Loading...
HomeMy WebLinkAboutB16-0413 CF Sprinkler Test (2) - O'113 Butte County Fire Department Q /(o —0 'l f `� KE COGS California Department of Forestry and Fire Protection KE CO , 4. J Fire Prevention Bureau J �+ \ 176 Nelson Avenue, Oroville, CA 95965 FIRE 530-538-7888/530-538-2105(fax) FIRE o 3g^Zl G-- 00 Fire Safety Inspection Business Address: 7,36vti I Business Name: 66,144,1,; Owner/Manager: Bus: Other: Other Contact: I Bus: Other: Building Owner: Bus: Other: Address: I Occ. Class: AN INSPECTION OF YOUR FACILITY REVEALED THE FOLLOWING: 1. Fire extinguishers: required, service due 10. Exit(s): obstructed, inadequate 2. Extension cords: Excessive use, defective 11. Exit sign(s): required, illumination, photo luminescent 3. Excessive rubbish, trash, debris 12. Exit sign lights: obstructed, defective 4. Fire alarm system defective 13. Exit lighting: required, defective 5. Sprinkler system: service required, defective 14. Heating system: defective appliance, flue combustibles 6. Kitchen hood ext. system: service due 15. Wiring: exposed, damaged connectors, etc. 7. Fire walls, ceilings, fire doors, draft stops 16. Address posted and visible from road 8. Smoke detectors: required, defective 17. Other 9. Fire drill log checked Yes n No 7 18. Other type of inspection—State below DETAILED EXPLANATION AND CORRECTIONS: CORRECTED: SprIvt0-e- F4w0..1 !(P- 041/3 Flo% a 1p — o q l ti r' to t.J b i all, t e.v i 0-u < I(\i ot- - , c64_. oC ALl s 'if 7 0 6 4 Z/l'`l d • Date: Discussed (/'� Signed: (Print 1,I Inspecting Officer: Battalion 1 2 3 4 5 6 Q3 Station: 7 / FPB By order of the Fire Chief: You are hereby notified to correct all violations immediately or Allow cause why you should not be required to do so. A re-inspection will be conducted on . Willful failure to comply with this notice is a misdemeanor. Violations that are not corrected immediately and/or remain after the re-inspection may be processed as a criminal offense. Thank you for your assistance and cooperation in minimizing the fire and life loss in our community. (H &S sec. 13112) White Copy-Station File Yellow Copy-Re-inspect/business Pink Copy-Business 0 Check when sent to prevention 04i13 Butte County Fire Department Q t(o —0 1 41 �.ct, co , California Department of Forestry and Fire Protection �E Co,,� J A Fire Prevention Bureau J A 176 Nelson Avenue, Oroville, CA 95965 FIRE 530-538-7888/530-538-2105(fax) FIRE 038—Z-( c,— C0 5 Fire Safety Inspection Business Address: 7,34 ti Business Name: Slot ,tc.h; Owner/Manager: Bus: I Other: Other Contact: I Bus: I Other: Building Owner: I Bus: I Other: Address: Occ. Class: AN INSPECTION OF YOUR FACILITY REVEALED THE FOLLOWING: 1. Fire extinguishers: required, service due 10. Exit(s): obstructed, inadequate 2. Extension cords: Excessive use, defective 11. Exit sign(s): required, illumination, photo luminescent 3. Excessive rubbish, trash, debris 12. Exit sign lights: obstructed, defective 4. Fire alarm system defective 13. Exit lighting: required, defective 5. Sprinkler system: service required, defective 14. Heating system: defective appliance, flue combustibles 6. Kitchen hood ext. system: service due 15. Wiring: exposed, damaged connectors, etc. 7. Fire walls, ceilings, fire doors, draft stops 16. Address posted and visible from road 8. Smoke detectors: required, defective 17. Other 9. Fire drill log checked Yes 7 No 7 18. Other type of inspection—State below DETAILED EXPLANATION AND CORRECTIONS: CORRECTED: S Kkke Ch /t - ()qI Floe, Te.v - 4 , I (p - o611q r' .cam �rvla� 1 f3 l b NA, cdt. isuz .