HomeMy WebLinkAboutFAI19-0024 CF Fire Alarm Test 2020 - Gozi
o i p 25c -0 9
Fire Alarm and Life Safety System
Inspection Certificate
For
WASHINGTON COURT
APARTMENTS
1001 WASHINGTON STREET
GRIDLEY, CA 95948
Tested to NFPA 72 Standards
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages
of this report provide performance measurements, listed ranges of acceptable results, and complete
documentation of the inspection. Whenever discrepancies exist between acceptable performance
standards and actual test results, notes and/or recommended solutions have been proposed or provided
for immediate review and approval.
Annual Inspection
Inspection Date
Jan 10, 2020
Building:WASHINGTON COURT APARTMENTS Company:Hue&Cry,Inc.
Contact: Scott Busch Contact:CESAR HERNANDEZ
Title: REGIONAL MANAGER Title:INSPECTOR
Executive Summary
Generated by:BuildingReports.corn
Building:WASHINGTON COURT APARTMENTS Contact: Scott Busch
Address: 1001 WASHINGTON STREET Phone: 1530846-2600
Address: Fax:
City/State/Zip: GRIDLEY, CA 95948 Mobile:
Country: United States of America Email: SBUSCH@CRESAPTS COM
In ection Performed By
Company: Hue&Cry, Inc. Inspector: CESAR HERNANDEZ
Address: 1751 Bruce Drive Phone: 9166064121
Address: Fax:
City/State/Zip:Anderson, California 96007 Mobile: 19166064121
Country: United States Email: C HERNANDEZ@HUEANDCRY COM
Sys Una
Manufacturer: Silent Knight Inspection Date: 01/10/2020 IDC Style:
Model Number: SK-5700 Install Date: 10/25/2011 SLC Style:
Software Version: 10.05 Version Date: 06/10/2010 NAC Style:Y
Location: Bldg H Office Current Protection: Breaker
Company: Phone: Account#:
,. �.�y" "K`?L !" ti � ,. �i i .^ a�yY9r ,qt c5 us+
alS�io Sin veri acaiion
Type: Mfg: Model#:
Test Time/Date: Restore Time:
Hue&Cry,Inc. Page 1 of 13 01/17/2020
Executive Summary
Total Items Serviced Passed Failed/Other
Category:g ry: Qty % Qty ` % I Qty 1 % Qty 1 %
Control 15 23.44% 15 100.00% 15 100.00% 0 0%
Monitor 10 15.62% 10 100.00% 10 100.00% 0 0%
Initiating 9 14.06% 9 100.00% 9 100.00% 0 0%
Supervisory 11 17.19% 11 100.00% 11 100.00% 0 0%
Indicating 19 29.69% 19 100.00% 1 19 100.00% 0 0%
Totals 64 1 100% ; 64 1100 00% , 64 1 104 00°!° 0 0%
Company: Hue&Cry, Inc. Building:WASHINGTON COURT APARTMENTS
Inspector:CESAR HERNANDEZ Contact: Scott Busch
C/ . : —'--
Signed:Jan 10,2020 Signed:Jan 10,2020
Hue&Cry,Inc. Page 2 of 13 01/17/2020
Executive Summary
Notes & Recommendations
Generated by:BuildingReports.com
The Notes&Recommendations Report details additional inspection notes made by the Inspectors during the course of the
building inspection. Notes are grouped by Category.
Replaced 2 12v 12a in the Fire Control Panel
Replaced 4 12v 7a in Buildings F and B
Hue&Cry,Inc. Page 3 of 13 01/17/2020
Notes&Recommendations
Inspection & Testing
Generated by:BuildingReports.com
The Inspection& Testing section lists all of the items inspected in your building. Items are grouped by Passed or
Failed/Other. Items are listed by Category. Each item includes the services performed, and the time&date at which testing
occurred.
