Loading...
HomeMy WebLinkAbout12.04.19 Email from Mac Empleo and N. Chico Neighborhood Safety Group - N. Chico Land Use and Flooding Concerns December 4, 2019 SENT VIA EMAIL (clerkoftheboard@buttecounty.net) Chair Lambert and Board of Supervisor Members Butte County Board of Supervisors 25 County Center Drive Oroville, CA 95965 RE: North Chico Land Use and Flooding Concerns Dear Chair Lambert and Board Members: This firm represents the North Chico Neighborhood Safety Group. This group is working to address issues in North Chico relating to flood hazards, new development proposals that could worsen flooding, and other related concerns. In the past few months, we have been gathering information to better understand the status of various issues pertaining to existing and proposed land uses within the North Chico Specific Plan and their associated environmental impacts including flood risk. Although our research is ongoing, we have developed enough information to bring the concerns discussed in this letter forward. The flooding that occurred in February 2019 was a major precipitating factor in the need to update the Board and other County officials regarding these issues. After heavy rains, Keefer Slough overtopped its banks and flooded the streets of Autumn Park as well as areas downstream. Water level at Garner Road bridge looking 4243 Anjou Court (2/27/19) north (2/27/19) Butte County Board of Supervisors December 4, 2019 Page 2 of 12 The flooding events of February 2019 make clear that the County must take action to address existing flood risks and avoid approving additional development that will exacerbate existing flood risks. These flood risks are addressed in more detail in the attached letter from MBK Engineers, who was asked to review flooding issues pertaining to development in North Chico. (See Exhibit A.) This letter includes: A Discussion of the Factual Background regarding the North Chico Specific Plan; A description of how proposed development in the NCSP would exacerbate flooding and other environmental concerns; An analysis of why new development must be analyzed in a single environmental document; and Requests for specific actions by County to address these concerns. I. FACTUAL BACKGROUND The Autumn Park Subdivision was constructed as part of the NCSP in the early surface water runoff from the subdivision. That retention pond is located on a 1.49 acre lot (APN 047-260-187), on the western side of Autumn Park that is owned by the Nicolaus Family Trust, which is encumbered by a County easement to allow for the construction and maintenance of a detention pond. The larger parcels to the west, north, and southwest (around three sides of the Autumn Park Subdivision) is owned by farmer and land developer George Nicolaus, and affiliated entities, such as ARCAPCO, Inc. (APNs 047-260-199, 047-440-012, and 047-260-198). Over the years, Mr. Nicolaus has endeavored to move forward on development of his lands, which are currently in orchard use. For instance, in 2007, the County prepared a Mitigated Negative Declaration for cancellation of Williamson Act Contract for APN 047-260-199, the parcel immediately to the west of the Autumn Park subdivision. This project was apparently never approved. Comments from Caltrans on this project raised concerns with the exacerbation of flooding of Highway 99 from the eventual development of this parcel, which would include raised building pads according to the 2007 MND. A. Actions by Mr. Nicolaus Exacerbated Flooding of Autumn Park Unfortunately, Mr. Nicolaus has taken actions that worsen flood conditions in Autumn Park and the greater region. For instance, in 2012, Mr. Nicolas planted a new Butte County Board of Supervisors December 4, 2019 Page 3 of 12 orchard in the area to the north of Autumn Park. In so doing, Mr. Nicolaus, leveled a protective berm adjacent to neighboring property within Autumn Park to the south. Newly planted orchard on APN 047-440-012, Google Earth Pro (5/2/2013) When Keefer Slough overtopped its banks on February 14 and 27, 2019, the flood waters overflowed to neighboring property. Water rushed through orchard, and down the fire lane that borders Autumn Park, west of Garner Lane. From the fire lane, water rushed down Bosc Drive to Magness and Anjou Courts. The retention pond also filled and flooded back onto Anjou and Magness Courts. Flood waters came within 15 feet of fronts doors, and were 4 feet deep. Flood waters flowing down fire lane on south Flood waters from Keefer Slough side of Nicolaus orchard (2/27/2019) flowing down Bosc Drive (2/14/19) Mr. Nicolaus acted negligently when he laser leveled his orchard in 2012, which included flattening a berm that previously protected neighboring property to the south Butte County Board of Supervisors December 4, 2019 Page 4 of 12 from flood damages. Private property owners are subject to traditional principles of negligence when they make