrial activity is the Discharger’s primary industrial activity. In some instances, a Discharger may have more than one primary industrial activity occurring at a facility. The 1987 SIC manual uses the term “establishment” to determine the primary economic activity of a facility. The manual instructs that where distinct and separate economic activities are performed at a single location, each activity should be treated as a separate establishment (and, therefore, as a separate primary activity). The SIC manual also discusses “auxiliary” functions of establishments. Auxiliary functions provide management or support services to the establishment. Examples of auxiliary functions are warehouses and storage facilities for the establishment’s own materials, maintenance and repair shops of the establishment’s own machinery, automotive repair shops or storage garages of the establishment’s own vehicles, administrative offices, research, development, field- engineering support, and testing conducted for the establishment. When auxiliary functions are performed at physically separate facilities from the establishment they serve, they generally are not subject to General Permit coverage. If auxiliary functions are performed at the same physical location as the establishment, then they are subject to General Permit coverage if they are associated with industrial activities. In 1997, the North American Industrial Classification System (NAICS) was published, replacing the SIC code system. The U.S. EPA has indicated that it intends to incorporate the NAICS codes into the federal stormwater regulations, but has not done so yet. Many Dischargers in newer industries were not included in the 1987 SIC code manual and may have difficulty determining their SIC code information. October 2019 Page 3 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc The Old Durham Wood facility does not fall directly under a specific SIC code; however, the discharge from the facility most resembles discharges from other wood-processing facilities. Based on the sampling data and discussions with the Regional Water Board, the site will be covered under SIC Code 2411 – Logging, as this SIC code is the only code dealing with chipping and grinding, the primary activities undertaken onsite. This SIC code applies to establishments primarily engaged in producing rough, round, hewn, or riven primary forest or wood raw materials, or in producing wood chips – there is no SIC code to address firewood/cordwood. 1.3 Purpose of the Stormwater Pollution Prevention Plan The preparation of a Stormwater Pollution Prevention Plan (SWPPP) is required by federal and state regulation and is administered by the State Water Resources Control Board (SWRCB) through the Regional Water Quality Control Board (RWQCB). This plan has been prepared to comply with the terms of the General Permit for Stormwater Discharges Associated with Industrial Activities (NPDES No. CAS000001, 2014-0057-DWQ). The intent of the order is to protect water quality by controlling pollutants in stormwater runoff. This SWPPP is designed to comply with Best Available Technology (BAT), Best Conventional Pollutant Control Technology (BCT), and Best Management Practices (BMPs) to reduce or eliminate pollution from industrial facilities during storm events. 1.4 Authority and Applicability 1.4.1 General Authority Regional Water Boards are primarily responsible for enforcement of the Industrial General Permit. The General Permit recognizes that Regional Water Boards have the authority to protect the beneficial uses of receiving waters and prevent degradation of water quality in their region. Dischargers of stormwater associated with industrial activity to waters of the United States are required to meet all applicable requirements of the General Permit. 1.4.2 SIC Code Specific Facilities classified as SICs 20XX through 39XX, identified as manufacturing facilities, are subject to stormwater effluent limitation guidelines. 1.5 Implementation Schedule/Revisions The BMPs detailed in this plan are implemented by ODW. Additional BMPs will be implemented on an as-needed basis following analyses of stormwater sampling results. The SWPPP will be updated whenever a change in the facility operations occurs that may significantly affect the discharge of pollutants to surface water. Randy McLaughlin is responsible for determining when SWPPP updates are required. Changes determined to be necessary in the SWPPP will be forwarded to the RWQCB and included in copies of the SWPPP that are retained onsite. October 2019 Page 4 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 1.5.1 Performance Standards This SWPPP was prepared to meet the performance standards outlined in the Industrial General Permit (NPDES No. CAS000001, 2014-0057-DWQ). These standards include the following: a. Identify and evaluate all sources of pollutants that may affect the quality of industrial stormwater discharges and authorized non-stormwater discharges (NSWD); b. Identify and describe the minimum BMPs and any advanced BMPs implemented to reduce or prevent pollutants in industrial stormwater discharges and authorized NSWDs. BMPs will be selected to achieve compliance with the General Permit; and, c. Identify and describe conditions or circumstances which may require future revisions to the SWPPP. 1.5.2 303(d) Applicability Final discharge of stormwater from the facility is to Hamlin Slough, an intermittent tributary to Butte Creek, hence to the Sacramento River. The location of Hamlin Slough is shown on Figure 2. Butte Creek has been listed as impaired at the mouth with the Sacramento River for the pesticides diazinon and molinate. The SWRCB has identified sources other than industrial and, per Appendix 3 of the IGP, dischargers are not required to sample for that parameter. Stormwater discharges from the ODW facility are not expected to contribute to these impairments. October 2019 Page 6 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 3.0 SITE INFORMATION 3.1 Facility Description The ODW facility receives logs, woody debris, and chips. Chips may be stored onsite pending need at a biomass facility. Material is chipped and ground onsite as well as imported from other sites. Firewood is imported and packaged for sale. 3.2 Areas of Industrial Activity 3.2.1 Chipping and Grinding Operations The general public and commercial businesses have historically delivered greenwaste to the Public Green Waste Dumping station within the facility. Greenwaste is no longer being accepted at the facility. Woody debris that can be chipped for hog fuel continues to be received. The length of time that the processed materials stay onsite depends on the needs of the cogeneration power plants and compost area. At certain times of the year, cogeneration facilities may stop accepting chips and materials would be stored onsite pending need. During the fall and winter months, cogeneration power plants have a greater need for material to burn and they accept more processed material. 