� t
`ib, re abi. a., Ri d..an.. z.i_
Control
Annunciator Inside Office Tested 1:34:55 PM 01/10/2020
Battery Bldg B Replaced 1:22:41 PM 01/10/2020
Battery Bldg B Replaced 1:23:11 PM 01/10/2020
Battery Bldg F Replaced 1:31:27 PM 01/10/2020
Battery Bldg F Replaced 1:32:05 PM 01/10/2020
Battery Bldg H FACP Replaced 1:09:22 PM 01/10/2020
Battery Bldg H FACP Replaced 1:09:51 PM 01/10/2020
Control Panel Bldg H Office Tested 1:00:08 PM 01/10/2020
Disconnect Bldg B Circuit 3 Outside Tested 1:25:04 PM 01/10/2020 '
Disconnect Bldg F Circuit 3 Outside Tested 12:57:16 PM 01/10/2020
Disconnect Bldg H Office Boiler Room Circuit 2 Tested 1:37:02 PM 01/10/2020
Phone Jack I Bldg H FACP 530-846-2136 Pri Tested 1:16:30 PM 01/10/2020
Phone Jack Bldg H FACP 530-846-2154 Sec Tested 1:16:27 PM 01/10/2020
Power Supply Bldg B Tested 11:57:46 AM 01/10/2020
Power Supply Bldg F Tested 12:46:26 PM 01/10/2020
Indicating
Horn/Strobe Bldg D Riser Tested 12:17:44 PM 01/10/2020
Horn/Strobe Bldg A Riser Riser Tested 11:43:06 AM 01/10/2020
Horn/Strobe Bldg B Apt 9 Bed 1 ADA Tested 9:36:42 AM 01/10/2020 '
Horn/Strobe Bldg B Apt 9 Bed 2 ADA Tested 9:36:30 AM 01/10/2020
Horn/Strobe Bldg B Apt 9 Bed 3 ADA Tested 9:36:22 AM 01/10/2020
Horn/Strobe Bldg B Apt 9 Living Room ADA Tested 10:39:01 AM 01/10/2020
Horn/Strobe Bldg B Riser Riser Tested 11:53:23 AM 01/10/2020
Horn/Strobe Bldg C Riser Riser Tested 11:59:53 AM 01/10/2020
Horn/Strobe Bldg E Riser Riser Tested 12:55:29 PM 01/10/2020
Horn/Strobe Bldg F Apt 41 Bed 1 ADA Tested 10:38:01 AM 01/10/2020
Horn/Strobe Bldg F Apt 41 Bed 2 ADA Tested 10:38:51 AM 01/10/2020
Horn/Strobe Bldg F Apt 41 Living Room ADA Tested 10:38:40 AM 01/10/2020
Horn/Strobe Bldg F Riser Tested 12:50:09 PM 01/10/2020
Horn/Strobe Bldg G Riser Tested 12:08:16 PM 01/10/2020
Horn/Strobe Bldg H Office Lobby Tested 1:37:47 PM 01/10/2020
Horn/Strobe Bldg H Office Outside Riser Tested 1:14:06 PM 01/10/2020
Strobe Bldg B Apt 9 Bathroom ADA Tested 9:37:03 AM 01/10/2020
Hue&Cry,Inc. Page 4 of 13 01/17/2020
Inspection&Testing
i.
��pp `
/' �,,..Z%4a �" as 4 � ,fin A� �' P: ,,,
�r<�, � '�� �., � 4�1 � 4... ,..,gib
Strobe Bldg B Apt 9 Master Bath ADA Tested 9:36:10 AM 01/10/2020
Strobe Bldg F Apt 41 Bed 1 ADA Tested 10:38:19 AM 01/10/2020
Initiating
Smoke Detector Office Riser Tested 1:16:20 PM 01/10/2020
Waterflow Switch Bldg A-ITV in Access Door Tested 11:38:08 AM 01/10/2020
Waterflow Switch Bldg B-ITV in Access Door Tested 9:52:22 AM 01/10/2020
Waterflow Switch Bldg C-ITV in Access Door Tested 12:01:45 PM 01/10/2020
Waterflow Switch Bldg D-ITV in Access Door Tested 12:18:56 PM 01/10/2020
Waterflow Switch Bldg E-ITV in Access Door Tested 12:55:01 PM 01/10/2020
Waterflow Switch Bldg F-ITV in Access Door Tested 12:48:56 PM 01/10/2020
Waterflow Switch Bldg G-ITV in Access Door Tested 12:11:04 PM 01/10/2020
Waterflow Switch Bldg H Office-ITV in Access Door Tested 1:10:15 PM 01/10/2020
Monitor
Monitor Device Bldg A Riser Room Tested 11:42:46 AM 01/10/2020
Monitor Device Bldg A Riser Room Tested 11:42:53 AM 01/10/2020
Monitor Device Bldg B Riser Room Tested 11:57:42 AM 01/10/2020
Monitor Device Bldg C Riser Room Tested 12:00:31 PM 01/10/2020
Monitor Device Bldg C Riser Room Tested 12:00:38 PM 01/10/2020
Monitor Device Bldg D Riser Room Tested 12:17:21 PM 01/10/2020
Monitor Device Bldg D Riser Room Tested 12:17:31 PM 01/10/2020
Monitor Device Bldg E Riser Room Tested 12:55:18 PM 01/10/2020
Monitor Device Bldg F Riser Room Tested 12:47:53 PM 01/10/2020
Monitor Device Bldg G Riser Room Tested 12:10:49 PM 01/10/2020
Supervisory
Tamper Switch Backflow by Bldg A Tested 11:47:23 AM 01/10/2020
Tamper Switch Backflow by Bldg A Tested 11:47:34 AM 01/10/2020
Tamper Switch Backflow by Bldg D Tested 12:37:14 PM 01/10/2020
Tamper Switch Backflow by Bldg D Tested 12:40:46 PM 01/10/2020
Tamper Switch Bldg A Tested 11:37:53 AM 01/10/2020
Tamper Switch Bldg B Tested 11:52:42 AM 01/10/2020
Tamper Switch Bldg C Tested 12:01:12 PM 01/10/2020
Tamper Switch Bldg D Tested 12:17:12 PM 01/10/2020
Tamper Switch Bldg F Tested 12:47:44 PM 01/10/2020
Tamper Switch Bldg G Tested 12:51:34 PM 01/10/2020
Tamper Switch Bldg H Office Tested 12:59:59 PM 01/10/2020
Hue&Cry,Inc. Page 5 of 13 01/17/2020
Inspection&Testing
Service Summary
Generated by:BuildingReports.com
The Service Summary section provides an overview of the services performed in this report.