�11N0.i ec44 s • r�- no- ---) . of ;s si=tm I 06, Viv/6 , Date: Discussed /I� Signed: //5/17 (Print Inspecting Officer: Battalion 1 2 3 4 5 6 Q Station: 7 FPB " By order of the Fire Chief: You are hereby notified to correct all violations immediately or ow cause why you should not be required to do so. A re-inspection will be conducted on . Willful failure to comply with this notice is a misdemeanor. Violations that are not corrected immediately and/or remain after the re-inspection may be processed as a criminal offense. Thank you for your assistance and cooperation in minimizing the fire and life loss in our community. (H&S sec. 13112) White Copy—Station File Yellow Copy—Re-inspect/business Pink Copy—Business ❑Check when sent to prevention ,3 14a-mi1 G36 _ 0o tea? Print> , Rk3 13-222 INSTALLATION OF SPRINKLER SYSTEMS Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by the property owner or their authorized agent Ail defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners,and contractor. It is understood the owner's,at„ .,:a .re's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,or failure to comply with approving authority's requirements or local ordinances. Prulxrty name 3 I 00n1 CIS{ l Floc tZM S 1 Date 1104 104 itc71 .7 Property address ' ,3(0 IQ 61t.�►..l I2,D r D 1.1 r2.1-k Or NA. Accepted by approving authorities(names)nt 1.re. t, ........ /0(4TT E C 00.v p 1 e.rC. Address 1..1 (p I )€t�O II 0\v 6 i c,ecr4 t uue e • Plans Installation conforms to accepted plans -Esi Yes ❑No Equipment used is approved Yes ❑No If no,explain deviations Has person in charge of fire equipment been instructed as Yes ❑No to location of control valves and care and maintenance of this new equipment? If no,explain Instructions Have copies of the following been left on the premises? 'J Yes ❑No 1. System components instructions `j Yes ❑No 2. Care and maintenance instructions Yes \[ J No 3. NFPA 25 ❑Yes .I No Location of systern SuPPUes buildings P\C7 tali L-4-0 I NI cr (o u z Is-cia. “ /6 I e•er:e 2IOQI, Year of Orifice Temperature Make Model manufacture size Quantity rating 'INC-o I -(-4- L I 7_,o,l (s I 53 .o ! 56S I 2l2 Spnnlders I ! I I I I I I I I I { I I I Pipe and Type of pipe 5 U,u-Mao S.S 4•Ckk t o Mtk I A S , e•>o`ITa eQ AD s f?AN linings Type of fittings t i 1% 1Vc1,`,ftf 0 r \I 1 C;,-CAVLtCi '.t eEI.Cc,K- Alarm Maximum time to operate Alarm device through test connection valvHowe or Type { Make co Model I Minutes I Sends indicator I V A l+ ! Pal-re Q-I V'S e... I I I 3o l I I 1 Dry valve I Q.O.D. Make I Model I Serial no. I Make I Model Serial no. \ I I I I Time Time water Alarm through test Water Air Trip point reached operated Drypipepna,b r���pressure air pressure test outlets b Property operating I Minutes I Seconds I Psi I Psi ! Minutes I Seconds { Yes No Without test Q.O.D. Q.o_ 1 K1---------- 1$ ff no,explain 0 2006 National Fire Protection Association NFPA 13 . 3) a Measured from time inspector's test connection is opened b NFPA 13 only requires the 60-second luuutation in specific sections FIGURE 24.1 Contractor's Material and Test Certificate for AL r 1,6..r.1,..1 Piping. 