3.2.2 Firewood Processing and Storage Operations A Firewood Processing and Storage Operation includes the pruning and sale of orchard and farm wood obtained from offsite or onsite sources, on a site occupying no more than 20 percent of the parcel’s total size (approximately 18 acres), and where more than 100 cords of firewood is stored for processing and offsite or onsite sales. Wood used in the firewood-processing operations is harvested from area orchards. It consists mainly of almond, walnut, and eucalyptus but can also include other types of orchard or farm wood. Wood is cut offsite and loaded onto trucks and hauled into the project site to be stored and cured. Logs brought to the site are unloaded with one of the wheel loaders and stacked. When time permits, the logs are cut into firewood lengths for curing. The wood is cured until the moisture content is below 20 percent, which generally takes 10 to 12 months. Cured wood is then split in place using portable hydraulic wood splitters. Split firewood is assembled into bundles, stacked on pallets, and shrink-wrapped. Firewood pallets are shipped from where they are made or moved into the onsite building for storage. Up to 6,000 cords of wood are processed every year. Commercial trucks ship the finished product to customers. 3.2.3 Composting Operations Feedstock material for composting operations is generated from fines produced during chipping and grinding operations. Composting feedstock is initially pushed into static piles until a sufficient quantity of feedstock has been accumulated, at which point, composting feedstock is October 2019 Page 7 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc transported by trailers or loaders into designated windrow areas. Approximately 30 to 35 acres have been used for composting operations. Upon completion of the curing stage, the finished compost is screened and transported for offsite sale. Composting will continue, but will only be conducted in the dry summer months, when stormwater retention is not an issue. 3.2.4 Orchard/Farm Wood Processing Operations (Milling) Wood used for offsite wood veneer production is obtained from area orchards and brought to the site intermittently. Wood is initially cut offsite and then transported to the site by trucks. Once onsite, the logs are trimmed to appropriate sizes using chainsaws and then milled into square logs to be stacked on pallets to dry. When logs reach the appropriate moisture content, logs are cut into 2-inch by 6-inch boards with the ripsaw and transported offsite for additional processing. All scraps generated from processing operations become feedstock material for chipping and grinding operations. 3.3 Materials Handling The facility layout is shown on Figure 2. 3.3.1 Operations Equipment Equipment that will be used at the facility includes:  Morbark 6600 Horizontal Grinder or Morbark 1300 Tub Grinder Used in the processing of green waste materials into biomass and compostable materials.  Front-Wheel Loaders There are always at least 2 front wheel loaders onsite at all times. They are used to feed material up to and into the grinders, pushing of feedstock into piles for storage, loading of biomass fuel and compost into trailers for transport, moving and turning of compost, moving of firewood and firewood scraps, as well any other material-moving needs.  Powerscreen Used for screening material from grinding operations to separate the fines (smaller particles such as dirt) from the higher-quality biomass fuel. It will also be used for screening finished compost product to remove large pieces prior to sale.  Truck Tipper Used for removing the contents of a commercial truck trailer by raising the trailer to a steep angle so that gravity will cause the material to slide out the back.  Water Truck Used for suppressing dust caused by vehicles and grinding operations, fire suppression, watering of compost to maintain moisture levels and lower temperatures, extracting accumulations of water for distribution elsewhere and applying additives to the composting piles.  Forklift Used for unloading pallets, crates, and moving packaged firewood products for storage or transport. October 2019 Page 8 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc  Hydraulic Woodsplitters Used for splitting firewood rounds into pieces that can be wrapped into firewood bundles or sold as bulk firewood. 3.3.2 Hazardous Materials Hazardous materials that are currently onsite, and proposed to be added to the facility, consist of the following:  Diesel fuel Diesel fuel is currently stored in a 500-gallon trap wagon to fuel equipment used at the facility. Eventually, a 10,000-gallon tank will be used for red diesel and a 10,000-gallon tank for on-road diesel.  Gasoline Gasoline that is used for the wood splitter engines is currently stored in a 500-gallon aboveground tank located near the existing metal building. The proposed expansion includes construction of a 1,000-gallon aboveground tank that will replace the existing 500-gallon tank.  Hydraulic Oil Hydraulic oil is currently kept in 5-gallon buckets inside the metal building, which is used in the wood splitters.  Engine Oil Used engine oil is currently kept in 5-gallon buckets inside the metal building prior to being transported to the owner’s property at 8616 Durnel Drive to be added to the waste oil container. New engine oil is kept in 5-gallon buckets that are kept inside the metal building, which is used for the wood splitters. 3.4 Storm Drainage System Discharge from the property historically occurred from a pond located in the southwest corner of the facility. Site stormwater will continue to be collected in this location of the site and pumped through a series of rice checks prior to discharge to Hamlin Slough. Biofiltration as a treatment method has been used successfully at other wood processing sites to remove coloration and total suspended solids from the stormwater. This treatment alternative was discussed with Regional Water Board staff as a feasible option. 3.5 Impervious Areas Approximately 100 percent of the site is impermeable lava cap. 3.6 Potential Areas of Soil Erosion The majority of the facility is lava cap that has been washed and paved to create a level surface and is not subject to soil erosion. October 2019 Page 9 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 4.0 SOURCE IDENTIFICATION This section includes the identification of various sources of pollutants. 4.1 Industrial Activities Industrial activities will include the receiving and processing of wood and chips. 