alterations to natural water channels or otherwise change the flow of flood waters. (Ektelon v. City of San Diego (1988) 200 Cal.App.3d 804, 810 (Ektelon) some protection to land owners making changes to protect themselves from flood waters, it is not without limitation. (Id. at 809.) Further, no such protection would apply here as Mr. Nicolaus was not attempting to protect his land from flood waters; rather, he removed protections from such flood waters. Mr. berm, whether inadvertent or purposeful, was unreasonable and negligent. B. New Well Installations Have Not Been Properly Overseen currently in agricultural use within the NCSP have disregarded County requirements and procedures applicable to groundwater wells. This disregard for basic groundwater permitting requirements also raise serious long-term groundwater sustainability concerns. In f Autumn Park retention pond is likely to exacerbate flooding conditions. An existing agricultural well at the corner of Garner Lane and Kittyhawk Drive, which serves Mr. Nico 1 well permitting system. It appears that a permit was issued in 2017 to attempt to make improvements to this existing well. Those improvements, however, were apparently ineffective. In September 2018, Mr. Nicolaus applied for a permit to drill a new well on APN 047-260-199, directly west of the Autumn Park subdivision and within the parcel for which Mr. Nicolaus is now seeking to build 4 homes (discussed below). The application indicates it would be for a Large Diameter Well, ostensibly for agricultural use. The permit for this well was not granted because no flood elevation certificate was ever provided, according to County . 1 The 2016 Municipal Service Review and Sphere of Influence Plan for CSA 172 (2016 MSR/SOI Plan) indicates that this well is the irrigation well serving CSA 172. This information is incorrect, as the irrigation and fire suppression well for CSA 172 is actually located in a fenced area at the north side of Kittyhawk Drive between Winesap Court and Bosc Drive. Given the description in the 2016 MSR/SOI Plan, it appears that Drive. That could explain the large increase in PG&E costs over the past few years, subsequent to the planting of the orchard by Mr. Nicolaus. Butte County Board of Supervisors December 4, 2019 Page 5 of 12 In August 2019, Mr. Nicolaus submitted another well construction permit 2 application, this time slightly to the west, located at Kittyhawk Drive and Comice Court. When personnel for Sullivan Drilling were asked what they were working on by a permit application does not indicate the well type, although it was apparently processed as a replacement well for the failed well at Kittyhawk Drive and Garner Lane. According to County EHS staff, the well was built to specifications for a Public Water System, confirming the statement of Sullivan Drilling personnel, but the well does not meet the setback from septic tank requirements. Note no box checked for well type in application Construction in County right of way south of Kittyhawk Drive for Maintenance of the retention basin has been an ongoing concern, both before and after the February 2019 flood events. Residents within Autumn Park subdivision have exchanged numerous emails, numerous phone calls with County Public Works to inspect, maintain and service the retention pond, yet nothing has been done. This belies common sense given the flooding in February 2019. 2 Though the well application lists APN 047-260-198 as the location of the well, the location is actually on a County parcel (APN 047-260-053). Butte County Board of Supervisors December 4, 2019 Page 6 of 12 In addition to failing to maintain the pond, the County has also allowed Mr. Nicolaus to use the pond for purposes unrelated to the provision of drainage for Autumn Park. Subsequent to completion of drilling the new 600 foot deep well in September and October 2019, Mr. Nicolaus proceeded to pump large amounts of water from the well into the Autumn Park subdivision retention pond. Despite the fact that the retention pond does not serve any of the parcels owned by Mr. Nicolaus and his parcels are not charged for services provided by CSA 172, the Assistant Public Works Director 3 . CSA 172 Retention Pond filled with well water pumped by George Nicolaus (10/1/2019) Subsequent to pumping water into the retention pond, in November 2019, the fact 4 that bentonite was part of the drilling solution was identified. Bentonite is a sealer and would be expected to decrease the infiltration rate of water in the detention pond. Subsequently, County Public Works advised that Mr. Nicolaus would scarify, or till the bottom of the pond to increase the percolation performance. On November 25, 2019, Mr. Nicolaus apparently undertook this work, without any engineering or other County oversight. The top layer of the soil contaminated with bentonite was simply moved to the sides and then scarified the bottom. Like the initial pumping, these actions were not formally authorized. 