r
Annunciator Tested 1
Battery Replaced 6
Control Panel Tested 1
Disconnect Tested 3
Horn/Strobe Tested 16
Monitor Device Tested 10
Phone Jack Tested 2
Power Supply Tested 2
Smoke Detector Tested 1
Strobe Tested 3
Tamper Switch Tested 11
Waterflow Switch Tested 8
Total 64
Hue&Cry,Inc. Page 6 of 13 01/17/2020
Service Summary
Auxiliary Functions Testing
Generated by:BuildingReports.com
The Auxiliary Functions Testing section lists each of the ancillary items,systems, and emergency equipment that are
controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type,
and a check box is provided to indicate if the test conducted was simulated.
Smoke Detector
Smoke Compartment Office Riser Passed 32022040
Hue&Cry,Inc. Page 7 of 13 01/17/2020
Auxiliary Functions Testing
Time, Temperature & Level Testing
Generated by:BuildingReports.com
The Time, Temperature, &Level Testing section details the measurements taken from various devices that are designed to
respond in a certain amount of time, respond at a certain temperature, or respond within the acceptable range of volume
or level. Items are grouped by Passed or Failed/Other.
Waterflow Switch
Bldg A-ITV in Access Door Passed 50 n/a n/a 32022038
Bldg B-ITV in Access Door Passed 45 n/a n/a 32022028
Bldg C-ITV in Access Door Passed 52 n/a n/a 32022023
Bldg D-IN in Access Door Passed 37 n/a n/a 32022019
Bldg E-IN in Access Door Passed 31 n/a n/a 32022011
Bldg F-IN in Access Door Passed 48 n/a n/a 32022004
Bldg G-IN in Access Door Passed 45 n/a n/a 32021999
Bldg H Office-IN in Access Door Passed 10 n/a n/a 32022043
Hue&Cry,Inc. Page 8 of 13 01/17/2020
Time,Temperature&Level Testing
Battery & Power Supply Testing
Generated by:BuildingReports.corn
The Control&Power Testing section details the readings and measurements of batteries and power supplies used to
provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
, S P
Battery
Sealed Lead Acid Bldg B 7 12
Sealed Lead Acid Bldg B 7 12
Sealed Lead Acid Bldg F 7 12
Sealed Lead Acid Bldg F 7 12
Sealed Lead Acid Bldg H FACP 12 12
Sealed Lead Acid Bldg H FACP 12 12
Power Supply
Bldg B 6 24
Bldg F 6 24
Hue&Cry,Inc. Page 9 of 13 01/17/2020
Battery&Power Supply Testing
Inventory & Warranty Report
Generated by:BuildingReports.com
The Inventory& Warranty Report lists each of the devices and items that are included in your Inspection Report. A
complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last
year, and devices installed for two years or more are grouped together for easy reference.