4.2 Material Handling and Storage Areas Hazardous materials from operations are stored onsite in a containment area which includes the appropriate containment BMPs. 4.3 Dust- and Particulate-Generating Activities Dust and particulate matter can be generated from onsite activities. 4.4 Non-Stormwater Discharges There are no regular or planned non-stormwater discharges for the facility. 4.5 Fuel and Oil Containment Area and Maintenance Area Potential sources for pollution on the site are fuels and oils used in machinery and heavy equipment. All trucks will be subcontracted and fueled offsite. Diesel fuel for onsite equipment is stored in a fuel storage tank near the center of the site. Vehicles and equipment used in the operation will be maintained to prevent any possible leaks. Routine onsite maintenance will be conducted in such a manner as to minimize the potential for leaks and spills. Major repairs, other than emergency repairs, will be conducted at an offsite facility. 4.6 Potential Spill Locations The loading area and fueling area are the locations in which spills are most likely to occur. Potential spills are unlikely to come into contact with stormwater, as fueling will be performed intermittently and under supervision. 4.7 Spills of Significant Materials No spills of significant materials have occurred on the site. October 2019 Page 10 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 5.0 POTENTIAL POLLUTANTS 5.1 Significant Materials That May Come in Contact with Surface Water The materials that may come into contact with surface water are identified in Section 4. They include:  Petroleum hydrocarbons  Organic woody debris 5.2 Types of Potential Pollutants by Source Potential pollutants that may be present in stormwater from the facility are identified by area in Table 5-1. Table 5-1 SIGNIFICANT MATERIALS THAT MAY COME IN CONTACT WITH SURFACE WATER BY SOURCE AREA Area Potential Contaminants Source/Pathway Quantity of Material Stored Frequency of Use Loading Area TPH-O&G, Organic Particulates Equipment engines and log bark 5-gallon hydraulic oil bucket Daily during operations Wood Storage and Processing Organic Particulates, TPH-O&G Detritus from woods, equipment engines n/a Daily during operations Hazardous Materials Storage TPH-O&G Oil and hydraulic oil stored <500 gals As needed for maintenance Fuel Tanks TPH-O&G Spills during fueling, leaks 500 gals – diesel 500 gals - gasoline As needed TPH-O&G – Total Petroleum Hydrocarbons Oil and Grease 5.3 Existing Data on Quality of Stormwater from the Site Historical stormwater quality data for the site is summarized in Table 5-2. At the request of the RWQCB, ODW conducted stormwater sampling during the 2018-2019 winter season. Analytical parameters of biochemical oxygen demand (BOD, average 54 mg/L), nitrate N (average 1.06 mg/L), and total suspended solids (TSS, 298 mg/L) exceeded Numeric Action Level (NAL) values. Nitrate results, however, did not use the SWRCB-specified method and will be sampled during the first storm episode. In addition, copper concentrations were elevated; however, these concentrations were within NAL limits after adjusting for hardness. October 2019 Page 11 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc Table 5-2 2019 SAMPLE RESULTS Total 1/9/2019 < MDL Precip previous 7 days = 2.7" (including day sampled) Durham CIMIS mg/L mg/L mg/L mg/L mg/L Direction Location ID T&L BOD Nitrate (N) Hardness TSS SE Upper Creek R4 TC 0.44 --- 1.67 --- 28.4 SE Upper Dis NO 2 --- --- --- --- --- SE Lower Dis NO 1 41.8 --- 1.61 --- 625 SE Lower Creek RD LC 0.43 --- 1.53 --- 30.5 NW By Shack NO 3 NW Slough R2D Total 1/18/2019 < MDL Precip previous 7 days = 2.5" SE Upper Creek R4 TC 0.13 --- 2.77 --- <2 SE Upper Dis NO 2 --- --- --- --- --- SE Lower Dis NO 1 14.7 --- 2.05 --- 73.3 SE Lower Creek RD LC 0.42 --- 2.7 --- 2 NW By Shack NO 3 NW Slough R2D Total 2/4/2019 < MDL Precip previous 7 days = 2.9" SE Upper Creek R4 TC --- <6 1.12 39 23.8 SE Upper Dis NO 2 --- 9 35.8 480 6.2 SE Lower Dis NO 1 --- 142 <0.2 344 325 SE Lower Creek RD LC --- 5 1.09 47 32.7 NW By Shack NO 3 --- 979 5.82 921 293 NW Slough R2D --- 27 0.64 131 65 Total 2/27/2019 <RL Precip previous 7 days = 4.0" SE Upper Creek R4 TC --- 4.2 0.89 30 130 SE Upper Dis NO 2 --- 16 50 460 43 SE Lower Dis NO 1 --- 49 0.43 250 170 SE Lower Creek RD LC --- 7.4 1.1 41 51 NW By Shack NO 3 --- 580 <0.4 540 140 NW Slough R2D --- 96 3 200 36 Dissolved 2/27/2019 <RL SE Upper Creek R4 TC --- --- --- --- --- SE Upper Dis NO 2 --- --- --- --- --- SE Lower Dis NO 1 --- --- --- --- --- SE Lower Creek RD LC --- --- --- --- --- NW By Shack NO 3 --- --- --- --- --- NW Slough R2D --- --- --- --- --- October 2019 Page 12 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 6.0 STEPS TO REDUCE POLLUTION FROM STORMWATER RUNOFF This section summarizes the BMPs that are to be implemented at the facility to reduce or limit stormwater pollution from the site. As stated in the regulations, priority will be given those BMPs that control pollution with low or modest cost. Source control and treatment control BMPs will be considered if operational BMPs do not prove to be effective. Copies of standard industry BMP description sheets are included in Appendix A. Required minimum BMPs from the new Industrial General Permit (NPDES No. CAS000001, 2014-0057-DWQ) are discussed in the following sections. 6.1 Stormwater Management Controls The site is generally flat. Stormwater controls will consist of the following: 6.1.1 Good Housekeeping Good housekeeping requires the maintenance of clean, orderly facility areas that discharge stormwater. Material handling areas will be inspected and cleaned to reduce the potential for pollutants to enter the stormwater conveyance system. Trash and refuse will be placed in appropriate containers onsite. Trash bin lids will be closed. To prevent organic debris from entering stormwater drainage, sweeping of the paved portion of the facility will be performed daily. Organic material from handling and processing of wood materials will be scraped daily and placed in piles. Wattles will be placed and maintained around all organic piles, including those in the initial vacating area and the unloading and storage area. Waste wood/organic material will be transported offsite to cogeneration facilities for use as landscape bark or for composting. Source control BMPs from the California Stormwater Quality Association used to control and prevent stormwater impacts include: EC-9 Earth Dikes and Drainage Swales SC-10 Non-Stormwater Discharges SC-11 Spill Prevention, Control, and Cleanup SC-20 Vehicle and Equipment Fueling SC-21 Vehicle and Equipment Cleaning SC-22 Vehicle and Equipment Repair SC-30 Outdoor Loading and Unloading SC-31 Outdoor Liquid Container Storage (portions of) SC-32 Outdoor Equipment Operations SC-33 Outdoor Storage of Raw Materials SC-34 Waste Handling and Disposal SC-35 Safer Alternative Products SC-41 Building and Grounds Maintenance SC-43 Parking/Storage Area Maintenance SC-44 Drainage System Maintenance October 2019 Page 13 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 6.1.2 Preventive Maintenance This practice includes inspection and maintenance of the stormwater conveyance system. Inspections will take place monthly and after significant rainfall events. An annual inspection of the site will be conducted in September of each year to identify and address any potential issues. 