3 Later, a 4 See http://wildlife.tamu.edu/files/2010/04/1_Sealing_Ponds.pdf, https://sturgismaterials.com/products-view/sodium-bentonite/. Butte County Board of Supervisors December 4, 2019 Page 7 of 12 Grading in the Autumn Park retention pond on November 25, 2019 In any case, these actions within the retention basin do nothing to address known flood issues from Keefer Slough. Clearly, Mr. Nicolaus should not be worsening the functionality of the Autumn Park subdivision detention pond (see Ektelon, supra, 200 Cal.App.3d 804, 809-810), and County staff have failed to provide adequate maintenance and with respect to well drilling and use of the retention pond. II. PROPOSED DEVELOPMENT PROPOSED IN THE NCSP WOULD EXACERBATE FLOODING AND OTHER ENVIRONMENTAL CONCERNS A. Nicolaus Proposed Four Home Subdivision Application Mr. Nicolaus submitted a four one-acre lot predevelopment application on February 19, 2019 for APN is 047-260-199. It is directly north of the proposed Legacy Village project (discussed below). (See Map, attached as Exhibit B.) Mr. Nicolaus has requested that the tentative parcel map be processed as a separate application from Legacy Village. It appears that the four homes would rely on the existing stormwater detention basin in Lot 44, despite the fact that the County has determined that APN 047- 260-199 does not benefit from CSA 172. The decision to approve the project would be As discussed in the MBK letter attached as Exhibit A, construction of these homes could increase flood risks on nearby parcels, since they would be raised. As can be seen in Exhibit B, the outdated flood map shows the Zone A flood line going through three of the four proposed parcels. Given recent flooding events, it is a nonstarter for additional drainage water being added to the community retention pond from these four houses. Moreover, the County specifically identified APN is 047-260-199 as not benefitting from Butte County Board of Supervisors December 4, 2019 Page 8 of 12 CSA 172 facilities. Last, the proposed access from the existing subdivision would not be compatible with existing development in Autumn Park. B. In October 2018, a predevelopment application to develop 100 clustered homes on 25 acres was submitted by Mr. Nicolaus. The Legacy Village project (previously called Almond Ranch) would be located on APN 047-260-198, with density transfer from . A golf course is also included in the plans. The golf course and homes would be located in APN 047-260-198. (See attached Exhibit B.) Drainage facilities are proposed to be located in the southernmost parcel. The application states that a lot line adjustment, tentative subdivision map, and rezone will be needed. County staff has indicated that an E) will be required for this project. (See attached Exhibit B.) Traffic, flood and drainage have been identified as key environmental issues by County staff. Flooding As discussed in the MBK letter attached as Exhibit A, development is constrained by the flood zone shown in the Standard Digital Flood Insurance Rate Map (Zone A in DFIRM). The existing DFIRM map product is not a precise indication of actual flood flows, nor is it intended to be. Though the proposed development is mostly aligned to avoid flood zone, with the homes proposed for the southeast corner of the parcel, there is no detailed, up-to-date flood map for this area, and the flooding of February 2019 showed that the mapped flood zone is incorrect. In 2017, the Nord community was approved for State funding to conduct feasibility study projects under the Small Communities Flood Risk Reduction Program. There is insufficient information upon which to base any determination of the current flood status of the area, or the effect of future development such as the Legacy Village. A new model would be updated to reflect existing topography and development, as well as storm event frequency. It is likely that the map will be different than the current DFIRM map. Even with the homes proposed out of the flood zone identified in the DFIRM map for insurance purposes, roads and other improvements associated with the project would be within the floodplain and could significantly constrain flood flows. These restrictions and the effect on regional flooding would need to be analyzed in an EIR. The 2016 LAFCo Municipal Services Review and Sphere of Influence report does not adequately address drainage issues in this area. For instance, drainage into Keefer Slough from the Pheasant Landing/Sierra Moon subdivision (CSA 169) is omitted. The Butte County Board of Supervisors December 4, 2019 Page 9 of 12 actual storm water drainage from this CSA of 140 homes is pumped into Keefer Slough by two pumps, contributing to flooding of the Keefer Creek Estates subdivision, homes off Dusty Lane, and Autumn Park Subdivision. 