Loading...
HomeMy WebLinkAbout02.18.20 Email from FERC - Letter Order Accepting S Feather Water & Power Agency's 12..19 Req. to Postpone 2019 Insp. of Kelly Ridge & Miners Ranch Conduit until 01.2020 for P-2088 FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile February 18, 2020 In reply refer to: Project No. 2088-CA Mr. Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro-Quincy Highway Oroville, CA 95965 Re: Notification of 2019 and 2020 Penstock Dewatering Schedules Dear Mr. Moseley: This is in response to a December 13, 2019 letter from Ms. Kristen McKillop and Mr. Matt Colwell that notified our office that the 2019 annual non-emergency inspection/maintenance of the Kelly Ridge and Miners Ranch Conduit penstocks was postponed until January 2020, and the planned 2020 inspections are scheduled for November 2-13, 2020. The letter also provided the planned 2020 inspection schedule for the Woodleaf, Forbestown, and Sly Creek Powerhouse penstocks, which are part of the South Feather Power Project, FERC No. 2088. Your request to postpone the 2019 inspection of Kelly Ridge and Miners Ranch Conduit penstocks until January 2020, and the proposed schedules to conduct the 2020 inspections of the penstocks by the dates listed in the letter are acceptable. We appreciate any questions, please contact Mr. Ricardo Galdamez at (415) 369-3310. Sincerely, Frank L. Blackett, P.E. Regional Engineer