6.1.3 Spill Prevention and Response This includes increasing employee awareness toward minimizing spills and the training to respond to spills if they occur (BMP SC-11). Each employee will be directed to clean up spills as they occur and to report any spills of significant quantity. 6.1.4 Material Handling and Storage This includes training employees on the proper way to handle the materials to minimize the potential for spills and to minimize the exposure of materials to stormwater. BMPs include SC- 30, SC-31, SC-32, SC-33, and SC-34. 6.1.5 Waste Handling and Recycling Employee training will include how to handle wastes that may occur in connection with future activities onsite (BMP SC-34). 6.1.6 Stormwater Management Practices Stormwater runoff generally flows in an easterly direction at the facility. Figure 2 shows the direction of stormwater runoff. Runoff will be directed to prevent comingling with other areas by berms and ditches (BMP EC-9). 6.1.7 Erosion and Sediment Control The majority of the facility is paved, minimizing the potential for erosion. Vehicle traffic is limited on the unpaved portions of the property during precipitation events to prevent erosion. 6.1.8 Dust- and Particulate-Generating Activities Dust may be generated by truck traffic and particulates may be generated by handling and processing woody materials onsite. The AQMD will manage the requirements for the dust- and particulate-generating activities as discussed in Section 4. 6.1.9 Non-Stormwater Discharges No non-stormwater discharges are associated with the facility. BMPs include SC-10, SC-21, and SC-35. October 2019 Page 14 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 6.1.10 Discharge Prohibitions The discharge of wastewater at a location or in a manner different from that described is prohibited. The discharge of sediment or any other waste to surface waters or surface water drainage courses is prohibited. Discharge of hazardous or toxic substances, including petroleum fuel, is prohibited. Bypass or overflow of untreated or partially treated waste, including domestic waste, is prohibited. 6.1.11 Employee Training Employee training programs will inform all personnel responsible for implementing the SWPPP. Training will address spill response, good housekeeping, material management practices, inspections, maintenance, and repair measures. Training will be performed for each new hire and on an annual review basis, usually prior to the wet season. 6.1.12 Inspections All inspections, visual observations, and sampling, as required in the Monitoring and Reporting Program, will be completed by trained personnel. 6.1.13 Recordkeeping and Internal Reporting Records of all inspections, spills, and maintenance activities will be kept onsite at the office. These are available to personnel as necessary. 6.1.14 Quality Assurance The procedures contained in the SWPPP will be conducted under the direction of Mr. Randy McLaughlin. 6.2 Structural BMPs BMPs for this facility are summarized in Table 6-1 and described below. The BMPs are tailored to the activities and conditions at the project site. Facility operators are required to develop and implement additional BMPs as appropriate and necessary to prevent or reduce pollutants. 6.2.1 Log/Wattle Barriers and Berms Log/wattle barriers and berms are used onsite along the northern boundary to prevent run-on and direct stormwater onsite to the sample point. If needed, logs and wattles can be placed in additional locations onsite to slow flow velocity and capture/direct onsite flow and sediment. Logs can be used collectively with wattles to prevent sediment and organic fines. Wattles will be placed on the upstream side of the logs. 6.2.2 Rice Check Filter System Old Durham will use the historical rice fields as a biofilter to filter stormwater prior to discharge to Hamlin Slough. October 2019 Page 15 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc Table 6-1 POTENTIAL POLLUTION SOURCES AND CORRESPONDING BMPs Area Pollutant Source Pollutant BMP Loading/ Unloading Area Spills and leaks during fueling and maintenance Particulate matter generated during loading and unloading Fuel, oil and lubricants Particulate organic matter  Train employees on proper fueling and equipment maintenance (do not top off, cleanup, and spill response techniques with dry absorbent countermeasures)  Implement preventative maintenance of equipment including visual inspections twice daily  Regular sweeping of exposed, paved surfaces  Scraping of accumulated debris Wood Storage and Processing Particulate matter for stacked logs Sediment and dust generated from the moving and stacking of logs Particulate organic matter Sediment  Regular sweeping of exposed, paved surfaces  Scraping of accumulated debris  Contain organic matter with log or straw bale perimeter or wattles  Use wattles, hay bales, and rock perpendicular to flow to filter runoff prior to discharge Spills and leaks during fueling and maintenance Spills and leaks during fueling and maintenance Fuel, oil and lubricants  Fuel storage has secondary containment  Train operators in proper refueling  Store all materials under cover when not in use Roadway Runoff from roadways Sediment  Sweep and/or scrape roadways 6.2.3 Organic Matter Control Because of the organic matter that can be generated onsite, source control and reduction are critical. Measures to reduce organic matter may include:  Remove organic matter from the facility as soon as possible  Contain organic matter in identified areas with a log or straw bale perimeter  Scrape accumulated debris daily  Place additional wattles in areas of organic matter accumulation if rain is predicted 6.3 Proposed Additional BMPs The site will collect water in a central location in the southwest area of the site and gravity-feed or pump collected stormwater through a grassland filter system on the southern parcel. The historical rice checks will provide retention time to settle any solids and the grass will filter additional organic material. ODW is currently rebuilding the rice checks to work as originally designed. Once completed, the discharge location map will be updated. October 2019 Page 16 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 7.0 MONITORING PLAN 7.1 Checking BMP Implementation Personnel responsible for implementation of the SWPPP will conduct inspections of the facility operations to ensure that BMPs are implemented and meet the objectives of the SWPPP. Inspections will be conducted monthly and during storm events (as required by Section XI.A.1.a). 