5 adequate infrastructure and flood protections improvements. The Sierra Moon development did not install adequate retention ponds; thus, stormwater runoff from these homes is diverted directly into Keefer Slough. More homes in this subdivision are being built every day. In addition, many other homes built off both sides of Keefer Road over to Highway 99 and the Garner Lane homes are not a part of a CSA. These homes are also annually flooded in their neighborhoods. Keefer Slough cannot accommodate drainage from existing development, let alone future development such as the Four Parcel Subdivision and Legacy Village projects proposed by Mr. Nicolaus. On November 5, 2019, the Board of Supervisors unanimously passed item 4.04 North Chico Flood Plan, where the Board acknowledged the flood problems in North Chico and adopted a resolution that requires the Planning Division to notify developers and prospective homeowners that it floods in North Chico. This is an important step forward, but more action and leadership is necessary given the severe flood risks posed. Unfortunately, the Resolution fails to reference existing County requirement for new development that the site be reasonably safe from flooding. (MBK Letter, Exhibit A, pp. 5-6, Butte County Code, § 26-23.) In its review, the County must take into consideration that the existing FEMA Zone A maps are outdated and are not accurate, based on the flooding that occurred in February 2019. As per Section 26-23(a)(2), the County must require the developer to prepare a cumulative hydraulic impact analysis to demonstrate that the proposed developments do not increase the water surface elevation on neighboring properties. (Id. at p. 6.) Thus, in addition to warning developers and permit applicants, the County must also responsibly assess incremental flood risks posed by new development and make sure the development does not increase flood base elevations on neighboring 5 Sierra Moon hat is failing and is causing wells to be contaminated. This same sewer package facility is slated to be used in the Legacy Village development, causing additional concerns. Butte County Board of Supervisors December 4, 2019 Page 10 of 12 property. We know from flooding in February 2019 that this duty has not been carried out, and that new pending development proposals will only make conditions worse. Groundwater The project description in the predevelopment application states the project would groundwater use would be consistent with the requirements of the Sustainable 6 From Nicolaus, groundwater is only available in the deep aquifer. To the extent Mr. Nicolaus intends to rely on the new well assumed to replace the agricultural well on the corner of Garner Lane and Kittyhawk Drive, it cannot meet the setback from septic requirements for a Public Water System. Wastewater Treatment The Legacy Village project would rely on a package Waste Water Treatment WWT plant. It is unclear where the waste water would discharge. Combined with the flooding issues, winter-time wastewater disposal could be a serious problem. This has been an ongoing issue in the Sierra Moon subdivision, for instance, where the package WWT is not functioning properly. Traffic Traffic issues and traffic congestion in North Chico continues to worsen, and would be exacerbated by the Legacy Village project. If housing continues to be approved in North Chico, issues to be addressed include mitigation for traffic congestion, delayed safety response times, and flooded evacuation routes. There are currently no mitigation plans for these serious traffic issues. III. SEPARATE ENVIRONMENTAL REVIEW OF THE FOUR PARCEL SUBDIVISION AND LEGACY VILLAGE WOULD CONSTITUTE UNLAWFUL PIECEMEALING Mr. Nicolaus has requested that the County analyze the environmental effects of the two adjacent development projects separately. This would constitute impermissible piecemealing. Piecemealing or segmenting means dividing a project into two or more 6 See https://www.buttecounty.net/waterresourceconservation/Sustainable- Groundwater-Management-Act/Butte-County-Subbasins/Vina. Butte County Board of Supervisors December 4, 2019 Page 11 of 12 pieces and evaluating each piece in a separate environmental document, rather than evaluating the whole of the project in one environmental document. This is explicitly forbidden by CEQA, because dividing a project into a number of pieces would allow a Lead Agency to minimize the apparent environmental impacts of a project by evaluating individual pieces separately, each of which may have a less-than- significant impact on the environment, but which together may result in a significant impact. Segmenting a project may also hinder developing comprehensive mitigation strategies. Given the intertwined environmental impacts associated with the proposed Four Parcel Subdivision and the Legacy Village project, they must be analyzed together in a single EIR. Under CEQA, the whole of the action must be considered