Strobe Indicating 4.69% 3
Horn/Strobe Indicating 25.00% 16
Waterflow Switch Initiating 12.50% 8
Tamper Switch Supervisory 17.19% 11
Monitor Device Monitor 15.62% 10
Power Supply Control 3.12% 2
Disconnect Control 4.69% 3
Control Panel Control 1.56% 1
Battery Control 9.38% 6
Smoke Detector Initiating 1.56% 1
Phone Jack Control 3.12% 2
may,( Annunciator Control 1.56% 1
Power-Sonic
Battery 2 PS-12120 F1 Sealed Lead Acid 01/10/2020
Battery 4 PS-1270 Fl Sealed Lead Acid 01/ 00/2020
Silent Knight
Smoke Detector 1 SK PHOTO Photoelectric 10/07/2016
�,,, ✓ � ... �.. _ �_ ,„.... _. ram �
Silent Knight
Monitor Device 1 SK-MONITOR-2 dual 11/11/2014
System Sensor
Horn/Strobe 2 P2RK 11/11/2014
KISCO
Tamper Switch 2 KT-505W-8 10/28/2011
Silent Knight
Monitor Device 1 SK-MONITOR-2 10/28/2011
Monitor Device 2 SK-MONITOR-2 Dual 10/28/2011
Power Supply 1 5496 10/28/2011
System Sensor
Waterflow Switch 4 WFD25 10/28/2011
Hue&Cry,Inc. Page 10 of 13 01/17/2020
Inventory&Warranty Report
Disconnect 3 Breaker 10/25/2011
Napco
Tamper Switch 1 OSY2 10/25/2011
NIBCO
Tamper Switch 1 GD-4765-8N 10/25/2011
Tamper Switch 4 KY-505W-8 10/25/2011
Silent Knight
Annunciator 1 LCD Display 10/25/2011
Control Panel 1 SK-5700 10/25/2011
Monitor Device 3 SK-MONITOR 10/25/2011
Monitor Device 3 SK-MONITOR-2 dual 10/25/2011
Phone Jack 2 SK-5700 10/25/2011
Power Supply 1 5496 10/25/2011
System Sensor
Horn/Strobe 2 P2R 10/25/2011
Horn/Strobe 5 P2RK 10/25/2011
Tamper Switch 3 OSY2 10/25/2011
Waterflow Switch 4 WFD25 10/25/2011
System Sensor
Horn/Strobe 7 P2RK 10/11/2009
Strobe 2 10/11/2009
Strobe 1 P2RK 10/11/2009
Hue&Cry,Inc. Page 11 of 13 01/17/2020
Inventory&Warranty Report
Zone Address Report
Generated by:BuildingReports.corn
•
The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a
common zone. The device type, location, and description are included for your reference.
Zone/Circuit: 004,005`
Monitor Device Bldg A Riser Room dual 32022035
Zone/Circuit: 005
Tamper Switch Bldg A 32022037
Tamper Switch Bldg H Office 32022042
Zone/Circuit: 006,007
Monitor Device Bldg B Riser Room dual 32022029
Zone/Circuit: 007
Tamper Switch Bldg B 32022027
Zone/Circuit: 008
Tamper Switch Bldg C 32022024
Monitor Device Bldg C Riser Room 32022022
Zone/Circuit: 009
Waterflow Switch Bldg C-ITV in Access Door 32022023
Monitor Device Bldg C Riser Room 32022021
Zone/Circuit: 013
Waterflow Switch Bldg D-ITV in Access Door 32022019
Zone/Circuit: 013,014
Monitor Device Bldg D Riser Room dual 32022017
Zone/Circuit: 014
Tamper Switch Bldg D 32022018
Zone/Circuit:015
Tamper Switch Bldg G 32022012
Zone/Circuit: 015,016
Monitor Device Bldg E Riser Room Dual 32022010
Zone/Circuit: 016
Waterflow Switch Bldg E-ITV in Access Door 32022011
Zone/Circuit: 018
Tamper Switch Bldg F 32022003
Zone/Circuit: 018, 019
Monitor Device Bldg F Riser Room Dual 32022005
Monitor Device Bldg G Riser Room 32022001
Zone/Circuit: 019
Waterflow Switch Bldg F-ITV in Access Door 32022004
Hue&Cry,Inc. Page 12 of 13 01/17/2020
Zone Address Report
Y ✓' Vi- , a, - f Rr1j '+' e,` b,r p "ry:�. ^.: + <,' : a,- t .b �y ,4 ,:grs4a , ^ 3Jk�,,, ,a
Waterflow Switch Bldg G-ITV in Access Door 32021999
Waterflow Switch Bldg H Office-ITV in Access Door 32022043
Zone/Circuit: 049 .
Monitor Device Bldg D Riser Room 32022016
01 Tamper Switch Backflow by Bldg D 32022014
02 Tamper Switch Backflow by Bldg D 32022015
Zone/Circuit: 050
Monitor Device Bldg A Riser Room dual 32022036
01 Tamper Switch Backflow by Bldg A 32022034
02 Tamper Switch Backflow by Bldg A 32022033
Zone/Circuit: 4
Waterflow Switch Bldg A-ITV in Access Door 32022038
Zone/Circuit:A
Power Supply Bldg B 32022032
Zone/Circuiit: B
Power Supply Bldg F 32022008
Zone/Circuit: M02 i
Bottom Battery Bldg B Sealed Lead Acid 61628414
Right
Bottom Battery Bldg B Sealed Lead Acid 61628415
Right
Zone/Circuit: M03
Bottom Left Battery Bldg F Sealed Lead Acid 61628412
Bottom Left Battery Bldg F Sealed Lead Acid 61628413
Hue&Cry.Inc. Page 13 of 13 01/17/2020
Zone Address Report