7.2 Effluent/Stormwater Monitoring (Discharge) Visual inspections will document the presence of any discoloration, stains, odors, floating materials, etc., as well as the source of any discharges. Stormwater runoff from the industrial area will discharge at one location as shown on Figure 2. Facilities classified as SIC 2411 are required to collect samples for TSS, pH, and total petroleum hydrocarbons – oil and grease (TPH-O&G). Based on analytical results from 2019 sampling, ODW will also sample for BOD and nitrate + nitrite nitrogen. Sampling parameters, test methods, annual Numeric Action Levels (NALs), and instantaneous NALs are shown in Table 7-1. Samples must be received by the laboratory within 24 hours of collection. Table 7-1 PARAMETER TEST METHODS AND NAL VALUES Parameter Test Method Reporting Units Annual NAL Instantaneous Maximum NAL pH Calibrated portable probe pH units n/a Less than 6.0 or greater than 9.0 Total Suspended Solids SM 2540-D mg/L 100 400 Oil and Grease EPA 1664A mg/L 15 25 BOD SM 5210B mg/L 30 --- Nitrate + Nitrite Nitrogen SM 4500-N03-E mg/L 0.68 --- Samples will be collected from one discharge location as identified on Figure 2. Monitoring and sampling requirements are summarized in Table 7-2. 7.3 Sampling Procedures Sampling and sample preservation procedures are conducted in accordance with the current edition of Standard Methods for the Examination of Water and Wastewater by the American Public Health Association, per SWRCB 2014-0057-DWQ and 40 CFR Part 136. Additional guidance on sampling procedures can be found in the U.S. EPA Industrial Stormwater Monitoring and Sampling Guide included as Appendix C. October 2019 Page 17 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc Table 7-2 MONITORING AND SAMPLING REQUIREMENTS Monitoring Description Annual Evaluation A comprehensive site inspection will be performed once during the reporting period (July 1 to June 30). The evaluation will include an inspection of BMPs, stormwater conveyance systems and areas of industrial activity as well as an assessment of the effectiveness of all BMPs and a review of all previous inspections during the reporting year. Monthly Visual Inspections Visual observations will be made during daylight hours with no storm discharges, during scheduled hours of operation. Sampling Event Visual Observations Four storm events that occur during normal hours of observations and proceeded by at least two days without stormwater discharges include a visual inspection (two between July 1 and December 31 and two between January 1 and June 30). The inspection occurs at the same time sampling occurs at a discharge location. At each discharge location where a sample is obtained, the Discharger shall observe the discharge of stormwater associated with the industrial activity. The Discharger shall visually observe and record the presence or absence of floating and suspended materials, oil and grease, discolorations, turbidity, odors, trash/debris, and sources of any discharged pollutants. Sampling Stormwater samples are collected at the monitoring point identified on Figure 2. Four samples are collected annually, two between July 1 and December 31 and two between January 1 and June 30. A qualifying storm event is a storm that produces a discharge for at least one drainage area and is preceded by 48 hours with no discharge from any drainage area. Samples are analyzed for:  Total Suspended Solids (TSS) –SM 2540-D  pH – EPA9040 and/or calibrated pH meter  Total Petroleum Hydrocarbons – Oil & Grease (TPH-O&G) – EPA 1664  BOD – SM 5210B  Nitrate + Nitrite Nitrogen – SM 4500-N03E Sampling preparation is essential due to infrequent measureable storm events. Laboratory- supplied sample bottles should be obtained well ahead of time and weather forecasts monitored for predicted measurable storm events. A list of the sample bottles required for each sampling and to be stored onsite is included in Table 7-3. No bottle is included for pH, which will be measured in the field. Sample bottles should be labeled using waterproof ink with the following information:  Facility name and address  Sample location identifier (e.g., Location SP-1)  Name or initials of sampling personnel  Parameter(s) sample being analyzed  Sample preservation notes  Date and time of sampling event A chain-of-custody form will also be filled out completely for samples collected. October 2019 Page 18 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc Table 7-3 SAMPLE BOTTLES AND METHODS Parameter Test Method Bottle Size Bottle Type Bottle Quantity1 pH Calibrated portable probe n/a n/a n/a Total Suspended Solids SM 2540-D 500 mL Polycarbonate 1 Oil and Grease EPA 1664A 1 L Amber Glass 2 BOD SM 5210B 1 L Polycarbonate 1 (no head space) Nitrate SM 4500-N03E 125 mL Polycarbonate 1 1 = Number of bottles listed is for each discharge location; two to three times the quantity listed is necessary to conduct sampling facility-wide. Sampling supplies should be maintained onsite at all times. Supplies include sample bottles (including spare bottles), visual monitoring form (included as Form B in Appendix B), clipboard, sampling pole, disposable nitrile gloves, waterproof pens, waterproof clothing, sample cooler, field multi-parameter probe, and camera. Sampling supplies should be stored in sealed coolers in an area with no exposure to possible contaminants, including sediments or oil and grease. Sample collection will be conducted in such a way as to ensure samples are representative of the quality and quantity of the facility’s stormwater discharge. Samples will be collected directly into laboratory-supplied sample bottles using disposable nitrile gloves. Sample bottles should be filled directly from the discharge; never collected in a container first and then transferred to the sample bottle. Samples should be collected from a turbulent section in the central part of the flow. The sampler should avoid touching the bottom or sides of the stormwater conveyance. Immediately following collection, samples will be placed directly into laboratory-supplied coolers, on ice, and transferred to a California-certified analytical laboratory. Monitoring instruments used to measure pH and specific conductance are calibrated and maintained in accordance with manufacturers’ specifications to ensure accuracy. A probe similar to Hanna Instruments HI 98129 can be used for pH measurements. The meter should be calibrated as outlined in the instruction manual immediately prior to each sample collection. When not in use, the probe should be kept moist with electrode storage solution. Additional information on operation, calibration, and maintenance of the HI 98129 probe is included as Appendix D. Laboratory analyses are conducted according to the test procedures described in 40 CFR Part 136 by a laboratory certified for the required analyses by the State Department of Health Services. October 2019 Page 19 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc 7.4 Inspections In addition to the maintenance inspection schedule described herein, supplemental inspections of the facility related to the control of pollutants in stormwater discharge may be required. 