and that the The piecemealing or segmenting issue is also de novo. (Communities for a Better Environment v. City of Richmond (2010) 184 Cal.App.4th 70, 98.) The County has been aware for decades that there is a flooding issue in North Chico yet has continued to approve new developments without adequate attention to flood control. In addition to flooding, groundwater and traffic impacts necessitate review of these North Chico development projects in a single EIR. Continuing to approve housing projects without adequate drainage and flooding facilities imperils existing communities. Interim fixes implemented by the County, Rock Creek Reclamation District and others are only temporary, one season fixes; a comprehensive solution is needed. * * * The North Chico Neighborhood Safety Group requests that the Board of Supervisors adopt a moratorium on all development within the NCSP area until flooding, infrastructure, and safety concerns are addressed. updated to address the current drainage conditions in North Chico, including the overreliance on Keefer Slough. If any new development is to proceed, it must only do so in full compliance with existing flood and safety requirements, including a showing that flood elevations will not increase, in addition to compliance with other environmental laws. The County must also provide proper oversight over CSA facilities, and not allow them to be managed or damaged by unauthorized parties not designated as beneficiaries. Last, environmental review of new development projects in the NCSP must not be segmented and must fully address and mitigate flooding impacts. Butte County Board of Supervisors December 4, 2019 Page 12 of 12 Please feel free to contact me with any questions about the information contained in this letter. Very truly yours, SOLURI MESERVE A Law Corporation By: Osha R. Meserve ORM/mre Attachments: Exhibit A Exhibit B, Map of Nicolaus Legacy Village and 4 Home Subdivision Proposal cc (via email): Butte County Board of Supervisors: Bill Connelly, bconnelly@buttecounty.net Debra Lucero, dlucero@buttecounty.net Tami Ritter, tritter@buttecounty.net Steve Lambert, district4@buttecounty.net Doug Teeter, dteeter@buttecounty.net Butte County Planning Commissioners: District 1, Michael Evans, oneniceplace@hotmail.com District 2, Vice Chair Peter Hansen, pzhbuttecounty@gmail.com District 3, Second Vice Chair Henry Schleiger, schleiger.bcpc@gmail.com District 4, Chair Rocky (Daniel) Donati, rockdonati@aol.com District 5, Ruby Roethler, rroethler@digitalpath.net Public Works Director Dennis Schmidt, publicworksdept@buttecounty.net Public Works Assistant Director Radley Ott, ROtt@buttecounty.net Environmental Health Director Elaine McSpadden, emcspadden@buttecounty.net County Counsel Bruce S. Alpert, balpert@buttecounty.net Deputy County Counsel Brunella M. Wood, bwood@buttecounty.net Butte County LAFCo Director, Steve Lucas, slucas@buttecounty.net EXHIBIT A WaterResourcesFloodControl WaterRights G ILBERT C OSIO, J R., P.E. A NGUS N ORMAN M URRAY M ARC V AN C AMP, P.E. 1913-1985 W ALTER B OUREZ, III, P.E. R IC R EINHARDT, P.E. D ON T RIEU, P.E. C ONSULTANTS: D ARREN C ORDOVA, P.E. J OSEPH I. B URNS, P.E. N ATHAN H ERSHEY, P.E., P.L.S. D ONALD E. K IENLEN, P.E. L EE G. B ERGFELD, P.E. B EN T USTISON, P.E. T HOMAS E NGLER, P.E., CFM M ICHAEL M ONCRIEF, P.E. November 27, 2019 Sent Via Electronic Transmittal Osha Meserve Soluri Meserve th 510 8Street Sacramento, CA 95814 Subject: Flood Comments on Proposed North Chico Specific Plan Development Projects Dear Ms. Meserve: George Nicolaus and other affiliated entities are proposing two housing developments near the Autumn Park Subdivision, north of the City of Chico and within the North Chico Specific Plan. These two housing developments are located near or within a Federal Emergency Management Agency (FEMA) Zone A and in an area which has historically flooded. These two housing developments have the potential to: 1.Put additional residences/homes in a flood hazard zone. 2.Exacerbate flooding in surrounding parcels. MBK Engineers (MBK) has compiled and reviewed existing reports, studies, photos and videos, maps, ordinances, etc., to help better inform local, state, and federal agencies the 1 potential flood hazard in this area and has summarized key findings and comments below. Proposed Development The proposed developments are to the west and south west of the Autumn Park Subdivision. The first development is located on a 52.5 acre parcel (APN 047-260-199) of the subdivision. The proposal is to sub-divide the western portion of the parcel into four 1 acre lots (Figure 1). 1 Attached is Exhibit 1 showing my qualifications and experience to review and comment on flood issues. 