2007 Edition SYSTEMS ACCEPTANCE 13-223 • • Operatwn ❑Pneumatic ❑Electric ❑Hydraulics Yes [ No Detecting media supervised IJYes ❑No Does valve operate manual trip,remote,or both ❑Yes ❑No control stations? Deluge and preaction Is there an accessible facility in each circuit ' I If no,explain valves for testing? I ❑Yes ❑No Does each circuit operate Does each cr i rate Maximum time to Make Model supervision loss alarm? valve release? operate release Yes I No Yes I No I Min Seconds '"" hPn !Make and Residual pressure Pressure I and floor I -moth: -i--Set bag ! Static pressure (flowing) Flow rate reducing valy I I I Inlet(pstfl $ Net(P�) Outlet(psi) Flow(win) I I 1 I T Hydrostatic: tsalic Hydrostatic ydrod rye in excess shall tests be 150of mpsi eat not less) than hours_ psiDif(13.6 bar) dry-pipe)for 2 hours or 50 psi(3.4 bar)a +y open during the test to prevent damage. Allsto pevald. shall be left Test aboveground piping leakage shall be stopped. description Pneumatic: Establish 40 psi(2.7 bar)air prss ire and measure drop,which shall not exceed 1' psi(0.1 bar) in 24 hours. Test pressure tanks at normal water level and air pre , ure and measure air pressure drop,which shall not exceed 1' psi(0.1 bar)in 24 hours. • ro All piping hydrostatically tested atZaa psi(1 bar)for 2.- hours If no,state reason Dry piping pneumatically tested IJ(A ❑Yes ❑No Equipment operates property N/A ❑Yes ❑No • Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of sodium silicate,brine,or other corrosive chemicals were not used for testing systems or stopping leaks? � jYes ❑No • Drain Reading of gauge located near water Residual pressure with valve in test • Tests test supply test correction: p ( bar) Connection open wide: Underground mains and lead-in,.,..,.,..;;:,,,,,to system risers flushed before connection made to sprinkler piping Verified by copy of the Contractor's Material and Test ❑Yes ❑No ( Frrpiain Certificate for Underground Piping. a L3, Ivi Rushed by installer of underground sprinkler piping ❑Yes ❑No SPR.d tJ Klee Otte .QAC c e If powder-driven fasteners are used in concrete, ❑Yes 'No If no,explain has..e.e.......;;.re sample testing been kto Po v1 tare, satisfactorily DQ J'e,J PASTE el ees Blanktesting Number used I Locations Number removed gaskets Wig piping '7 Yes ❑No If yes... Do you certify as the sprinkler contractor that welding procedures used complied with Yes the minimum requirements of AWS 82.1,ASME Section IX Welding and Brazing ❑No Qualifications,or other applicable qualification standard as required by the AHJ? Do you certify that all welding was performed by welders or welding operators '''.42:1 Yes Li No qualified in e,....,,.:a.,,,..with the minimum requirementsof AWS 82.1,ASME Section IX Welding and Brazing Qualifications,or other applicable qualification standard as Welding required by the AHJ? Do you certify that the welding was conducted in compliance with a documented Yes ❑No quality control procedure to ensure that(1)all discs are retrieved;(2)that openings in piping are sieu,th,that slag and other welding residue are removed;(3)the internal diameters of piping are not penetrated;(4)completed welds are free from cracks, incomplete fusion,surface porosity greater than Y,e in.diameter,undercut deeper than the lesser of 25%of the wall thickness or 1/a2 in.;and(5)completed circuniferertiai butt weld,ww,;,,.,,..,,artt does riot exceed 91s in.? ®2006 National Fire Protection Association NFPA 13(p.2 of 3) FIGURE 24.1 Continued 2007 Edition 13-224 LNSTAT LATION OF SPRINKLER SYSTEMS Cutouts Do you certify that you have a control feature to ensure that yes ❑No (discs) all cutouts(discs)are retrieved? Hydrate Namr.ptatp provided if no,explain data nameplate Yes No IDate left in service with all control valves open Remarks I l 1 Z(o i ZO t U Name of sprinkler contractor bL e:6 PRoTe dtat.) t✓-1t C)5Z ) Ter Tests witnessed by Signatures i The property owner or ' (signed) Tittle Date 04A.dA7 17 • For 41 =er cx Title Date 0/ittetm Addi onal explanations and notes V/ 2006 National Fire Protection Association NFPA 13(p-3 of 3) FIGURE 24.I. Continued 2007 Edition