7.4.1 Monthly Non-Stormwater Inspections Routine facility inspections and comprehensive site inspections are conducted by a representative designated by the facility owner/operator. In addition, the facility manager may assist with these inspections as needed. See Form A in Appendix B. Routine facility inspections are conducted once per month during daylight hours of scheduled facility operating hours and on days without precipitation. Monthly inspections include observations for:  The presence or indications of prior, current, or potential unauthorized non-stormwater discharges and their sources;  Authorized non-stormwater discharges and associated BMPs;  Outdoor industrial equipment and storage areas, outdoor industrial activities areas, BMPs, and other potential sources of industrial pollutants. 7.4.2 Sampling Event Visual Observations Sampling event visual observations are conducted at the same time sampling occurs at a discharge location. A qualifying storm event is one that produces stormwater discharge during daylight-scheduled facility operating hours and is preceded by at least two working days without stormwater discharge as specified in SWRCB 2014-0057-DWQ. See Form B in Appendix B. The presence or absence of suspended materials, oil and grease, discolorations, turbidity, and odors, and the source of any observed pollutants will be documented. 7.4.3 Annual Comprehensive Facility Evaluation Comprehensive facility inspections will be performed at least once every stormwater reporting period (July 1 through June 30; see Form C in Appendix B). Comprehensive annual facility inspections will involve inspection of the entire facility for stormwater damage and adequacy of control features for evidence of or potential for pollutants entering the drainage system during a rain event. A visual inspection of all equipment needed to implement the SWPPP will be included. It is recommended that this inspection occur before the first storm of the year. 7.5 Reporting Annual reports will be submitted via the SMARTS system no later than July 15th following each reporting year using the standardized format and checklists in SMARTS. Annual reports will include the following: October 2019 Page 20 P:\Projects\2017\71730 Old Durham Wood\SWPPP\ODW SWPPP October 2019.doc  A Compliance Checklist that indicates whether a Discharger complies with, and has addressed all applicable requirements of this General Permit;  An explanation for any non-compliance of requirements within the reporting year, as indicated in the Compliance Checklist;  An identification, including page numbers and/or sections, of all revisions made to the SWPPP within the reporting year;  The date(s) of the annual evaluation. 7.6 Recordkeeping All inspections and analytical results will be kept in the SWPPP binder onsite. Figures SITE LOCATION FIGURE 1GENERAL SITE LAYOUTOLD DURHAM WOOD, INC.DURHAM, CALIFORNIA05102.5 Miles SOURCE: USGS NATIONAL MAPP:\GIS\71730\Figures\SWPPP\71730_GeneralSiteLocation.mxd 0 600 1,200300Feet Storm Water Flow Direction Hamlin Slough Pipeline Facility Boundary-Area 100% Impervious Area of Proposed Descharge Location Retention Pond and Pump Station Approximate Parcel Boundary Rice Checks SOURCE: DIGITALGLOBE 2018 AERIAL PHOTOGRAPH FIGURE 2SITE LAYOUTOLD DURHAM WOODBUTTE COUNTY, CALIFORNIA P:\GIS\71730\Figures\SWPPP\71730_Pipeline_SiteLayout.mxd Appendix A Standard Industry Best Management Practices Appendix B Inspection/Training Forms Page 1 of 3 INDUSTRIAL STORM WATER MONTHLY INSPECTION REPORT – FORM A Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact storm water quality at the facility, and evaluate the effectiveness of best management practices required by this permit. FACILITY NAME: Old Durham Wood INSPECTION TIME: DATE: WEATHER INFORMATION:  Description of Weather Conditions (e.g., sunny, cloudy, raining, windy, etc.): ________________________________________________________________________________________________________  Was storm water (runoff from rain) flowing at sample locations shown on the Site Map during the inspection: Yes No Comments: ________________________________________________________________________________________________________ I. POTENTIAL POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION SWPPP and Site Map: Have a copy of the SWPPP and site map with you during the inspection so that you can ensure they are current and accurate. Use it as an aide in recording the location of any issues you identify during the inspection.  Is the Site Map current and accurate?  Are all inspection records current? o Spill response/management records Yes No Findings and Remedial Action Documentation: Access Roads:  Are the roads clear of debris?  Have regular sweepings of road surfaces been ongoing?  Is the road surface in good condition?  Are wattles and hay bales in good conditioning and functioning as desired? Yes No Findings and Remedial Action Documentation: Debarker Areas:  Is there excess oil and grease buildup on mechanical equipment surfaces that could be washed away by rainwater?  Are there indications that any debris is being discharged offsite? Yes No Findings and Remedial Action Documentation: Equipment:  Is there excess oil and grease buildup on mechanical equipment surfaces that could be washed away by rainwater?  Are there signs of leaks in mechanical equipment hydraulic supply lines?  Are the ground surfaces underneath mechanical equipment free of staining?  Is the housing structure in good condition? Identify problems, if necessary, document and address.  If equipment is present, are spill materials available and are there adequate amounts available?  Is spill absorbent material dry and stored indoors or in a waterproof container? Yes No Findings and Remedial Action Documentation: Page 2 of 3 Log Storage Area:  Are there indications that any debris is being discharged offsite?  Are wattles and hay bales in good conditioning and functioning as desired?  Have regular sweepings of exposed paved surfaces been ongoing?  Is diverted runoff flowing as desired? Yes No Findings and Remedial Action Documentation: Good Housekeeping BMPs:  Is all litter being picked up and disposed of properly?  Is stockpiled material managed properly to limit erosion? Yes No Findings and Remedial Action Documentation: Spill Response:  Have all spills been cleaned up immediately upon detection with necessary repairs or maintenance performed to minimize impact to storm water?  