455 University Ave. Suite 100 Sacramento, California 95825 Phone: (916) 456-4400 Fax: (916) 456-0253 Website: www.mbkengineers.com Osha MeserveNovember 27, 2019 Flood Comments on Proposed North Chico Specific Plan Development ProjectsPage 2 Figure 1. Western Portion of the Parcel Divided in Four 1-acre lots The second development (Legacy Village, a.k.a. Almond Ranch) is located southwest of the subdivision near the projected intersection of Kittyhawk Drive and Highway 99. The proposed development is on a 51 acre parcel (APN-047-260-198) with plans for 100 clustered residential lots and a nine-hole golf course with associated facilities (Figure 2). The proposed housing density is about 5 units/acre. Figure 2. Proposed Development Osha MeserveNovember 27, 2019 Flood Comments on Proposed North Chico Specific Plan Development ProjectsPage 3 FEMA Flood Hazard Zone The two proposed developments are in or near a FEMA Zone A (see Figure 3). A FEMA Zone A is defined as “Areas subject to inundation by the 1-percent annual chance flood event generally determined using approximate methodologies. Because detailed hydraulic analyses have not been performed, no Base Flood Elevations (BFEs) or flood depths are shown. Mandatory flood insurance purchase requirements and floodplain management standards apply.” The FEMA Zone A for Keefer Slough was developed in April 2000 as part of a county wide effort to investigate the existence and severity of flood hazards. To determine flood hazards, hydrologic and hydraulic analysis was performed which: 1.Quantifies the flows in the river/slough. 2. Computes or estimates the water surface elevations in the river and floodplain associated with the 1% chance annual flood (100-year flood). Figure 3. Location of the Two Proposed Developments Hydrologic Analysis The April 2000 hydrologic analysis estimated the 100-year flood event for Rock Creek and Keefer Slough. Rainfall-runoff models were developed using software developed by USACE Hydrologic Engineering Center (HEC). HEC-1 was the computer model used in the April 2000 hydrologic analysis. This computer model used 30 years of recorded precipitation data from the City of Chico and physical parameters of the Rock Creek/Keefer Slough dating back to a USACE 1975 study. A key assumption in the hydrologic model is the determination of how much of the Rock Creek total flow gets diverted into Keefer Slough. For the April 2000 analysis, a rating curve was Osha Meserve November 27, 2019 Flood Comments on Proposed North Chico Specific Plan Development ProjectsPage 4 developed using normal depthcalculations using typical cross sections/topography at the Rock Creek and Keefer Slough flow split. It was estimated that approximately 44% of the Rock Creek 100-year flow is diverted into Keefer Slough. Table 1 below shows the estimated 1% annual peak flows along Keefer Slough used in the April 2000 analysis. Table 1. Estimated 1% Annual Peak Flows used in April 2000 Analysis Location100-Year Flood Peak Discharge (cfs) Keefer Slough approximately 1125 ft downstream of 560 Hicks Lane Keefer Slough approximately 500 feet upstream of 680 Garner Lane Keefer Slough at State Highway 99525 Source: FEMA (2011) Hydraulic Analysis The hydraulic analysis to develop the FEMA Zone A shown on Figure 3 was also performed in April 2000. A hydraulic analysis typically requires a discharge rate, topography, and parameters associated with vegetation within the river/slough. The April 2000 hydraulic analysis utilized the computer model HEC-2, developed by the U.S. Army Corps of Engineers (USACE). Ground elevations of Keefer Slough and surrounding floodplains were obtained from U. S. Geological Survey (USGS) 7.5 minute quadrangle maps. Flooding Dynamics/Historic Flooding The Autumn Park Subdivision and surrounding parcels are located within the south overbank of Keefer Slough. During periods of extreme flow rates on Keefer Slough, water will overtop its bank and flow in a southwesterly direction, overtop Highway 99, and continue to flow towards the town of Nord. Butte County has documented flooding in January 1995, March 1995, January 1997, and February 1998 (Butte County Supervisor Agenda Item 4.05, January 8, 2013). Other years that this area experienced flooding include 1969, 1970, 1973, 1974, 1978, 1982,and 1983. The cause of the flooding in the Rock Creek/Keefer Slough system has been attributed to: 1. Insufficient channel capacity in Rock Creek and Keefer Slough for flows produced by the watershed size and slope (USACE,2008). 2. Leveling of fields (California Department of Water Resources \[DWR\], 2014). 3.Private levees (DWR,2014). 