Are the spill management and response records current? Yes No Findings and Remedial Action Documentation: Storm water BMPs and Treatment Structures: Visually inspect all storm water BMPs  Are BMPs and drainage structures in good repair and operational?  Are BMPs and treatment structures free from debris, sediment, oil, gas, or grease buildup that may impair function? Identify, document, and address if necessary Yes No Findings and Remedial Action Documentation: Observation of Storm water Discharges Check NA if no discharge observed and skip section  Is the discharge free of floating materials, visible oil sheen, discoloration, turbidity, odor, foam or any other signs of contamination?  Were any other illicit, non-storm water discharges observed during the inspection or known to occur since last inspection? Yes No NA Findings and Remedial Action Documentation: Page 3 of 3 II. CORRECTIVE ACTION AND SWPPP MODIFICATIONS DESCRIPTIONS: Additional space to describe inspection findings and corrective actions if needed. Provide brief explanation of the general location and the rationale for the additional or different BMPs. ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ III. CERTIFICATION STATEMENTS AND SIGNATURES: Inspector - Certification: This section must be completed by the person who conducted the site inspection prior to submitting this form to the person with signature authority (per SWPPP and Industrial Storm water General Permit) or a duly authorized representative of that person. The facility is in compliance with the terms and conditions of the SWPPP and the Industrial Storm water General Permit. The facility is out of compliance with the terms and conditions of the SWPPP and the Industrial Storm Water General Permit. This report includes the remedial actions that must be taken to meet the requirements of the SWPPP and permit, including a schedule of implementation of the remedial actions. “I certify that this report is true, accurate, and complete, to the best of my knowledge and belief.” Inspector’s Name – Printed Inspector’s Signature Inspector’s Title Date SIDE A VISUAL OBSERVATIONS OF STORM WATER DISCHARGES – FORM B  Storm water discharge visual observations are required at the time sampling occurs at a discharge location.  Visual observations should be conducted during the first hour of discharge at all discharge locations.  Discharges of temporarily stored or contained storm water and treatment system bypass water must be observed at the time of discharge. Observation Date: __________________________ Drainage Location Description #1 #2 #3 #4 Observers Name: _ Observation Time P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Title: _ Time Discharge Began P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Signature: _ Were Pollutants Observed (If yes, complete reverse side) Observation Date: __________________________ Drainage Location Description #1 #2 #3 #4 Observers Name: _ Observation Time P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Title: _ Time Discharge Began P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Signature: _ Were Pollutants Observed (If yes, complete reverse side) Observation Date: __________________________ Drainage Location Description #1 #2 #3 #4 Observers Name: _ Observation Time P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Title: _ Time Discharge Began P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Signature: _ Were Pollutants Observed (If yes, complete reverse side) Observation Date: __________________________ Drainage Location Description #1 #2 #3 #4 Observers Name: _ Observation Time P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Title: _ Time Discharge Began P.M. : A.M. P.M. : A.M. P.M. : A.M. P.M. : A.M. Signature: _ Were Pollutants Observed (If yes, complete reverse side)  Indicate “None” in the first column of this form if you did not conduct a monthly visual observation.  Make additional copies of this form as necessary.  Record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge. NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES SIDE B VISUAL OBSERVATIONS OF STORM WATER DISCHARGES – FORM B DATE/TIME OF OBSERVATION (From Reverse Side) DRAINAGE AREA DESCRIPTION EXAMPLE: Discharge from material storage Area #2 DESCRIBE STORM WATER DISCHARGE CHARACTERISTICS Indicate whether storm water discharge is clear, cloudy, or discolored; causing staining; containing floating objects or an oil sheen, has odors, etc. IDENTIFY AND DESCRIBE SOURCE(S) OF POLLUTANTS EXAMPLE: Oil sheen caused by oil dripped by trucks in vehicle maintenance area. DESCRIBE ANY REVISED OR NEW BMPs AND THEIR DATE OF IMPLEMENTATION / / _ : AM PM / / _ : AM PM / / _ : AM PM / / _ : AM PM / / _ : AM PM P:\Projects\2017\71730 Old Durham Wood\SWPPP\Inspection Forms\Annual Facility Inspection_formC.doc Page 1 of 4 INDUSTRIAL STORM WATER ANNUAL INSPECTION REPORT – FORM C Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact storm water quality at the facility, and evaluate the effectiveness of best management practices required by this permit. FACILITY NAME: Old Durham Wood INSPECTION TIME: DATE: WEATHER INFORMATION:  Description of Weather Conditions (e.g., sunny, cloudy, raining, windy, etc.): ________________________________________________________________________________________________________  Was storm water (runoff from rain) flowing at sample locations shown on the Site Map during the inspection: Yes No Comments: ________________________________________________________________________________________________________ SEASONAL TASKS:  Have erosion control BMPs been implemented prior to rainy season? Yes No Date last performed: _________________  Will this inspection count as comprehensive annual inspection to be performed by facility general manager (to be performed within every 8-months, see SWPPP for guidance)? Yes No Date last performed: _________________ Comments: __________________________________________________________________________________________________ I. POTENTIAL POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION SWPPP and Site Map: Have a copy of the SWPPP and site map with you during the inspection so that you can ensure they are current and accurate. Use it as an aide in recording the location of any issues you identify during the inspection.  Is the Site Map current and accurate?  Are all inspection records current? o Monthly tank inspections o Daily inventory reconciliation o Spill response/management records o Monthly facility inspections Yes No Findings and Remedial Action Documentation: Describe any findings below and the schedule for remedial action completion, including the date initiated and date completed or expected to be completed. Equipment/Vehicle Cleaning and Maintenance: Equipment/Vehicle cleaning: Check NA if not performed on-site. Skip section. Are all vehicles and equipment washed and/or cleaned only in designated areas?  Observe washing: Is all wash water captured and properly disposed of? Equipment/Vehicle maintenance: Check NA if not performed on-site. Skip section.  Are maintenance tools, equipment and materials stored under shelter, elevated and covered?  Are any vehicles and/or equipment leaking fluids? Identify if necessary, document, and address.  Are materials, equipment, and activities located so that leaks are contained in existing containment and diversion systems Yes No NA Findings and Remedial Action Documentation: Add additional site-specific BMPs that apply to any sections of this page: P:\Projects\2017\71730 Old Durham Wood\SWPPP\Inspection Forms\Annual Facility Inspection_formC.doc Page 2 of 4 I. POTENTIAL POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION Hazardous Material Storage Area:  Are all containers stored with proper containment?  Are exteriors of containers kept outside free of deposits?  Is there evidence of leaks or spills since last inspection? Identify if necessary, document, and address. Yes No Findings and Remedial Action Documentation: Access Roads:  Is the storm water eroding the road surface?  Is the road surface in good condition?  Are wattles and hay bales in good conditioning and functioning as desired? Yes No Findings and Remedial Action Documentation: Debarker Area:  Is there excess oil and grease buildup on mechanical equipment surfaces that could be washed away by rainwater?  Are there indications that any debris is being discharged offsite? Yes No Findings and Remedial Action Documentation: Equipment Areas:  Is there excess oil and grease buildup on mechanical equipment surfaces that could be washed away by rainwater?  Are there signs of leaks in mechanical equipment hydraulic supply lines?  Are the ground surfaces underneath mechanical equipment free of staining?  If equipment is present, are spill materials available and are there adequate amounts available?  Is spill absorbent material dry and stored indoors or in a waterproof container? Yes No Findings and Remedial Action Documentation: Add additional site-specific BMPs that apply to any sections of this page: ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ P:\Projects\2017\71730 Old Durham Wood\SWPPP\Inspection Forms\Annual Facility Inspection_formC.doc Page 3 of 4 I. POTENTIAL POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION Good Housekeeping BMPs:  Is all litter being picked up and disposed of properly?  Is stockpiled material managed properly to limit erosion? Yes No Findings and Remedial Action Documentation: Spill Response:  Are spills being managed in accordance with the site SPCC Plan?  Have all spills been cleaned up immediately upon detection with necessary repairs or maintenance performed to minimize impact to storm water?  Are the spill management and response records current? Yes No Findings and Remedial Action Documentation: Storm water BMPs and Treatment Structures: Visually inspect all storm water BMPs (berms, booms, covers, curbs, secondary containments, drop inlets)  Are BMPs and treatment structures in good repair and operational?  Are BMPs and treatment structures free from debris, sediment, oil, gas, or grease buildup that may impair function? Identify, document, and address if necessary Yes No Findings and Remedial Action Documentation: Observation of Storm water Discharges Check NA if no discharge observed and skip section  Is the discharge free of floating materials, visible oil sheen, discoloration, turbidity, odor, foam or any other signs of contamination?  Water from washing vehicles or equipment, steam cleaning and/or pressure washing is considered process wastewater and is not allowed to comingle with storm water or enter storm drains. Is process water comingling with storm water or entering storm drains?  Were any other illicit, non-storm water discharges observed during the inspection or known to occur since last inspection? Yes No NA Findings and Remedial Action Documentation: Add additional site-specific BMPs that apply to any sections of this page: ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ P:\Projects\2017\71730 Old Durham Wood\SWPPP\Inspection Forms\Annual Facility Inspection_formC.doc Page 4 of 4 II. CORRECTIVE ACTION AND SWPPP MODIFICATIONS DESCRIPTIONS: Additional space to describe inspection findings and corrective actions if needed. Provide brief explanation of the general location and the rationale for the additional or different BMPs. ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ III. CERTIFICATION STATEMENTS AND SIGNATURES: Inspector - Certification: This section must be completed by the person who conducted the site inspection prior to submitting this form to the person with signature authority (per SWPPP and Industrial Storm water General Permit) or a duly authorized representative of that person. The facility is in compliance with the terms and conditions of the SWPPP and the Industrial Storm water General Permit. The facility is out of compliance with the terms and conditions of the SWPPP and the Industrial Storm Water General Permit. This report includes the remedial actions that must be taken to meet the requirements of the SWPPP and permit, including a schedule of implementation of the remedial actions. “I certify that this report is true, accurate, and complete, to the best of my knowledge and belief.” Inspector’s Name – Printed Inspector’s Signature Inspector’s Title Date Permittee – Certification: The facility is in compliance with the terms and conditions of the SWPPP and the Industrial Storm Water General Permit. The facility is out of compliance with the terms and conditions of the SWPPP and the Industrial Storm Water General Permit. This report includes the remedial actions that must be taken to meet the requirements of the SWPPP and permit, including a schedule of implementation of the remedial actions. “I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” PRINTED NAME of person with Signature Authority (per SWPPP and Industrial Storm Water General Permit) SIGNATURE of person with Signature Authority (per SWPPP and Industrial Storm Water General Permit) or a Duly Authorized Representative DATE EMPLOYEE TRAINING Date of Session: _____________________ Time: _____________________ I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Trainer : ________________________ ________________________________ (printed) (Signature) Attendees (names, printed): Signature: _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ ________________________________ Topics Covered: ________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ Appendix C EPA Industrial Stormwater Monitoring and Sampling Guide Appendix D Probe Information