4. Sedimentation at the Rock Creek-Keefer Slough flow split (DWR, 2014; USACE, 2008; FEMA,2011). Most recently, this area flooded in February 2019. Exhibit 2 shows pictures of flooding in the Autumn Park Subdivision. Keefer Slough overtopped its banks downstream of Garner Road then flowed in a southwesterly direction through the streets of Autumn Park Subdivision then continued to sheet flow towards Highway 99 ponding against overtopping the highway causing closure of the highway. There was widespread media coverage of flooding in February 2019: Osha Meserve November 27, 2019 Flood Comments on Proposed North Chico Specific Plan Development ProjectsPage 5 https://www.chicoer.com/2019/04/12/north-chico-flooding-focus-of-listening-session/ https://www.chicoer.com/2019/04/17/north-chico-resident-irate-over-flooding-issues/ https://krcrtv.com/news/butte-county/county-finds-temporary-fix-for-keefer-slough-flooding- nord-more-troublesome https://krcrtv.com/news/butte-county/sandbag-barrier-put-up-to-protect-se-chico-subdivision- from-flooding https://www.actionnewsnow.com/content/video/506412552.html https://kpay.com/kpay-news/archives/2019-02/ https://twitter.com/CALFIRE_ButteCo/status/1101536680916336641 Of particular note, the FEMA Zone A map does not show flooding within the Autumn Park Subdivision. However, Exhibit 2 clearly shows streets and yards being flooded. Technical Flood Comments 1. The existing FEMA Firm Maps for the area are not detailed flood zones and are based on outdated hydrologic and hydraulic analysis and underlying data. The hydrologic and hydraulic models (HEC-1 and HEC-2) are legacy models dating back to the 1980s and 1990s. The HEC-2 model is a simplified standard-step backwater calculation of water surface elevation, and cannot accurately simulate the shallow overland flow that actually occurs in the Rock Creek/Keefer Slough floodplain. The topography used in the HEC-2 model dates back to 1951, and has an accuracy of plus or minus 2.5 feet. 2. The FEMA Zone A along Keefer Slough is based on a 100-year flow rate of 560-680 cfs. This flow rate is based on a rating curve which approximated a total of 41% of the total Rock Creek flow being diverted into Keefer Slough. This rating curve was based on USGS quadrangles dating back to 1951. As noted by USACE and DWR, this area has experienced significant sediment deposition, which has the potential to send more flood waters down Keefer Slough. The use of a rating curve to estimate the flow rate in Keefer Slough is not accurate and is not reflective of the actual site conditions today. This may result in flooding in areas not delineated by the FEMA FIRM Maps. 3.The Legacy Village planned development and the four lots shown in Figure 1 has lots at the edge of the FEMA Zone A. The FEMA Zone A is an estimated delineation of the flood hazard and is not accurate and outdated based on comments 1 and 2 above. DWR acknowledges that the existing FEMA FIRM maps are outdated and is currently working through a Co-operative Technical Partnership with FEMA to revise the FEMA FIRM maps in the Rock-Keefer Slough areas (as per a teleconference with Todd Hillare). 4. In the County’s review of these two proposed development projects, the County must follow Butte County Code 26-23, cited below. Section 26-23(a)(1) requires the County to Osha Meserve November 27, 2019 Flood Comments on Proposed North Chico Specific Plan Development ProjectsPage 6 determine that the site is reasonably safe from flooding. In its review, as per this section, the County must take into consideration that the existing FEMA Zone A maps are outdated and are not accurate, based on the flooding that occurred in February 2019. As per Section 26-23(a)(2) the County must require the developer to prepare a cumulative hydraulic impact analysis to demonstrate that the proposed developments do not increase the water surface elevation on neighboring properties. 26-23 - Review of development permit applications—Generally. (a)The Department of Development Services and Department of Public Works shall review all development permit applications to determine that:(1)The site of the proposed development is reasonably safe from flooding;(2)All necessary permits have been received as required by federal or state law;(3)The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designed. For purposes of this article, "adversely affects" means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will increase the water surface elevation on neighboring properties. The county will not allow development to increase the water surface elevation of the base flood more than one (1) foot at any point, nor will it allow any increase in the base flood elevation which adversely affects any neighboring property. 5. The four proposed lots shown in Figure 1 are within a FEMA Zone A. As per Butte County Code 26-24(b)(3). The applicant must determine the FEMA BFE in accordance using detailed hydrologic and hydraulic analysis. 26-24(b)(3) In an A Zone, without BFE's specified on the FIRM (unnumbered A Zone), all structures, residential and nonresidential, shall be elevated at least one (1) foot above the BFE as determined by methods comparable to those in a Flood Insurance Study or by using the detailed methods as described in the most current edition of FEMA publication, FEMA 265, "Managing Floodplain Development in Approximate Zone A Areas—A Guide for Obtaining and Developing Base (100-year) Flood Elevations" or any successor FEMA document. References 1. (DWR, 2014). Mid and Upper Sacramento River Regional Flood Management Plan. November 10, 2014. 2. (FEMA, 2011). Flood Insurance Study, Butte County California and Incorporated Areas, Federal Emergency Management Agency.January 6, 2011. 3. (USACE,2008). Rock Creek-Keefer Slough, Butte County CA, 905(b) Reconnaissance Report. September 2008. Osha Meserve November 27, 2019 Flood Comments on Proposed North Chico Specific Plan Development ProjectsPage 7 If you have any questions or require additional information, please call or email me. Sincerely, MBK ENGINEERS Don Trieu, P.E. DT/oh R:8888.9/Flood Comments on Proposed Development 11-25-2019 Enclosures:Exhibit 1. Qualifications and Experience Exhibit 2. Autumn Park Subdivision Photos EXHIBIT 1 D ON T RIEU EDUCATION California State University, Sacramento BS in Civil Engineering, 1995 California State University, Sacramento MS in Civil Engineering, 2002 PROFESSIONAL LICENSES &SOCIETIES Registered Civil Engineer, California No. C058284 Member, American Society of Civil Engineers EXPERIENCE 1995 to Present MBK Engineers, Sacramento, CA Principal Principal Engineer in charge of hydraulic/hydrologic models for evaluation of flood control alternatives and development of design water surface elevation. Perform hydraulic/hydrologic analysis of flood problems and evaluation of flood control alternatives using HEC-RAS, RMA-2, FLO-2D, UNET, HEC-1. EXPERIENCE HIGHLIGHTS Technical adviser, hydraulic model development, and 200-year floodplain mapping for the lower San Joaquin River Flood Control Project and Stockton urban area streams in support of DWR’s Central Valley Floodplain Evaluation and Delineation Program (2008-2013). Formulation, oversight and review of hydraulic analysis in support of alternatives evaluation and hydraulic impact analysis for widen of the Sacramento Weir (2019). Hydraulic model development and re-calibration of a SRFCP hydraulic model in support of USACE WRDA 2016 projects. Develop 2D model and hydraulic analysis of the Yuba River Goldfields in support of a new levee south of the Yuba River Goldfields (2017-2019). Reconnaissance level hydraulic impact analysis in support of alternatives formulation for Little Egbert Tract Multi-Objective Project (2017). Prepare cumulative hydraulic impact analysis in support of Lower Sacramento River/Delta North regional flood control components (2017). Update hydraulic model of the North Delta region in support of the McCormack-Williamson Tract Levee Modification and Habitat Development Project and Sacramento County Point Pleasant FEMA Base Flood Elevation Study. Developed 2D model of the lower San Joaquin River and tributaries in support of hydraulic impact analysis of 1700 acres of habitat restoration at Dos Rios Ranch (2017). Principal in charge of hydraulic analysis for the Lower Feather River Corridor Management Plan. Evaluate hydraulic impacts of wetland restoration project on Cougar Wetlands using the North Delta HEC-RAS model. Evaluate hydraulic impacts using the North Delta HEC-RAS for the Cosumnes Mitigation Bank. Evaluate hydraulic impact using RMA-2 for Liberty Island Conservation Bank on the Yolo Bypass. Technical adviser for development of RMA-2 model of the Sutter Bypass for evaluation of vegetation management. EXHIBIT 2 Osha Meserve November 27, 2019 Exhibit 2Page 1 Photo No. 1. Flood waters from Keefer Slough Flowing down Bosc Drive (2/14/19) Osha Meserve November 27, 2019 Exhibit 2Page 2 Photo No. 2. Flooding of Fire Lane between Orchard and Northern Boundary of Autumn Park (2/27/19) Photo No. 3. 4243 Anjou Court (2/27/19) Osha MeserveNovember 27, 2019 Exhibit 2Page 3 Photo No. 4. 4243 Anjou Court (2/27/19) Photo No. 5. 4231 Anjou Court (2/27/19) Osha Meserve November 27, 2019 Exhibit 2Page 4 Photo No. 6. 4231 Anjou Court (2/27/19) Osha Meserve November 27, 2019 Exhibit 2Page 5 Photo No. 7. 4231 Anjou Court (2/27/19) Photo No. 8. Water level at Garner Road Bridge looking North (2/27/19) Osha Meserve November 27, 2019 Exhibit 2Page 6 Photo No. 9. Looking west from Garner Road Bridge down Keefer Slough (2/27/19) Photo No. 10. East End of Orchard where Water Flowed into Orchard; Garner Road Bridge in background (2/27/19) Osha Meserve November 27, 2019 Exhibit 2Page 7 Photo No. 11. Water in Nicolaus Orchard (2/27/19) Photo No. 12. Water being Pumped from CSA-172 Retention Pond back into Keefer Slough (3/3/19) Osha Meserve November 27, 2019 Exhibit 2Page 8 Photo No. 13. Sand Bags being Installed in Nicolaus' Orchard bordering Keefer Slough (early March 2019) Osha Meserve November 27, 2019 Exhibit 2Page 9 Photo No. 14. Sand Bags on Nicolaus' Orchard bordering Keefer Slough (early March 2019) EXHIBIT B OjdpmbvtMfhbdzWjmmbhfboe5IpnfTvcejwjtjpoQspqptbm Qspqptfe5Qbsdfm UfoubujwfNbq BQO158.551.123 BQO58.371.2:: BQO158.371.2:9 MfhbdzWjmmbhf 211ipnft